INSTALLATION

INSTALLATION MUST CONFORM TO LOCAL CODES

1. WITH HYDRONIC BOILERS

All ERGOMAX

7

units must be installed vertically. Adjustable feet for levelling are provided.

PRESSURE RELIEF VALVE: Set at 30 psi.

DOMESTIC WATER CONNECTIONS (copper): See tank labels. Cold - in at bottom. Hot - out at top.

TIP: Look into pipe and you will see several small diameter pipes inside.

BOILER WATER CONNECTIONS (steel pipes): See tank labels. Supply - in at top. Return - out at bottom.

SPACE HEATING CONNECTIONS: All E23, E44 and E45 are now made with two extra connections to the boiler water in the tank

(for a total of four).

See the attached piping schematic and dip tube specifications.

AQUASTAT: Controls water temperature and activates the circulator. Dial shows both Farenheit and

Centigrade calibrations representing the operating range from 50 o

to 190 o

F (10 o

-83 o

C). Set the dial to the desired output temperature. (Reference mark is at 12 o'clock.) The aquastat can use 110v or 24v.

Electrical wires are behind the front cover plate. WARNING: WATER ABOVE 120 o

F CAN CAUSE

SERIOUS INJURY. The installation of a mixing or tempering valve is recommended. See

INSTALLING AN ANTI-SCALD valve.

CIRCULATOR: Between boiler & ERGOMAX unit -- calculate circulator flow based on a 20 o

to 30 o

F boiler differential. Refer to manual or call GTI for ERGOMAX tank pressure drop.

PRIORITY SWITCH: If one is used, domestic hot water production will have priority over a call for heat. In installations with above average hot water demand, this will increase the amount of hot water available. It can also be used in conjunction with a mixing or tempering valve to further increase the amount of hot water output. NOTE: Installation per Schematic A will provide maximum boiler power for heating

domestic water without using a priority switch. However, a mixing valve MUST be installed.

BACKFLOW PREVENTER: Some codes require installation of a backflow preventer. In such instances it should be installed in the cold water (domestic) supply line. A system containing a backflow preventer is considered a closed system and a pressure relief valve may have to be installed.

System should be filled with water and air evacuated before starting the boiler. Check that an air vent, expansion tank, gauges, valves, etc., are installed and fully seated to avoid potential leaks. ERGOMAX tank(s) can be filled with water using the boiler makeup water valve or via the drain. Open the pressure relief valve to let the air escape during filling. If the two connections for space heating will not be used, water should come up to the top of these pipes before caping them off (this will ensure that no air is trapped in the connections). All hot water pipes should be insulated to prevent heat loss.

ANTI-SCALD valve: Mandatory in the COMMONWEALTH OF MASSACHUSETTS.

COMMONWEALTH OF PENNSYLVANIA: See NOTE.

SAMPLE SCHEMATICS

Typical residential installations:

A -- ERGOMAX units installed in series within a heating loop.

B -- ERGOMAX units installed as a heating zone.

Examples of commercial installations:

C -- two ERGOMAX units used in a high volume/dual temperature application.

D -- ERGOMAX units installed as a heating zone with a storage tank.

IMPORTANT: These are general installation instructions. ERGOMAX units can be installed in other ways. For installation assistance, contact GROUP THERMO INCORPORATED.

2. WITH LOW PRESSURE STEAM BOILERS

The general installation process is similar to above but some specifics related to low pressure steam boilers must be taken into account. Please refer to STEAM INSTALLATIONS and the accompanying schematic.

INSTAL0612

STEAM INSTALLATIONS

General: Boiler water in the piping and ERGOMAX unit may be at a higher level than the water level in the steam boiler. It will not flow back into the boiler if all air is eliminated from the entire boiler/ERGOMAX unit loop.

ERGOMAX units can be installed with low pressure steam boilers by using the water below the steam as boiler water supply for ERGOMAX units. However, some precautions must be taken:

1. There should be no air vents on the system. An expansion tank is not needed.

2. ERGOMAX units must be isolated from the boiler with ball valves to fill it with water.

3. A ball valve should be placed on the boiler supply pipe to let the air out of the ERGOMAX tank during the fill process. (See following schematic.) Note: the pressure relief valve could also be used for this purpose.

However, the seating must be perfect, else air will get into the system.

4. The offtake for boiler water supply must be well below the water line in the boiler (at least 9 inches). If it is too close to the water level, the circulator may suck air or steam with the boiler water when it starts up. This air could accumulate in the ERGOMAX tank, reducing performance and causing the tank to rust and eventually to fail. An indication that this is occurring is the water level in the sight glass bobing up and down when the circulator is running. To eliminate this problem, the offtake should be moved further below the water line in the boiler. If this is not possible, one of the ball valves (preferably downstream of the circulator for the

ERGOMAX unit zone) should be shut down somewhat to minimize the movement of water in the sight glass.

Be careful not to close the ball valve too much as this will restrict the flow of boiler water to the ERGOMAX tank, lowering its performance.

5. Sludge. Sludge tends to accumulate in steam boilers over time. (Add conditioner annually to control acidity and sludge formation.) This sludge may also be pumped into ERGOMAX unit via the circulator and accumulate at the bottom of the ERGOMAX tank. To prevent sludge accumulation in the ERGOMAX unit : a) the boiler should be flushed before ERGOMAX unit is installed and at the beginning of each heating season; and b) a strainer/filter must be installed on the boiler water supply to ERGOMAX unit and cleaned at regular intervals. (See following schematic.) Accumulation of sludge in ERGOMAX unit will cause the ERGOMAX tank to fail. The warranty does not cover failure due to sludge accumulation. Check for any sludge accumulation at regular intervals by opening the tank drain on ERGOMAX unit. If sludge is present, flush the boiler and

ERGOMAX tank and make sure the strainer is clean.

NOTE: Be very careful when draining the tank as this water is very hot. Isolate ERGOMAX unit from the boiler by closing the ball valves, refill with water and evacuate all air.

6. Water in steam boilers tends to become acidic. Boiler water conditioner should be added to the boiler water annually to keep acidity within the normal Environmental Protection Agency (EPA) recommended range of between pH 6.5 - 8.5. If this is not done, the warranty will be voided.

7. An anti-scald valve is mandatory in the COMMONWEALTH OF MASSACHUSETTS.

INSTALLING AN ANTI-SCALD VALVE

We recommend that anti-scald valves (conforming to ASSE 1017) be installed as part of all domestic hot water installations for two reasons:

1. to maximize boiler operating efficiency. To obtain the greatest benefit from a boiler/ERGOMAX unit combination (particularly a low mass boiler) the boiler should operate at maximum efficiency. This happens when a boiler does not short cycle. Such an operating environment can be established by maximizing

ERGOMAX unit's thermal storage capacity, e.g., operating ERGOMAX unit at a relatively high temperature and using an anti-scald valve to keep the domestic water temperature within the normal use range.

2. ERGOMAX units can produce very high temperature water which could pose a scalding danger.

Installing an anti-scald valve will prevent this from happening.

To maximize protection from possible scalding, many local plumbing codes require anti-scald valves be installed on all water heaters. Get into the habit of opening the cold water faucet first and then the hot

water one.

NOTE

In the Commonwealth of Pennsylvania ERGOMAX heat exchangers, when the heat input per ERGOMAX is greater than 200,000 btu/hr, do not require code construction when relieved by an ASME 15 psi safety relief valve. When such a valve is installed one must make sure that the expansion tank is adequate to handle the extra volume of boiler water in the ERGOMAX tank, else the relief valve will Ablow off@ from time to time. When such a valve is installed it is recommended that the circulator be installed on the boiler return between

ERGOMAX and the boiler.

INSTAL0612

TROUBLE-SHOOTING CHECK LIST

PROBLEM PROBABLE CAUSE SOLUTION

No hot water Boiler does not operate - Press reset button

- Check fuse

- Check main cut off switch

Circulator does not operate - Check power supply

Zone valve does not open - Check power supply

Improper setting on aquastat - Turn aquastat to a higher temperature

Electrical problem - Check relay, fuse and replace

- Reset circuit breaker (if applicable)

- Check power supply

- Check all wiring

Inoperative aquastat - Set aquastat to higher temperature and see if circulator starts to

operate. Replace aquastat if needed

Air trapped in ERGOMAX tank - Open safety valve on top of ERGOMAX to let air out

Not enough hot water Aquastat set too low - Turn aquastat to a higher setting & install mix valve

Demand greater than boiler output - Check sizing calculation

Defective aquastat - Replace

Insufficient boiler output (Btu) - Reduce hot water flow rate. Install priority switch. Install mix valve

with no priority for DHW

Air trapped in ERGOMAX tank - Open pressure relief valve on top of ERGOMAX to let air out

Water temperature Aquastat set too low - Set aquastat to higher temperature

starts to drop Boiler undersized, no priority for DHW - Install priority switch

Demand for hot water greater - Check boiler/ERGOMAX sizing calculations

than boiler Btu output - Reduce hot water flow rate, check boiler/ERGOMAX sizing calcs.

Water pressure is very high - Install pressure reducing valve. Set to 60-65 psi.

Water temperature Aquastat set too high - Set aquastat to lower temperature

too hot - Install and set mix valve to lower temperature

- Check aquastat operation. (As aquastat is set to lower temperature, circulator should stop.)

Check mix valve - Clean mix valve

Improper plumbing - Check plumbing against installation instructions

Improper system wiring - Check wiring

Sound of rushing water Air in piping and/or tank - Open safety valve to let air out. Install air vent on last elbow in

when circulator starts piping leading into the tank

Gurgling sounds Air in tank - Open safety valve to let air out.. Install air vent on last elbow in

in ERGOMAX piping leading into tank

Coils making a noise Air in tank - Open safety valve to let air out

Surges of hot/cold Shower fixture problem - Check pressure balancing valve operation

water in shower

Pressure relief valve Pressure on boiler side too high - Lower boiler pressure

opens occasionally - Check pressure relief valve operation

- Check if expansion tank has failed

Pressure relief valve Pressure on boiler side too high - Could indicate coil failure. Call your plumber

discharges often

Boiler cycles too Boiler high limit set too low - Set high limit higher

often Electrical wiring - Check aquastat/boiler control wiring

Boiler control - Check boiler control operation

Aquastat - Check aquastat operation

Tank leak Determine location - Check tank drain for leak

- Call your plumber to determine location (aquastat well not tight,

safety valve leaking, temp/pressure gauge not tight, tank leak)

ERGOMAX

®

Heat Exchangers

Suggested Piping Schematic

--------------------------------------------

All ERGOMAX models E23, E44 and E45 are now produced with two extra connections to the tank (for a total of four, see Dip Tube Specifications below). This improvement allows boiler

water in the ERGOMAX tank to be used not only to heat domestic water, but also for space

heating, both radiant and baseboard/radiators, and to buffer boilers, eliminating short cycling and saving fuel. ERGOMAX installation below, primarily for residential applications, shows the suggested piping.

Please note that the dip tube is now built into the E23 models and the double threaded bushing

is no longer needed for that model.

The double threaded bushing is still needed for the E24, E44 & E45.

Install-General 5/08

DIP TUBE

Specifications for Space Heating Return

-------------------------------------------------------------------

Note: Dip Tube & Double Threaded Bushing are

NOT SUPPLIED with ERGOMAX Heat Exchangers

Dip-Tube-Specs 5/08

TO REPLACE THE ERGOMAX

7

AQUASTAT

Switch off the boiler and electrical power to the aquastat. Isolate ERGOMAX from boiler by closing boiler side valves and undo the electrical connections to the aquastat.

If the ERGOMAX jacket is square:

1. Remove cover plate. The aquastat is in a well, and there is no need to drain the tank. Carefully loosen the small capillary lock nut and unscrew it. Next unscrew the plug from the well. Remove the bulb from the well.

2. Pull the aquastat control knob from the spindle and remove the aquastat control box by unscrewing the two small screws. Remove aquastat.

3. Insert the new bulb into the well. Note: make sure that the bulb can go all the way into the well. The end of the bulb must touch the end of the well to ensure good contact.(If the capillary is coated with plastic, carefully remove enough plastic to make sure that the bulb will go all the way into the well.) Screw the plug into to well.

Tighten the capillary lock nut in the plug only slightly, (hand tight) else the capillary may by pinched and cause the aquastat to malfunction .. (The lock nut only needs to hold the capillary in place since the well is a dry well.)

4. Install the electrical wires on the control box contacts, install the control on the panel (be careful not to kink/damage the capillary), reinstall the cover onto the front panel and reconnect the aquastat electrical wires.

Replace the temperature control knob.

5. Open the ball valves, set temperature on ERGOMAX. System is ready for operation.

If the ERGOMAX jacket is round:

1. The tank must be drained. Connect a hose to the drain valve at the bottom of ERGOMAX . Drain the tank by opening the drain valve and open the pressure relief valve on top of the tank to let air in. The other end of the hose should be placed into a drain. Be very careful - the water from the tank will be very hot.

2. Unscrew the compression fitting through which the capillary enters the tank and carefully pry out the washers/rubber gasket (to be reused). Pull the bulb out.

3. Pull the aquastat control knob from the spindle and remove the aquastat control box by unscrewing the two small screws. Remove aquastat.

4. Install the new aquastat by putting the bulb through the flange well into the tank. Reinstall the washers and gasket and screw in the plug. Do not over tighten as it will pinch the capillary and cause the aquastat to malfunction.

5. Install the control box (be careful not to kink/damage the capillary) and reconnect the aquastat electrical wires.

6. Close the drain and refill ERGOMAX tank with water by opening the ball valves. This will fill ERGOMAX with fresh water via the boiler make up water valve. Make sure the pressure relief valve is open to let the air out.

When the tank is full, water will start to flow through the pressure relief valve. Close the relief valve. Make sure there is no leak at the aquastat fitting. Reinstall the front cover. Switch on the electric power to the aquastat and set aquastat to desired temperature. The aquastat should call for heat and the boiler should fire.

Note: Water above 120 o

F may cause scalding and severe burns. We strongly recommend that a mix or a tempering valve be installed on the hot water output pipe.

LIMITED LIFETIME WARRANTY

In residential service the Manufacturer warrants to the original retail Purchaser that the tank and coil assembly shall be free of leaks for as long as the original Purchaser owns the home in which ERGOMAX is installed, provided that: a) the acidity of the water is within the normal Environmental Protection Agency (EPA) recommended range of between pH 6.5 - 8.5; b) the domestic water does not contain abnormal levels of particulate matter; and c) water hardness does not exceed 10.5 gpg. Residential service shall mean use in dwellings with no more than two apartments. Warranty will also be voided when installed with low pressure steam boilers if sludge is allowed to accumulate in ERGOMAX tank and boiler water acidity is outside the levels indicated above.

In commercial service the Manufacturer warrants the tank and copper coil assembly for ten (10) years, the first five (5) years in full and years six (6) through ten (10) prorated 20% each year at the prevailing retail price, provided water and sludge prevention conditions defined above are met. Commercial service shall mean use in other than residential service.

In the event of tank leakage due to defective material or workmanship, such leak having been verified by an authorized company representative, Manufacturer will repair or replace the failed unit with a comparable ERGOMAX unit available at the time of replacem ent at no cost to the original retail Purchaser, except as set forth in this Warranty. The repaired or replacement unit may have changes in design, material or construction which in the judgement of Manufacturer constitute an improvement of former practice. The original Purchaser is responsible for all costs associated with the removal and reinstallation, shipping and handling to and from Manufacturer. The replacement unit will be warranted for the remaining portion of the original Warranty.

Component Parts W arranty

Controls are warranted by the respective original equipm ent manufacturer for a period of one (1) year.

Exclusions And Limitations

This Warranty shall apply only if:

1. ERGOMAX is installed according to the installation instructions provided with the unit.

2. Any failure or malfunction does not result from improper or negligent operation, accident, abuse (including freezing), misuse, unauthorized alteration or improper repair or maintenance.

3. The unit is used in the United States.

4. The consumer presents a copy of the original sales receipt at the time claim is filed. (For first occupant of a new home, the date of closing will be deemed the date of purchase.)

5. This Warranty shall be void if the manufacturer's tag has been tampered with or removed from the ERGOMAX without written permission from GROUP THERMO Inc.

Transferability of Warranty - Residential Use Only

The original residential Purchaser has the option to transfer the balance of this W arranty to the new purchaser of the home in which the ERGOMAX unit is installed by completing the coupon below and sending it with payment of $75 plus applicable state taxes to

GROUP THERMO Inc.., within ten (10) years of the original purchase date.

M anufacturer shall not be liable for incidental or consequential damages. Some states do not allow the exclusion or limitation of consequential damages, so the above limitation or exclusion m ay not apply to you. You should be aware that you may have other rights that vary from state to state.

To receive the full benefit of this Warranty the original retail purchaser must fill in and return the enclosed Registration Card to

GROUP THERMO Inc. within thirty (30) days of date of purchase.

------------------------------------------ Tear off at this line and send with your paym ent -----------------------------------------

Warranty Transfer Request

_____________________________________________________ _____________________________________

________________ I wish to transfer the Warranty. My check for the total amount is attached.

Signed ____________________ Print _______________________ Warranty Transfer Fee $ 75.00

New Owner ____________________________________________ Applicable sales tax

Date ------------

Total Amount $

ERGOMAX Serial # _______

Mail coupon and payment to: GROUP THERMO Inc.

PO Box 555, So. Plainfield, NJ 07080

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement