SP1199 ABX COP PIR inst sheet 2 00

Add to my manuals
2 Pages

advertisement

SP1199 ABX COP PIR inst sheet 2 00 | Manualzz

Anybus X-gateway CANopen - PROFINET IRT

INSTALLATION SHEET

Module Front

Communication Status

Link Activity 1

CANopen Subnet Status

3

5

LED Ind.

1 2

4

6

Module Status

Link Activity 2

Device Status

Ethernet Port 2

Ethernet Port 1

Ethernet Port

1 8

2

3

Pin no

1

Description

TD+

TD-

RD+

6 RD-

4, 5, 7, 8 (reserved)

LED Indicators

LED no

1 (Communication

Status)

Indication

Off

Single flash, green

Green

2 (Module status)

3 (Link activity 1)

4 (Link activity 2)

5 (CANopen Subnet

Status) 1

Off

Green

Single flash, green

Double flash, green

Single flash, red

Triple flash, red

Quadruple flash, red

Off

Green

Flickering green

Off

Flickering green/red

Blinking green

Single flash, green

Green

Blinking red

Single flash, red

Double flash, red

Triple flash, red

Quadruple flash, red

Red

6 (Device Status) Off

Single flash, green

Green

Single flash, red

Double flash, red

Triple flash, red

Quadruple flash, red

Red

Power off

Bootup

Running

Initialization error

Timeout

Hardware failure

General error

Fatal error

1. This LED shows the status of the CANopen subnet that is controlled by the

X-Gateway CANopen.

Meaning

Off line

On-line, STOP (connection established, IO controller in STOP State)

On-line, RUN (connection established, IO controller in RUN State)

Not initialized

No error, initialized

Diagnostic data available

Blink, used to identify the device

Configuration error

No Station Name or no IP Address assigned

Internal error

No link established on port 1/2

Link established on port 1/2

Exchanging packets on port 1/2

Power off

The LSS services are in progress

Pre-operational state

Stopped state

Operational state

Configuration error

Warning limit reached

Error control event

Sync error

Data communication timeout

Bus off

HMS Industrial Networks AB

Web: www.anybus.com

Tel: +46 35 172900

E-mail: [email protected]

SP1199, rev 2.00, Apr 2012. AB7309.

www.anybus.com

Side View

4

5

6

1

2

Setting

0

3

7

8, 9

Baud Rate (kbit/s)

20

50

125

250

500

800

1000

Auto

Not available

Baud rate

Address x10

Address x1

Allowed node address range is 1 - 127. Addresses 1

- 99 are available using the address rotary switches.

To set e.g. node address 42, set the left address switch to 4 and the right address switch to 2. Cover the switches with the enclosed switch covers to ensure EMC compliance.

Bottom View

USB port:

Connect a PC to the

USB port for firmware upgrades.

Power:

A. +24 V DC

B. GND

5

1

A

B

9

6

CANopen Connector

Pin no.

2

5

Description

CAN_L

Shield

7

3, 6

1, 4, 8, 9

CAN_H

CAN_GND

(not connected)

Accessories Checklist

The following items are required for installation:

CANopen:

• CANopen configuration tool (available at www.anybus.com)

• CANopen adapter for configuration tool (not included)

• CANopen cable (not included)

• EDS file, available at www.anybus.com

PROFINET IO Interface:

• Suitable LAN cable (not included)

• PROFINET configuration tool (not included)

• GSD file, available at www.anybus.com

Installation and Startup Summary

• Select baud rate and an unused node address for the interface.

(Cover the switches with the enclosed switch covers.)

• Connect the gateway to the CANopen network.

• Install the EDS file in the CANopen configuration tool.

• Power up and (if required) configure the module.

• Restart the module after the CANopen interface has been configured.

• Connect the gateway to the PROFINET network.

• Install the GSD file in the PROFINET configuration tool,

• Power up and (if required) configure the module.

Please note that the module will start up as a CANopen slave. The module can be reconfigured as a CANopen master during configuration.

Technical Details

• Power supply:

24 V DC (-10% to +10%).

• Power consumption:

Maximum power consumption is 250 mA @ 24 V DC.

Typical power consumption: 100 mA @ 24 V DC.

• Protective Earth (PE):

Internal connection to PE via DIN-rail.

Note: Make sure the DIN-rail is properly connected to PE.

CANopen Support

Technical support regarding the CANopen fieldbus system should be addressed to CAN in Automation (CiA).

Online: www.can-cia.org

PROFINET Support

Technical questions regarding the PROFINET IRT fieldbus system should be addressed to your local PROFINET user group.

Online: www.profibus.org

For maintenance and support, contact the HMS support department.

Contact information is available at the support pages at www.anybus.com.

Further information and documents about this product can be found at the product pages on www.anybus.com.

Anybus X-gateway CANopen

INSTALLATION SHEET

DIN-rail Mounting

1

To snap the gateway on, first press it downwards (1) to compress the spring in the DIN-rail mechanism, then push it against the DIN-rail as to make it snap on (2).

2

1

To snap the gateway off, push it downwards (1) and pull it out from the

DIN-rail (2), as to make it snap off from the DIN-rail.

Additional Installation and Operating

Instructions

Supply voltage: The X-gateway requires a regulated 24 V (21.6 V to 26.4

V) DC power source.

Field wiring terminal markings (wire type (Cu only, 14-30AWG)

“Use 60/75 or 75 o C copper (CU) wire only”

Terminal tightening torque (5-7 lb-in (0.5 - 0.8 Nm)).

Use in Overvoltage Category I Pollution Degree 2 Environment.

Install in an enclosure considered representative of the intended use.

To comply with ATEX directives, the equipment must be installed within an IP54 enclosure and must be installed with a transient suppressor on the supply that does not exceed 140% (33.6 V DC) of the nominal rated supply voltage.

Operating temperature/Surrounding temperature:

-25 to +55 degrees C @ 250 mA @ 24 V DC.

Maximum surface temperature: 135 degrees C.

Pressure: 850 - 1050 millibar.

This product is designed to safely operate in class I, division 2 Hazardous location according to ANSI/ISA 12.12.01-2011 and category 3, zone 2 according to EN 60079-0, EN 60079-11, and EN 60079-15.

SUITABLE FOR USE IN CLASS I, DIVISION 2, GROUPS A, B, C AND D HAZ-

ARDOUS LOCATIONS, OR NONHAZARDOUS LOCATIONS ONLY.

2

Warnings

• WARNING - EXPLOSION HAZARD - SUBSTITION OF

ANY COMPONENTS MAY IMPAIR SUITABILITY FOR

CLASS I, DIVISION 2.

• WARNING - EXPLOSION HAZARD - WHEN IN HAZ-

ARDOUS LOCATIONS, TURN OFF POWER BEFORE

REPLACING OR WIRING MODULES.

• WARNING - EXPLOSION HAZARD - DO NOT DIS-

CONNECT EQUIPMENT WHILE THE CURCUIT IS

LIVE OR UNLESS THE AREA IS KNOWN TO BE

FREE OF IGNITABLE CONCENTRATIONS.

• WARNING - EXPLOSION HAZARD - THE USB CON-

NECTOR IS NOT FOR USE IN HAZARDOUS LOCA-

TIONS AND FOR TEMPORARY CONNECTION ONLY.

DO NOT USE, CONNECT OR DISCONNECT UNLESS

THE AREA IS KNOWN TO BE NONHAZARDOUS.

CONNECTION OR DISCONNECTION IN AN EXPLO-

SIVE ATMOSPHERE COULD RESULT IN AN EXPLO-

SION.

• WARNING - INSTALL IN AN ENCLOSURE CON-

SIDERED REPRESENTATIVE OF THE INTENDED

USE. TO COMPLY WITH ATEX DIRECTIVES, THE

EQUIPMENT MUST BE INSTALLED WITHIN AN IP54

ENCLOSURE AND MUST BE INSTALLED WITH A

TRANSIENT SUPPRESSOR ON THE SUPPLY THAT

DOES NOT EXCEED 140% (33.6 V DC) OF THE

NOMINAL RATED SUPPLY VOLTAGE.

UL Certification

I

Atex Certification

EX nA ic IIC T4 Gc

Y

II 3 G

DEMKO 12 ATEX 1062548X

EMC Compliance (CE)

Label Markings

Product number Product name and description

This product is in accordance with the EMC directive 2004/108/EC through conformance with the following standards:

• EN 61000-6-4 (2007)

Emission standard for industrial environment

EN 55016-2-3, Class A (2006)

• EN 61000-6-2 (2005)

Immunity for industrial environment

EN 61000-4-2 (2009)

EN 61000-4-3 (2006)

EN 61000-4-4 (2004)

EN 61000-4-5 (2005)

EN 61000-4-6 (2007)

Surrounding air temperature and electrical ratings

Warnings

Product information bar code

HMS Industrial Networks AB

Stationsgatan 37

302 45 Halmstad

Sweden

Further information and documents about this product can be found at the product pages on www.anybus.com.

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement