Assembly & Operating Instructions

READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

This manual provides important information on proper operation and maintenance. Every effort has been made to ensure the accuracy of this manual. We reserve the right to change this product at any time without prior notice.

STOP!

DO NOT RETURN THIS PRODUCT TO THE RETAILER.

Questions? Problems? CONTACT BUFFALO TOOLS.

If you experience a problem or need parts for this product, visit our website http://www.buffalotools.com

or call our customer help line at 1-800-568-6657, Monday-Friday, 8 AM - 4 PM Central Time. A copy of the sales receipt is required.

Aluminum Multi-Use Scaffold Interior or Exterior GSAL6 Assembly & Operating Instructions

WARNING: Improper erection, dismantling or use of Multi-Use Scaffold may result in serious injury or death! Erectors, dismantlers, and users of Multi-Use Scaffold must read and fully understand these

Safety Rules and Instructions.

MAXIMUM LOAD CAPACITY: 750 lbs (Workers & Materials)

WARNING: DO NOT OVERLOAD SCAFFOLD! IT MAY RESULT IN SERIOUS INJURY!

SPECIFICATIONS

Total

Length

Total

Width

Total Height

74 in 29.5 in 75 in

ASSEMBLY INSTRUCTION

Highest

Upright

75 in

Total

Weight

103 LB

Total

Thickness

.135 in

For proper assembly, the Multi-Use Scaffold must be comprised of 13 individual parts. (See Figure A)

A Frame 2

C Platform 1

D Caster 4

2

Figure A

GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions

STEP 1

Attach side brace B to two frames A:

• Pull L-shape lock pin at each end of side brace to the disengaged position.

(See Figure B)

• While holding L-shape pin in disengaged position, place U-channel on each end of side brace B around leg of frame A at desired platform height.

• Release lock pin and be sure that pin fully engages into hole in frame A leg.

Pin Is Disengaged (Unlocked Position)

Pin Is Fully Engaged (Locked Position)

Figure B

STEP 2

Attach second side brace B to both frames A (REPEAT INSTRUCTIONS IN STEP 1).

WARNING:

BOTH SIDE BRACES MUST BE POSITIONED AT THE SAME HEIGHT ON THE FRAMES

SO THAT THE PLATFORM WILL BE LEVEL.

BE SURE ALL 4 L-SHAPE LOCK PINS ARE FULLY ENGAGED IN HOLES OF FRAMES.

REMOVE THE PLATFORM BEFORE ADJUSTING THE DECK LEVEL.

STEP 3

Install platform C on side braces B so that platform is fully seated within inner channel on top of side braces.

STEP 4

Rotate the platform clips into the engaged position. (See Figure C)

Figure C

STEP 5

Install 4 casters D into legs of frames A and pin with lock pins E.

GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions 3

WARNING:

RECHECK ALL SIDE BRACE LOCK PINS FOR FULL ENGAGEMENT BEFORE

ACCESSING PLATFORM.

RECHECK PLATFORM TO BE SURE IT IS PROPERLY SEATED WITHIN SIDE BRACE

CHANNEL AND THE PLATFORM CLIPS ARE FULLY ENGAGED BEFORE ACCESSING.

WHEN ACCESSING PLATFORM, CLIMB OVER TOP OF FRAME LADDER – DO NOT

SWING AROUND SIDE OF FRAME.

REMOVE THE PLATFORM BEFORE ADJUSTING THE DECK LEVEL.

TYPICAL APPLICATIONS INCLUDE:

• Painting

• Acoustical/Ceilings

• Drywall installation & taping

• Overhead Door Installation

• Lighting and wire Maintenance & Electrical

• General Building Maintenance

• Window Cleaning & Treatment Installation • HVAC Installation

• Sign Installation and Maintenance • Shelving

DISMANTLING NOTES

The work of dismantling scaffolding should be under the supervision of an individual with proper experience and aptitude. The following should be observed while dismantling:

1. It shall be the responsibility of the user to read and comply with the following common sense guidelines that are designed to promote safety in the dismantling of scaffolding.

2. Check to see if scaffold has been structurally altered in any way that would make it unsafe; and, if so, reconstruct where necessary before commencing with the dismantling procedures.

3. Dismantle scaffold from the top down. Begin by removing all accessories from that section being dismantled at the time.

4. On stacked scaffolds do not remove ties and braces until dismantling has reached the section to which they are attached.

5. Always work within the inside of the scaffolding.

6. When moving up or down the scaffold do NOT climb on ties, braces or un-braced components.

Climb over the top of the frame. Do not swing around outside of the frame.

7. Be sure that area below is clear of individuals not involved in the dismantling and is secured against unauthorized access.

8. Lower scaffold components in a safe manner as they are dismantled. Avoid dropping or throwing the components as this could result in injury or damage to the equipment.

9. Use energy absorbing lanyards and full body harness when feasible

4 GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions

SCAFFOLDING SAFETY RULES

SERIOUS INJURY OR DEATH MAY RESULT FROM IMPROPER ERECTION OR USE of scaffolding equipment. Erectors and users must be familiar with and follow safe practice and the

Safety Rules contained herein. These Safety Rules cover generalized situations only and should not be used to replace any other additional safety and precautionary measures that may be necessary to cover the many usual or unusual conditions encountered during installation or dismantling. The

Rules are not intended to conflict with, or supersede the requirements of OSHA or any other governmental regulations, codes and ordinances; the user must refer to and comply with all such specific provisions of law.

A. FOLLOW SAFE PRACTICE OF THE SAFETY RULES AND COMPLY WITH OSHA and all other federal, state and local regulations, codes and ordinances pertaining to scaffolding during any use of the equipment.

B. THE POTENTIALLY HAZARDOUS NATURE OF SCAFFOLDING ERECTION WORK makes it important that all personnel assigned to this work be instructed in these Safety Rules, safe practices and procedures and be under the supervision of an experienced and knowledgeable person. Assure that these Safety Rules are posted and that all persons erecting and using the scaffold are aware of and follow them.

C. REPORT ANY UNSAFE CONDITIONS TO SUPERVISORS. Do not work or allow persons to work on scaffolds when sick or suffering from dizziness, unsteadiness or other physical symptoms which could affect their ability to work safely.

D. INSPECT ALL EQUIPMENT BEFORE USING. Never use any equipment which is damaged, defective or deteriorated in any way.

E. INSPECT ERECTED SCAFFOLD FREQUENTLY and be sure that they are maintained in safe condition, that scaffold connections have not become loose and that components have not been improperly released or removed.

F. MAINTAIN ALL EQUIPMENT IN GOOD REPAIR. Never use corroded or excessively rusted equipment; the strength of such equipment is not known.

G. CONSULT YOUR SCAFFOLDING SUPPLIER WHEN IN DOUBT. NEVER TAKE CHANCES.

H. ALWAYS READ THESE SAFETY RULES in conjunction with the safety packet.

I. ALWAYS SUPPORT SCAFFOLDS FROM A SOUND, STABLE SURFACE and assure that it is adequate to support the intended scaffold loads. Never support scaffolds on unstable, loose objects which could tip, break or become dislodged.

J. LIFT AND LOWER COMPONENTS CAREFULLY AND SAFELY; use tag lines when appropriate to the handling method. Never allow excessive quantities of components to be stockpiled on partially complete scaffolds. Stock only sufficient components consistent with the progress of the work. Lower dismantled components as soon as possible. Never drop components deliberately.

GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions 5

K. TIEING THE SCAFFOLD TO THE STRUCTURE IS OF GREAT IMPORTANCE to the stability and safety of the scaffold. Assure that the structure to which the scaffold is tied or anchored is capable of safely supporting all loads imposed by the scaffold.

L. FREE STANDING SCAFFOLDS other than wall scaffolds must be restrained from tipping by guying or other means, recognizing that stability is essential to the safety of the scaffold.

M. INSTALL GUARDRAILS, MIDRAILS, AND TOEBOARDS at all openings, open sides and ends of every work platform when recommended or required.

N. NEVER USE LADDERS OR MAKESHIFT DEVICES on top of scaffold to increase the height.

Never place plank on or stand on guardrails and mid-rails.

O. POWER LINES NEAR SCAFFOLDS ARE DANGEROUS. Use extreme caution and consult the power service company to have the lines de-energized, insulated or otherwise rendered safe.

Never allow any installation or use of scaffolds until this is done.

P. WHEN ANY CANTILEVERS ARE USED, such as brackets, etc., proper care and precautions must be taken to prevent tipping of the scaffold.

Q. FOR ROLLING SCAFFOLDS, FOLLOW THESE ADDITIONAL SAFETY RULES: a. Never ride rolling scaffolds. b. Remove all material and equipment from the scaffold before moving. c. Lock caster brakes at all times the scaffold is not being moved. d. Do not attempt to move rolling scaffolds without sufficient help and roll on level surfaces only.

Watch out for holes or floor obstructions and for overhead obstructions, including power lines, energized craneways, and other hazards. e. The maximum platform height of a rolling scaffold must not exceed four (4) times the narrowest dimension. Check local state/OSHA Regulations for other height/base limitations such as 3:1 in CA,

OH, OR, MT and ME; 3.5:1 in WA. Comply with these regulations by appropriately widening and /or lengthening the scaffold at the lower levels so that the above proportions are not exceeded. If the base dimensions cannot be increased, extreme care must be taken to secure the scaffold from tipping; it must be guyed, or tied to a solid structure and maintained in a stabilized condition at all times so that it cannot tip over while supporting persons, while being moved or while being erected or dismantled. f. Apply pulling or pushing forces at the bottom frames and as close to the scaffold base as possible.

Never attempt to move scaffold from on top. g. If rolling scaffolds are used outdoors, care must be taken to assure that they cannot become unstable due to wind or other conditions.

R. DO NOT OVERLOAD SCAFFOLD. Refer to and do not exceed the scaffold load capacities.

6 GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions

Contact your retailer to purchase these components & create your own Multi-Use Scaffold Tower

(All Items Sold Separately)

(A) 1-Piece Guard Rail System Set

(Item No. GSGRS/GSGRAL)

For interior or exterior use. Includes hinged doors, steel frame, durable powder coat paint finish.

Assembled size: 69 inch L x 39 inch H x 29 inch W

(B) 2-Pieces 6 Foot Multi-Use Scaffold Unit

(Item No. GSSI/GSAL6)

(C) 4-Pieces 18 inch Outrigger

(Item No. GSORIG)

For interior or exterior use. Steel frame, powder coat paint finish. Extends the width of the base so that units can be stacked.

(Requires four 5 inch casters from first scaffold unit, and four 5 inch casters from second scaffold unit for a total of eight casters.)

GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions

Multi-Use Scaffold Tower

7

071201

8 GSAL6 Aluminum Multi-Use Scaffolding Assembly & Operating Instructions

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals