Quadra-Fire TOPAZ Direct Vent Room Heater 839-1340 Owner`s manual

Quadra-Fire TOPAZ Direct Vent Room Heater 839-1340 Owner`s manual

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Manual
Quadra-Fire TOPAZ Direct Vent Room Heater 839-1340 Owner`s manual | Manualzz

R

TOPAZ

DIRECT VENT ROOM HEATER

Owner’s Manual

Installation and Operation

Model:

839-1290

839-1320

839-1340

TOPAZ-D-CSB

Tested and

Listed by

O-T L Portland

Oregon USA

C US

OMNI-Test Laboratories, Inc.

Quartet Front Solitaire Front

CAUTION

DO NOT DISCARD THIS MANUAL

• Important operating and maintenance instructions included.

• Read, understand and follow these instructions for safe installation and operation.

• Leave this manual with party responsible for use and operation.

T

WARNING: If the information in these instructions is not followed exactly, a fi re or explosion may result causing property

damage, personal injury, or death.

• Do not store or use gasoline or other fl ammable vapors and liquids in the vicinity of this or any other appliance.

• What to do if you smell gas

- Do not try to light any appliance.

Do not touch any electrical switch. Do not use any phone in your building.

- Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.

- If you cannot reach your gas supplier, call the fi re department.

• Installation and service must be performed by a qualifi ed installer, service agency, or the gas supplier.

WARNING

HOT SURFACES!

Glass and other surfaces are hot during operation AND cool down.

Hot glass will cause burns.

• Do not touch glass until it is cooled

• NEVER allow children to touch glass

• Keep children away

• CAREFULLY SUPERVISE children in the same room as appliance

• Alert children and adults to hazards of high temperatures

High temperatures may ignite clothing or other fl

ammable materials.

• Keep clothing, furniture, draperies and other combustibles away.

This appliance may be installed as an OEM installation in manufactured home (USA only) or mobile home and must be installed in accordance with the manufacturer's instructions and the manufactured home construction and safety standard,

Title 24 CFR, Part 3280 or Standard for Installation in Mobile

Homes, CAN/CSA Z240MH.

This appliance is only for use with the type(s) of gas indicated on the rating plate.

In the Commonwealth of Massachusetts:

• installation must be performed by a licensed plumber or gas fi

tter.

See Table of Contents for additional Commonwealth of Massachusetts requirements.

Installation and service of this appliance should be performed by qualifi ed personnel. Hearth & Home

Technologies suggests NFI certifi ed or factory-trained professionals, or technicians supervised by an NFI certifi ed professional.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

and Welcome to the Quadra-Fire Family

!

Hearth & Home Technologies welcomes you to our tradition of excellence! In choosing a Quadra-Fire appliance, you have our assurance of commitment to quality, durability, and performance.

This commitment begins with our research of the market, including ‘Voice of the Customer’ contacts, ensuring we make products that will satisfy your needs. Our Research and Development facility then employs the world’s most advanced technology to achieve the optimum operation of our stoves, inserts and fi replaces. And yet we are oldfashioned when it comes to craftsmanship. Each appliance is meticulously fabricated and gold and nickel surfaces are hand-fi nished for lasting beauty and enjoyment. Our pledge to quality is completed as each model undergoes a quality control inspection.

We wish you and your family many years of enjoyment in the warmth and comfort of your hearth appliance. Thank you for choosing Quadra-Fire.

2

SAMPLE OF SERIAL NUMBER / SAFETY LABEL

LOCATION: HANGING ON A CHAIN ON BACK OF APPLIANCE

Portland MODEL / MODÈLE: TOPAZ

VENTED GAS FIREPLACE HEATER FOURNAISE AU GAZ AVEC

VENTILATION. NOT FOR USE WITH SOLID FUEL / NE PAS UTILISER

AVEC LE COMBUSTIBLE SOLIDE.

SERIAL NO.

1445 North HIghway

Colville, WA 99114 www.quadrafire.com

APPROVED FOR CANADA AND USA TO:

ANSI Z21.88a-2000 / CSA 2.33a-M-00 Vented Gas Fireplace Heaters, and applicable sections of UL307b Gas Burning Heating Appliances for

Manufactured Homes and Recreational Vehicles, CAN/CGA 2.17-M91

“Gas Fired Appliances for use at High Altitudes.” This appliance is manufactured for operation with Natural Gas.

FAN TYPE VENTED CIRCULATOR / VENTILATEUR CIRCULATOIRE

Blower Electrical Rating / Évaluation du Ventilateur Électrique:

115 V., 1.5 Amps, 60 Hz, 150 Watts

Top Vent/Rear Vent:

Input Rate on “HI” (BTU/Hr)

Input Rate on “LO” (BTU/Hr)

Maximum Output (BTU/Hr)**

Main Burner Orifice (DMS)

Minimum Inlet Pressure (Inches W.C.)

Maximum Inlet Pressure (Inches W.C.)

Manifold Pressure on “HI” (Inches W.C.)

**Max Venting, Blower On

For use with Natural Gas

Usage au Gaz Naturel

0-2000’

39,500

26,500

33,600

.125”

4.5“

7.0”

3.5”

F

SA

C

APPROUVÉ POUR LE CANADA ET LES ÉTATS-UNIS:

ANSI Z21.88a-2000 / CSA 2.33a-M-00 Fournaises au Gaz avec Ventilation, et les sections applicable de UL 307b Appareils de Chauffage Au Gaz pour les Maisons Mobiles et les Véhicules Motorisés, CAN/CGA 2.17-M91 “Gas

Fired Appliances for use at High Altitudes”.

Cet appareil est manufacturé pour l’opération avec le Gaz Naturel.

Thermal Efficiency / Efficacité Thermique* 85% NG (blower on / avec ventilateur allumé)

85% LP (blower on / avec ventilateur allumé)

* With Maximum horizontal length. / Avec longueur horizontale maximum.

P.4.1-02 Canada Minimum pipe (P.4.1-02 Le canada tuyau minimum) 62.98% NG / 64.14% LP

For use with Propane

Usage au Gaz Propane

0-2000’

38,000

30,500

32,500

.073” (49DMS)

11“

14”

10”

Bouche Supérieure/Conduit postérieur:

Puissance Évaluée à “HI” (BTU/Hr)

Puissance Évaluée à “LO” (BTU/Hr)

Puissance Maximum (BTU/Hr)**

Orifice du Brûleur Principal

Pression Minimum de la Valve (pouces W.C.)

Pression Maximum de la Valve (pouces W.C.)

Pression du Collecteur d’ Échappement à “HI” (pouces W.C.)

** Ventilation Maximum, Ventilateur Allumé

G

LE

This appliance equipped only for altitudes 0-2000’ (0-610m) in USA; and in Canada for altitudes of 0-4500’ (0-1370m). In USA for Altitudes above 2000’, the vent configuration, orifice, or combination of both may need to be changed. See Owner’s Manual for information on making these changes.

This appliance must be installed in accordance with local codes, if any (and Commonwealth of Massachusetts approved); if none, follow National Fuel Gas Code ANSI Z223.1, or Canadian Installation Codes, CAN/CGA-B149 in Canada. Install and use only in accordance with manufacturer’s installation and operating instructions. NOTE: Have the gas supply line installed in accordance with local building codes by a qualified installer approved and/or licensed as required by the locality. (In the Commonwealth of Massachusetts, installation must be performed by a licensed plumber or gas fitter.)

MP

REMARQUE: respecter les règlements municipaux. (Dans la République de Massachusetts, l'installation doit être effectuée par un plombier ou un installateur d'appareils à gaz agrée.)

This appliance must be installed in accordance with the current Standard CAN/CSA Z240 MH, Mobile Housing or with Manufactured Home Construction and Safety Standard,

Title 24 CFR, Part 3280, or when such standard is not applicable, ANSI/NCSBCS A225.1/NFPA 501A, Manufactured Home Installation Standard.

WARNING: Do not operate the appliance until all sections have been assembled and installed in accordance with the manufacturer's instructions.

Installer l'appareil selon la norme CAN/CSA-Z240, Série MM, Maisons mobiles ou la norme 24 CFR Part 3280, Manufactured Home Construction and Safety Standard. Si ces normes ne sont pas pertinentes, utilisez la norme ANSI/NCSBCS A225.1/NFPA 501A, Manufactured Home Installations Standard.

AVERTISSEMENT: Ne pas utiliser l'appareil tant que toutes les sections n'ont pas ete assemblees et installees selon les instructions du fabricant.

This appliance must be properly connected to a venting system in accordance with the manufacturer's installation instructions.

Cet apprareil doit être correctement raccordé à un système d'évacuation, conformément aux instructions du fabricant

A A

B D

E

C

A A

A. Side of stove top to side wall

B. Rear of stove top to back wall

C. Corner of stove top to side wall

D. Minimum Alcove Height

6.5" (152 mm)

6" (100 mm)

1" (152 mm)

54" (1372 mm)

Du coté du poêle au coté du mur

Le contrôle arrière au mur arrière

Du Coin du poêle du mur

Hauteur minimum du plancher au plafond

E. Maximum Alcove Depth

F. Minimum Alcove Width

36" (914 mm)

40"(915 mm)

Profondeur maximale de l'alcôve

Largeur minimum de l'alÔve

G. Mantle clearance from stove top 23"(584mm) Espace libre du poêle au manteau

HEARTH: A non-combustible hearth pad is not required. However, the floor beneath the stove must be stable, level, and strong enough to support the stove without a tipping hazard.

CHEMINÉE: Un coussinet non-combustible de cheminée n’est pas exigé. Cependant, le plancher en dessous du poêle doit être droit, à niveau et assez fort pour supporter le poêle sans le hasard de basculer.

2008 2009 2010 Jan

Date of Manufacture / Date du Manufacturier

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DO NOT REMOVE THIS LABEL / NE PAS ENLEVER L’ÉTIQUETTE Made in U.S.A. / Fait Aux États-Unis 250-7141

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Serial Number

Barcode

Model Name

Test Lab & Report No.

Manufactured Date

- TABLE OF CONTENTS -

Section 1: Listing and Code Approvals

A. Appliance Certifi cations ......................4

B. Glass Specifi cations ............................4

C. BTU Specifi cations ..............................4

D. High Altitude Installations ....................4

E. Non-Combustible Materials .................4

F. Combustible Materials ........................4

G. Requirements for the

Commonwealth of Massachusetts ......5

Section 2: Getting Started

A. Design & Installation

Considerations ....................................6

B. Tools and Supplies Needed................6

C. Inspect Appliance & Components .......6

Section 3: Appliance Location & Clearances

A. Selecting Appliance Location..............7

B. Clearances to Combustibles ...............7

Section 7: Electrical Information

A. Recommendation for Wire ..................27

B. Connecting to the Appliance ...............27

C. Standing Pilot Ignition System Wiring ..27

Section 8: Appliance Setup

A. Remove Shipping Materials ................29

B. Top to Rear Vent Conversion .............29

C. Leg Leveling System ...........................30

D. Accessories .........................................30

E. Front Installation .................................31

F. Brick Installation ..................................31

G. Positioning the Logs ............................32

H. Mineral Wool .......................................33

I. Glass Door Assembly Replacement ...34

J. Blower Installation ...............................34

K. Damper Adjustment ............................36

L. Shutter Adjustment .............................36

Section 9: Operating Instructions

A. Before Lighting Appliance ...................37

B. Controls ...............................................37

C. Lighting Appliance ...............................38

D. After Appliance is Lit ...........................39

E. Frequently Asked Questions ...............39

Section 4: Termination Locations

A. Vent Termination Minimum

Clearances..........................................8

Section 5: Vent Information

A. Venting Components ..........................10

B. Use of Elbows .....................................10

C. Measuring Standards ..........................10

D. How to Use the Vent Graph ................11

E. Venting Guidelines ..............................11

F. Horizontal Termination ........................12

G. Vertical Termination ............................15

Section 6: Gas Information

A. Fuel Conversions ................................23

B. Gas Pressures ....................................25

C. Gas Connection.. ................................26

Section 10: Troubleshooting ...............................40

Section 11: Maintaining & Servicing Appliance

A. Maintenance Tasks .............................43

Section 12: Reference Materials

A. Appliance Dimension Diagram ...........44

B. Vent Components Diagram ................45

C. Vent Components List ........................46

D. Service Parts List ................................48

E. Limited Lifetime Warranty ...................54

F. Contact Information ............................56

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 3

4

1

Listing and Code Approvals

A. Appliance Certifi cation

C. BTU Specifi cations

MODEL:

LABORA-

TORY:

Topaz

OMNI Test Laboratories, Inc.

061-S-24-5

TYPE: Direct Vent Gas Heater

STANDARD: ANSI Z21.88a-2000

CSA 2.33a-M00

UL307b CAN/CBA 2.17-M91

The product is listed to ANSI standards for “Vented Gas

Appliance Heaters” and applicable sections of “Gas Burning

Heating Appliances for Manufactured Homes and Recreational Vehicles” and "Gas Fired Appliances for use at High

Altitudes".

Manufactured Home or Mobile Home installation may occur only after the home is site located and must conform with the Manufactured Home Construction and Safety Standard,

Title 24 CFR, Part 3280, or, when such a standard is not applicable, the Standard for Manufactured Home

Installations, ANSI/NCSBCS A225.1, or Standard for Gas

Equipped Recreational Vehicles and Mobile Housing, CSA

Z240.4.

Model

(US or Canada)

Top Vent

Topaz (NG)

Topaz (LP)

Rear Vent

Topaz (NG)

Topaz (LP)

Maximum Input

BTU

39,500

38,000

35,000

27,500

Minimum Input

BTU

26,500

30,500

23,500

16,500

D. High Altitude Installations

Orifi ce Size

.125

.073

.113

.063

Omni-Test Laboratories listed gas appliances are tested and approved without requiring changes for elevations from 0 to

2000 feet in the U.S.A. and 0 to 4500 feet in Canada.

When installing this appliance at an elevation above 2000 feet, it may be necessary to decrease the input rating by changing the existing burner orifi ce to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a

2000 foot elevation in the U.S.A. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifi ce size, check with the local gas utility.

When installed, the appliance must be electrically grounded in accordance with local codes or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA C22.1.

If installing this appliance at an elevation above 4500 feet (in

Canada), check with local authorities.

B. Glass Specifi cations

This appliance is equipped with 5mm ceramic glass. Replace glass only with 5mm ceramic glass. Please contact your dealer for replacement glass.

E. Non-Combustible Materials

Materials that are reported as passing ASTM E 136,

Standard Test Method for Behavior of Materials in a

Vertical Tube Furnace at 750°C, shall be considered noncombustible materials.

NOTE: This installation must conform with local codes. In the absence of local codes you must comply with the National

Fuel Gas Code, ANSI Z223.1-latest edition in the U.S.A. and the CAN/CGA B149 Installation Codes in Canada.

F. Combustible Materials

Materials made of or surfaced with wood, compressed paper, plant fibers, plastics, or other materials that can ignite and burn, whether flame proofed or not, or whether plastered or unplastered shall be considered combustible materials.

WARNING

Do NOT use this appliance if any part has been under water.

Immediately call a qualifi ed service technician to inspect the unit and to replace any part of the control system and any gas control which has been under water.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

NOTE: The following requirements reference various

Massachusetts and national codes not contained in this document.

G. Requirements for the Commonwealth of

Massachusetts

For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above fi

nished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfi ed:

Inspection

The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a) 1 through 4.

Exemptions

The following equipment is exempt from 248 CMR 5.08(2)

(a) 1 through 4:

The equipment listed in Chapter 10 entitled “Equipment

Not Required To Be Vented” in the most current edition of

NFPA 54 as adopted by the Board; and

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gas fi tter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the fl oor level where the gas equipment is to be installed. In addition, the installing plumber or gas fi tter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualifi ed licensed professionals for the installation of hard wired carbon monoxide detectors.

• Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separated from the dwelling, building or structure used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved side wall horizontally vented gas fueled equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

Detailed instructions for the installation of the venting system design or the venting system components; and

In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery backup may be installed on the next adjacent fl oor level.

In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certifi ed.

Signage

A metal or plastic identifi cation plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY

BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS.”

• A complete parts list for the venting system design or venting system.

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the fl ue gases, but identifi es “special venting systems”, the following requirements shall be satisfi ed by the manufacturer:

The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and

The “special venting system” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/ or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

See Gas Connection section for additional Commonwealth of Massachusetts requirements.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 5

2

Getting Started

A. Design & Installation Considerations

Quadra-Fire direct vent gas appliances are designed to operate with all combustion air drawn from outside of the building and all exhaust gases expelled to the outside. No additional air source is required.

C. Inspect Appliance & Components

CAUTION

Check building codes prior to installation.

• Installation MUST comply with local, regional, state and national codes and regulations.

• Consult local building, fi re offi cials or authorities having jurisdiction about restrictions, installation inspection, and permits.

WARNING

Inspect appliance and components for damage. Damaged parts may impair safe operation.

• Do NOT install damaged components.

• Do NOT install incomplete components.

• Do NOT install substitute components.

Report damaged parts to dealer.

When planning an installation, it is necessary to determine the following information before installing:

• Where the appliance is to be installed.

• The vent system confi guration to be used.

• Gas supply piping.

• Electrical wiring.

• Whether optional accessories - devices such as a blower,

thermostat or remote control - are desired.

• Carefully remove the appliance and components from

the packaging.

• Remove cast door and glass door, and set aside on pro-

tective surface. See page 34.

• Remove log set and component pack from fi rebox.

• Report to your dealer any parts damaged in shipment, particularly the condition of the glass.

• Read all of the instructions before starting the installation. Follow these instructions carefully during the installation to ensure maximum safety and benefi t.

WARNING

Keep appliance dry.

• Mold or rust may cause odors.

• Water may damage controls.

B. Tools and Supplies Needed

Before beginning the installation be sure that the following tools and building supplies are available. Note: Not all tools will apply to every installation.

WARNING

Hearth & Home Technologies disclaims any responsibility for, and the warranty will be

voided by, the following actions:

• Installation and use of any damaged appliance or vent system component.

• Modifi cation of the appliance or vent system.

• Installation other than as instructed by Hearth & Home

Technologies.

• Improper positioning of the gas logs or the glass door.

• Installation and/or use of any component part not approved by Hearth & Home Technologies.

Any such action may cause a fi re hazard.

Reciprocating saw

Pliers

Variable Speed Drill/Driver

Wrench Set

Hammer Framing Square

Phillips Screwdriver Framing Material

Flat Blade Screwdriver Voltmeter

Plumb Line Gloves

Level

Manometer

Safety Glasses

Tape Measure

Non-corrosive Leak Check Solution or combustible gas detector

Caulking material (300ºF minimum continuous exposure rating)

6 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

3

Appliance Location and Clearances

NOTE:

·

Illustrations refl ect typical installations and are FOR

DESIGN PURPOSES ONLY.

·

Illustrations/diagrams are not drawn to scale.

·

Actual installation may vary due to individual design preference.

A. Selecting Appliance Location

When selecting a location for your appliance it is important to consider the required clearances to walls (see Figure 3.1).

B. Clearances

F

D

G

B

E

A A C

WARNING

Fire Risk

Provide adequate clearance:

• Around air openings

• To combustibles

• For service access

Locate appliance away from traffi c areas.

WARNING

Fire Risk.

Locate and install appliance to all clearance specifi cations in manual.

C

A A

Model

Topaz Inches

Millimeters

A

6-1/2

165

B C D E F G

6 1 54 36 40 23

152 25 1372 914 1016 584

Figure 3.1

It is permissible to place the appliance on carpet.

CAUTION

Some carpet materials may be sensitive to radiant heat from the appliance causing discoloration or odor.

NOTE: Flooring beneath appliance may reach 90 degrees plus room ambient temperature. Check with flooring manufacturer for maximum temperature allowed on flooring surfaces.

WARNING

Fire Risk.

Odor Risk.

Tipping Risk

• Install appliance on a stable, level platform/ fl

oor strong enough to support appliance without tipping.

• USE wood fl ooring, ceramic tile, brick hearth or high pressure laminate fl ooring applied directly over the sub-fl ooring material.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 7

4

Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as specifi ed.

• Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fi re.

Measure vertical clearances from this surface.

2 FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

LOWEST

DISCHARGE

OPENING

HORIZONTAL

OVERHANG

VERTICAL

WALL

12

X

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF

TO LOWEST DISCHARGE OPENING

Measure horizontal clearances from this surface.

(See Figure 4.4 for specifi c clearances.)

Figure 4.1 Termination Clearances

A

6 in. (minimum) up to 20 in.

152 mm/508 mm

20 in. and over

Gas, Wood or Fuel Oil

Termination Cap

B

18 in. minimum

457 mm

0 in. minimum

B

A *

Gas

Termination

Cap **

Roof Pitch H (Min.) Ft.

Flat to 6/12 ......................................................... 1.0*

Over 7/12 to 8/12 ............................................... 1.5*

Over 8/12 to 9/12 ............................................... 2.0*

Over 9/12 to 10/12 ............................................. 2.5*

Over 10/12 to 11/12 ........................................... 3.25

Over 11/12 to 12/12 ........................................... 4.0

Over 12/12 to 14/12 ........................................... 5.0

Over 14/12 to 16/12 ........................................... 6.0

Over 16/12 to 18/12 ........................................... 7.0

Over 18/12 to 20/12 ........................................... 7.5

Figure 4.3 Minimum Height from Roof to Lowest Discharge

Opening

Figure 4.3 specifi es minimum vent heights for various pitched roofs.

8

**

* If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 4.2 Multiple Vertical Termination

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

P

M

N

D v

E

L v

B

F v v

B v

A v

G v

A

H

U.S.

(3 FT)

I

M v X

J or K

R

V

Q

(See Note 2)

S

V

T

Electrical

Service

D*

V

S

V

V = VENT TERMINAL X = AIR SUPPLY INLET

I

F

G

A

B

= 12 inches ............. clearances above grade, veran-

(See Note 1) da, porch, deck or balcony

= 12 inches ............ clearances to window or door that may be opened, or to permanently closed window. (Glass)

D* = 18 inches ............. vertical clearance to unventilated soffit or to ventilated soffit located above the terminal

*30 inches ............ for vinyl clad soffits and below electrical service

H

= 9 inches .............. clearance to outside corner

= 6 inches ............... clearance to inside corner

= 3 ft. (Canada) ...... not to be installed above a gas meter/regulatorassemblywithin 3 feet (90cm) horizontally from the center-line of the regulator

J

= 3 ft. ....................... clearance to gas service regulator vent outlet

= 9 inches (U.S.A.)

12 inches (Canada)clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other appliance

= AREA WHERE TERMINAL IS NOT PERMITTED

K = 3 ft. (U.S.A.)

6 ft. (Canada) ......... clearance to a mechanical

(powered) air supply inlet

L** = 7 ft. ......................... clearance above paved

(See Note 1) sidewalkor a paved driveway located on public property

M*** = 18 inches .............. clearance under veranda , porch, deck, balcony or overhang

42 inches .............. vinyl

S = 6 inches ................. clearance from sides of

(See Note 3) electrical service

T = 12 inches ................ clearance above electrical

(See Note 3) service

Alcove Applications

N = 6 inches ................. non-vinyl sidewalls

12 inches ............... vinyl sidewalls

P = 8 ft.

Q

MIN

R

MAX

1 cap

2 caps

3 feet

6 feet

2 x Q

1 x Q

3 caps

4 caps 12 feet

Q

MIN

= # termination caps x 3

9 feet

R

MAX

2/3 x Q

1/2 x Q

ACTUAL

= (2 / # termination caps) xQ

ACTUAL

** a vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

*** only permitted if veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor, or meets Note 2.

NOTE 1: On private property where termination is less than 7 feet above a sidewalk, driveway, deck, porch, veranda or balcony, use of a listed cap is suggested. (See vents components pages.)

NOTE 2: Termination in an alcove space (spaces only open on one side and without an overhang) are permitted with the dimensions specified for vinyl or non-vinyl siding and soffits.

1. There must be at least 3 feet minimum between termination caps.

2. All mechanical air intakes within

10 feet of a termination cap must be a minimum of 3 feet below the termination cap.

3. All gravity air intakes within 3 feet of a termination cap must be a minimum of 1 foot below the termination cap.

NOTE 3: Location of the vent termination must not interfere with access to the electrical service.

Figure 4.4

NOTE: clearances.

Local codes or regulations may require different

NOTE: Termination caps may be hot. Consider their proximity to doors or other traffic areas.

WARNING: In the U.S.: Vent system termination is NOT permitted in screened porches. You must follow side wall, overhang and ground clearances as slated in the instructions.

In Canada: Vent system termination is NOT permitted in screened porches. Vent system termination is permitted in porch areas with two or more sides open. You must follow side wall, overhang and ground clearances as stated in the instructions.

Quadra-Fire assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH

VINYL SIDING, IT IS SUGGESTED THAT A VINYL PRO-

TECTOR KIT BE INSTALLED.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 9

10

5

Vent Information

A. Venting Components

In order to comply with applicable codes and product warranties, use only following venting components:

B. Use of Elbows

• Hearth & Home Technologies (HHT)

• Simpson Dura-Vent

• Selkirk Direct-Temp

• Amerivent Direct

• Security Secure Vent

CAUTION

ALL vent confi guration specifi cations MUST be followed.

• This product is tested and listed to these specifi cations.

• Appliance performance will suffer if specifi cations are not followed.

DO NOT USE FIELD-FABRICATED VENTING

COMPONENTS. Refer to the venting manufacturer’s instructions.

This product is approved to be vented either horizontally, through the side wall or vertically through the roof. You may vent through a Class A or masonry chimney if an approved adapter is used.

Diagonal runs have both vertical and horizontal vent aspects when calculating the effects. Use the rise for the vertical aspect and the run for the horizontal aspect. (See Figure 5.1.)

Two 45° elbows may be used in place of one 90° elbow. On

45° runs, one foot of diagonal is equal to 8-1/2 in. (216mm) horizontal run and 8-1/2 in. (216mm) vertical run. A length of straight pipe is allowed between two elbows. (See Figure 5.1.)

This appliance is a direct vent heater. All combustion air must come directly from the outside of the building. The vent pipe for this unit consists of an inner and an outer pipe. The inner pipe carries the appliance exhaust out of the system, and the outer pipe brings fresh combustion air into the appliance.

Vertical

• A round support box/wall thimble or heat shield is required when the venting passes through a combustible wall.

• A support box or ceiling fi restop is required when the venting passes through a ceiling.

• Roof fl ashing and a storm collar are required when venting passes through the roof.

• Follow instructions provided with the venting for installation of these items.

Figure 5.1

12 in.

8-1/2 in.

Horizontal

WARNING

Fire Hazard.

Explosion Risk.

Asphyxiation Risk.

Do NOT connect this gas appliance to a chimney fl

ue serving a separate solid-fuel or gas burning appliance.

• Vent this appliance directly outside.

• Use separate vent system for this appliance.

May impair safe operation of this appliance or other appliances connected to the fl ue.

C. Measuring Standards

Vertical and horizontal measurements were made using the following standards.

• Pipe measurements are from center line to center line.

• Horizontal terminations are measured to the outside of the mounting surface (fl ange of termination cap). See

Figure 4.1 on page 8.

• Vertical terminations are measured to the top of the last pipe before termination cap.

• Horizontal pipe installed level with 1/4 in. rise.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

D. How to Use the Vent Graph

1. Measure the vertical distance from the center line of the flue pipe to the center of the 90° elbow. On the graph below, draw a horizontal line from that measurement on the vertical axis across until it intersects with the slanted line.

2. From the point of this intersection, draw a vertical line to the bottom of the graph.

3. The point at which this line meets the bottom line of the graph is the maximum length of the horizontal run.

EXAMPLE 1: If the vertical dimension from the center line of the fl ue vent to the center of the 90° elbow is 7 ft. (2m), the horizontal run to the outer wall fl ange must not exceed

16 ft. (5m).

EXAMPLE 2: If the vertical dimension from the center line of the fl ue vent is 21ft. (6m), the horizontal run to the outer wall fl ange must not exceed 12 ft. 10 in. (4m).

4. Each 90° elbow is equivalent to 3 ft. (914mm) of vent pipe and each 45° elbow is equivalent to 1ft. (305mm) of vent pipe, and must be subtracted from the vent pipe run. A single horizontal to vertical 90° elbow is already calculated into the allowable 20 ft. (6m) run. Each additional 90° elbow reduces the maximum horizontal distance by 3 ft. (914mm).

EXAMPLE: The use of 3 elbows would reduce the allowable horizontal run to 9 ft. (3 -1 = 2 elbows x 3 ft. = 6 ft.; 20 ft. max. - 6 ft. = 14 ft. max.).

E. Venting Guidelines

NOTES

The maximum horizontal vent run is 20 ft. (6m) when the vertical vent rise is 10 ft. (3m).

The minimum horizontal vent run is 6 in. (152mm)

Horizontal sections require a 1/4 in. (6mm) rise for every 12 in. (305mm) of horizontal travel.

Exterior Vent Diameter = 6-5/8 in. (168mm); Inner Vent

Diameter = 4 in. (102mm).

Horizontal sections require noncombustible support every 3 ft. (914mm), e.g. wall straps.

For any vertical termination a minimum of 6 ft. (1.8m) vertical must be used.

EXCEPTIONS FOR HORIZONTAL INSTALLATIONS:

*When installing the Topaz in a rear vent configuration with no vertical rise, a Snorkel Kit must be used.

A derating orifice must be installed with a rear vent configuration with no vertical rise. The appropriate orifice is supplied with the rear vent kit.

*The maximum horizontal vent run is 3 ft. (914mm).

*The maximum horizontal vent run with a 45° elbow is 2 ft. (609mm).

*The minimum horizontal vent run is 6 in. (152mm).

INDIVIDUAL INSTALLATIONS MAY VARY. PERCENTAGE

CLOSED BASED ON FULL RANGE OF DAMPER

TRAVEL.

NOTE: If your installation falls within the gray-shaded area on graph, see information on VERTICAL DAMPER

ADJUSTMENT in Section 8.

*In the Commonwealth of Massachusetts, the word damper shall be replaced with the words flue restrictor.

Figure 5.2

40 ft. (12m)

Maximum Vertical

VERTICAL DISTANCE

FROM APPLIANCE TO

90° ELBOW

Example 2

Example 1

6 ft. (1.8m) Minimum

Vertical with a Vertical

Termination

C L

C L

For rear vent or top of appliance for top vent

20'

18'

16'

14'

12 '

10'

8'

6'

4'

2'

40'

39'

38'

37'

36'

35'

34'

32'

30'

28'

26'

24'

22' more CLOSED in this area

Damper position more OPEN in this area

No damper in this area

2' 4' 6 ' 8' 10' 12' 14' 15' 16' 17' 18' 19' 20'

3 ft. (914mm) Maximum Horizontal run with no vertical pipe and with 1/4 in (6mm) rise per foot.

Must use Snorkel cap.

6 in. (152mm) Minimum starter pipe

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 11

F. Horizontal Termination

Type A Up & Out Installations for Top Vent

Configurations

Wall Thimble

90º Degree

Elbow

Pipe Length

Pipe Length

Termination Cap

Wall Thimble Cover

Type B - Rear Installations for Use with Rear Vent

Kit

Snorkle Kit

Wall Thimble Cover

15-5/8 in.

(397mm)

CL 21 in.

(533mm)

WARNING

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

• Ensure vent components are locked together correctly.

• Pipe may separate if not properly joined.

Step 2.

Direct vent pipe is designed with a locking connection. To connect the venting system to the appliance flue outlet, a twist-lock adapter is built into the appliance at the factory.

Wall thickness may vary. Remember to include wall thickness in minimum clearances when figuring venting lengths for your installation needs.

Note: Female ends of direct vent pipe/elbows are designed to slide straight onto the male ends of adjacent pipes by orienting the pipe indentations so they match and slide into the entry slots on the male ends, see Figure 5.4.

Push the pipe sections completely together, then twist-lock one section clockwise approximately one-quarter turn, until the two sections are fully locked. The female locking lugs may not be visible from the outside. They may be located by examining the inside of the female ends.

Female Locking Lugs

Male Locking Lugs

Pipe Length

Wall Thimble

Wall Strap

14 in. (356mm) Wide

Figure 5.4

(See Section 12 for conversion kit and venting components.) This is the only venting configuration that requires the use of the rear vent derating orifice that comes with the rear vent kit. NOTE: A Snorkel Kit is required.

Figure 5.3

Step 1.

Determine the desired location of the appliance. Check to ensure that wall studs or roof rafters are not in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance.

WARNING

Fire Risk.

Explosion Risk.

Combustion Fume Risk.

Use vent run supports per installation instructions.

Connect vent sections per installation instructions.

• Maintain all clearances to combustibles.

• Do NOT allow vent to sag below connection point to appliance.

• Maintain specifi ed slope (if required).

Improper support may allow vent to sag or separate.

12 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Step 3.

For installations using a round support box/wall thimble

(check pipe manufacturer's instructions), mark the wall for a

10 in. x 10 in. (254mm x 254mm) square hole. The center of the square hole should line up with the center line of the horizontal pipe, as shown in Figure 5.5. Cut and frame the hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, i.e. masonry block or concrete, a 7 in. (178mm) diameter hole is acceptable.

Top Vent

Center �ine

Wall Thimble

Center of �ole

Center �ine

NOTE:

(1) Installation requires a minimum of 6 in. (152mm) horizontal run of vent with a 1/4 in. (6mm) rise run towards the termination. Each 1 ft. (305mm) of horizontal venting must include a 1/4 in. (6mm) rise. Never allow the vent to run downward. This could cause high temperatures and may present the possibility of a house or structure fire.

(2) The location of the horizontal vent termination on an exterior wall must meet all local and national building codes, and must not be easily blocked or obstructed, see Figure 4.4 on page 9.

(3) For installations requiring a vertical rise on the exterior of the building, a snorkel kit is available with a 14 in.

(356mm) and a 36 in. (914mm) tall snorkel termination cap. Follow the same installation procedures as used for standard horizontal terminations. If the snorkel termination must be installed below grade (i.e. basement application), proper drainage must be provided to prevent water from entering the snorkel termination. Do not backfill around snorkel termination.

Rear Vent

Center �ine

Snorkel Kit

Center of �ole

Step 4.

Position the horizontal termination cap in the center of the 10 in. x 10 in. (254mm x 254mm) square hole and run a bead of non-hardening mastic around its outside edges, so as to make a seal between it and the wall, attach termination cap to the exterior wall with the four wood screws provided. The arrow on the vent cap should be pointing up ( Figure 5.6).

Wall Thimble

Center �ine

WOOD

SCREW

45°

Elbow

45° Elbow in Corner Installation

Wall Thimble

14 in. (356mm) Pipe Length

Max. Wall Depth

10 in. (254mm)

1 in. (25mm) clearance from appliance corner to

1 in. (25mm) clearance from appliance corner to combustible wall

When installing in a rear vent configuration with no vertical

rise: a Snorkel Kit must be used.

Figure 5.5

HOT

WALL THIMBLE

Figure 5.6

NOTES:

(1) The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

(2) A termination cap with a built-in vinyl siding standoff is highly recommended on a building with vinyl siding. The pilot hole will be 2 in. (51mm) closer to the bottom of the square than the top. Using a framing square, draw a 14 in. x 14 in. (356mm x 356mm) square around the pilot hole in the siding. See Figure 5.7 on the next page.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 13

the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe section ( Figure 5.9).

8 in.

(203mm)

7 in.

(178mm)

7 in.

(178mm)

6 in.

(152mm)

1/4 in. (6mm)

Fold Strap Here

Sheet Metal Screw

Wall Thimble

Figure 5.7

Wall Thimble Cover/Ceiling

Firestop as Required by Local

Jurisdiction

Strap

( NOTE: Some termination caps may cause the vent pipe to be off center on flashing). Ensure that proper clearances to combustible materials are maintained.

If you are not using an approved termination cap with a built-in vinyl siding standoff on a building with vinyl siding, a vinyl siding standoff should be installed between the termination cap and the exterior wall ( Figure 5.8).

Follow manufacturer’s instructions for attaching the vinyl siding standoff to the horizontal termination cap.

The vinyl siding standoff prevents excessive heat from possibly melting the vinyl siding material. The vent terminal cap shall not be recessed into a wall or siding.

Remove siding from the area where the standoff will be located.

VINYL SIDING

Figure 5.9

Note: The attachment from the vent pipe to the vent termination cap must be sealed with silicone. Termination caps shall not be recessed into a wall or siding.

WARNING

Fire Hazard.

Exhaust Fume Risk.

Impaired Performance of Appliance.

• Ensure vent components are locked together correctly.

• Pipe may separate if not properly joined.

Apply sealant to all four sides

SCREWS

Bolt horizontal top to vinyl standoff

WARNING

Do NOT connect a pipe section to a termination cap without using the telescoping fl ue section found on the termination cap.

WALL THIMBLE COVER

SCREWS

Vinyl siding standoff with siding beneath removed

WALL THIMBLE

Figure 5.8

Step 5.

Place the wall thimble cover over the pipe assembly and slide the appliance and vent assembly towards the wall, carefully inserting the vent pipe into the vent termination cap assembly. It is important that the vent pipe extend into the vent termination cap a sufficient distance so as to result in a minimum pipe overlap of 1-1/4 in. (32mm). Secure the connection between the vent pipe and the vent termination cap by attaching the two sheet metal strips extending from the vent termination cap assembly into the outer wall of

14 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

WARNING

Burn Risk.

Local codes may require installation of a cap shield to prevent anything or anyone from touching the hot cap.

G. Vertical Termination

1. Direct Vent Pipe

Vertical Termination Cap

Storm Collar

Flashing

40 ft. (12m)

Maximum

Firestop

Support Box

Pipe Length

Figure 5.11

Figure 5.10

Step 1.

Check the installation instructions for required 1 in. (25mm) clearances (air space) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. See page 16, Figure

5.16. Check the instructions below for maximum vertical rise of the venting system, and any maximum horizontal offset limitations. All offsets must fall within the set parameters of the vent graph ( Figure 5.2) located on page 11.

NOTE: Maximum vertical rise allowable is 40 ft. (12m)

Fi gure 5.11).

NOTE: Maximum number of 45° elbows permitted for a vertical installation is eight, provided their installation does not decrease maximum allowable horizontal run (as specified by vent graph, on page 11).

Step 2.

S

et the gas appliance in its desired location. Drop a plumb bob down from the ceiling to the position of the appliance flue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at this point. Next, drop a plumb bob from the roof to the hole previously drilled in the ceiling, and mark the spot where the vent will penetrate the roof.

Determine if ceiling joists, roof rafters, or other framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Figure 5.12 to avoid cutting loadbearing members. When location is determined, drill small hole.

Plumber’s Tape connected to

Wall Strap

Wall Strap

WARNING

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as specifi ed.

• Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fi re.

Figure 5.12

Two 45˚ Elbows

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 15

Step 3.

To install the round support box/wall thimble cover in a flat ceiling, cut a 10 in. (254mm) square hole in the ceiling, centered on the hole drilled in Step 2. Frame the hole as shown in Figure 5.13.

Ceiling

Joists

Framing

Shingles overlap on top edge of flashing

CAP AND STORM

COLLAR NOT SHOWN

FOR CLARITY

Figure 5.14

Figure 5.13

1 - 1/2 in. (38mm) Long

Wood Screws

Step 4.

Assemble the desired lengths of pipe and elbows necessary to reach from the appliance up through the round support box. Ensure that all pipe and elbow connections are in their fully twist-locked position. Assemble as instructed.

Step 7.

Continue to assemble pipe sections until the height of the vent (before adding the termination cap) meets the minimum code requirements as outlined in the current CAN/CGA-

B149 Installation Codes (in Canada), the National Fuel

Gas Code NFPA 54/ANSI Z223.1 (in USA), or local codes.

Note that for steep roof pitches, the vent height must be increased. See Roof Pitch Table ( Figure 4.3, on page 8). In high wind conditions, nearby trees adjoining rooflines, steep pitched roofs, and other similar factors can result in poor draft, or down drafting. In these cases increasing the vent height or switching to the high wind termination cap may solve this problem.

Step 5.

Cut a hole in the roof centered on the small drill hole placed in the roof in Step 2. The hole should be of sufficient size to meet the minimum requirements for clearance to combustibles, as specified. Continue to assemble lengths of pipe and elbows necessary to reach from the ceiling support box/wall thimble up through the roof line. Galvanized pipe and elbows may be utilized in the attic, as well as above the roofline. The galvanized finish is desirable above the roofline, due to its higher corrosion resistance.

NOTE:

(1

) If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 ft.

(914mm) to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose , Figure 5.12, page 15.

Step 8.

Slip the storm collar over the pipe, and push it down to the top of the flashing ( Figure 5.15). Use non-hardening sealant above and below the joint between the storm collar and the pipe.

Optional High Wind Termination Cap

Secure Flashing with Non-Hardening

Sealant and Roofing Nails

(2) Whenever possible, use 45° elbows, instead of 90° elbows. The 45° elbow offers less restriction to the flow of flue gases and intake air.

Step 6.

Slip the flashing over the pipe section(s) protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Ensure the roofing material overlaps the top edge of the flashing as shown in Figure 5.14. Verify that the chimney is the required height above the roof. See roof pitch table, Figure 4.3, on page 8.

Figure 5.15

16 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Step 9.

Twist-lock the vent cap and seal.

Note: For multi-story vertical installations, a ceiling firestop is required at the second floor, and any subsequent floors

( Figure 5.16). The opening should be framed to 10 in. x

10 in. (254mm x 254mm) inside dimensions, in the same manner as shown in Figure 5.13.

Ceiling Firestop

Nails

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Minimum 1 in.

(25mm) Clearance

Figure 5.16

WARNING

Fire Risk.

Explosion Risk.

• Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passed through must be enclosed. The enclosure may be framed and sheetrocked with standard construction materials; however, refer to these installation instructions for the minimum allowable clearance between the outside of the vent pipe and the combustible surfaces of the enclosure. Do not fill any of the required air space with insulation.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 17

2. Cathedral Ceiling

Step 1.

Follow installation Steps 1 and 2 under vertical installation section, page 15.

Step 2.

Using the plumb-bob, mark the center line of the venting system on the ceiling, and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the cathedral ceiling support box.

Step 3.

Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Cut the hole 1/8 in.

(3mm) larger than the support box outline.

Figure 5.18

Step 4.

Lower the support box through the hole in the roof until the bottom of the support box protrudes at least 2 in. (51mm) below the ceiling ( Figure 5.17). Align the support box both vertically and horizontally with a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

Step 6.

Complete the cathedral ceiling installation by following the same procedures outlined in steps 7 through 9 for vertical installations, pages 16-17.

Level

Cathedral Ceiling

Support Box

Step 7.

Place the support clamp (provided with the support box) inside the support box (at the bottom), and secure to the pipe section. The clamp allows the support box to support the weight of the pipe sections. Continue to add pipe sections until you are above the roofline.

Cut hole 1/8 in. (3mm) greater in size than pattern of support box as it is projected onto roof line

2 in. (51mm)

Min. below finished ceiling

Step 8.

Install the black trim collar around the outside of the cathedral ceiling support box ( Figure 5.19). The two pieces of the trim collar slide over one another to allow for easy adjustment around the support box. Using the six screws provided, secure the four corners and the overlapping sections of the trim collar to the ceiling. You may want to predrill the holes for the overlapped sections for ease of installation.

Figure 5.17

Trim Collar

Step 5.

Using tin snips, cut the support box from the top corners down to the roofline, and fold the resulting flaps over the roof sheathing ( Figure 5.18). Before nailing it to the roof, run a bead of non-hardening mastic around the top edges of the support box to make a seal between it and the roof.

Clean out any combustible material from inside the support box.

Figure 5.19

Cathedral

Ceiling

Support

Box

Screws

18 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

3. Class A Metal Chimney

Existing

Metal Chimney System

Termination Cap

Top Adaptor

Flashing

4 in. (102mm) Flex Pipe

Retro Connector

Direct Vent Pipe

Step 4.

Pass the flex pipe down through the center of the chimney system, and center the top adapter on the top of the chimney pipe. Drill four 1/8 in. (3mm) diameter holes through the top adapter, and into the chimney top. Ensure that you are drilling into the metal on the chimney. Twist lock the high wind termination cap onto the top adapter (Figures 5.22

and 5.23).

Figure 5.22

Figure 5.20

CAUTION

Ensure that existing chimney is functionally sound and clean.

• Have inspection done by qualified chimney sweep or professional installer BEFORE converting to direct vent appliance.

Step 1.

Remove existing chimney cap.

Step 2.

Measure the distance from the top of the chimney to the bottom of the ceiling support box, add 3 in. (76mm) to this measurement, and cut a section of 4 in. (101mm) flex pipe to that length (the flex should be fully extended).

Step 3.

Connect the end of the flex pipe section to the underside of the top adapter, using four sheet metal screws (Figure

5.21).

Figure 5.21

Flex Pipe

Top Adapter

Sheet Metal Screws

Figure 5.23

Drill Four 1/8 in.

(3mm) Diamater

Holes

High Wind Termination

Cap

Sheet Metal Screws

Step 5.

Pull the flex pipe down through the ceiling support box, until it protrudes approximately 3 in. (76mm). Connect the flex pipe to the retro connector, and attach with sheet metal screws.

Step 6.

Push the flex pipe back up into the ceiling support box, center the retro connector, and attach it to the support box with sheet metal screws.

Step 7.

The connection between the appliance and the retro connector may be completed with sections of direct vent pipe.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 19

4. Existing Masonry Chimney

Type A - Up & Out Installations for Top Vent

Configurations

Top Adaptor

Termination Cap

Flashing

4 in. (102mm)

Flex Liner

Retro Connector

90° Elbow

Direct Vent Pipe

Type B - Hearth Rear Vent Installations for Use With

Rear Vent Kit (see Section 12 for conversion kit and venting components.)

Chimney Liner

Termination Cap

Co-Axial to

Co-Linear Connector

Pipe Length

Optional

3 in. (76mm)

Flex Liner

20

Figure 5.24

Co-Axial to

Co-Linear

Connector

Pipe Length

Optional

Chimney Liner

Termination Cap

30 ft. (9m) of 3 in.

(76mm) Flex Liner

Exhaust Section

This section of the chimney must be sealed

The chimney must be sealed from the 4 ft. (1m) section to termination using a smoke shelf or a damper.

The seal should be 6 in.

(152mm) below the end of the

4 ft. (1m) Air Intake section.

4 ft. (1m) of 3 in.

(76mm) Flex Liner

Air Intake Section

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

CAUTION

Ensure that existing chimney is functionally sound and clean.

• Have inspection done by qualified chimney sweep or professional installer BEFORE converting to direct vent appliance.

Cut and bend flashing as needed to fit

Step 1.

Before cutting any holes, assemble the desired sections of direct vent pipe to determine the center of the masonry penetration.

Step 2.

Once the center point of the penetration has been determined, cut a 6 in. (152mm) diameter hole in the masonry. If the hole is too large, the retro connector might not mount properly; if the hole is too small, the appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10 in. (254mm) square opening in the wall

(centered around the 6 in. (152mm) masonry opening). If there is sheet rock only (no studs) in front of the masonry the

10 in. (254mm) opening is still needed, but does not need to be framed. If the hole is framed a round support box/wall thimble is required. This allows the retro connector to mount directly on the masonry and provide the correct clearances to combustibles (Figure 5.25).

Studwall

10 in. x 10 in. (254mm x 254mm) framed opening in wall

Retro Connector

Masonry

Chimney

Figure 5.26

Step 4.

Sealant adhesive

To determine the length of flex needed, measure from 3 in.

(76mm) above the top of the flashing down to the level of the opening. Add the distance from the center of the chimney out through the wall. Cut a piece of 4 in. (102mm) flex to this length (extended to its nominal length). Be sure to leave 2-3 in. (51-76mm) of flex above the existing chimney to allow for connection to the termination kit.

Step 5.

Connect the flex liner to the top adapter using three sheet metal screws ( Figure 5.21 page 19).

Step 6.

Feed the flex liner through the flashing into the chimney.

Carefully feed the flex liner down the chimney to the bottom and out the opening in the masonry wall, forming an angle to line up the flex liner with the vent opening on the appliance.

(4) Masonry Bolts

(Not Included)

Wall Thimble Cover

NOTE: For hearth applications refer to page 20, Figure 5.24 for the use of a co-axial to co-linear appliance connector.

Figure 5.25

WARNING

Fire Risk.

Explosion Risk.

• Do not let the fl ex liner sag below the level at which it will connect to the appliance or connector.

This could allow hot gas to become trapped and potentially become a fi re hazard. The fl ex liner path should always be sloped up toward the termination cap.

Step 3.

Secure the flashing to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the flashing is larger than the top of the chimney, cut and fold flashing as needed to fit chimney (Figure 5.26).

Step 7.

If additional lengths of flex liner are needed to span the chimney height, use a flex coupler to connect the pieces of flex liner together. Connect the flex to the coupler by using four sheet metal screws for each side ( Figure 5.27, on the next page).

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 21

Flex Liner

6 in. (152mm) diameter opening in masonry wall

Flex Coupler

Sheet Metal Screws

Retro Connector

(3) Masonry Bolts

(Not included) Figure 5.27

Figure 5.29

Step 8.

Secure the top adapter to the flashing. Use three sheet metal screws through the side of the top adapter into the flange on the flashing ( Figure 5.28). Twist lock the high wind termination cap on to the top adapter.

High Wind

Termination Cap

Step 10.

Slide wall thimble cover over retro connector and secure with masonry bolts ( Figure 5.30). If you have a framed wall in front of the masonry, use wood screws to mount wall thimble cover to framed wall, over retro connector and 10 in. (254mm) square framed opening ( Figure 5.25, on page

21). If needed, add a section of direct vent pipe to the retro connector in order to extend through the opening in the wall thimble cover.

Top Adaptor

(3) Sheet Metal Screws

Retro Connector

Wall Thimble Cover

(4) Masonry Bolts

(Not included)

Flashing

Figure 5.28

Figure 5.30

Step 9.

Attach the flex to the retro connector. Use three sheet metal screws to attach the flex liner to the connector ( Figure

5.29). Mount the retro connector to the masonry wall using masonry bolts. Redrill larger holes on connector as needed.

Be careful to ensure that the connector is centered in the opening and the mounting holes line up with the masonry wall.

Step 11.

The connection between the appliance and the retro connector may be completed with sections of direct vent pipe.

22 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

6

Gas Information

A. Fuel Conversions

Before making gas connections ensure that the appliance being installed is compatible with the available gas type.

Any natural or propane gas conversions necessary to meet the appliance and locality needs must be made by a qualifi

ed technician using Hearth & Home Technologies specifi ed and approved parts.

3 screws

1. Converting to LP Gas

NOTE: Gas conversions should only be performed by a qualified service person, and/or where required by state and local codes, licensed installer/service technician. In the Commonwealth of Massachusetts, installation must be performed by a licensed plumber or gas fitter.

KIT CONTENTS: Replacement orifice; replacement pilot injector; and valve regulator.

TOOLS REQUIRED: Power drill (a 90° handle is helpful); #2

Phillips bit; 5/32 in. Allen wrench; 5/8 in. open end wrench.

Figure 6.3

Remove the three screws on the front of the burner support. Set screws aside.

Opens Left Closes Right

Figure 6.1

Disconnect power and turn off gas supply if installed. Remove front, glass, and logs if installed. Loosen the shutter adjustment nut (located underneath the appliance) with a 7/16 in. wrench. Slide the shutter to the left

(open position).

Figure 6.4

Slide the burner support to the left to access the orifi ce.

Burner Screws

Figure 6.2

Burner removal: Remove burner by fi rst removing the two screws indicated and lifting the burner out.

Figure 6.5

Remove the main burner orifi ce using a 5/8 in. wrench and replace the orifi ce with the proper size as indicated below for your gas type and venting.

TOPAZ TOP VENT

TOPAZ REAR VENT

PROPANE

.073 (49 DMS)

.063

NATURAL GAS

.125 (1/8 in.)

.113 (33 DMS)

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 23

2. Valve Regulator Replacement

WARNING

Fire Risk.

Explosion Risk.

Disconnect any electrical cords and turn off gas supply to unit before proceeding if converting fuel on an appliance already fully installed.

Figure 6.6

Pull off pilot hood and set it aside.

NOTE: Do not remove the retaining clip from the hood.

Remove upper and lower back shield. Loosen the set collars on the extension rods with the 3/32 in. Allen wrench.

Remove the rods and adapter cap.

A

Mounting Screws

B Pressure Regulator Tower

C Diaphragm

Figure 6.7

Use a 5/32 in. Allen wrench to remove the pilot injector.

Replace pilot injector with the one supplied with the appliance (#35 for Propane, #62 for Natural Gas).

Replace pilot hood, snapping it into position, making sure notch and tab line up.

Reinstall burner by placing it into the fi rebox. Make sure to reinstall all the screws previously removed.

Reinstall logs, glass and front.

Figure 6.8

Turn control knob to the OFF position, ensure that gas supply to the valve has been turned off. Using a Torx

TH20, or slotted screwdriver, remove the three pressure regulator mounting screws (A), pressure regulator tower (B), and diaphragm (C).

24 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

E

Screws

B. Gas Pressures

Proper input pressures required for optimum appliance performance, gas line sizing requirements need to be followed from NFPA51.

Identification Label F

D

Rubber Gasket

WARNING

Fire Risk.

Explosion Hazard.

High pressure will damage valve.

• Disconnect gas supply piping BEFORE pressure testing gas line at test pressures above 1/2 psig.

• Close the manual shutoff valve BEFORE pressure testing gas line at test pressures equal to or less than 1/2 psig.

Figure 6.9

Ensure that the rubber gasket (D) is properly positioned and install the new HI/LO pressure regulator assembly to the valve using the new screws (E) supplied with the kit. Tighten screws securely. (Reference torque = 25 in./lb.)

Install the enclosed identifi cation label (F) to the valve body where it can be seen.

Fill out the conversion label and attach it to the valve cover.

WARNING

Verify inlet pressures.

• High pressure may cause overfi re condition.

• Low pressure may cause explosion.

Install regulator upstream of valve if line pressure is greater than 1/2 psig.

WARNING

Fire Risk.

Explosion Risk.

Gas Leak Risk.

• Rubber gasket must be seated properly on valve face.

• Do no install a valve or regulator that has been dropped.

Pressure requirements for appliance are shown in the table below.

PRESSURE

Minimum Inlet Pressure

Maximum Inlet Pressure

NG

5 inches w.c.

10 inches w.c.

Manifold Pressure on “HI” 3.5 inches w.c.

LP

11 inches w.c.

13 inches w.c.

10 inches w.c.

WARNING

Fire Risk.

Explosion Risk.

If the information in these instructions is not followed exactly, a fi re, explosion or production of carbon monoxide may result causing property damage, personal injury or loss of life.

• The qualifi ed service agency is responsible for the proper installation of this conversion kit. The installation is not proper and complete until the operation of the converted appliance is checked as specifi ed in the manufacturer’s instructions supplied with the kit.

If the pressure is not suffi cient, ensure:

1) the piping used is large enough.

2) the supply regulator is adequately adjusted.

3) that the total gas load for the residence does not exceed the amount supplied.

The supply regulator (the regulator that attaches directly to the residence inlet or to the propane tank) should supply gas at the suggested input pressure listed above. Contact the local gas supplier if the regulator is at an improper pressure.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 25

C. Gas Connection

NOTE: Have the gas supply line installed in accordance with local building codes, if any. If not, follow ANSI Z223.1. Installation should be done by a qualifi ed installer approved and/or licensed as required by the locality. (In the Commonwealth of

Massachusetts, installation must be performed by a licensed plumber or gas fi tter.)

• A small amount of air will be in the gas supply lines.

When fi rst lighting appliance it will take a short time for air to purge from lines. When purging is complete the appliance will light and operate normally.

Air only needs to be purged again if gas valve has been turned to the OFF position.

NOTE: A listed (and Commonwealth of Massachusetts approved) 1/2 inch (13mm) T-handle manual shut-off valve and fl exible gas connector are connected to the 1/2 inch (13mm) control valve inlet.

• If substituting for these components, please consult local codes for compliance.

WARNING

Gas Leak Risk.

• Support control when attaching pipe to prevent bending gas line.

WARNING

CHECK FOR GAS LEAKS

Explosion Risk

Fire Risk

Asphyxiation Risk

• Check all fi ttings and connections.

• Do not use open fl ame.

• After the gas line installation is complete, all connections must be tightened and checked for leaks with a commercially-available, non-corrosive leak check solution. Be sure to rinse off all leak check solution following testing.

Fittings and connections may have loosened during shipping and handling.

NOTE: The gap between the supply piping and gas access hole may be plugged with non-combustible insulation to prevent cold air infi ltration.

WARNING

Fire hazard.

Do NOT change the valve settings.

• This valve has been preset at the factory.

• Changing valve settings may result in fi re hazard or bodily injury.

Leak test all gas line joints and the gas control valve prior to and after starting the fi replace.

Before making the gas connection, ensure that the appliance you are installing is designed for the type of gas being supplied. This information can be found on the Ratings Label under the appliance. If the appliance has been converted to propane (LP), the valve cover should have a label stating that the unit has been converted to propane.

Connect the gas line at the 3/8 in. (9.5mm) pipe connector on the valve at the back of appliance. We recommend connecting the appliance with an approved flex gas line.

If flex gas lines are not approved in your area, you must connect a hard pipe to the gas hookup.

You must supply a manual shut-off valve in a visible location within 3 feet (914mm) of the appliance.

Omni-Test Laboratories listed gas appliances are tested and approved without requiring changes for elevations from

0 to 2000 feet in the U.S.A. and 0 to 4500 feet in Canada.

When installing this appliance at an elevation above 2000 feet, it may be necessary to decrease the input rating by changing the existing burner orifi ce to a smaller size. Input rate should be reduced by 4% for each 1000 feet above a

2000 foot elevation in the U.S.A. If the heating value of the gas has been reduced, these rules do not apply. To identify the proper orifi ce size, check with the local gas utility.

If installing this appliance at an elevation above 4500 feet

(in Canada), check with local authorities.

WARNING

Fire or Explosion Hazard

• Gas build-up during line purge may ignite.

• Purge should be performed by qualifi ed technician.

• Ensure adequate ventilation.

• Ensure there are no ignition sources such as sparks or open fl ame.

26 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

7

Electrical Information

A. Recommendation for Wire

See B5 below for recommended maximum lead length (two wire) when using wall thermostat/switch.

NOTE: This appliance must be electrically wired and grounded in accordance with local codes or, in the absence of local codes, with National Electric Code ANSI/NFPA

70-latest edition or the Canadian Electric Code, CSA

C221.1.

8. Ensure the thermostat is mounted level for accurate readings.

9. The thermostat should be mounted on an inside wall and not in direct line with the appliance convection air.

10. If the thermostat is located too close to the appliance, you may need to set the temperature setting slightly higher to maintain the desired temperature in your home.

B. Connecting to the Appliance

WARNING

Wire 110v to electrical junction box.

Do NOT wire 110v to the valve.

Do NOT wire 110V to wall switch.

• Incorrect wiring will damage millivolt systems.

Do not connect this appliance to a thermostat serving any other appliance.

Bedroom installation in Canada requires this appliance to be connected to a thermostat.

WARNING

Shock hazard.

• This appliance is equipped with a three pronged (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle. Do not cut or remove the grounding prong from this plug.

1. This appliance may be used with a wall switch, wall mounted thermostat and / or a remote control.

2. If using thermostat, use one compatible with a millivolt gas valve system.

C. Standing Pilot Ignition System Wiring

3. Follow parameters for locating thermostat (see individual thermostat instructions) to ensure proper operation of appliance.

This appliance DOES NOT require 110 VAC supply for operation. A wiring diagram is shown in Figure 7.1 on the next page.

4. Use low resistance thermostat wire for wiring from ignition system to the wall switch and thermostat.

This appliance is equipped with a millivolt control valve.

5. Use the following chart for wire sizing.

Wire Size

16 gauge

18 gauge

20 gauge

22 gauge

Max. Length

65 feet

40 feet

25 feet

18 feet

6. Keep wire lengths as short as possible by removing any excess wire length.

7. Low voltage and 110 VAC voltage cannot be shared within the same wall box.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 27

Gas Pilot Ignitor Thermocouple

Ignitor

ON/OFF

Switch

Red 28 in.

(711mm)

Red 28 in.

(711mm)

Figure 7.1

CAUTION

Label all wires prior to disconnection when servicing controls.

Wiring errors can cause improper and dangerous operation.

Verify proper operation after servicing.

VALVE

CAUTION

Shock hazard.

• Replace damaged wire with type 105 O C rated wire.

• Wire must have high temperature insulation.

28 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

8

Appliance Setup

A. Remove Shipping Materials

Remove shipping materials from inside or underneath the fi

rebox.

B. Top to Rear Vent Conversion

KIT CONTENTS: Rear vent grille; NG orifi ce (.113); LP orifi ce (.063)

TOOLS REQUIRED: Power drill; #2 Phillips bit; high-temp silicone sealant (optional.)

Figure 8.3

Remove rear valve cover shield. Remove rear access plate and gasket. Save the screws.

Figure 8.1

Remove top trivet, if installed. Remove vent pipe adapter and gasket. If gasket breaks, apply high-temperature silicone to the bottom of the adapter before installing as indicated in Figure 8.6.

CAUTION

Sharp Edges

• Wear protective gloves and safety glasses during installation.

Figure 8.4

Place cover plate and gasket over top vent and attach with the four screws previously removed.

Figure 8.5 Insert inner collar adapter to rear vent flue.

Figure 8.2

Remove inner collar adapter

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 29

Figure 8.6

Install vent pipe adapter with gasket or high-temp silicone to rear vent opening.

Figure 8.9

Slide assembled nuts and bolts into the slots on the legs with the nuts on the bottom.

Figure 8.10

Use a 5/32 in. 4mm) Allen wrench to adjust legs up and down to desired level.

Figure 8.7

Place grille gently into the opening on top of the appliance .

Refer to Section 6 (Fuel Conversions) for burner removal and orifice change/replacement.

D. Accessories

Install approved accessories per instructions included with accessories. Refer to Section 12 for appropriate accessories.

C. Leg Leveling System

WARNING

Shock or fi re risk.

Use ONLY optional accessories approved for this appliance.

• Using non-listed accessories voids warranty.

• Using non-listed accessories may result in a safety hazard.

• Only Hearth & Home Technologies approved accessories may be used safely.

Figure 8.8

Thread Allen bolts through nuts until fl ush. The

Allen bolts and nuts are included in the component pack inside the appliance fi rebox.

30 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

E. Front Installation

Fronts shipped attached to face

INSTALLATION AND REMOVAL INSTRUCTIONS

FOR QUARTET AND SOLITAIRE FACE OPTIONS.

Quartet Front

Figure 8.13

Lift up on the top of the Front, gently pulling out on the bottom. Set aside in a safe location.

Solitaire Front

Spacer

Figure 8.11

For BOTH Quartet and Solitaire Fronts:

Figure 8.14

The quartet door requires the use of a spacer for installation. The spacer is shipped in place and should be put back if removed.

F. Brick Installation

NOTE: The brick supplied with the Topaz is not an optional accessory. The brick must be installed for safe and proper operation.

Figure 8.12

To remove the face, loosen the thumb bolt beneath the ashlip.

Figure 8.15

Install rear panel by placing it behind the log pins, fl

ush and centered against the back of the fi rebox.

NOTE: Rear panel and top panel/baffl e are the same size.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 31

Figure 8.18

Fully installed brick set. Note that with the brick installed the firebox is narrower at the back than in the front.

G. Positioning the Logs

While still breakable, the logs do not become fragile until after the appliance is burned and they have cured. After curing, any handling must be done with care as breakage can easily occur.

Figure 8.16

Install left or right side panel. Place in lower channel and rotate into place.

NOTE: Side brick panels will fit only if installed at an angle.

Do not attempt to push the brick flat against the outer wall of the firebox. Brick should rest against spacer on inside of firebox.

PLEASE NOTE: Logs have been designed to work specifically with the burner of this appliance. Exact placement will ensure proper operation of your gas appliance and reduce sooting.

1

Figure 8.17

Bend over tabs to hold panel in place.

Install the top panel/baffle. If rear venting, set damper prior to installing the top panel/baffle. (In the Commonwealth of

Massachusetts, the word damper shall be replaced with the word damper shall be replaced with the words fl ue restrictor.)

The back edge will slide in front of the rear brick panel. Rest one end of the top panel/baffl e on the installed side panel and support the other end with one hand.

Install the remaining side panel and bend over the tabs to hold it in place. Rest top panel/baffl e on sides and slide top panel/baffl e left or right until centered.

Figure 8.19

The log set is packed in the components box and consists of the following:

Qty.

1

1

1

1

1

Description

Rear Log

Left Front Log

Right Front Log

Right Twig

Left Twig

#

1

2

3

4

5

32 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Locater Pins

Figure 8.20 Insert locator pin into right front log. Insert rear log onto log pan over stud.

Figure 8.24 Place left twig over locator pins on the rear log and the left front log. To complete your log set application reinstall the glass and the front of the unit.

Figure 8.21 Insert locator pin into left front log. Place left front log on burner in the grooved provided on the burner surface.

H. Mineral Wool

WARNING

Explosion Risk.

• Follow ember placement instructions in manual.

• Do NOT place embers directly over burner ports.

• Replace ember material annually.

Improperly placed embers interferes with proper burner operation.

Figure 8.22 Insert locator pin into right front log. Place right front log on burner in the grooves provided on the burner surface.

Figure 8.25

Place individual pieces of embers in front of and around the gas log where they can be seen. Space them so that gas can contact them on all sides. Avoid stacking the embers on top of each other.

NOTE: Do not block gas ports.

Figure 8.23 Place right twig over the locator pins on the rear log and the right front log.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 33

I. Glass Door Assembly Replacement

Remove the glass door assembly by opening latches at the bottom front of the appliance, on both the left and right sides.

Lift out and away from the appliance.

Replace with a new glass door assembly.

CAUTION

Handle glass assembly with care.

• Inspect the gasket to ensure it is undamaged.

• Inspect the glass for cracks, chips or scratches.

• Do NOT strike, slam or scratch glass.

• Do NOT operate appliance with glass door removed, cracked, broken or scratched.

• Replace glass assembly as a complete assembly.

Figure 8.28 Connect electrical connector to snap disc.

J. Blower Installation

FROM THE KIT YOU WILL NEED: Blower motor; snap disc bracket with wire harness; rheostat, rheostat nut; knob; screws; 1 zip-tie.

TOOLS REQUIRED: #2 Phillips head bit; hand drill; 11/16 in. wrench; and a 5/16 in. wrench.

Figure 8.29 Install speed control to switch panel. Attach knob to speed control.

Attach with 4 screws

Figure 8.26 Turn off gas supply, (if gas is connected,) and remove rear shield. Remove blower from packaging. Place blower under appliance. Attach blower from front with 4 screws to blower bracket.

Figure 8.30 Reinstall rear shield. Connect blower to power supply and turn on gas supply.

NOTE: This blower utilizes a snap disc to control ON and

OFF operation. When the correct temperature is reached, the blower will automatically turn ON. Use the rheostat knob to adjust the fan to High or Low to suit your preferences.

5/16� nut

�nap �isc

Bracket

Figure 8.27 Install snap disc in bracket. Attach bracket to fi rebox with 5/16 in. wrench.

34 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Fan Speed Control

WHITE

Thermal Disc

WHITE

Power Cord

(110 VAC)

BLACK

GREEN

Ground

Strain Relief

Bushing

BLACK

BLACK

Fan Assembly

Figure 8.31 Blower Wiring Diagram

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 35

K. Damper Adjustment

FOR TOP OR REAR VENT INSTALLATIONS

See Vent Graph for Recommendations on page 11

before you begin your adjustment. If your installation falls within the range of the gray shaded area of graph, it may be necessary to make an adjustment to the vertical damper to improve the flame appearance in your appliance.

L. Shutter Adjustment

OPEN CLOSE

Figure 8.34

The shutter is located on the underside of the appliance, on the right side. To adjust the shutter, loosen the wingnut..

Figure 8.32

TOP VENT INSTALLATIONS:

Locate the damper adjustment on the intake plenum. Access through the appliance front. Adjustor is centered at the top of the appliance.

Make adjustment:

Let appliance warm up before adjusting.

Loosen screw using a Phillips head screwdriver.

Pivot the vertical damper adjustor in 1/4 in. (6mm) increments while observing the fl ame activity.

Turning clockwise to open damper = less fl ame height and more blue in fl ame color.

Turning counterclockwise to close damper = increased fl ame height and more yellow in fl ame color.

Make adjustment until fl ame size and activity suits your personal preference, and then retighten screws on adjustment control.

Moving the shutter bolt to the right closes the shutter. Moving the shutter bolt to the left, will open the shutter. Opening the shutter causes flames to become shorter and blue. Closing the shutter creates taller orange/yellow flames.

NOTE: Do not close so much as to cause a sooty flame.

Improper adjustment can cause sooting in the firebox and/ or on the outside of a house with a horizontal termination.

After adjustment, tighten wingnut to lock in place.

Figure 8.33

REAR VENT INSTALLATIONS: The rear vent damper is located in the back of the firebox behind the rear brick panel. It is recommended to make adjustment prior to installation.

Remove front/glass/ logs and brick if installed. Loosen screws and slide up to suggested settings. Reinstall accordingly... Tighten screws.

36 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

9

Operating Instructions

A. Before Lighting Appliance

Read this entire manual prior to using the appliance. Failure to follow the instructions may result in property damage, bodily injury, or even death.

• Remove all shipping materials from inside and/or underneath the fi rebox.

• Review proper placement of logs, mineral wool.

• Check the wiring.

• Check the baffl e adjustment.

• Ensure that there are no gas leaks.

• Ensure that the glass is sealed and in the proper position.

• Ensure that the fl ow of combustion and ventilation air is not obstructed (front grilles and vent caps).

WARNING

Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Refer to the owner’s information manual provided with this appliance.

For assistance or additional information consult a qualifi ed installer, service agency or the gas supplier.

WARNING

Do NOT use this appliance if any part has been under water.

Immediately call a qualifi ed service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.

WARNING

Glass door must be in place when appliance is operating.

Risk of:

• Combustion Fumes

• Fire

Do NOT operate appliance with glass door removed.

• Open viewing glass for servicing only.

• Glass door MUST be in place and sealed before operating appliance.

• Only use glass door certifi ed for use with appliance.

• Glass replacement should be done by qualifi ed technician.

WARNING

HOT! DO NOT TOUCH.

SEVERE BURNS MAY RESULT.

CLOTHING IGNITION MAY RESULT.

Glass and other surfaces are hot during operation and cool down.

• Keep children away.

• CAREFULLY SUPERVISE children in same room as appliance.

• Alert children and adults to hazards of high temperatures.

• Do NOT operate with protective barriers open or removed.

• Keep clothing, furniture, draperies and other combustibles away.

B. Controls

FAN SPEED: This knob controls the speed of the blower that pushes the heated air into the room.

MAIN BURNER: This control is used to turn the appliance on and off.

PILOT IGNITOR: The pilot ignitor is used only to start the pilot. When the valve control knob is turned to the pilot position and fully depressed press the piezo ignitor repeatedly creating a blue spark directly next to the pilot, igniting the pilot flame.

VALVE CONTROL: This knob is used to control gas to the appliance and for starting the pilot. There are three positions,

ON, OFF, & PILOT. The indicator on the valve indicates the position of the knob.

COMFORT CONTROL: This knob controls the flame height from low (“LO”) to high (“HI”).

NOTE: If using a remote control wall switch, or thermostat, the On/Off Switch must be left “OFF”. Turning the On/Off

Switch to “ON” will keep the appliance on continually.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 37

C. Lighting Appliance

FOR YOUR SAFETY READ BEFORE LIGHTING

WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life

A. This appliance has a pilot that must be lit manually. When lighting the pilot, follow these instructions exactly.

B. BEFORE LIGHTING, smell around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS:

* Do not try to light any appliance.

* Do not touch any electric switch, do not use any phone in your building.

* Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions.

* If you cannot reach your gas supplier, call the fire department.

C. Use only your hand to push in or turn the gas control knob. Never use tools. If the knob will not push in or turn by hand, don't try to repair it, call a qualified service technician. Force or attempted repair may result in a fire or explosion.

D. Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.

LIGHTING INSTRUCTIONS

1. STOP! Read the safety information above on this label.

2. Set the thermostat to the lowest setting (if applicable) and turn off the switch at the control panel.

3. Disconnect the power from the appliance.

4. Open the door of the appliance. May need to remove face/front first.

5. Push in gas control knob slightly and turn clockwise to the "OFF" position. Do not force.

6. Wait five (5) minutes to clear out any gas. Smell for gas, including near the floor. If you smell gas, STOP! Follow "B" of the safety information above. If you don't smell gas go to the next step.

7. Push gas control knob in and turn counterclockwise to the pilot position. NOTE: Knob cannot be turned unless knob is pushed in slightly. Do not force.

8. PIEZO IGNITER: Press down on the gas control knob in pilot position and simultaneously press the piezo igniter.

(This may take many repetitions for lighting.)

ELECTRONIC IGNITER: If the unit is equipped with an electronic igniter it should begin sparking right away.

9. The pilot should be visible through the door opening.

10. After the pilot is lit, continue holding control knob down for approximately

30 seconds. Release the knob and it will pop back up. Pilot should remain lit.

If it goes out, repeat steps 7 through 9.

* If the knob does not pop up when released, stop and immediately call your service technician or gas supplier.

* If the pilot will not stay lit after several tries, turn the gas control knob clockwise to "OFF" and call your service technician or gas supplier.

11. Re-install door and face. Wait five minutes to allow pilot flame to stabilize and establish proper draft.

MILLIVOLT

GENERATOR

PILOT HOOD

THERMOCOUPLE

12. Push down and turn gas control knob counterclockwise to "ON".

13. Push burner rocker switch on the control panel to "ON". If thermostat is to be used, leave switch in "OFF" position and set the thermostat to desired setting.

14. Reconnect electrical power to appliance.

TO TURN OFF GAS TO APPLIANCE

1. Set the thermostat to lowest setting.

2. Turn off all electric power to the appliance if service is to be performed.

3. Push in gas control knob slightly and turn clockwise to "OFF" position.

38 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

D. After Appliance is Lit

Initial Break-in Procedure

When you light your appliance, you may notice that it produces heat which does have an associated odor or smell. If you feel this odor is excessive it may require the initial three to four hour continuous burn on high followed by a second burn up to 12 hours to fully drive off any odor from paint and lubricants used in the manufacturing process. Condensation on the glass is normal.

NOTE: The appliance should be run three to four hours on the initial start-up. Turn it off and let it cool completely.

Remove and clean the glass. Replace the glass and run the appliance for an additional 12 hours. This will help to cure the products used in the paint and logs.

During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the appliance’s initial burning.

CAUTION

• Prevent accidental appliance operation when not attended.

• Unplug or remove batteries from remote control if absent or if appliance will not be used for an extended period of time.

• Property damage possible from elevated temperatures.

CAUTION

Smoke and odors released during initial operation.

• Open windows for air circulation.

• Leave room during initial operation.

• Smoke may set off smoke detectors.

Smoke and odors may be irritating to sensitive individuals.

WARNING

Fire Risk.

High Temperatures.

Keep combustible household items away from appliance.

Do NOT obstruct combustion and ventilation air.

• Do NOT place combustible items on top of or in front of appliance.

• Keep furniture, draperies away from appliance.

WARNING

Fire Hazard.

Keep combustible materials, gasoline and other fl ammable vapors and liquids clear of appliance.

• Do NOT store fl ammable materials in the appliance’s vicinity.

• Do NOT use gasoline, lantern fuel, kerosene, charcoal lighter fl uid or similar liquids in this appliance.

• Combustible materials may ignite.

E. Frequently Asked Questions

ISSUE

Condensation on the glass

Blue fl ames

Odor from appliance

Film on the glass

Metallic noise

SOLUTIONS

This is a result of gas combustion and temperature variations. As the appliance warms, this condensation will disappear.

This is a result of normal operation and the fl ames will begin to yellow as the appliance is allowed to burn for 20 to 40 minutes.

When fi rst operated, this appliance may release an odor for the fi rst several hours.

This is caused by the curing of the paint and the burning off of any oils remaining from manufacturing. If appliance has not been used for some time, dust can build up and cause an odor.

This is a normal result of the curing process of the paint and logs. Glass should be cleaned within 3 to 4 hours of initial burning to remove deposits left by oils from the manufacturing process. A non-abrasive cleaner such as gas appliance cleaner may be necessary. See your dealer.

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to the sound produced by a furnace or heating duct. This noise does not affect the operation or longevity of the appliance.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 39

40

10

Troubleshooting

With proper installation, operation, and maintenance your gas appliance will provide years of trouble-free service. If you do experience a problem, this troubleshooting guide will assist a qualifi ed service person in the diagnosis of a problem and the corrective action to be taken. This troubleshooting guide can only be used by a qualifi ed service technician.

Symptom

1. After repeated triggering of the piezo button, the spark ignitor will not light the pilot.

Possible Cause Corrective Action

a. Defective ignitor.

Check the spark at the electrode and pilot. If no spark and electrode wire is properly connected, replace the ignitor.

b. Defective pilot or misaligned electrode

(spark at electrode).

c. No gas or low gas pressure.

d. No LP in tank.

a. Defective thermocouple.

Using a match, light the pilot. If the pilot lights, turn off the pilot and trigger the piezo button again. If the pilot lights, an improper gas/air mixture caused the bad lighting and a longer purge period is recommended. If the pilot will not light, ensure the gap at the electrode and pilot is one-eighth (1/8) inch to have a strong spark. If the gas is OK, replace the pilot.

Check the remote shut-off valve from the appliance. Usually, there is a valve near the gas main. There can be more that one (1) valve from the appliance and the main.

Check the LP (propane) tank. You may be out of fuel.

Check that the pilot fl ame impinges on the thermocouple. Clean and / or adjust the pilot for maximum fl ame impingement.

2. The pilot will not stay lit after carefully following the lighting instructions.

Ensure that the thermocouple connection at the gas valve is fully inserted and tight (hand tighten plus 1/4 turn).

3. The pilot is burning, there is no gas to the burner, the valve knob is in the ON position, and the ON/OFF switch is in the ON position.

b. Thermopile may not be generating suffi cient millivoltage.

Disconnect the thermocouple from the valve, place one millivolt lead wire on the tip of the thermocouple and the other meter wire on the thermocouple copper lead. Start the pilot and hold the valve knob in. If the millivolt reading is less than 15mV, replace the thermocouple.

b. Defective valve.

If the thermocouple is producing more than 15 millivolts, replace faulty valve.

a. ON/OFF switch or wires defective.

Check the ON/OFF switch and wires for proper connections. Place the jumper wires across the terminals at the switch. If the burner comes on, replace the defective switch. If the switch is OK, place the jumper wires across the switch wires at the gas valve. IF the burner comes on, the wires are faulty or connections are bad.

If the pilot fl ame is not close enough physically to the thermopile, adjust the pilot fl ame.

Be sure the wire connections from the thermopile at the gas valve terminals are tight and that the thermopile is fully inserted into the pilot bracket.

Check the thermopile with a millivolt meter. Take the reading at TH-

TP&TP terminals of the gas valve. The meter should read 325 millivolts minimum, while holding the valve knob depressed in the pilot position, with the pilot lit, and the ON/OFF switch in the OFF position. Replace the faulty thermopile if the reading is below the specifi ed minimum.

With the pilot in the ON position, disconnect the thermopile leads from the valve. Take a reading at the thermopile leads. The reading should be 325 millivolts minimum. Replace the thermopile if the reading is below the minimum.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Symptom

3. (Continued)

4. Frequent pilot outage problem.

5. The pilot and main burner extinguish while in operation.

6. Glass soots.

7. Flame burns blue and lifts off burner.

Possible Cause Corrective Action

c. Defective valve.

Turn the valve knob to the ON position. Place the ON/OFF switch in the ON position. Check the millivolt meter at the thermopile terminals.

The millivolt meter should read greater than 125mV. If the reading is acceptable, and if the burner does not come on, replace the gas valve.

Check the burner orifi ce for stoppage. Remove stoppage.

d. Plugged burner orifi ce.

e. Wall switch or wires are defective.

a. Pilot fl ame may be too high or too low, or blowing

(high), causing safety pilot to drop out.

a. No LP in tank.

b. Inner vent pipe leaking exhaust gases back into the system.

c. Horizontal vent improperly pitched.

d. Bad thermopile or thermocouple.

e. Improper vent cap installation.

a. Flame impingement.

b. Improper shutter setting.

c. Debris around opening at base of burner.

a. Insuffi cient oxygen being supplied.

Follow the corrective action in Symptom and Possible Cause 1.a.

Check the switch and wiring. Replace where defective.

Clean and adjust the pilot fl ame for maximum fl ame impingement on thermocouple. Follow lighting instructions carefully.

Check the LP (propane) tank. Refi ll the fuel tank.

Check for proper vent connection at fl ue collar and all vent joints.

The horizontal vent cap should slope down only enough to prevent any water from entering the appliance.

Replace if necessary.

Check for proper installation and freedom from debris or blockage.

Adjust the log set so that the fl ame does not excessively impinge on it.

Check that logs are placed according to installation instructions.

Adjust the air shutter at the base of the burner.

Inspect the opening at the base of the burner. NO MATERIAL SHOULD

BE PLACED IN THIS OPENING.

Ensure that the vent cap is installed properly and free of debris. Ensure that the vent system joints are tight and have no leaks.

Ensure that no debris has been placed at the base of, or in the area of the air holes in the center of the base pan beneath the burner.

Ensure that the glass is tightened properly on the appliance, particularly on top corners.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 41

42

11

Maintaining and Servicing Your Appliance

Although the frequency of your appliance servicing and maintenance will depend on use and the type of installation, a qualifi ed service technician should perform an appliance check-up at the beginning of each heating season.

CAUTION

Handle glass assembly with care.

NOTE: Clean glass after initial 3-4 hours operation. Longer operation without cleaning glass may cause a permanent white fi lm on glass.

WARNING

Risk of injury or property damage.

Before servicing:

• Turn off gas.

• Turn off electricity to appliance.

• Ensure appliance is completely cooled.

After servicing:

• Replace front and glass, if removed.

• Reseal and reinstall any venting removed for servicing.

When cleaning glass door:

• Avoid striking, scratching or slamming glass.

• Do NOT use abrasive cleaners.

• Use a hard water deposit glass cleaner on white fi lm.

• Do NOT clean glass when hot.

• Turn off appliance after 3-4 hours of operation and ALLOW

TO COOL.

• Remove and clean glass assembly.

• Replace glass assembly and operate appliance for additional

12 hours.

Refer to maintenance instructions.

WARNING

Annual inspection by qualifi ed technician recommended.

Check:

• Condition of glass, glass assembly and glass seal.

• Obstructions of combustion and ventilation air.

• Obstructions of termination cap.

• Burner ignition and operation.

• Burner air shutter adjustment

• Gas connections and fi ttings.

Clean:

• Glass

• Air passageways, grilles,

control compartment

• Burner, burner ports. USE CAUTION WHEN CLEANING/

HANDLING CERAMIC BURNER.

Risk of:

• Fire

• Delayed ignition or explosion

• Exposure to combustion fumes

• Odors

WARNING

Inspect external vent cap regularly.

• Ensure no debris blocks cap.

• Combustible materials blocking cap may ignite.

• Restricted air fl ow affects burner operation.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

A. Maintenance Tasks

Doors

Inspect

Gasket Seal, Glass

Assembly and Glass

Valve Compartment and Firebox Top

Logs

Firebox

Burner Ignition and

Operation

Venting

Remote Controls

Maintenance Tasks

1. Inspect for scratches, dents or other damage and repair as necessary.

2. Verify no obstructions to air fl ow.

3. Verify maintenance of proper clearance to combustible household objects.

1. Inspect gasket seal and its condition.

2. Inspect glass for scratches and nicks that can lead to breakage when exposed to heat.

3. Confi rm there is no damage to glass or glass frame, Replace as necessary.

4. Verify that latches engage properly and glass attachment components are intact and operating properly. Replace as necessary.

5. Clean glass. Replace glass assembly if severely coated with silicate deposits that cannot be removed.

1. Vacuum and wipe out dust, cobwebs, debris or pet hair. Use caution when cleaning these areas. Screw tips that have penetrated the sheet metal are sharp and should be avoided.

2. Remove any foreign objects.

3. Verify unobstructed air circulation.

1. Inspect for broken, damaged, or missing logs. Replace as necessary.

2. Verify correct log placement and no fl ame impingement causing sooting. Correct as necessary.

1. Inspect for paint condition, warpage, corrosion or perforation. Sand and repaint as necessary.

2. Replace appliance if fi rebox has been perforated.

1. Verify burner is properly secured and aligned with pilot or igniter.

2. Clean off burner top, inspect for plugged ports, corrosion or deterioration. Replace burner if necessary. USE CAUTION WHEN CLEANING/HANDLING CERAMIC BURNER.

3. Replace ember material with new dime-size and shape pieces. Do not block ports or obstruct lighting paths.

4. Check for smooth lighting and ignition carryover to all ports. Verify there is no ignition delay.

5. Inspect for lifting and other fl ame problems.

6. Inspect orifi ce for soot, dirt or corrosion.

7. Verify manifold and inlet pressures. Adjust regulator as required.

8. Inspect pilot fl ame strength. Clean or replace orifi ce as necessary.

9. Inspect thermocouple/thermopile sensor rod for soot, corrosion and deterioration. Polish with fi ne steel wool or replace as required.

10. Verify millivolt output. Replace as necessary.

1. Inspect venting for blockage or obstruction such as bird nests, leaves, etc.

2. Confi rm that termination cap remains clear and unobstructed by plants, etc.

3. Verify that termination cap clearance to subsequent construction (building additions, decks, fences or sheds) has been maintained.

4. Inspect for corrosion or separation.

5. Verify weather stripping, sealing and fl ashing remains intact.

1. Verify operation of remote.

2. Replace batteries in remote transmitters and battery-powered receivers.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 43

12

Reference Materials

A. Appliance Dimension Diagram

Dimensions are actual appliance dimensions. Use for reference only. For clearances refer to Section 3.

A

D

E

H

I

J

K

C

L

B

G

F

O

M

N

44

Location Inches

A 27-3/8

B 7

E

F

C

D

G

H

27-3/4

27-1/2

13-3/4

8-3/8

5-1/8

22-5/8

Figure 12.1 Appliance Dimensions

Millimeter

695

178

705

698

349

213

130

575

Location

J

I

K

L

M

N

O

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Inches

19-3/8

16-7/8

22-1/2

3-1/8

29-1/2

18

23-1/8

Millimeter

492

429

572

79

749

457

687

B. Vent Components Diagram

6-3/8 in.

(162mm)

6-1/2 in.

(165mm)

9-1/4 in.

(235mm)

SLP45-BK

6-5/8 in.

(168mm)

6-3/8 in.

(162mm)

6-1/2 in.

(165mm) 9-5/8 in.

(244mm)

6-5/8 in.

(168mm)

SLP90M

9-5/8 in.

(244mm)

17-24 in.

(432-610mm)

SLP12AM

11-3/4 in.

(298mm)

SLP12M

6-1/2 in.

(165mm)

5-3/4 in.

(146mm)

SLP6M

6-5/8 in.

(168mm)

14 in.

356 mm

10-9/16 in.

269 mm

SLP-CCS-BK

Cathedral Ceiling

Support Box-Black

35-3/4 in.

(908mm)

23-3/4 in.

(603mm)

3-3/4 in.

(95mm)

SLP4M

12-17 in.

(305-432mm)

SLP6AM SLP24M SLP36M

4 in. (102 mm) inner pipe 6-5/8 in. (168 mm) outer pipe

47-3/4 in.

(1213mm)

SLP48M

Figure 12.2 SL-D Series Vent Components

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 45

C. Vent Components List

Description

4” Pipe Length, Galvanized

4

6 ”

” P

P i i p e p e

L

L e e n n g g t t h h

,

,

B

G l a a c l v k

6 ” P i p e L e n g t h , B l a c k a n i z e d

9

9

” P i p e L e n g t h , G a l v a n i z e d

” P i p e L e n g t h , B l a c k

12” Pipe Length, Galvanized

1 2 ” P i p e L e n g t h , B l a c k

1 8

1 8 ”

” P

P i i p p e e

L

L e e n n g g t t h h

,

,

G

B l a a l c v k a n i z e d

24” Pipe Length, Galvanized

2 4 ” P i p e L e n g t h , B l a c k

36” Pipe Length, Galvanized

3 6 ” P i p e L e n g t h , B l a c k

48” Pipe Length, Galvanized

4 8 ” P i p e L e n g t h , B l a c k

Adjustable Length, 3”-6”, Black

Adjustable Length, 3”-6”, Galvanized

Adjustable Length, 3”-7”, Galvanized

Adjustable Length, 3”-7”, Black

Adjustable Length, 3”-12”, Black

Adjustable Length, 3”-12”, Galvanized

Adjustable Length, 3”-14.5”, Galvanized

Adjustable Length, 3”-14.5”, Black

Adjustable Length, 16”, Galvanized

A d j u s t a b l e L e n g t h , 1 6 ” , B l a c k

2 ’ F l e x i b l e P i p e L e n g t h

3 ’ F l e x i b l e P i p e L e n g t h

5 ’ F l e x i b l e P i p e L e n g t h

1 0 ’ F l e x i b l e P i p e L e n g t h

3 ” x 3 5 ’ F l e x E x t e n s i o n

4 ” x 3 5 ’ F l e x E x t e n s i o n

4 5 ° E l b o w , G a l v a n i z e d

4 5 ° E l b o w , B l a c k

4 5 ° E l b o w , S w i v e l , G a l v a n i z e d

4 5 ° E l b o w , S w i v e l , B l a c k

HHT SLP

M= Multi Pack (6)

Simpson

Dura-Vent

®

DirectVent Pro

-

-

4 6 D V A 0 6

4 6 D V A 0 6 B

4 6 D V A 0 9

4 6 D V A 0 9 B

46-DVA-12

4 6 D V A 1 2 B

4 6 D V A 1 8

4 6 D V A 1 8 B

46-DVA-24

4 6 D V A 2 4 B

46-DVA-36

4 6 D V A 3 6 B

46-DVA-48

4 6 D V A 4 8 B

-

-

46DVA-08A

46DVA-08AB

-

-

46DVA-16A

46DVA-16AB

46DVA-16A

4 6 D V A 1 6 A B

-

-

-

-

2 2 8 0

2 2 8 1

-

S e e S w i v e l

4 6 D V A E 4 5

4 6 D V A E 4 5 B

SLP4M

S L P 4 B K

S L P 6 M

S L P 6 B K

-

-

SLP12M

S L P 1 2 B K

-

-

-

-

S L P F L E X 2

S L P F L E X 3

S L P F L E X 5

S L P F L E X 1 0

-

-

S L P 4 5 M

S L P 4 5 B K

-

-

-

-

SLP24M

S L P 2 4 B K

SLP36M

S L P 3 6 B K

SLP48M

S L P 4 8 B K

SLP6A-BK

SLP6AM

-

-

SLP12A-BK

SLP12AM

46 Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

C. Vent Components List (continued)

Description

HHT SLP

M= Multi Pack (6)

9 0 ° E l b o w , G a l v a n i z e d

9 0 ° E l b o w , B l a c k

9

9

0

0

°

°

E

E l l b b o o w w

,

,

S

S w w i i v v e e l l

, G a l v a n i z e d

, B l a c k

Adjustable Flashing, 0/12-6/12

Adjustable Flashing, 7/12-12/12

A t it c I n s u l a it o n S h i e l d 1 2 ”

Attic Insulation Shield, Adjustable 11”-20”

C a t h e d r a l S u p p o r t B o x

C e i il n g S u p p o tr

Co-Axial to Co-Lineal Appliance Connector

Decorative Ceiling Firestop - Black

D e c o r a it v e R a d i u s C o v e r

Firestop Spacer/Ceiling Firestop

S

S L

L P

S L P

P -

-

-

-

9 0 M

9 0 B

SLP-RF6M

SLP-RF12M

A S

S L P C C S

-

-

K

2 M

B K

SLP-DCF-BK

D R C R A D I U S

SLP-FSM

Flex Trap Cap with Firestop

O ff s e t S u p p o tr

SLP-FLEX-TRAP

Flex Trap Cap with Firestop and 30” Flex Pipe SLP-FLEXTRAP30B

Masonry Chimney Conversion Kit -

-

O ff s e

S t o r m

t W a l

C o

l T ll a r h i m b l e , B l a c k

W

W a l a l

l S u p p o r

l T h i m b l e

t B a n d

, B l a c k

TERMINATION CAPS & KITS

Basic Horizontal Termination Kit (A)

C h i m n e y L i n e r T e r m i n a it o n K ti

S L P -

S L P

W T B

S C M

K

S L P H V S M

S L P W S M

SLP-SK-BK

-

SLP-HHW2 Horizontal Square Termination Cap

H o

S n o ir z o n t a r k e

l T e r m

l T e r m i n a i n a it o n it o n

1 4 ”

K ti ( B )

S n o r k e l T e r m i n a it o n 3 6 ”

*Stove Adaptor Kit (Vertical Cap Kit)

S L K

-

S N K D

-

LINK-STOVE

Trapezoid Termination Kit (3-1/8”-4-3/4”)

Trapezoid Termination Kit (5-1/4” X 9-1/4”)

V e r it c a l T e r m i n a it o n C a p

SLP-TRAP1

SLP-TRAP2

S L P T V H W

Simpson

Dura-Vent ®

DirectVent Pro

S e e S w i v e l

S e e S w i v e l

4 6 D V A E 9 0

4 6 D V A E 9 0 B

46DVA-F6

46DVA-F12

-

46-DVA-IS

4 6 D V A C S

4 6 D V A D C

46DVA-GCL

-

-

46DVA-FS

-

-

46DVA-KMC

4 6 D V A E S

-

4 6 D V A S C

4 6 D V A W S

4 6 D V A W T

46DVA-KHA

4 6 D V A G K

46DVA-HC

4 6 D V A K H C

4 6 D V A S N K 1 4

4 6 D V A S N K 3 6

-

-

4 6 D V A V C H

This is not a complete list - contact individual manufacturer for a complete and detailed list

NOTES: 1 Before cutting any holes check pipe manufacturers current instructions.

2 Each pipe manufacturer has their own list of parts for kits.

3 SL is not interchangeable with SLP.

*

Stove Adaptor Kit (Vertical Cap Kit) Includes 30’-4” À ex, adapters, wall thimble, masonry, ZC À ashing, 991DA vertical cap.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14 47

E. Limited Lifetime Warranty

Hearth & Home Technologies

LIMITED LIFETIME WARRANTY

Hearth & Home Technologies, on behalf of its hearth brands (”HHT”), extends the following warranty for HHT gas, wood, pellet, coal and electric hearth appliances that are purchased from an HHT authorized dealer.

WARRANTY COVERAGE:

HHT warrants to the original owner of the HHT appliance at the site of installation, and to any transferee taking ownership of the appliance at the site of installation within two years following the date of original purchase, that the HHT appliance will be free from defects in materials and workmanship at the time of manufacture. After installation, if covered components manufactured by HHT are found to be defective in materials or workmanship during the applicable warranty period,

HHT will, at its option, repair or replace the covered components. HHT, at its own discretion, may fully discharge all of its obligations under such warranties by replacing the product itself or refunding the verified purchase price of the product itself. The maximum amount recoverable under this warranty is limited to the purchase price of the product. This warranty is subject to conditions, exclusions and limitations as described below.

WARRANTY PERIOD:

Warranty coverage begins on the date of original purchase. In the case of new home construction, warranty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent, authorized HHT dealer/ distributor, whichever occurs earlier. The warranty shall commence no later than 24 months following the date of product shipment from HHT, regardless of the installation or occupancy date. The warranty period for parts and labor for covered components is produced in the following table.

The term “Limited Lifetime” in the table below is defined as: 20 years from the beginning date of warranty coverage for gas appliances, and 10 years from the beginning date of warranty coverage for wood, pellet, and coal appliances. These time periods reflect the minimum expected useful lives of the designated components under normal operating conditions.

Warranty Period

Parts Labor Gas

HHT Manufactured Appliances and Venting

Wood Pellet

EPA

Wood

Coal Electric Venting

1 Year

2 years

3 years

5 years 1 year

7 years 3 years

10 years

1 year

Limited

Lifetime 3 years

90 Days

4021-645F 02-18-13

54

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

All parts and material except as covered by Conditions,

Exclusions, and Limitations listed

Igniters, electronic components, and glass

Factory-installed blowers

Molded refractory panels

Firepots and burnpots

Castings and baffles

Manifold tubes,

HHT chimney and termination

Burners, logs and refractory

See conditions, exclusions, and limitations on next page.

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

X

Components Covered

Firebox and heat exchanger

All replacement parts beyond warranty period

Page 1 of 2

E. Limited Lifetime Warranty (continued)

WARRANTY CONDITIONS:

• This warranty only covers HHT appliances that are purchased through an HHT authorized dealer or distributor. A list of

HHT authorized dealers is available on the HHT branded websites.

• This warranty is only valid while the HHT appliance remains at the site of original installation.

• This warranty is only valid in the country in which the HHT authorized dealer or distributor that sold the appliance resides.

• Contact your installing dealer for warranty service. If the installing dealer is unable to provide necessary parts, contact the nearest HHT authorized dealer or supplier. Additional service fees may apply if you are seeking warranty service from a dealer other than the dealer from whom you originally purchased the product.

• Check with your dealer in advance for any costs to you when arranging a warranty call. Travel and shipping charges for parts are not covered by this warranty.

WARRANTY EXCLUSIONS:

This warranty does not cover the following:

• Changes in surface finishes as a result of normal use. As a heating appliance, some changes in color of interior and exterior surface finishes may occur. This is not a flaw and is not covered under warranty.

• Damage to printed, plated, or enameled surfaces caused by fingerprints, accidents, misuse, scratches, melted items, or other external sources and residues left on the plated surfaces from the use of abrasive cleaners or polishes.

• Repair or replacement of parts that are subject to normal wear and tear during the warranty period. These parts include: paint, wood, pellet and coal gaskets, firebricks, grates, flame guides, batteries and the discoloration of glass.

• Minor expansion, contraction, or movement of certain parts causing noise. These conditions are normal and complaints related to this noise are not covered by this warranty.

• Damages resulting from: (1) failure to install, operate, or maintain the appliance in accordance with the installation instructions, operating instructions, and listing agent identification label furnished with the appliance; (2) failure to install the appliance in accordance with local building codes; (3) shipping or improper handling; (4) improper operation, abuse, misuse, continued operation with damaged, corroded or failed components, accident, or improperly/ incorrectly performed repairs; (5) environmental conditions, inadequate ventilation, negative pressure, or drafting caused by tightly sealed constructions, insufficient make-up air supply, or handling devices such as exhaust fans or forced air furnaces or other such causes; (6) use of fuels other than those specified in the operating instructions; (7) installation or use of components not supplied with the appliance or any other components not expressly authorized and approved by HHT; (8) modification of the appliance not expressly authorized and approved by HHT in writing; and/or (9) interruptions or fluctuations of electrical power supply to the appliance.

• Non-HHT venting components, hearth components or other accessories used in conjunction with the appliance.

• Any part of a pre-existing fireplace system in which an insert or a decorative gas appliance is installed.

• HHT’s obligation under this warranty does not extend to the appliance’s capability to heat the desired space. Information is provided to assist the consumer and the dealer in selecting the proper appliance for the application. Consideration must be given to appliance location and configuration, environmental conditions, insulation and air tightness of the structure.

This warranty is void if:

• The appliance has been over-fired or operated in atmospheres contaminated by chlorine, fluorine, or other damaging chemicals. Over-firing can be identified by, but not limited to, warped plates or tubes, rust colored cast iron, bubbling, cracking and discoloration of steel or enamel finishes.

• The appliance is subjected to prolonged periods of dampness or condensation.

• There is any damage to the appliance or other components due to water or weather damage which is the result of, but not limited to, improper chimney or venting installation.

LIMITATIONS OF LIABILITY:

• The owner’s exclusive remedy and HHT’s sole obligation under this warranty, under any other warranty, express or implied, or in contract, tort or otherwise, shall be limited to replacement, repair, or refund, as specified above. In no event will HHT be liable for any incidental or consequential damages caused by defects in the appliance. Some states do not allow exclusions or limitation of incidental or consequential damages, so these limitations may not apply to you.

This warranty gives you specific rights; you may also have other rights, which vary from state to state. EXCEPT TO

THE EXTENT PROVIDED BY LAW, HHT MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY

SPECIFIED HEREIN. THE DURATION OF ANY IMPLIED WARRANTY IS LIMITED TO DURATION OF THE

EXPRESSED WARRANTY SPECIFIED ABOVE.

4021-645F 02-18-13

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

Page 2 of 2

55

F. Contact Information

R

Quadra-Fire, a brand of Hearth & Home Technologies

7571 215 th Street West, Lakeville, MN 55044 www.quadrafi re.com

Please contact your Quadra-Fire dealer with any questions or concerns.

For the location of your nearest Quadra-Fire dealer, please visit www.quadrafi re.com.

CAUTION

Do NOT discard this manual.

• Important operating and maintenance instructions included.

• Read, understand and follow these instructions for safe installation and operation.

• Leave this manual with party responsible for use and operation.

Your Records for Model:

Topaz

SERIAL NUMBER: __________________

DATE PURCHASED: __________________ _______________________________________

DATE INSTALLED: __________________

DEALERSHIP WHERE PURCHASED:

______________________________________

_______________________________________

DEALER TELEPHONE: __________________

This product may be covered by one or more of the following patents: (United States) 5601073, 5613487, 5647340,

5890485, 5941237, 6006743, 6019099, 6053165, 6145502, 6374822, 6484712, 6601579, 6769426, 6863064, 7077122,

7098269, 7258116, 7470729, 8147240 or other U.S. and foreign patents pending.

2000-945B

56

Printed in U.S.A. - Copyright 2014

Quadra-Fire • Topaz • 7009-113 Rev. Q • 6/14

advertisement

Related manuals

Download PDF

advertisement