SolarRiver 2600TL-S
Power Quality. Harmonics.
SSEG rating per phase (rpp)
Harmonic
2.5
kW
NV=MV*3.68/rpp
At 45-55% of rated output
100% of rated output
Measured
Normalised
Value (MV) Value (NV)
Measured
Value (MV)
Normalised Limit in BS EN
Value (NV) 61000-3-2 in
Higher limit for
odd harmonics
in Amps
in Amps
in Amps
in Amps
Amps
21 and above
2
0.116
0.170
0.132
0.194
1.080
3
0.155
0.227
0.096
0.142
2.300
4
0.030
0.044
0.016
0.023
0.430
5
0.063
0.093
0.051
0.074
1.140
6
0.036
0.054
0.023
0.034
0.300
7
0.049
0.072
0.023
0.034
0.770
8
0.031
0.045
0.021
0.031
0.230
9
0.041
0.060
0.012
0.017
0.400
10
0.025
0.036
0.015
0.023
0.184
11
0.034
0.049
0.008
0.011
0.330
12
0.017
0.024
0.014
0.020
0.153
13
0.027
0.039
0.003
0.005
0.210
14
0.014
0.020
0.012
0.017
0.131
15
0.020
0.029
0.003
0.004
0.150
16
0.008
0.012
0.004
0.006
0.115
17
0.017
0.024
0.001
0.001
0.132
18
0.004
0.005
0.004
0.006
0.102
19
0.014
0.020
0.004
0.005
0.118
20
0.002
0.003
0.007
0.010
0.092
21
0.011
0.016
0.002
0.003
0.107
22
0.001
0.002
0.005
0.008
0.084
23
0.009
0.014
0.008
0.012
0.098
24
0.002
0.002
0.007
0.011
0.077
25
0.006
0.009
0.004
0.006
0.090
26
0.001
0.002
0.006
0.008
0.071
0.160
0.147
0.135
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 3 of 9
27
0.005
0.007
0.007
0.010
0.083
28
0.002
0.003
0.002
0.004
0.066
29
0.004
0.006
0.001
0.002
0.078
30
0.000
0.001
0.001
0.002
0.061
31
0.003
0.005
0.004
0.006
0.073
32
0.000
0.000
0.003
0.004
0.058
33
0.002
0.004
0.003
0.005
0.068
34
0.001
0.001
0.002
0.003
0.054
35
0.002
0.003
0.005
0.007
0.064
36
0.001
0.001
0.002
0.003
0.051
37
0.001
0.002
0.004
0.005
0.061
38
0.001
0.001
0.002
0.003
0.048
39
0.001
0.002
0.002
0.003
0.058
40
0.001
0.001
0.001
0.002
0.046
0.124
0.117
0.109
0.102
0.096
0.091
0.087
Note the higher limits for odd harmonics 21 and above are only allowable under certain conditions, if
these higher limits are utilised please state the exemption used as detailed in part 6.2.3.4 of BS EN
61000-3-2 in the box below.
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 4 of 9
SolarRiver 2600TL-S
Power Quality. Voltage fluctuations and Flicker.
Starting
Stopping
dmax
dc
[%]
d(t)
[%]
[%]
0.24
0
0
Normalised
to
standard impedance
and 3.68kW for
multiple units
N/A
N/A
N/A
Limits set under BS
EN 61000-3-2
4%
3.3%
dmax
dc
[%]
Measured Values
Test start date
Test location
3.3%
500ms
Running
[%]
d(t)
[%]
Pst
Plt 2 hours
0.24
0
0
0.173
0.207
N/A
N/A
N/A
N/A
N/A
4%
3.3%
1.0
0.65
3.3%
500ms
05\05\2014
Test end date
Eurofins Product Testing Service (Shanghai) Co., Ltd.
05\05\2014
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 5 of 9
SolarRiver 1100TL-S
Power Quality. DC injection.
Test power level
10%
55%
100%
Recorded value
0.010
0.005
0.002
as % of rated AC current
0.22%
0.11%
0.04%
Limit
0.25%
0.25%
0.25%
SolarRiver 2600TL-S
Power Quality. DC injection.
Test power level
10%
55%
100%
Recorded value
0.016
0.009
0.020
as % of rated AC current
0.11%
0.06%
0.14%
Limit
0.25%
0.25%
0.25%
SolarRiver 1100TL-S
Power Quality. Power factor.
216,2V
230V
253V
Measured value
0.998
0.996
0.997
Limit
>0.95
>0.95
>0.95
Measured at three voltage levels
and at full output. Voltage to be
maintained within ±1.5% of the
stated level during the test.
SolarRiver 2600TL-S
Power Quality. Power factor.
216.2V
230V
253V
Measured value
0.998
0.998
0.998
Limit
>0.95
>0.95
>0.95
Measured at three voltage levels
and at full output. Voltage to be
maintained within ±1.5% of the
stated level during the test.
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 6 of 9
Protection. Frequency tests
Function
Setting
Frequency
Trip test
Time
delay
Frequency
“No trip tests”
Time
delay
Frequency/Time
Confirm
no trip
U/F stage 1
47.5Hz
20s
47.50
20.10
47.7Hz/ 25s
No Trip
U/F stage 2
47Hz
0.5s
47.00
0.56
47.2Hz/ 19.98s
No Trip
46.8Hz/ 0.48s
No Trip
O/F stage 1
51.5Hz
90s
51.50
90.10
51.3Hz/ 95s
No Trip
O/F stage 2
52Hz
0.5s
52.00
0.504
51.8Hz/ 89.98s
No Trip
52.2Hz/0.48s
No Trip
Protection. Voltage tests
Function
Setting
Voltage Time delay
Trip test
Voltage
Time delay
“No trip tests”
Voltage /Time
Confirm no
trip
U/V stage 1
200.1 V
2.5s
199.0
2.51
204.1V/ 3.5s
No trip
U/V stage 2
184 V
0.5s
183.0
0.503
188V/ 2.48s
No trip
180V/ 0.48s
No trip
O/V stage 1
262.2 V
1.0s
261.5
1.01
258.2V/ 2.0s
No trip
O/V stage 2
273.7 V
0.5s
273.0
0.51
269.7V/ 0.98s
No trip
277.7V/ 0.48s
No trip
Note for Voltage tests the Voltage required to trip is the setting ±3.45V. The time delay can
be measured at a larger deviation than the minimum required to operate the protection.
The No trip tests need to be carried out at the setting ±4V and for the relevant times as
shown in the table above to ensure that the protection will not trip in error.
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 7 of 9
Protection. Loss of Mains test according BS EN 62116
Frequency : 50+/-0.1 Hz
UN = 230+/-3 Vac
Test conditions
Distortion factor of chokes < 2%
Quality = 1
Disconnection limit
0.5 s
No.
PEUT(%
of EUT
rating
Reactive
load (% of
QL in
6.1.d)
PAC (% of
nominal)
QAC (%
of
nominal)
Run on
Time
(ms)
PEUT
(W)
Qf
Remarks
1
100
100
0
0
287.5
2510
1.01
Test A at BL
4
100
100
-5
-5
276.5
2510
0.98
Test A at IB
5
100
100
-5
0
213.5
2510
1.03
Test A at IB
6
100
100
-5
+5
184
2510
1.03
Test A at IB
7
100
100
0
-5
267.5
2510
1.01
Test A at IB
8
100
100
0
+5
269
2510
0.98
Test A at IB
9
100
100
+5
-5
202
2510
0.98
Test A at IB
10
100
100
+5
0
280
2510
1.01
Test A at IB
11
100
100
+5
+5
216
2510
1.03
Test A at IB
12
66
66
0
-5
174.5
1650
0.98
Test B at IB
13
66
66
0
-4
283.5
1650
0.99
Test B at IB
14
66
66
0
-3
181
1650
1.00
Test B at IB
15
66
66
0
-2
160.5
1650
1.01
Test B at IB
16
66
66
0
-1
241
1660
1.01
Test B at IB
2
66
66
0
0
305.5
1650
1.02
Test B at BL
17
66
66
0
+1
285.5
1650
0.98
Test B at IB
18
66
66
0
+2
187
1650
0.96
Test B at IB
19
66
66
0
+3
466
1660
0.96
Test B at IB
20
66
66
0
+4
272.5
1650
0.95
Test B at IB
21
66
66
0
+5
274.5
1650
0.95
Test B at IB
22
33
33
0
-5
269
870
0.99
Test C at IB
23
33
33
0
-4
252
870
0.99
Test C at IB
24
33
33
0
-3
235.5
870
1.03
Test C at IB
25
33
33
0
-2
176.5
870
1.02
Test C at IB
26
33
33
0
-1
236.5
870
1.04
Test C at IB
3
33
33
0
0
484
870
1.05
Test C at BL
27
33
33
0
+1
107.6
870
0.99
Test C at IB
28
33
33
0
+2
99
870
0.98
Test C at IB
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 8 of 9
29
33
33
0
+3
82
870
0.96
Test C at IB
30
33
33
0
+4
55.5
870
0.95
Test C at IB
31
33
33
0
+5
68
870
0.90
Test C at IB
Protection. Frequency change, Stability test
Start Frequency
Change
End
Frequency
Confirm no trip
Positive Vector Shift
49.5Hz
+9 degrees
No trip
Negative Vector Shift
50.5Hz
-9 degrees
No trip
Positive Frequency Drift
49.5Hz
+0.19Hz/sec
51.5Hz
No trip
Negative Frequency Drift
50.5Hz
-0.19Hz/sec
47.5Hz
No trip
Protection. Re-connection timer.
Test should prove that the reconnection sequence starts after a minimum delay of 20
seconds for restoration of voltage and frequency to within the stage 1 settings of table 1.
Time delay Measured
setting
delay
30s
33s
Checks on no reconnection when voltage or frequency is
brought to just outside stage 1 limits of table 1.
At 266.2V
Confirmation that the
No re-connect
SSEG does not re-connect.
At 196.1V
At 47.4Hz
At 51.6Hz
No re-connect
No re-connect
No re-connect
ENGINEERING RECOMMENDATION G83/2
CERTIFICATE & SAFETY – R&D
TR 10004
Page 9 of 9
Fault level contribution.
SolarRiver 2600TL-S
For a directly coupled SSEG
Parameter
For a Inverter SSEG
Symbol
Value
ip
--
A
Initial
symmetrical
short-circuit current*
Time After
Fault
Volts
Amps
20ms
36.25
0.655
--
100ms
36.25
0.635
Ik
--
250ms
32.50
0.610
Decaying (aperiodic)
component of short
circuit current*
iDC
--
500ms
26.25
0.580
Reactance/Resistance
Ratio of source*
X/R
--
Time to trip
0.018
In seconds
Peak Short
Current
Circuit
Initial
Value
aperiodic current
of
-
End of Document
-
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement