Set Zero Menu
Only use the Set Zero function when the unit no longer displays zero. See Periodic Inspection and Maintenance.
This option allows users to set the sensor Zero. In the main Set Zero screen, press enter to begin. If there is a remote sensor
connected, you must scroll to select Z1 (built-in sensor) or Z2 (remote sensor).
* Menu*
Set Zero
Set Zero
Z1

Before starting the calibration, connect the regulator to the appropriate cylinder (nitrogen for all sensors except combustible,
which uses air).

Adjust the flow rate to the indicated rate.

Connect the tubing from the regulator to the sensor calibration cap as shown in Figure 10.

Let the gas flow for at least 3 minutes before starting calibration.

The next screen requests confirmation. Use the arrow keys to display Yes and press enter to confirm.
Set Zero
Yes
A confirmation screen briefly displays and the zero calibration begins.
A success or failure message displays and the screen returns to the main menu option.
Figure 10. Calibration Installation
Page 1 of 4
CALIBRATION PROCEDURE E³Point
PROCÉDURE D’ÉTALONNAGE E³Point
Set Span Menu
WARNING: If the calibration gas concentration exceeds alarm setpoints, alarms will be triggered. Either change alarm
levels so the alarms are not triggered, or put the entire system in service mode so no external equipment (lights, fans,
ventilators, buzzers) will be activated.
Only use the Set Span function when inspection or calibration maintenance indicate that it is necessary. See
Periodic Inspection and Maintenance.
This option allows users to calibrate the sensor’s span. In the main Set Span screen, press enter to begin. If there is a remote
sensor connected, you must scroll to select Z1 (built-in sensor) or Z2 (remote sensor).
* Menu*
Set Span
Set Span
Z1
•
Before starting calibration, connect the regulator to the gas cylinder.
•
Adjust the flow rate to 0.5 L/min.
•
Connect the tubing from the regulator to the sensor calibration cap. See Figure 10.
•
Let the gas flow for at least 3 minutes before starting the calibration.
If the gas is not allowed to flow for at least 3 minutes, it will affect the calibration accuracy.
The next screen allows you to specify the span calibration gas concentration value.
Set Gas
200 ppm
Set Span
Yes
•
Use the arrow keys to increase or decrease the value and press enter to select.
•
The next screen requests confirmation.
•
Press enter to confirm and the screen displays the concentration during calibration.
Set Span
198 ppm
A success or failure message displays and the screen returns to the main menu option.
Page 2 of 4
CALIBRATION PROCEDURE E³Point
PROCÉDURE D’ÉTALONNAGE E³Point
Menu Cal Zero
Seulement utiliser la fonction Cal Zero lorsque l’unité n’affiche plus zéro.
Voir la section Inspection et entretien régulier.
Cette option permet d’ajuster le zéro de la sonde. Appuyer sur la touche entrée depuis l’écran Cal Zero pour accéder au menu : si
une sonde à distance est connectée, il est nécessaire de sélectionner Z1 (sonde intégrée) ou Z2 (sonde à distance).
*Menu*
Cal Zero
Cal Zero
Z1
•
Connecter le régulateur au cylindre approprié avant de commencer l’ajustement.
•
Ajuster le débit selon les indications.
•
Connecter le tuyau du régulateur au port d’étalonnage de l’unité. Voir l’illustration 10.
•
Ouvrir le régulateur puis laisser le gaz circuler pendant 3 minutes avant de démarrer l’ajustement.
•
L’écran suivant demande une confirmation; utiliser les touches de flèches pour afficher Oui puis appuyer sur la touche
entrée pour confirmer.
Cal Zero
Qui
Un écran de confirmation est affiché brièvement, puis l’ajustement démarre.
Un message de succès ou d’échec est affiché puis l’écran retourne au menu principal.
Illustration 10. Étalonnage
Page 3 of 4
CALIBRATION PROCEDURE E³Point
PROCÉDURE D’ÉTALONNAGE E³Point
Menu Etalon.
ATTENTION. Si la concentration du gaz d’étalonnage excède les points de consigne d’alarme, des alarmes seront
déclenchées. Soit changer les niveaux d’alarmes pour assurer qu’aucune alarme n’est déclenchée ou mettre le
système entier en mode Service pour éviter d’activer des équipements externes (lumières, ventilateurs,
avertisseurs).
Seulement utiliser l’option Etalon. (étalonnage) lorsque l’inspection ou l’entretien d’étalonnage l’indique.
Voir la section Inspection et entretien régulier.
Cette option permet d’étalonner le gain de la sonde. Appuyer sur la touche entrée depuis l’écran Etalon. pour accéder au menu
: si une sonde à distance est connectée, il est nécessaire de sélectionner Z1 (sonde intégrée) ou Z2 (sonde à distance).
*Menu*
Etalon
Etalon
Z1
•
Avant de démarrer l’étalonnage, connecter le régulateur au cylindre approprié avant de commencer l’ajustement.
•
Ajuster le débit à 0.5L/min.
•
Connecter le tuyau du régulateur au port d’étalonnage de l’unité (voir l’illustration 10).
•
Ouvrir le régulateur puis laisser le gaz circuler pendant 3 minutes avant de démarrer l’ajustement.
À défaut de laisser circuler le gaz pendant au moins 3 minutes, il y aura un impact sur l’exactitude de
l’étalonnage.
L’écran suivant permet de préciser la concentration du gaz d’étalonnage.
Etalon
200 ppm
•
Utiliser les touches de flèches pour augmenter ou diminuer la valeur puis appuyer sur la touche entrée pour sélectionner.
•
L’écran suivant demande une confirmation
Etalon
Qui
•
Appuyer sur la touche entrée pour confirmer.L’écran affiche la concentration au long de l’étalonnage.
Etalon
198 ppm
Un message de succès ou d’échec est affichée puis l’affichage retourne au menu principal.
Page 4 of 4
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
ST
IF YOUR TRANSMITTER WAS PURCHASE BEFORE APRIL 1ST 2004, CONTACT OUR TECHNICAL SUPPORT LINE AT 1-800-563-2967
CALIBRATION PROCEDURE
VA201T/M
1. WARM-UP PERIOD
Turn the unit on for a minimum of five (5) minutes when battery back-up sensor board is included.
Check Calibration Information table (Table I) for specific warm-up time.
2. CONNECTING THE HARDWARE
Plug the voltmeter probes in the unit and adjust it to read Vdc.
Plug the calibration adaptor into the gas sensor inlet.
Screw the regulator to the calibration span gas cylinder.
Connect the regulator outlet to the calibration adaptor with the 1/8 I.D. polymer tubing.
3. ADJUSTING THE ZERO (IF REQUIRED)
If you suspect the presence of the target gas, inject zero gas at the specified flow rate for a
minimum of 1 minute prior to adjusting the potentiometer.
Adjust the zero potentiometer to read -35 mV.
This must be achieved in a well ventilated area where there is no presence of the target gas.
CAUTION :
For all refrigerant detectors bought after April 25, 2005, do the following steps:
Adjust the zero potentiometer to read 10 mV.
Very slowly, adjust the zero potentiometer to read 0 mV. Be careful do not go under 0 mV because
the negative voltage won’t be displayed.
4. ADJUSTING THE SPAN
Turn on the regulator and inject span gas at the specified flow rate.
The span gas is now flowing into the unit.
After 2.5 minutes, the voltmeter readings should be stabilized.
Then adjust the span potentiometer to read the following value:
Span Gas Value x Factor x 2.5 = Calibration value (in VDC) (+/- 3 % of the scale)
Full scale
PAGE 1 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
TABLE I - CALIBRATION INFORMATION
Gas (Q1)
Sensor
VA201T
Scale
VA201M
Scale
Warm-up
Factor
Zero
Pot
Span
Pot
Flow
Rate
L/min
CL2
CO
SCL2-7CLH
SCO-4BW
15.3 ppm
0 - 255 ppm
15 ppm
0 - 250 ppm
5 min.
5 min.
-
-
2
2
0.5
0.5
Combustible
SCH4-VQ21TB
0 - 102%
0 - 100%
5 min.
Table II
3
2
0.5
ETO
SETO-7ETO
0 – 20.4 ppm
0 – 20ppm
5 min. *
-
3
2
1
H2
H2S
SH2-3HYE
SH2S-7HH
0 - 2.5 %
0 - 51 ppm
0 - 2.5 %
0 - 50 ppm
5 min.
5 min.
-
-
2
2
0.5
1
HCL
SHCL-7HL
0 - 51 ppm
0 - 50 ppm
5 min. *
-
3
2
1
HCN
NH3
SHCN-7HCN
SNH3-1000S
0 - 51 ppm
0 - 102 ppm
0 - 50 ppm
0 - 100 ppm
5 min.
1 hour
-
3
2
2
1
0.5
NO
SNO-7NT
0 - 102 ppm
0 - 100 ppm
5 min. *
-
3
2
1
NO2
SNO2-B1
0 – 10.2 ppm
0 – 10 ppm
5 min.
-
3
2
1
O2
SO2-4OX
0 – 25.5%
0 – 25%
5 min. **
-
-
2
0.5
0 – 10 ppm
0 - 35.7
ppm
5 min.
-
-
2
1
5 min.
-
-
2
0.5
Flow
Rate
L/min
SO2
SSO2-7SH
0 – 10.2 ppm
Smoke
SCO-7EF
0 - 35.7 ppm
Gas (Q2)
Sensor
VA201T
Scale
VA201M
Scale
Warm-up
Factor
Zero
Pot
Span
Pot
C3H8
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
2
1
CH4
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
2
1
0.04
0.04
CO
SCO-MONOXC
SQ2-FIG
0 - 255 ppm
0 - 250 ppm
5 min.
24 hours
-
2
2
1
0.5
0.04
H2
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
2
1
0.04
Refrigerant
SQ2-FREON
0 - 1020 ppm
0 - 1000
ppm
24 hours
1.2
2
1
0.04
Notes
1% Volume CH4 = 20% LEL
CH4.
* If the sensor don’t have a
backup circuit, 7 days of
Warm Up are required.
* If the sensor don’t have a
backup circuit, 7 days of
Warm Up are required.
* If the sensor don’t have a
backup circuit, 7 days of
Warm Up are required.
** If the sensor don’t have a
backup circuit, 24 hours of
Warm Up are required.
Notes
1% Volume CH4 = 20% LEL
CH4.
1% Volume H2 = 25% LEL
H2.
500 ml/min = 30 l/h on regulator
PAGE 2 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
TABLE II - CONVERSION FACTOR FOR COMBUSTIBLES (Q1)
Gas
Factor
Gas
Factor
Gas
Factor
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
Methane
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
1.000
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane (gasoline)
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
PAGE 3 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
CALIBRATION KIT
Standard Calibration Kit for VA201T / M Q1
Order Number
SKCOMBQ1
SKC3H8Q1
SKH2Q1
SKO2Q1
SKCOQ1
SKH2SQ1
SKHCLQ1
SKHCNQ1
SKCL2Q1
SKSO2Q1
SKNO2Q1
SKNOQ1
SKETOQ1
Standard Calibration Kit for VA201T / M Q2
Order Number
SKCOMBQ2
SKC3H8Q2
SKH2Q2
SKCOQ2MX
SKCOQ2
SKR11Q2
SKR12Q2
SKR22Q2
SKR125Q2
SKR134AQ2
LOW
LOW
LOW
LOW
LOW
PAGE 4 OF 8
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
Description
COST CAL KIT FOR VA201T/MQ1 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ1 PROPANE, 17L (C3H8 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ1 H2, 17L (H2 1% BAL AIR)
COST CAL KIT FOR VA201T/MQ1 O2, 17L (O2 20% BAL N2)
COST CAL KIT FOR VA201T/MQ1 CO, 17L (CO 200 ppm BAL N2)
Low Cost Calibration Kit for VA201T / M Q2
Order Number
LCCOMBQ2
LCC3H8Q2
LCH2Q2
LCCOQ2MX
LCCOQ2
LCR11Q2
LCR12Q2
LCR125Q2
LCR134AQ2
LCR22Q2
Description
STANDARD CAL KIT FOR VA201T / M Q2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 PROPANE, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 H2, 103L (H2 1% BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 CO MONOX, Electro chemical, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 CO, Solid State, 103L (CO 400 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R11, 103L (R11 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R12, 103L (R12 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R22, 103L (R22 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R125, 103L (R125 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R134A, 103L (R134A 500 ppm BAL N2)
Low Cost Calibration Kit for VA201T / M Q1
Order Number
LCCOMBQ1
LCC3H8Q1
LCH2Q1
LCO2Q1
LCCOQ1
Description
STANDARD CAL KIT FOR VA201T / M Q1 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 PROPANE, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 H2, 103L (H2 1% BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 O2, 103L (O2 20% BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 H2S, 58L (H2S 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 HCL, 58L (HCL 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 HCN, 58L HCN 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 CL2, 58L (CL2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 SO2, 58L (SO2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 NO2, 58L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 NO, 58L (NO 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 ETO, 58L (ETO 10 ppm BAL N2)
Description
COST CAL KIT FOR VA201T/MQ2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ2 PROPANE, 17L (C3H8 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ2 H2, 17L (H2 1% BAL AIR)
COST CAL KIT FOR VA201T/MQ2 CO MONOX, 17L (CO 200 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 CO, 17L (CO 400 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R11, 17L (R11 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R12, 17L (R12 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R125, 17L (R125 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R134A, 17L (R134A 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R22, 17L (R22 500 ppm BAL N2)
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
ER
SI VOTRE TRANSMETTEUR A ETE ACHETE AVANT LE 1ER AVRIL 2004, SVP CONTACTEZ NOTRE DEPARTEMENT DU SERVICE TECHNIQUE AU NUMERO
SUIVANT 1-800-563-2967
PROCÉDURE D’ÉTALONNAGE
VA201T/M
1. PERIODE DE RECHAUFFEMENT
Alimenter l’appareil, laisser la sonde chauffer pendant la période requise (Table III).
2. ÉTALONNAGE DU ZERO (SI REQUIS)
Ajuster votre multimètre pour lire des voltages DC
Ajuster le potentiomètre du zéro pour lire –35mV au multimètre. Cette étape doit être réalisée dans
un environnement libre de gaz ayant un facteur de sensibilité sur la sonde.
ATTENTION :
Pour tous les détecteurs de réfrigérant achetés après le 25 avril 2005, suivre les étapes suivantes :
Ajuster potentiomètre du zéro pour lire 10mV.
Très lentement, ajuster le potentiomètre du zéro à 0mV. Attention de ne pas descendre sous 0mV
car la tension négative ne s’affichera pas.
3. BRANCHER LES REGULATEURS
Ajuster votre multimètre pour lire des voltages DC
Brancher le régulateur de débit sur le cylindre de gaz et ajuster le régulateur au débit requis (Table
III).
Brancher l’adaptateur d’étalonnage dans le port de calibration du transmetteur
4. ÉTALONNAGE DU GAIN
Le gaz d’étalonnage est maintenant injecté dans la sonde.
Après 2 ½ min. la lecture au multimètre devrait être stabilisée.
Ajuster le potentiomètre de gain pour lire la valeur selon la formule suivante:
Gaz d’étalonnage x Facteur x 2.5 = Valeur d’étalonnage en VDC (+/- 3 % de l’échelle)
Échelle
PAGE 5 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
TABLE III - INFORMATION D’ÉTALONNAGE
Zéro
Pot.
Gain
Débit
L/min
-
-
2
2
0.5
0.5
5 min.
Table IV
3
2
0.5
0 – 20ppm
5 min.*
-
3
2
1
0 - 2.5 %
0 - 51 ppm
0 - 2.5 %
0 - 50 ppm
5 min.
5 min.
-
-
2
2
0.5
1
SHCL-7HL
0 - 51 ppm
0 - 50 ppm
5 min.*
-
3
2
1
HCN
NH3
SHCN-7HCN
SNH3-1000S
0 - 51 ppm
0 - 102 ppm
0 - 50 ppm
0 - 100 ppm
5 min.
1 hour
-
3
2
2
1
0.5
NO
SNO-7NT
0 - 102 ppm
0 - 100 ppm
5 min.*
-
3
2
1
NO2
SNO2-B1
0 – 10.2 ppm
0 – 10 ppm
5 min.
-
3
2
1
O2
SO2-4OX
0 – 25.5%
0 – 25%
5 min. **
-
-
2
0.5
SO2
SSO2-7SH
0 – 10.2 ppm
5 min.
-
-
2
1
Smoke
SCO-7EF
0 - 35.7 ppm
0 – 10 ppm
0 - 35.7
ppm
5 min.
-
-
2
0.5
Gas (Q2)
Sonde
VA201T
Échelle
VA201M
Échelle
Temps de
réchauffement
Facteur
Pot.
Pot.
Gain
Débit
L/min
C3H8
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
Zéro
2
1
CH4
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
2
1
0.04
0.04
CO
SCO-MONOXC
SQ2-FIG
0 - 255 ppm
0 - 250 ppm
5 min.
24 hours
-
2
2
1
0.5
0.04
H2
SQ2-COMB
0 - 102%
0 - 100%
15 min.
-
2
1
0.04
Refrigerant
SQ2-FREON
0 - 1020 ppm
0 - 1000
ppm
24 hours
1.2
2
1
0.04
Gas (Q1)
Sonde
VA201T
Échelle
VA201M
Échelle
Temps de
réchauffement
Facteur
CL2
CO
SCL2-7CLH
SCO-4BW
15.3 ppm
0 - 255 ppm
15 ppm
0 - 250 ppm
5 min.
5 min.
Combustible
SCH4-VQ21TB
0 - 102%
0 - 100%
ETO
SETO-7ETO
0 – 20.4 ppm
H2
H2S
SH2-3HYE
SH2S-7HH
HCL
Pot.
Notes
1% Volume CH4 = 20% LEL
CH4.
*Si la sonde est sans circuit
de maintient, 7 jours de
temps de réchauffement
*Si la sonde est sans circuit
de maintient, 7 jours de
temps de réchauffement
*Si la sonde est sans circuit
de maintient, 7 jours de
temps de réchauffement
**Si la sonde est sans circuit
de maintient, 24 heures de
temps de réchauffement
Notes
1% Volume CH4 = 20% LEL
CH4.
1% Volume H2 = 25% LEL
H2.
500 ml/min = 30 l/h sur le régulateur
PAGE 6 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
TABLE IV – FACTEUR DE CONVERSION POUR GAZ EXPLOSIF (Q1)
Gaz
Facteur
Gaz
Facteur
Gaz
Facteur
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
Methane
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
1.000
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane (gasoline)
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
PAGE 7 OF 8
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA201T/M
PROCÉDURE D’ÉTALONNAGE VA201T/M
KIT D’ÉTALONNAGE
Kit D’étalonnage Standard for VA201T / M Q1
Order Number
SKCOMBQ1
SKC3H8Q1
SKH2Q1
SKO2Q1
SKCOQ1
SKH2SQ1
SKHCLQ1
SKHCNQ1
SKCL2Q1
SKSO2Q1
SKNO2Q1
SKNOQ1
SKETOQ1
Kit D’étalonnage Standard for VA201T / M Q2
Order Number
SKCOMBQ2
SKC3H8Q2
SKH2Q2
SKCOQ2MX
SKCOQ2
SKR11Q2
SKR12Q2
SKR22Q2
SKR125Q2
SKR134AQ2
LOW
LOW
LOW
LOW
LOW
PAGE 8 OF 8
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
LOW
Description
COST CAL KIT FOR VA201T/MQ1 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ1 PROPANE, 17L (C3H8 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ1 H2, 17L (H2 1% BAL AIR)
COST CAL KIT FOR VA201T/MQ1 O2, 17L (O2 20% BAL N2)
COST CAL KIT FOR VA201T/MQ1 CO, 17L (CO 200 ppm BAL N2)
Kit D’étalonnage « Low Cost » for VA201T / M Q2
Order Number
LCCOMBQ2
LCC3H8Q2
LCH2Q2
LCCOQ2MX
LCCOQ2
LCR11Q2
LCR12Q2
LCR125Q2
LCR134AQ2
LCR22Q2
Description
STANDARD CAL KIT FOR VA201T / M Q2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 PROPANE, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 H2, 103L (H2 1% BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q2 CO MONOX, Electro chemical, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 CO, Solid State, 103L (CO 400 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R11, 103L (R11 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R12, 103L (R12 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R22, 103L (R22 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R125, 103L (R125 500 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q2 R134A, 103L (R134A 500 ppm BAL N2)
Kit D’étalonnage « Low Cost » for VA201T / M Q1
Order Number
LCCOMBQ1
LCC3H8Q1
LCH2Q1
LCO2Q1
LCCOQ1
Description
STANDARD CAL KIT FOR VA201T / M Q1 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 PROPANE, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 H2, 103L (H2 1% BAL AIR)
STANDARD CAL KIT FOR VA201T / M Q1 O2, 103L (O2 20% BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 H2S, 58L (H2S 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 HCL, 58L (HCL 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 HCN, 58L HCN 25 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 CL2, 58L (CL2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 SO2, 58L (SO2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 NO2, 58L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 NO, 58L (NO 5 ppm BAL N2)
STANDARD CAL KIT FOR VA201T / M Q1 ETO, 58L (ETO 10 ppm BAL N2)
Description
COST CAL KIT FOR VA201T/MQ2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ2 PROPANE, 17L (C3H8 20% LEL BAL AIR)
COST CAL KIT FOR VA201T/MQ2 H2, 17L (H2 1% BAL AIR)
COST CAL KIT FOR VA201T/MQ2 CO MONOX, 17L (CO 200 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 CO, 17L (CO 400 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R11, 17L (R11 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R12, 17L (R12 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R125, 17L (R125 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R134A, 17L (R134A 500 ppm BAL N2)
COST CAL KIT FOR VA201T/MQ2 R22, 17L (R22 500 ppm BAL N2)
© COPYRIGHT VULCAIN ALARME INC.
507759 VA201TM CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301M
PROCÉDURE D’ÉTALONNAGE VA301M
CALIBRATION PROCEDURE
VA301M
1. WARM-UP PERIOD
If the VA301M doesn’t have a display, remove the cover and plug in a cover with display in J3.
Turn the unit on for a minimum of five (5) minutes.
Check Calibration Information (Table I) for specific warm-up time.
2. CONNECTING THE HARDWARE
Screw the regulator to the appropriate calibration gas cylinder.
Adjust the regulator with the suitable flow rate (see Table I).
Plug the calibration adaptor onto the gas sensor inlet.
Connect the regulator outlet to the calibration adaptor as shown on Figure I.
3. ADJUSTING THE ZERO (IF REQUIRED)
This must be achieved in a well ventilated area where there is no presence of the target gas.
If you suspect the presence of the target gas in the area, inject zero gas at the specified flow rate
for a minimum of 2 minutes prior to doing a Set Zero.
Press the Enter key, and using the Scroll key enter the VA password.
Using the Scroll key select Zone 1 (built-in CO sensor) or Zone 2 (remote sensor) and press Enter.
Scroll to get the Set Zero menu.
Press Enter to start the zero calibration.
Wait will be displayed on the screen until calibration is completed.
Scroll until Back is displayed, press Enter.
Scroll until Quit is displayed, press Enter to exit.
4. ADJUSTING THE SPAN
Turn on the regulator and inject span gas at the specified flow rate.
The span gas is now flowing into the unit.
Wait 2 minutes before starting the Set Span calibration.
Press the Enter key, and using the Scroll key enter the VA password.
Using the Scroll key select Zone 1 (built-in CO sensor) or Zone 2 (remote sensor) and press Enter.
Scroll to get the Set Span menu and press Enter to go in.
Using the Scroll and Enter key, input the concentration of span gas that’s going to be used.
Wait will be displayed on the screen until calibration is completed.
Scroll until Back is displayed, press Enter.
Scroll until Quit is displayed, press Enter to exit.
PAGE 1 OF 4
© COPYRIGHT VULCAIN ALARME INC.
508756 CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301M
PROCÉDURE D’ÉTALONNAGE VA301M
TABLE I - CALIBRATION INFORMATION
Gas
Scale
Warm-up
Flow
Rate
CO
NO2
C3H8
CH4
H2
0 - 250 ppm
0 - 10 ppm
0 - 50% LEL
0 - 100% LEL
0 – 100% LEL
5 min.
5 min.
15 min.
5 min
5 min
500 ml/min
500 ml/min
50 ml/min
500 ml/min
500 ml/min
Notes
Figure I – Calibration equipment setup
CALIBRATION KIT
Order Number
SK301MQ2CO
SK301MQ2CO-NO2
SK301MQ2CO-C3H8
SK301MQ2CO-CH4
SK301MQ2CO-H2
PAGE 2 OF 4
Description
Standard Cal Kit for VA301M CO including Display (103L CO 200 ppm BAL N2)
Standard Cal Kit for VA301M CO-NO2 including Display
(103L CO 200 ppm BAL N2 and 58L NO2 5 ppm BAL N2)
Standard Cal Kit for VA301M CO-C3H8 including Display
(103L CO 200 ppm BAL N2 and 103L C3H8 20% LEL BAL AIR)
Standard Cal Kit for VA301M CO-CH4 including Display
(103L CO 200 ppm BAL N2 and 103L CH4 1% LEL BAL AIR)
Standard Cal Kit for VA301M CO-H2 including Display
(103L CO 200 ppm BAL N2 and 103L H2 1% LEL BAL AIR)
© COPYRIGHT VULCAIN ALARME INC.
508756 CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301M
PROCÉDURE D’ÉTALONNAGE VA301M
PROCÉDURE D’ÉTALONNAGE
VA301M
1. PÉRIODE DE RÉCHAUFFEMENT
Si le VA301M n’a pas d’afficheur, installer un couvercle avec afficheur et brancher ce dernier dans
le connecteur J3.
Alimenter l’appareil, laisser la sonde chauffer pendant la période requise (voir Table II).
2. BRANCHER LES RÉGULATEURS
Brancher le régulateur de débit sur le cylindre de gaz approprié.
Ajuster le débit du régulateur tel qu’indiqué à la Table II.
Insérer l’adaptateur d’étalonnage dans le port de calibration du transmetteur.
Brancher le régulateur à l’adaptateur d’étalonnage tel qu’illustré à la Figure II.
3. ÉTALONNAGE DU ZÉRO (SI REQUIS)
La calibration du Zéro doit se faire dans un environnement bien ventilé et exempt du gaz à détecter.
Si vous soupçonner la présence de gaz cible, injecter le gaz du Zéro, au débit spécifié, pour une
période de 2 minutes minimum avant de débuter l’étalonnage du Zéro.
Appuyer sur le bouton Enter pour accéder au menu.
Utiliser le bouton Scroll pour entrer le mot de passe VA
Appuyer sur le bouton Enter pour valider le mot de passe.
Utiliser le bouton Scroll pour sélectionner le menu Set Zero et la zone d’étalonnage.
(Zone 1 = Sonde de CO interne, Zone 2 = Sonde à distance)
Appuyer sur le bouton Enter pour lancer l’étalonnage.
Le message Wait apparaît pour indique que l’étalonnage est en cours.
Utiliser le bouton Scroll pour afficher le message Back et appuyer sur le bouton Enter.
Utiliser le bouton Scroll pour afficher le message Quit et appuyer sur le bouton Enter pour quitter.
4. ÉTALONNAGE DU GAIN
Ouvrir le régulateur
Attendre un minimum de 2 minutes pour permettre à la lecture de se stabiliser.
Appuyer sur le bouton Enter pour accéder au menu.
Utiliser le bouton Scroll pour entrer le mot de passe VA
Utiliser le bouton Scroll pour sélectionner le menu Set Span et la zone d’étalonnage.
(Zone 1 = Sonde de CO interne, Zone 2 = Sonde à distance)
Appuyer sur le bouton Enter pour valider les sélections.
Utiliser le bouton Scroll pour entrer la concentration du gaz étalon et appuyer sur Enter.
Le message Wait apparaît pour indique que l’étalonnage est en cours.
Utiliser le bouton Scroll pour afficher le message Back et appuyer sur le bouton Enter.
Utiliser le bouton Scroll pour afficher le message Quit et appuyer sur le bouton Enter pour quitter.
PAGE 3 OF 4
© COPYRIGHT VULCAIN ALARME INC.
508756 CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301M
PROCÉDURE D’ÉTALONNAGE VA301M
TABLE II – INFORMATION D’ÉTALONNAGE
Gaz
Échelle
Temps de
réchauffement
Débit
ml/min
CO
NO2
C3H8
CH4
H2
0 - 250 ppm
0 - 10 ppm
0 - 50% LEL
0 - 100% LEL
0 – 100% LEL
5 min.
5 min.
15 min.
5 min
5 min
500 ml/min
500 ml/min
50 ml/min
500 ml/min
500 ml/min
Notes
Figure II – Configuration de l’équipement
KIT D’ÉTALONNAGE
Order Number
SK301MQ2CO
SK301MQ2CO-NO2
SK301MQ2CO-C3H8
SK301MQ2CO-CH4
SK301MQ2CO-H2
PAGE 4 OF 4
Description
Standard Cal Kit for VA301M CO including Display (103L CO 200 ppm BAL N2)
Standard Cal Kit for VA301M CO-NO2 including Display
(103L CO 200 ppm BAL N2 and 58L NO2 5 ppm BAL N2)
Standard Cal Kit for VA301M CO-C3H8 including Display
(103L CO 200 ppm BAL N2 and 103L C3H8 20% LEL BAL AIR)
Standard Cal Kit for VA301M CO-CH4 including Display
(103L CO 200 ppm BAL N2 and 103L CH4 1% LEL BAL AIR)
Standard Cal Kit for VA301M CO-H2 including Display
(103L CO 200 ppm BAL N2 and 103L H2 1% LEL BAL AIR)
© COPYRIGHT VULCAIN ALARME INC.
508756 CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE S301M
PROCÉDURE D’ÉTALONNAGE S301M
CALIBRATION PROCEDURE
S 301M
1. WARM-UP PERIOD
Turn the unit on for a minimum of fifteen (15) minutes.
2. CONNECTING THE HARDWARE
Screw the regulator to the appropriate calibration gas cylinder.
Adjust the regulator with a flow rate of according to specification on Table I.
Connect the regulator outlet to the sensor as shown on Figure I.
3. REMOTE CALIBRATING THE S301M SENSOR
When using the S301M in a network of sensors, connected to a VA301C controller (with firmware 3.0 or higher), it is possible to
perform a “remote calibration” using the VA301C menu:
7. Network
Statistics
Calibration
1.
2.
3.
Using the navigation arrows, access the VA301C’s menu
Scroll through the menu options and select option 7. Network
Scroll through the Network options screens to the last screen and select the Calibration option
The Calibration screen contains four (4) lines of information:
Calib
007
S301M
Status:
Normal
Set Zero
Set Span
246
PPM
Line 1:
Line 2:
Line 3:
Line 4:
1.
2.
3.
4.
Indicates the mode (Calib, meaning calibration), the (Modbus) address of the device to calibrate (007) and the type of
device to calibrate (S301M)
Indicates the status (Normal or In calib…) of the specified device
Displays the function to perform (Set Zero)
Displays the function to perform (Set Span) and the span gas concentration value (246 ppm)
On the first line, scroll to the device address and press Enter
Scroll through the devices to display the desired device* and press Enter to select.
The second line displays the device’s status
Scroll to select the desired function, Set Zero to set the device's zero, and press Enter to select.
Calib
007
Calibrate Zero?
Set Zero
Set Span
246
5.
6.
7.
S301M
PPM
Upon pressing Set Zero, the controller requests confirmation.
Press Enter to confirm or Esc to cancel. If confirmed, the controller sets the S301M’s Zero. This takes only a few moments
and the display returns to the default calibration screen.
To calibrate the device, scroll to Set Span** and change the span gas calibration value using this procedure;
Calib
007
S301 M
Status :
In calib ...
Set Zero
Set Span
246
PPM
a.
b.
c.
Using the right arrow, move the cursor to xxx PPM (span value field). Press Enter to select the field (it’s editable when
flashing).
Use the up or down arrows to increase or decrease the value, press Enter to validate the new value.
Move the cursor back to Set Span and press Enter to start the calibration.
The device Span is being calibrated. The screen will display the device’s status as “In calib...” until the calibration is complete.
*The device must be configured in the VA301C’s database in order to be included in the device addresses displayed on screen.
**When selecting Set Span, make sure that the device has been exposed to the appropriate calibration gas.
PAGE 1 OF 4
© COPYRIGHT VULCAIN ALARME IN C.
510181 S301M CALIBRATION PROCED URE.P DF REV 01
CALIBRATION PROCEDURE S301M
PROCÉDURE D’ÉTALONNAGE S301M
TABLE I - CALIBRATION INFORMATION
Gas
Scale
CO
0 - 255 ppm
No2
0 – 10.2 ppm
C3H8
0 – 25.5 % Vol.
Combustibles
0 – 102 %
Warm-up
Flow Rate
15 min.
15 min.
15 min.
15 min.
0.5L/min
0.5L/min
100 ml/min
100 ml/min
Notes
Figure I – Calibration equipment setup
CALIBRATION KIT
Standard Calibration Kit (103L cylinder)
SKS301MCOQ1
SKS301MNO2Q1
SKS301MC3H8Q1
SKS301MCOMBQ1
PAGE 2 OF 4
STANDARD CAL KIT FOR S301M CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR S301M NO2, 58L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR S301M C3H8, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR S301M COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
© COPYRIGHT VULCAIN ALARME IN C.
510181 S301M CALIBRATION PROCED URE.P DF REV 01
CALIBRATION PROCEDURE S301M
PROCÉDURE D’ÉTALONNAGE S301M
PROCÉDURE D’ÉTALONNAGE
S 301M
1. PERI ODE DE RECHAUFFEMENT
Alimenter l’appareil pour une période minimale de 15 minutes.
2. BRANCHER LES REGULATEURS
Brancher le régulateur de débit sur le cylindre de gaz approprié.
Ajuster le débit du régulateur selon les spécifications de la Table II.
Relier la sortie du régulateur à la sonde tel qu’illustré à la Figure II.
3. ÉTALONNAGE À DISTANCE DE LA SONDE S301M
Lorsque le S301M est utilisé sur un réseau de sondes, connectées à la centrale VA301C (micrologiciel version 3.0 et plus), il est
possible d'effectuer un étalonnage à distance par l'entremise du menu du VA301C:
7. Reseau
Statistiques
Etalonnage
1.
2.
3.
Utiliser les flèches de navigation pour accéder au menu du VA301C
Dérouler les options du menu et sélectionner l'option 7. Reseau
Dérouler les options de Reseau et sélectionner Etalonnage, au dernier écran
L'écran d'étalonnage contient quatre (4) lignes d'information:
Calib
007
S301M
Statut:
Normale
Etal Zero
Etal Plage
246
PPM
Ligne 1:
Ligne 2:
Ligne 3:
Ligne 4:
1.
2.
3.
Indique le mode (Calib), l'adresse de l'unité pour l'étalonnage (007) et le type d'unité à étalonner (VA301M)
Indique le statut (Normale ou En Etalon…) de l'unité sélectionnée
Affiche la fonction à effectuer (Etal Zero)
Affiche la fonction à effectuer (Etal Plage) et la concentration d'étalonnage (246 ppm)
Déplacer le curseur à la gauche de l'adresse de l'unité sur la première ligne et appuyer sur Enter
Dérouler la liste pour afficher l'adresse de l'unité désirée* puis appuyer sur Enter pour sélectionner.
La deuxième ligne affiche le statut de l'unité
Calib
007
Etalonner Zero?
Etal Zero
Etal Plage
246
4.
5.
6.
7.
S301M
PPM
Déplacer le curseur à la gauche de la fonction désirée, Etal Zero pour étalonner le zéro de l'unité, et appuyer sur Enter pour
sélectionner.
Lors de la sélection d'Etal Zero, la centrale demande la confirmation.
Appuyer sur Enter pour confirmer ou Esc pour annuler. Si confirmé, la centrale procède à l'étalonnage du zéro de l'unité. Le
processus nécessite seulement quelques instant, puis l'écran affiche de nouveau l'écran d'étalonnage.
Pour effectuer l'étalonnage de la plage** de l'unité, déplacer le curseur à la gauche de Etal Plage et changer la valeur
d'étalonnage avec la procédure suivante;
Calib
007
S301M
Statut :
En Etalon...
Etal Zero
Etal Plage
246
PPM
a.
b.
c.
Utiliser la flèche droite pour déplacer le curseur à la gauche de to xxx PPM (champs de valeur d'étalonnage). Appuyer sur
Enter pour sélectionner le champs.
Utiliser les flèches haut et bas pour augmenter ou diminuer la valeur
Déplacer le curseur à la gauche de la fonction Etal Plage et appuyer sur Enter pour valider la valeur de gaz d'étalonnage et
démarrer l'étalonnage.
L'étalonnage de la plage démarre. L'écran affiche le statut de l'unité, « En etalon... » jusqu'à la terminaison de l'étalonnage.
*L'unité doit être configurée dans la base de donnée du VA301C pour figurer dans la liste d'adresse d'unité affichée à l'écran.
**Lors de la sélection d'Etal Plage, assurer que l'unité a été exposée au gaz d'étalonnage approprié.
© COPYRIGHT VULCAIN ALARME IN C.
PAGE 3 OF 4
510181 S301M CALIBRATION PROCED URE.P DF REV 01
CALIBRATION PROCEDURE S301M
PROCÉDURE D’ÉTALONNAGE S301M
TABLE II – INFORMATION D’ÉTALONNAGE
Gaz
Échelle
Temps de
réchauffement
Débit
CO
No2
C3H8
Combustibles
0 – 255 ppm
0 – 10.2 ppm
0 – 50 %
0 – 102 %
15 min.
15 min.
15 min.
15 min.
0.5 L/min
0.5 L/min
100 ml/min
100 ml/min
Notes
Figure II – Configuration de l’équipement
KIT D’ÉTALONNAGE
Kit D’étalonnage Standard (Cylindre de 103L)
SKS301MCOQ1
SKS301MNO2Q1
SKS301MC3H8Q1
SKS301MCOMBQ1
PAGE 4 OF 4
STANDARD CAL KIT FOR S301M CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR S301M NO2, 58L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR S301M C3H8, 103L (C3H8 20% LEL BAL AIR)
STANDARD CAL KIT FOR S301M COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
© COPYRIGHT VULCAIN ALARME IN C.
510181 S301M CALIBRATION PROCED URE.P DF REV 01
CALIBRATION PROCEDURE 301W
PROCÉDURE D’ÉTALONNAGE 301W
CALIBRATION PROCEDURE
301W
1. WARM-UP PERIOD
Turn the unit on for a minimum of fifteen (15) minutes.
2. CONNECTING THE HARDWARE
Screw the regulator to the appropriate calibration gas cylinder.
Adjust the regulator with a flow rate of according to specification on Table I.
Connect the regulator outlet to the sensor as shown on Figure I.
3. REMOTE CALIBRATING THE 301W SENSOR
When using the 301W in a network of sensors, connected to a 301C controller (with firmware 3.0 or higher), it is possible to perform
a “remote calibration” using the 301C menu:
1.
2.
3.
Using the navigation arrows, access the 301C’s menu
Scroll through the menu options and select option 7. Network
Scroll through the Network options screens to the last screen and select the Calibration
option
Calib
121
301W
Status :
In calib...
Set Zero
Set Span 246
PPM
The Calibration screen contains four (4) lines of information:
Line 1:
Line 2:
Line 3:
Line 4:
Indicates the mode (Calib, meaning calibration), the (Modbus) address of the
device to calibrate (121) and the type of device to calibrate (301W)
Indicates the status (Normal or In calib…) of the specified device
Displays the function to perform (Set Zero)
Displays the function to perform (Set Span) and the span gas concentration value
(246 ppm)
4.
5.
6.
7.
On the first line, scroll to the device address and press Enter
Scroll through the devices to display the desired device* and press Enter to select.
The second line displays the device’s status
Scroll to select the desired function, Set Zero to set the device's zero, and press Enter to
select.
8. Upon pressing Set Zero, the controller requests confirmation.
9. Press Enter to confirm or Esc to cancel. If confirmed, the controller sets the S301M’s
Zero. This takes only a few moments and the display returns to the default calibration
screen.
10. To calibrate the device, scroll to Set Span** and change the span gas calibration value
using this procedure;
11. Using the right arrow, move the cursor to xxx PPM (span value field). Press Enter to
select the field (it is editable when flashing).
12. Use the up or down arrows to increase or decrease the value, press Enter to validate the
new value.
13. Move the cursor back to Set Span and press Enter to start the calibration.
Calib
121
301W
Status:
Normal
Set Zero
Set Span 246
PPM
Calib
121
Calibrate Zero?
Set Zero
Set Span 246
301W
PPM
Calib
121
301W
Status :
In calib...
Set Zero
Set Span 246
PPM
The device Span is being calibrated. The screen will display the device’s status as “In calib...” until the calibration is complete.
*The device must be configured in the 301C’s database in order to be included in the device addresses displayed on screen.
**When selecting Set Span, make sure that the device has been supplied with the appropriate calibration gas before and during the
calibration process.
PAGE 1 OF 4
© COPYRIGHT HONEYWELL ANALYTICS NA – VULCAIN
511131 301W CALIBRATION PROCEDURE.PDF REV 01
CALIBRATION PROCEDURE 301W
PROCÉDURE D’ÉTALONNAGE 301W
TABLE I - CALIBRATION INFORMATION
Gas
Scale
Warm-up
Flow Rate
CO
No2
O2
0 - 255 ppm
0 – 10.2 ppm
0 – 25.5 % Vol.
15 min.
15 min.
15 min.
0.5L/min
1L/min
0.5L/min
Notes
Figure I – Calibration equipment setup
CALIBRATION KIT
Standard Calibration Kit (103L cylinder)
SK301WCOQ1
SK301WNO2Q1
SK301WO2Q1
PAGE 2 OF 4
STANDARD CAL KIT FOR 301W CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR 301W NO2, 103L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR 301W O2, 103L (O2 20% BAL N2)
© COPYRIGHT HONEYWELL ANALYTICS NA – VULCAIN
511131 301W CALIBRATION PROCEDURE.PDF REV 01
CALIBRATION PROCEDURE 301W
PROCÉDURE D’ÉTALONNAGE 301W
PROCÉDURE D’ÉTALONNAGE
301W
1. PERIODE DE RECHAUFFEMENT
Alimenter l’appareil pour une période minimale de 15 minutes.
2. BRANCHER LES REGULATEURS
Brancher le régulateur de débit sur le cylindre de gaz approprié.
Ajuster le débit du régulateur selon les spécifications de la Table II.
Relier la sortie du régulateur à la sonde tel qu’illustré à la Figure II.
3. ÉTALONNAGE À DISTANCE DE LA SONDE 301
W
301W
Lorsque le 301W est utilisé sur un réseau de sondes, connectées à la centrale 301C (micrologiciel version 3.0 et plus), il est possible
d'effectuer un étalonnage à distance par l'entremise du menu du 301C:
1.
2.
3.
Utiliser les flèches de navigation pour accéder au menu du 301C
Dérouler les options du menu et sélectionner l'option 7. Reseau
Dérouler les options de Reseau et sélectionner Etalonnage, au dernier écran
7. Reseau
Statistiques
Etalonnage
L'écran d'étalonnage contient quatre (4) lignes d'information:
Ligne 1: Indique le mode (Calib), l'adresse de l'unité pour l'étalonnage (121) et le type
d'unité à étalonner (301W)
Ligne 2: Indique le statut (Normale ou En Etalon…) de l'unité sélectionnée
Ligne 3: Affiche la fonction à effectuer (Etal Zero)
Ligne 4: Affiche la fonction à effectuer (Etal Plage) et la concentration d'étalonnage (246
ppm)
4.
Déplacer le curseur à la gauche de l'adresse de l'unité sur la première ligne et appuyer
sur Enter
5. Dérouler la liste pour afficher l'adresse de l'unité désirée* puis appuyer sur Enter pour
sélectionner.
6. La deuxième ligne affiche le statut de l'unité
7. Déplacer le curseur à la gauche de la fonction désirée, Etal Zero pour étalonner le zéro de
l'unité, et appuyer sur Enter pour sélectionner.
8. Lors de la sélection d'Etal Zero, la centrale demande la confirmation.
9. Appuyer sur Enter pour confirmer ou Esc pour annuler. Si confirmé, la centrale procède
à l'étalonnage du zéro de l'unité. Le processus nécessite seulement quelques instants,
puis l'écran affiche de nouveau l'écran d'étalonnage.
10. Pour effectuer l'étalonnage de la plage** de l'unité, déplacer le curseur à la gauche de Etal
Plage et changer la valeur d'étalonnage avec la procédure suivante;
11. Utiliser la flèche droite pour déplacer le curseur à la gauche de to xxx PPM (champs de
valeur d'étalonnage). Appuyer sur Enter pour sélectionner le champ.
12. Utiliser les flèches haut et bas pour augmenter ou diminuer la valeur
13. Déplacer le curseur à la gauche de la fonction Etal Plage et appuyer sur Enter pour
valider la valeur de gaz d'étalonnage et démarrer l'étalonnage.
Calib
121
301W
Statut:
Normale
Etal Zero
Etal Plage
246
PPM
Calib
121
Etalonner Zero?
Etal Zero
Etal Plage
246
301W
PPM
Calib
121
301W
Statut :
En Etalon...
Etal Zero
Etal Plage
246
PPM
L'étalonnage de la plage démarre. L'écran affiche le statut de l'unité, « En etalon... » jusqu'à la terminaison de l'étalonnage.
*L'unité doit être configurée dans la base de donnée du 301C pour figurer dans la liste d'adresse d'unité affichée à l'écran.
**Lors de la sélection d'Etal Plage, assurer que l'unité a été exposée au gaz d'étalonnage approprié.
PAGE 3 OF 4
© COPYRIGHT HONEYWELL ANALYTICS NA – VULCAIN
511131 301W CALIBRATION PROCEDURE.PDF REV 01
CALIBRATION PROCEDURE 301W
PROCÉDURE D’ÉTALONNAGE 301W
TABLE II – INFORMATION D’ÉTALONNAGE
Gaz
Échelle
Temps de
réchauffement
Débit
CO
No2
O2
0 – 255 ppm
0 – 10.2 ppm
0 – 25.5 % Vol.
15 min.
15 min.
15 min.
0.5L/min
1L/min
0.5L/min
Notes
Figure II – Configuration de l’équipement
KIT D’ÉTALONNAGE
Kit D’étalonnage Standard (Cylindre de 103L)
SK301WCOQ1
SK301WNO2Q1
SK301WO2Q1
PAGE 4 OF 4
STANDARD CAL KIT FOR 301W CO, 103L (CO 200 ppm BAL N2)
STANDARD CAL KIT FOR 301W NO2, 103L (NO2 5 ppm BAL N2)
STANDARD CAL KIT FOR 301W O2, 103L (O2 20% BAL N2)
© COPYRIGHT HONEYWELL ANALYTICS NA – VULCAIN
511131 301W CALIBRATION PROCEDURE.PDF REV 01
CALIBRATION PROCEDURE VA301IRF
APRIL 1ST, 2004
ST
IF YOUR TRANSMITTER WAS PURCHASE BEFORE APRIL 1ST 2004, CONTACT OUR TECHNICAL SUPPORT LINE AT 1-800-563-2967
CALIBRATION PROCEDURE
VA301IRF
1. WARM-UP PERIOD
Turn the unit on for a minimum of fifteen (15) minutes.
2. CONNECTING THE HARDWARE
Plug the calibration adaptor onto the gas sensor inlet.
Screw the regulator to the calibration span gas cylinder or air cylinder for the zero adjustment.
Connect the regulator outlet to the calibration adaptor with the 1/8” I.D. polymer tubing.
3. ADJUSTING THE ZERO (IF REQUIRED)
This must be achieved in a well ventilated area where there is no presence of refrigerant.
If you suspect the presence of refrigerant in the area, inject air at a flow rate of 100ml/min (air gas bottle
available at Vulcain 103L: #501008 or 17L: #501036), let the gas flow for 1 minute before going on.
Press Enter to get into the menu.
Use the Up or Down button until the password VA is reached.
Press Enter to acknowledge.
Use the Up or Down arrow until the Set Zero field is reached.
Press Enter to acknowledge.
Press Enter again to activate GoCalib.
Wait message appears, the transmitter will go into zero calibration.
When the Menu Set Zero message appears, the zero calibration is complete.
Use the Up or Down arrow until the Quit field is reached.
Press Enter to exit.
4. ADJUSTING THE SPAN
Turn on the regulator.
The calibration span gas is now flowing into the unit.
Let the gas flow for a minimum of 1 minute.
After one minute, the reading should be stabilized.
Press Enter to get into the menu.
Use the Up or Down button until the password VA is reached.
Press Enter to acknowledge.
Use the Up or Down arrow until the Set Span field is reached.
You can now set the Span gas value (in PPM) using the Up or Down button.
Press Enter to acknowledge.
Press Enter again to activate GoCalib.
Wait message appears, the transmitter will go into span calibration.
When the Menu Set Span message appears, the calibration is complete.
Use the Up or Down arrow until the Quit field is reached.
Press Enter to exit.
PAGE 1 OF 3
© COPYRIGHT VULCAIN ALARME INC.
DI0141
CALIBRATION PROCEDURE VA301IRF
APRIL 1ST, 2004
CALIBRATION INFORMATION
Gas
Sensor
Scale
Warm-up
Refrigerant
Rxxx
301IRFCAPRD
0 - 1000 ppm
15 min.
Notes
Replace the xxx by the required refrigerant.
REGULATOR
CALIBRATION
GAS MIXTURE
GAS COMPOSITION
XXXXX bal. XXXXXX
Accuracy: +/- 2%
TUBING
Caution - High pressure
103-LITRE
DD-0004
CALIBRATION SPAN
GAS CYLINDER
Fig.1 - Calibration equipment setup
PAGE 2 OF 3
© COPYRIGHT VULCAIN ALARME INC.
DI0141
CALIBRATION PROCEDURE VA301IRF
APRIL 1ST, 2004
EQUIPMENT REQUIRED DURING CALIBRATION
Gas
Calibration kit
Standard
Calibration Gas
Standard
Calibration kit
Low Cost
Calibration Gas
Low Cost
R11
R12
R22
R123
R125
R134a
SK301IRFR11 (505096)
SK301IRFR12 (505097)
SK301IRFR22 (505078)
SK301IRFR123 (505098)
SK301IRFR125 (505099)
SK301IRFR134a (505101)
CKR11500BN2103 (501012)
CKR12500BN2103 (501002)
CKR22500BN2103 (501005)
CKR123500BN2103 (501003)
CKR125500BN2103 (501004)
CKR134A500BN2103L (504530)
LC301IRFR11 (506115)
LC301IRFR12 (506116)
LC301IRFR22 (506111)
LC301IRFR123 (506118)
LC301IRFR125 (506120)
LC301IRFR134a (506121)
CKR11500BN217 (501029)
CKR12500BN217 (501030)
CKR22500BN217 (501034)
CKR123500BN217 (501039)
CKR125500BN217 (501031)
CKR134A500BN217 (501032)
CALIBRATION KIT STANDARD INCLUDES:
Item number
Description
Calibration gas
CK-CASE-103L/58L (501056)
CK-TUBE1/8 (501062)
CK-REG0.1LPM/103L/58L (502874)
Span calibration gas (depends on refrigerant type).
Carrying case 103L.
1/8” I.D. polymer tubing.
0.1 lpm pressure reducing regulator for 103 litre cylinder.
CALIBRATION KIT LOW COST INCLUDES:
Item number
Description
Calibration gas
CK-CASE-17L (501057)
CK-TUBE1/8 (501062)
CK-REG.1LPM/17L (505425)
Span calibration gas (depends on refrigerant type).
Carrying case 17L.
1/8” I.D. polymer tubing.
0.1 lpm pressure reducing regulator for 17 litre cylinder.
PAGE 3 OF 3
© COPYRIGHT VULCAIN ALARME INC.
DI0141
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
CALIBRATION PROCEDURE
VA301EM
1. WARM-UP PERIOD
Turn the unit on for a minimum of fifteen (15) minutes.
Check Calibration Information (Table I) for specific warm-up time.
2. CONNECTING THE HARDWARE
Plug the calibration adaptor onto the gas sensor inlet.
Screw the regulator to the calibration Span gas cylinder for the Span adjustment or Zero gas
cylinder for the Zero adjustment and set the appropriate flow rate (Table I).
Connect the regulator outlet to the calibration adaptor (Figure I & II).
3. ADJUSTING THE ZERO (IF REQUIRED)
When the unit indicates 0 %/ppm in an area with no presence of the target gas, proceed to step 4.
To adjust the zero, inject zero gas at the specified flow rate.
The zero calibration gas is now flowing into the unit.
Let the gas flow for a minimum of 2.5 minutes.
After 2.5 minutes, the reading should be stabilized.
Press Enter to get into the menu.
Use the Up or Down button until the password VA is reached.
Press Enter to acknowledge.
Use the Up or Down arrow until the Set Zero field is reached.
Press Enter to acknowledge.
Use the Up or Down arrow to select the sensor to be calibrated.
Press Enter to acknowledge.
Press Enter again to activate GoCalib.
Wait message appears, the transmitter will go into zero calibration.
The calibration procedure is finished when the Menu Set Zero message appears.
Use the Up or Down arrow until the Quit field is reached.
Press Enter to exit.
4. ADJUSTING THE SPAN
Turn on the regulator.
The calibration span gas is now flowing into the unit.
Let the gas flow for a minimum of 2.5 minutes.
After 2.5 minutes, the reading should be stabilized.
Press Enter to get into the menu.
Use the Up or Down button until the password VA is reached.
Press Enter to acknowledge.
Use the Up or Down arrow until the Set Span field is reached.
Press Enter to acknowledge.
Use the Up or Down arrow to select the sensor to be calibrated.
Press Enter to acknowledge.
Use the Up or Down button to set the span gas value multiplied by the conversion factor, if needed
(see Table I & II).
Press Enter to acknowledge.
Press Enter again to activate GoCalib.
Wait message appears, the transmitter will go into span calibration.
The calibration procedure is finished when the Menu Set Span message appears.
Use the Up or Down arrow until the Quit field is reached.
Press Enter to exit.
PAGE 1 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
TABLE I - CALIBRATION INFORMATION
Gas
Scale
Warm-up
Factor
Flow Rate
Combustible
CL2
CO
0 - 102% LEL
0 - 15.3 ppm
0 - 255 ppm
15 min.
15 min.
N/A
Table II
N/A
N/A
500 ml/min
500 ml/min
500 ml/min
ETO
0 - 20.4 ppm
15 min.
N/A
500 ml/min
H2S
0 - 51.0 ppm
15 min.
N/A
500 ml/min
Notes
1% Volume CH4 = 20% LEL CH4.
HCL
0 - 25.5 ppm
15 min.
N/A
500 ml/min
HCN
HF
0 - 51.0 ppm
0 - 10.2 ppm
15 min.
15 min.
N/A
0.2
500 ml/min
500 ml/min
NO
0 - 102 ppm
15 min.
N/A
500 ml/min
NO2
O2
SO2
SIH4
F2
Refrigerant
Rxxx
0 - 10.2 ppm
0 - 25.5%
0 -10.2 ppm
0 -10.2 ppm
0 – 2.6 ppm
15 min.
N/A
15 min.
15 min.
15 min
N/A
N/A
N/A
N/A
1.3
500 ml/min
500 ml/min
500 ml/min
500 ml/min
500 ml/min
CL2 is a surrogate gas for F2
0 – 1000 ppm
15 min
N/A
100 ml/min
Replace the xxx by the required refrigerant
Nitrogen dioxide is a surrogate gas for HF
TABLE II - CONVERSION FACTOR FOR COMBUSTIBLES (PELLISTOR)
Gas
Factor
Gas
Factor
Gas
Factor
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
Methane
1.000
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
PAGE 2 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
Figure I – S301D2 Calibration equipment setup
REGULATOR
CALIBRATION
GAS MIXTURE
GAS COMPOSITION
XXXXX bal. XXXXXX
Accuracy: +/- 2%
TUBING
Caution - High pressure
103-LITRE
DD-0004
CALIBRATION SPAN
GAS CYLINDER
Fig.1 - Calibration equipment setup
Figure II – 301IRFS Calibration equipment setup
PAGE 3 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
Calibration Kit
Standard Calibration Kit (58L or 103L cylinder) for S301D2 Sensors
Order Number
Description
SKCOMBEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
SKCH4EXPL2.5
STANDARD CAL KIT FOR VA201D, VA301D / D2IR COMBUSTIBLE, 103L (CH4 50% LEL BAL AIR)
SKH2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2, 103L (H2 1% BAL AIR)
SKO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 O2, 103L (O2 20% BAL N2)
SKCOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO, 103L (CO 200 ppm BAL N2)
SKH2SEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2S, 58L (H2S 25 ppm BAL N2)
SKHCLEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCL, 58L (HCL 25 ppm BAL N2)
SKHCNEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCN, 58L (HCN 25 ppm BAL N2)
SKCL2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CL2, 58L (CL2 5 ppm BAL N2)
SKETOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 ETO, 58L (ETO 10 ppm BAL N2)
SKSO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SO2, 58L (SO2 5 ppm BAL N2)
SKNO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO2, 58L (NO2 5 ppm BAL N2)
SKCOEXPL3K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO 3000 ppm, 103L (CO 3000 ppm BAL AIR)
SKNOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO, 58L (NO 5 ppm BAL N2)
SKO3Q1
STANDARD CAL KIT FOR VA301D2 O3 GENERATOR
SKF2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 F2, 58L (CL2 2 ppm BAL N2)
SKSIH4EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SIH4, 58L (SiH4 5 ppm BAL N2)
SKHFEXPL
STANDARD CAL KIT FOR VA301D2 HF, 58L (NO2 5 ppm BAL N2)
SKCO2EXPL10K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 1% (10000 ppm), 103L (CO 10000 ppm BAL N2)
SKCO2EXPL25K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 2.5% (25000 ppm), 103L (CO2 25000 ppm BAL N2)
Low Cost Calibration Kit (17L cylinder) for S301D2 Sensors
Order Number
Description
LCCOMBEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
LCH2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 H2, 17L (H2 1% BAL AIR)
LCO2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 O2, 17L (O2 20% BAL N2)
LCCOEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 CO, 17L (CO 200 ppm BAL N2)
Standard Calibration Kit (103L cylinder) for 301IRFS Sensors
SK301IRFR11
STANDARD CAL KIT FOR 301IRF R11, 103L (R11 500 ppm BAL N2)
SK301IRFR12
STANDARD CAL KIT FOR 301IRFR12, 103L (R12 500 ppm BAL N2)
SK301IRFR22
STANDARD CAL KIT FOR 301IRFR22, 103L (R22 500 ppm BALN2)
SK301IRFR123
STANDARD CAL KIT FOR 301IRFR123, 103L (R123 500 ppm BAL N2)
SK301IRFR125
STANDARD CAL KIT FOR 301IRFR125, 103L (R125 500 ppm BAL N2)
SK301IRFR134A
STANDARD CAL KIT FOR 301IRFR134A,103L (R134A 500 ppm BAL N2)
Low Cost Calibration Kit (17L cylinder) 301IRFS Sensors
LC301IRFR11
LOW COST CAL KIT FOR VA301IRF R11, 17L (R11 500 ppm BAL N2)
LC301IRFR12
LOW COST CAL KIT FOR VA301IRF R12, 17L (R12 500 ppm BAL N2)
LC301IRFR22
LOW COST CAL KIT FOR VA301IRF R22, 17L (R22 500 ppm BAL N2)
LC301IRFR123
LOW COST CAL KIT FOR VA301IRF R123, 17L (R123 500 ppm BAL N2)
LC301IRFR125
LOW COST CAL KIT FOR VA301IRF R125, 17L (R125 500 ppm BAL N2)
LC301IRFR134A
LOW COST CAL KIT FOR VA301IRF R134A, 17L (R134A 500 ppm BAL N2)
PAGE 4 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
PROCÉDURE D’ÉTALONNAGE
VA301EM
1. PERIODE DE RECHAUFFEMENT
Alimenter l’appareil, laissez les sondes chauffer pendant la période requise (voir Table III).
2. BRANCHER LES REGULATEURS
Ajuster votre multimètre pour lire des voltages DC
Brancher le régulateur de débit sur le cylindre de gaz et ajuster le régulateur au débit requis (voir
Table III)
Brancher l’adaptateur d’étalonnage dans le port de calibration du transmetteur (Figure II)
3. ÉTALONNAGE DU ZERO (SI REQUIS)
Dans un environnement libre du gaz à détecté, l’étalonnage du Zéro n’est pas requise si l’unité
affiche une concentration de 0 %/ppm. Continuer à l’étape 4.
Ouvrir le régulateur
Attendre un minimum de 2.5 minutes pour permettre à la lecture de se stabiliser.
Appuyer sur le bouton Enter pour accéder aux menus.
Appuyer sur les flèches Haut ou Bas pour entrer le mot de passe VA.
Appuyer sur le bouton Enter pour valider le mot de passe.
Appuyer sur les flèches Haut ou Bas pour afficher le message Set Zero.
Appuyer sur le bouton Enter pour valider.
Appuyer sur les flèches Haut ou Bas pour sélectionner la sonde à étalonner.
Appuyer sur le bouton Enter pour valider.
Le message GoCalib apparaît.
Appuyer sur le bouton Enter pour lancer l’étalonnage du Zéro.
Le message Wait apparaît pour indiquer que l’étalonnage du Zéro est en cours.
L’étalonnage est terminé lorsque le message Menu Set Zero apparaît.
Appuyer sur les flèches Haut ou Bas pour afficher le message Quit.
Appuyer sur le bouton Enter pour quitter.
4. ÉTALONNAGE DU GAIN
Ouvrir le régulateur.
Attendre un minimum de 2.5 minutes pour permettre à la lecture de se stabiliser.
Appuyer sur le bouton Enter pour accéder aux menus.
Appuyer sur les flèches Haut ou Bas pour entrer le mot de passe VA.
Appuyer sur le bouton Enter pour valider le mot de passe.
Appuyer sur les flèches Haut ou Bas pour afficher le message Set Span.
Appuyer sur le bouton Enter pour valider.
Appuyer sur les flèches Haut ou Bas pour entrer la Concentration du gaz utilisée multiplié par le
Facteur de conversion, si besoin (voir Table III & IV).
Appuyer sur le bouton Enter pour valider.
Le message GoCalib apparaît.
Appuyer sur le bouton Enter pour lancer l’étalonnage du Gain.
Le message Wait apparaît pour indiquer que l’étalonnage du Gain est en cours.
L’étalonnage est terminé lorsque le message Menu Set Span apparaît.
Appuyer sur les flèches Haut ou Bas pour afficher le message Quit.
Appuyer sur le bouton Enter pour quitter.
PAGE 5 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
Figure III – Configuration de l’équipement S301D2
REGULATOR
CALIBRATION
GAS MIXTURE
GAS COMPOSITION
XXXXX bal. XXXXXX
Accuracy: +/- 2%
TUBING
Caution - High pressure
103-LITRE
DD-0004
CALIBRATION SPAN
GAS CYLINDER
Fig.1 - Calibration equipment setup
Figure IV – Configuration de l’équipement 301IRFS
PAGE 7 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
KIT D’ÉTALONNAGE
Kit D’étalonnage Standard (Cylindre de 58L ou 103L) pour les Sondes S301D2
Order Number
Description
SKCOMBEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
SKCH4EXPL2.5
STANDARD CAL KIT FOR VA201D, VA301D / D2IR COMBUSTIBLE, 103L (CH4 50% LEL BAL AIR)
SKH2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2, 103L (H2 1% BAL AIR)
SKO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 O2, 103L (O2 20% BAL N2)
SKCOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO, 103L (CO 200 ppm BAL N2)
SKH2SEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2S, 58L (H2S 25 ppm BAL N2)
SKHCLEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCL, 58L (HCL 25 ppm BAL N2)
SKHCNEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCN, 58L (HCN 25 ppm BAL N2)
SKCL2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CL2, 58L (CL2 5 ppm BAL N2)
SKETOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 ETO, 58L (ETO 10 ppm BAL N2)
SKSO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SO2, 58L (SO2 5 ppm BAL N2)
SKNO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO2, 58L (NO2 5 ppm BAL N2)
SKCOEXPL3K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO 3000 ppm, 103L (CO 3000 ppm BAL AIR)
SKNOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO, 58L (NO 5 ppm BAL N2)
SKO3Q1
STANDARD CAL KIT FOR VA301D2 O3 GENERATOR
SKF2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 F2, 58L (CL2 2 ppm BAL N2)
SKSIH4EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SIH4, 58L (SiH4 5 ppm BAL N2)
SKHFEXPL
STANDARD CAL KIT FOR VA301D2 HF, 58L (NO2 5 ppm BAL N2)
SKCO2EXPL10K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 1% (10000 ppm), 103L (CO 10000 ppm BAL N2)
SKCO2EXPL25K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 2.5% (25000 ppm), 103L (CO2 25000 ppm BAL N2)
Kit D’étalonnage « Low Cost » (Cylindre 17L) pour les Sondes S301D2
Order Number
Description
LCCOMBEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
LCH2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 H2, 17L (H2 1% BAL AIR)
LCO2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 O2, 17L (O2 20% BAL N2)
LCCOEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 CO, 17L (CO 200 ppm BAL N2)
Kit D’étalonnage Standard (Cylindre de 103L) pour les Sondes 301IRFS
SK301IRFR11
STANDARD CAL KIT FOR 301IRF R11, 103L (R11 500 ppm BAL N2)
SK301IRFR12
STANDARD CAL KIT FOR 301IRFR12, 103L (R12 500 ppm BAL N2)
SK301IRFR22
STANDARD CAL KIT FOR 301IRFR22, 103L (R22 500 ppm BALN2)
SK301IRFR123
STANDARD CAL KIT FOR 301IRFR123, 103L (R123 500 ppm BAL N2)
SK301IRFR125
STANDARD CAL KIT FOR 301IRFR125, 103L (R125 500 ppm BAL N2)
SK301IRFR134A
STANDARD CAL KIT FOR 301IRFR134A,103L (R134A 500 ppm BAL N2)
Kit D’étalonnage « Low Cost » (Cylindre 17L) pour les Sondes S301D2
LC301IRFR11
LOW COST CAL KIT FOR VA301IRF R11, 17L (R11 500 ppm BAL N2)
LC301IRFR12
LOW COST CAL KIT FOR VA301IRF R12, 17L (R12 500 ppm BAL N2)
LC301IRFR22
LOW COST CAL KIT FOR VA301IRF R22, 17L (R22 500 ppm BAL N2)
LC301IRFR123
LOW COST CAL KIT FOR VA301IRF R123, 17L (R123 500 ppm BAL N2)
LC301IRFR125
LOW COST CAL KIT FOR VA301IRF R125, 17L (R125 500 ppm BAL N2)
LC301IRFR134A
LOW COST CAL KIT FOR VA301IRF R134A, 17L (R134A 500 ppm BAL N2)
PAGE 8 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
CALIBRATION PROCEDURE VA301EM
PROCÉDURE D’ÉTALONNAGE VA301EM
TABLE III - INFORMATION D’ETALONNAGE
Gas
Scale
Warm-up
Factor
Flow Rate
Combustible
CL2
CO
0 - 102% LEL
0 - 15.3 ppm
0 - 255 ppm
15 min.
15 min.
N/A
Table IV
N/A
N/A
500 ml/min
500 ml/min
500 ml/min
ETO
0 - 20.4 ppm
15 min.
N/A
500 ml/min
H2S
0 - 51.0 ppm
15 min.
N/A
500 ml/min
Notes
1% Volume CH4 = 20% LEL CH4.
HCL
0 - 25.5 ppm
15 min.
N/A
500 ml/min
HCN
HF
0 - 51.0 ppm
0 - 10.2 ppm
15 min.
15 min.
N/A
0.2
500 ml/min
500 ml/min
NO
0 - 102 ppm
15 min.
N/A
500 ml/min
NO2
O2
SO2
SIH4
F2
Refrigerant
Rxxx
0 - 10.2 ppm
0 - 25.5%
0 -10.2 ppm
0 -10.2 ppm
0 – 2.6 ppm
15 min.
N/A
15 min.
15 min.
15 min
N/A
N/A
N/A
N/A
1.3
500 ml/min
500 ml/min
500 ml/min
500 ml/min
500 ml/min
CL2 is a surrogate gas for F2
0 – 1000 ppm
15 min
N/A
100 ml/min
Replace the xxx by the required refrigerant
Nitrogen dioxide is a surrogate gas for HF
TABLE IV – FACTEUR DE CONVERSION POUR GAZ EXPLOSIF (PELLISTOR)
Gas
Factor
Gas
Factor
Gas
Factor
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
Methane
1.000
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
PAGE 6 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508871 VA301EM CALIBRATIONPROCEDURE.PDF R01
Using the IAQPoint
Calibrating the Unit
Setting the Sensor Zero
The Sensor Zero function is represented by the LED blink code 2, and
the procedure to set the sensor zero is as follows:
Never calibrate the sensor Zero with ambiant air. Always
use Nitrogen (N2). Make sure to release the gas to the
sensor for at least 10 minutes before beginning and
continue throughout.
•
•
•
•
•
•
•
Before starting the calibration
(using the programming menus),
connect the regulator to the gas
cylinder.
Adjust the flow rate to 0.1 L/min.
Open the rubber cap on the
IAQPoint calibration port and
connect the tubing from the
regulator to the sensor, as shown.
Let the gas flow for at least 10
minutes before starting the
calibration.
Calibration
Gas Cylinder
Press and hold the pushbutton and count 2 blinks and release the
pushbutton.
the LED will blink the 2-blink code three times (2 blinks, pause; 2
blinks, pause; 2 blinks, pause) to request confirmation to set the
sensor zero.
Press the pushbutton and hold for one blink only once to confirm
(you must confirm within 32 seconds or the screen will return to the
main menu). The unit begins setting the sensor zero (throughout
the zero process, the LED will blink 3 times every 4 seconds).
If the zero calibration is successful, the LED remains on without
blinking.
If the calibration failed, the LED will blink non-stop.
22
IAQPoint User Manual
Honeywell
511703
9/08
Using the IAQPoint
Calibrating the Unit
Calibrating the CO2 Sensor
The span calibration function is represented by the LED blink code 4,
and the calibration procedure is as follows:
Note: When calibrating a duct mounted unit,it is best to remove the unit
from its base to ensure proper calibration.
•
•
•
Before starting the calibration (using the programming menus),
connect the regulator to the gas cylinder.
Adjust the flow rate to 0.1 L/min.(for the 2000 ppm range)
Connect the tubing from the regulator to the sensor, as shown in
the image at left.
Start exposing the sensor to the calibration gas at least
10 minutes before starting and throughout the calibration
process.
•
•
•
Press and hold the pushbutton and count 4 blinks and release the
pushbutton.
the LED will blink the 4-blink code three times (4 blinks, pause; 4
blinks, pause; 4 blinks, pause) to request confirmation to calibrate
the span.
Press the pushbutton once and hold for one blink only to confirm
(you must confirm within 32 seconds or the screen will return to the
main menu). The unit begins the calibration (throughout the
calibration process, the LED will blink 5 times every 4 seconds).
If the span calibration is successful, the LED remains on without
blinking.
If the calibration failed, the LED will blink non-stop.
511703
9/08
IAQPoint User Manual
Honeywell
23
Comment utiliser l’IAQPoint
Étalonnage du zéro et du gain
Comment régler le zéro
La fonction de réglage du zéro est représentée par le code de
clignotement 2, dont voici la procédure :
Ne jamais régler le zéro de la sonde à l’air ambiant.
Toujours utiliser de l’azote (N2). Émettre le gaz pendant
10 minutes avant de démarrer et tout au long du réglage.
•
•
•
•
•
•
•
Avant de démarrer l’étalonnage
(depuis le menu de
programmation), brancher le
régulateur de débit sur le
cylindre de gaz.
Ajuster le débit du régulateur à
0.1 L/min.
Bouteille à gaz
d’étalonnage
Ouvrir le bouchon du port
d’étalonnage puis relier la
sortie du régulateur à la sonde
tel qu'illustré.
Émettre le gaz pendant 10
minutes AVANT de démarrer
l’étalonnage.
Appuyer sur le bouton poussoir et maintenir enfoncé pendant deux
clignotements de la DEL, puis relâcher.
La DEL clignotera le code de 2 clignotements trois fois (2
clignotements et une pause; 2 clignotements et une pause; 2
clignotements et une pause), pour confirmer la fonction
sélectionnée.
Appuyer sur le bouton poussoir une fois pour confirmer la
commande (s’il n’y a pas de confirmation après 32 secondes,
l’écran revient au menu principal). Le réglage du zéro commence
et la DEL clignote 3 fois aux 4 secondes.
Si le réglage est réussi, la DEL est allumée et ne clignote pas.
Si le réglage a échoué, la DEL clignote sans cesse.
22
Manuel d’utilisateur IAQPoint
Honeywell
511703
9/08
Comment utiliser l’IAQPoint
Étalonnage du zéro et du gain
Comment étalonner la sonde CO2
La fonction d’étalonnage du gain est représentée par le code de
clignotement 2, dont voici la procédure :
•
•
•
Avant de démarrer l’étalonnage (depuis le menu de
programmation), brancher le régulateur de débit sur le cylindre de
gaz.
Ajuster le débit du régulateur à 0.1 L/min (pour la plage de 2000
ppm).
Relier la sortie du régulateur à la sonde tel qu'illustré (ci-gauche).
Commencer à exposer la sonde au gaz d’étalonnage 10
minutes avant de démarrer l’étalonnage et tout au long
du processus.
•
•
•
Appuyer sur le bouton poussoir et maintenir enfoncé pendant deux
clignotements de la DEL, puis relâcher.
La DEL clignotera le code de 4 clignotements trois fois (4
clignotements et une pause; 4 clignotements et une pause; 4
clignotements et une pause), pour confirmer la fonction
sélectionnée.
Appuyer sur le bouton poussoir une fois pour confirmer la
commande (s’il n’y a pas de confirmation après 32 secondes,
l’écran revient au menu principal). Le réglage du zéro commence et
la DEL clignote 3 fois toutes les 4 secondes.
Si l’étalonnage du gain est réussi, la DEL est allumée et ne clignote
pas.
Si l’étalonnage du gain a échoué, la DEL clignote sans cesse.
511703
9/08
Manuel d’utilisateur IAQPoint
Honeywell
23
Using the IAQPoint
Programming Menus
Setting the Sensor Zero
This option allows users to calibrate the sensor Zero.
Never calibrate the sensor Zero with ambiant air. Always
use Nitrogen (N2). Make sure to release the gas to the
sensor for at least 10 minutes before beginning and
continue throughout.
•
•
•
•
•
Before starting the calibration (using
the programming menus), connect
the regulator to the gas cylinder.
Adjust the flow rate to 0.1 L/min.
Open the rubber cap on the
IAQPoint calibration port and
connect the tubing from the regulator
to the sensor, as shown.
Let the gas flow for at least 10
minutes before starting the
calibration.
Calibration
Gas Cylinder
Scroll to the CO2 Set Zero screen and press Enter to select.
* Menu *
CO2 Set Zero
•
The next screen requests confirmation; Use the Up or Down buttons
to display YES and press Enter to confirm. (If there is no confirmation
within 32 seconds, the calibration is automatically canceled and
display returns to the main menu option.)
CO2 Set Zero
YES
IAQPoint User Manual
25
Using the IAQPoint
Programming Menus
A confirmation screen is briefly displayed and the zero calibration begins.
*Menu*
In Calib
A success or failure message is displayed and the screen returns to the
main menu option.
CO2 Set Zero
SUCCESS
Calibrating the CO2 Sensor
This option allows users to calibrate the sensor’s span.
Note: When calibrating a duct mounted unit, the unit must be removed
from its base to ensure proper calibration.
•
•
•
Before starting the calibration (using the programming menus),
connect the regulator to the gas cylinder.
Adjust the flow rate to 0.1 L/min.(for the 2000 ppm range)
Connect the tubing from the regulator to the sensor, as shown in the
image at left.
Start exposing the sensor to the calibration gas at least
10 minutes before starting and throughout the calibration
process.
•
•
Let the gas flow for at least 10 minutes before starting the calibration.
Scroll to the “CO2 Set Span” main menu option and press Enter to
select.
* Menu *
CO2 Set Span
•
The next screen allows you to specify the span calibration gas
concentration value.
Set Span Gas
2000
26
IAQPoint User Manual
Using the IAQPoint
Programming Menus
•
Use the Up or Down buttons to increase or decrease the value and
press Enter to select.
CO2 Set Span
YES
•
The next screen requests confirmation; press Enter to confirm and
the screen displays the following message. (If there is no confirmation
within 32 seconds, the calibration is automatically canceled and
display returns to the main menu option)
*Menu*
In Calib
A success or failure message is displayed and the screen returns to the
main menu option.
CO2 Set Span
SUCCESS
IAQPoint User Manual
27
Comment utiliser l’IAQPoint
Menus de programmation
Comment régler le zéro de la sonde
Cette option permet de régler le zéro de la sonde.
Ne jamais régler le zéro de la sonde à l’air ambiant.
Toujours utiliser de l’azote (N2). Émettre le gaz pendant
10 minutes avant de démarrer et tout au long du réglage.
•
•
•
Avant de démarrer l’étalonnage
(depuis le menu de
programmation), brancher le
régulateur de débit sur le cylindre
de gaz.
Ajuster le débit du régulateur à
0.1 L/min.
Ouvrir le bouchon du port
d’étalonnage puis relier la sortie
du régulateur à la sonde tel
qu'illustré.
Bouteille à gaz
d’étalonnage
•
Émettre le gaz pendant 10
minutes AVANT de démarrer l’étalonnage.
•
Naviguer à l’option « CO2 Set Zero » puis appuyer sur Retour pour
sélectionner.
* Menu *
CO2 Set Zero
•
L’écran suivant demande une confirmation; utiliser le bouton haut ou
bas pour afficher YES puis appuyer sur Retour pour confirmer. (Si le
système n’a pas de confirmation après 32 secondes, le réglage est
annulé puis l’écran revient à l’option de menu principale.)
CO2 Set Zero
YES
Un écran de confirmation est affiché brièvement et le réglage du zéro
commence.
*Menu*
In Calib
Manuel d’utilisateur IAQPoint
25
Comment utiliser l’IAQPoint
Menus de programmation
Un message de réussite ou d’échec est affiché puis l’écran revient au
menu principal.
CO2 Set Zero
SUCCESS
Comment étalonner la sonde CO2
L’option « CO2 Set Span » permet d’étalonner le gain de la sonde.
Note: Lors de l’étalonnage d’unité monté sur conduit, l’unité doît être
déconnnectée de sa base pour assurer un étalonnage exact.
•
•
•
Avant de démarrer l’étalonnage (depuis le menu de programmation),
brancher le régulateur de débit sur le cylindre de gaz.
Ajuster le débit du régulateur à 0.1 L/min (pour la plage de 2000
ppm).
Relier la sortie du régulateur à la sonde tel qu'illustré (ci-gauche).
Commencer à exposer la sonde au gaz d’étalonnage 10
minutes avant de démarrer l’étalonnage et tout au long
du processus.
•
•
Émettre le gaz pendant 10 minutes AVANT de démarrer l’étalonnage.
Naviguer à l’écran « CO2 Set Span » puis appuyer sur Retour pour
sélectionner.
* Menu *
CO2 Set Span
•
L’écran suivant permet de préciser la concentration du gaz
d’étalonnage.
Set Span Gas
2000
26
Manuel d’utilisateur IAQPoint
Comment utiliser l’IAQPoint
Menus de programmation
•
Utiliser les boutons haut ou bas pour augmenter ou pour diminuer la
valeur puis appuyer sur Retour pour confirmer.
CO2 Set Span
YES
•
L’écran suivant demande une confirmation; utiliser le bouton haut ou
bas pour afficher YES puis appuyer sur Retour pour confirmer. (Si le
système n’a pas de confirmation après 32 secondes, l’étalonnage est
annulé puis l’écran revient à l’option de menu principale.)
*Menu*
In Calib
•
Un écran de confirmation est affiché brièvement et le réglage du zéro
commence.
CO2 Set Span
SUCCESS
Un message de réussite ou d’échec est affiché puis l’écran revient au
menu principal.
Manuel d’utilisateur IAQPoint
27
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
ST
IF YOUR TRANSMITTER WAS PURCHASED BEFORE APRIL 1ST 2004, CONTACT OUR TECHNICAL SUPPORT LINE AT 1-800-563-2967
CALIBRATION PROCEDURE
VA301D2
1. WARM-UP PERIOD
Turn the unit on for a minimum of fifteen (15) minutes.
Check Calibration Information (Table I) for specific warm-up time.
2. CONNECTING THE HARDWARE
Plug the calibration adaptor onto the gas sensor inlet.
Screw the regulator to the calibration Span gas cylinder for the Span adjustment or Zero gas
cylinder for the Zero adjustment and set the appropriate flow rate (Table I).
Connect the regulator outlet to the calibration adaptor (Figure I)
3. ADJUSTING THE ZERO (IF REQUIRED)
When the unit indicates 0 %/ppm in an area with no presence of the target gas, proceed to step 4.
Turn on the regulator.
The calibration zero gas is now flowing into the unit.
Wait for 2.5 minutes minimum to allow the reading to stabilize.
Place the magnet on top of Menu.
Then place it above Up or Down arrow until the password VA is reached.
Place the magnet on top of Menu to acknowledge.
Place the magnet on top of Up or Down arrow until the Set Zero field is reached.
Place the magnet on top of Menu to acknowledge.
Place the magnet on top of Menu to activate GoCalib.
Wait message appears, the transmitter will go into zero calibration.
The calibration procedure is finished when the Menu Set Zero message appears.
Place the magnet on top of Up or Down arrow until the Quit field is reached.
Place the magnet on top of Menu to confirm.
4. ADJUSTING THE SPAN
Turn on the regulator.
The calibration span gas is now flowing into the unit.
Wait for 2.5 minutes minimum to allow the reading to stabilize.
Place the magnet on top of Menu.
Then place it above Up or Down arrow until the password VA is reached.
Place the magnet on top of Menu to acknowledge.
Place the magnet on top of Up or Down arrow until the Set Span field is reached.
Place the magnet on top of Menu to acknowledge.
Place the magnet on top of Up or Down arrow to select the proper gas value multiplied by the
conversion factor, if needed (see Table I, II or III).
Once the span gas value is selected, place the magnet on top of Menu to acknowledge.
When GoCalib? Is displayed, place the magnet on top of Menu to start the calibration.
Wait message appears, the transmitter will go into auto calibration mode.
During the calibration, Set Span and gas reading are displayed
The calibration procedure is finished when the Menu Set Span message appears.
Place the magnet on top of Up or Down arrow until the Quit field is reached.
Place the magnet on top of Menu to exit.
PAGE 1 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
TABLE I - CALIBRATION INFORMATION
Gas
Scale
Warm-up
Factor
Flow Rate
Combustible
Infrared
Combustible
CL2
CO
0 - 102% LEL
15 min.
Table II
500 ml/min
1% Volume CH4 = 20% LEL CH4.
0 – 102% LEL
15 min.
Table III
500 ml/min
2.5% Volume CH4 = 50% LEL CH4.
0 - 15.3 ppm
0 - 255 ppm
15 min.
N/A
N/A
N/A
500 ml/min
500 ml/min
ETO
0 - 20.4 ppm
15 min.
N/A
500 ml/min
H2S
0 - 51.0 ppm
15 min.
N/A
500 ml/min
HCL
0 - 25.5 ppm
15 min.
N/A
500 ml/min
HCN
HF
0 - 51.0 ppm
0 - 10.2 ppm
15 min.
15 min.
N/A
0.2
500 ml/min
500 ml/min
NO
0 - 102 ppm
15 min.
N/A
500 ml/min
15 min.
N/A
15 min.
15 min.
15 min
N/A
N/A
N/A
N/A
1.3
500 ml/min
500 ml/min
500 ml/min
500 ml/min
500 ml/min
NO2
0 - 10.2 ppm
O2
0 - 25.5%
SO2
0 -10.2 ppm
SIH4
0 -10.2 ppm
F2
0 – 2.6 ppm
500 ml/min = 30 l/h on regulator
Notes
Nitrogen dioxide is a surrogate gas for HF
CL2 is a surrogate gas for F2
Figure I – Calibration equipment setup
PAGE 2 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
TABLE II - CONVERSION FACTOR FOR COMBUSTIBLES (PELLISTOR)
Gas
Factor
Gas
Factor
Gas
Factor
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
Methane
1.000
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
TABLE III - CONVERSION FACTOR FOR COMBUSTIBLES (INFRARED)
Gas
Acetone
Acetylene
Butane
Cyclohexane
Ethylacetate
Ethylene
Heptane
Hexane
PAGE 3 OF 8
© COPYRIGHT VULCAIN ALARME INC.
Factor
0.025
0.050
0.900
0.800
0.600
0.010
0.800
0.750
Gas
Hydrogen
Isopropyl Alcohol
Methane
Methylethyl Ketone
Octane
Pentane
Propane
Toluene
Unleaded petrol
Factor
-0.800
0.350
0.400
0.600
1.000
1.000
0.150
0.550
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
CALIBRATION KIT
Standard Calibration Kit (58L or 103L cylinder)
Order Number
Description
SKCOMBEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
SKCH4EXPL2.5
STANDARD CAL KIT FOR VA201D, VA301D / D2IR COMBUSTIBLE, 103L (CH4 50% LEL BAL AIR)
SKH2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2, 103L (H2 1% BAL AIR)
SKO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 O2, 103L (O2 20% BAL N2)
SKCOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO, 103L (CO 200 ppm BAL N2)
SKH2SEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2S, 58L (H2S 25 ppm BAL N2)
SKHCLEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCL, 58L (HCL 25 ppm BAL N2)
SKHCNEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCN, 58L (HCN 25 ppm BAL N2)
SKCL2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CL2, 58L (CL2 5 ppm BAL N2)
SKETOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 ETO, 58L (ETO 10 ppm BAL N2)
SKSO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SO2, 58L (SO2 5 ppm BAL N2)
SKNO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO2, 58L (NO2 5 ppm BAL N2)
SKCOEXPL3K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO 3000 ppm, 103L (CO 3000 ppm BAL AIR)
SKNOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO, 58L (NO 5 ppm BAL N2)
SKO3Q1
STANDARD CAL KIT FOR VA301D2 O3 GENERATOR
SKF2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 F2, 58L (CL2 2 ppm BAL N2)
SKSIH4EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SIH4, 58L (SiH4 5 ppm BAL N2)
SKHFEXPL
STANDARD CAL KIT FOR VA301D2 HF, 58L (NO2 5 ppm BAL N2)
SKCO2EXPL10K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 10000 ppm, 103L (CO2 1% BAL N2)
SKCO2EXPL25K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 30000 ppm, 103L (CO2 3% BAL N2)
Low Cost Calibration Kit (17L cylinder)
Order Number
Description
LCCOMBEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
LCH2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 H2, 17L (H2 1% BAL AIR)
LCO2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 O2, 17L (O2 20% BAL N2)
LCCOEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 CO, 17L (CO 200 ppm BAL N2)
PAGE 4 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
ER
SI VOTRE TRANSMETTEUR A ETE ACHETE AVANT LE 1ER AVRIL 2004, SVP CONTACTEZ NOTRE DEPARTEMENT DU SERVICE TECHNIQUE AU NUMERO
SUIVANT 1-800-563-2967
PROCÉDURE D’ÉTALONNAGE
VA301D2
1. PERIODE DE RECHAUFFEMENT
Alimenter l’appareil, laissez la sonde chauffer pendant la période requise (voir Table IV).
2. BRANCHER LES REGULATEURS
Ajuster votre multimètre pour lire des voltages DC
Brancher le régulateur de débit sur le cylindre de gaz et ajuster le régulateur au débit requis (voir
Table IV)
Brancher l’adaptateur d’étalonnage dans le port de calibration du transmetteur (Figure II)
3. ÉTALONNAGE DU ZERO (SI REQUIS)
Dans un environnement libre du gaz à détecté, l’étalonnage du Zéro n’est pas requise si l’unité
affiche une concentration de 0 %/ppm. Continuer à l’étape 4.
Ouvrir le régulateur
Attendre un minimum de 2.5 minutes pour permettre à la lecture de se stabiliser.
Placer l’aimant au dessus de Menu.
Activer les flèches Haut ou Bas pour entrer le mot de passe VA.
Placer l’aimant au dessus de Menu pour valider le mot de passe.
Activer les flèches Haut ou Bas pour afficher le message Set Zero.
Placer l’aimant au dessus de Menu pour valider.
Le message GoCalib apparaît.
Placer l’aimant au dessus de Menu pour lancer l’étalonnage du Zéro.
Le message Wait apparaît pour indiquer que l’étalonnage du Zéro est en cours.
L’étalonnage est terminé lorsque le message Menu Set Zero apparaît.
Activer les flèches Haut ou Bas pour afficher le message Quit.
Placer l’aimant au dessus de Menu pour quitter.
4. ÉTALONNAGE DU GAIN
Ouvrir le régulateur
Attendre un minimum de 2.5 minutes pour permettre à la lecture de se stabiliser.
Placer l’aimant au dessus de Menu.
Activer les flèches Haut ou Bas pour entrer le mot de passe VA.
Placer l’aimant au dessus de Menu pour valider le mot de passe.
Activer les flèches Haut ou Bas pour afficher le message Set Span.
Placer l’aimant au dessus de Menu pour valider.
Activer les flèches Haut ou Bas pour entrer la Concentration du gaz utilisée multiplié par le Facteur
de conversion, si besoin (voir Table IV, V ou VI).
Placer l’aimant au dessus de Menu pour valider la valeur calculée précédemment.
Le message GoCalib apparaît.
Placer l’aimant au dessus de Menu pour lancer l’étalonnage du Gain.
Le message Wait apparaît pour indiquer que l’étalonnage du Gain est en cours.
L’étalonnage est terminé lorsque le message Menu Set Span apparaît.
Activer les flèches Haut ou Bas pour afficher le message Quit.
Placer l’aimant au dessus de Menu pour quitter.
PAGE 5 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
TABLE IV - INFORMATION D’ETALONNAGE
Temps de
Facteurr
réchauffement
Débit
Gaz
Échelle
Notes
Combustible
Combustible
Infra rouge
CL2
CO
0 - 102% LEL
15 min.
Table V
500 ml/min
1% Volume CH4 = 20% LEL CH4.
0 – 102% LEL
15 min.
Table VI
500 ml/min
2.5% Volume CH4 = 50% LEL CH4.
0 - 15.3 ppm
0 - 255 ppm
15 min.
N/A
N/A
N/A
500 ml/min
500 ml/min
ml/min
ETO
0 - 20.4 ppm
15 min.
N/A
500 ml/min
H2S
0 - 51.0 ppm
15 min.
N/A
500 ml/min
HCL
0 - 25.5 ppm
15 min.
N/A
500 ml/min
HCN
HF
0 - 51.0 ppm
0 - 10.2 ppm
15 min.
15 min.
N/A
0.2
500 ml/min
500 ml/min
NO
0 - 102 ppm
15 min.
N/A
500 ml/min
NO2
0 - 10.2 ppm
15 min.
O2
0 - 25.5%
N/A
SO2
0 -10.2 ppm
15 min.
SIH4
0 -10.2 ppm
15 min.
F2
0 – 2.6 ppm
15 min
500 ml/min = 30 l/h sur le régulateur
N/A
N/A
N/A
N/A
1.3
500 ml/min
500 ml/min
500 ml/min
500 ml/min
500 ml/min
Le NO2 est utilisé en remplacement du HF
CL2 est utilisé en remplacement du F2
Figure II – Configuration de l’équipement
PAGE 6 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
Table V – Facteur de conversion pour gaz explosif (pellistor)
Gaz
Facteur
Gaz
Facteur
Gaz
Facteur
1,2-Propylene Oxide
1,3-Butadiene C4H6
1,4 Dioxane
1,4-Hexadiene
1-Butene C4H8
1-Pentene
1-Hexene
Acetaldehyde
Acetic Acid
Acetic Anhydride
Acetone
Acetonitrile
Acetylene
Acrylonitrile
Aniline
Benzene
Carbonyl Sulphide
Chlorobenzene
Cis-Butene-2
Cis-Hexene (2&3)
Cyanogen
Cyclohexane
Cyclopentane
Cyclopropane
Deutarium
Diethyl Ether
Diiso-propyl Ether
Dimethly Butane
Dimethyl Ether
Dimethylhydrazine
Dimethyl Sulphide
Dimethyl Pentane
Ethane
Ethyl Acetate
2.593
2.546
2.513
1.504
2.146
2.207
2.535
2.034
3.413
2.056
2.208
2.328
1.665
2.202
2.985
2.512
1.023
2.976
2.051
2.525
1.058
2.492
1.966
1.518
1.067
2.285
2.342
2.683
1.714
1.424
2.323
2.317
1.392
2.563
Ethyl Alcohol C2H6O
Ethyl Bromide
Ethyl Chloride
Ethyl Formate
Ethyl Mercaptan
Ethyl Methyl Ether
Ethylamine
Ethyl Benzene
Ethylene
Ethylene Alcohol C2H6O2
Ethylene Dichloride
Ethyl Pentane
Hydrazine
Hydrogen
I-Propyl Acetate
Iso-Butane
Iso-Butyl Alcohol
Isobutylene
Iso-Pentane
Iso-Propyl Alcohol C3H8O
1.691
0.942
1.748
2.374
1.750
2.305
1.394
2.884
1.537
1.700
1.502
2.354
1.949
1.233
2.442
1.832
2.541
1.950
2.300
2.582
Methane
1.000
Methyl Acetate
Methyl Alcohol
Methyl Bromide
Methyl Chloride
Methyl Ethyl Ketone
Methyl Formate
Methylhydrazine
Methyl Mercaptan
Methyl Propionate
Methyl Propyl Ketone
Methylamine
Methylcyclohexane
Methylene Chloride
2.156
1.460
1.055
1.297
2.631
1.857
2.358
1.602
2.091
2.694
1.250
2.559
1.026
Methylhexane
Methylpentane
M-Xylene
N-Butane
N-butyl Alcohol C4H10O
N-Butyric Acid
N-Decane
Neo-Pentane
N-Heptane
N-Hexane
Nitromethane
N-Octane
N-Pentane
N-Propyl Acetate
N-Propyl Alcohol
N-Propyl Chloride
N-Propylamine
O-Xylene
Propyne
Propane C3H8
Propene C3H6
P-Xylene
sStyrene Monomer
Tert-Butyl Alcohol
Tetrahydrofuran
Toluene C7H8
Trans-Butene-2
Trans-Hexene (2&3)
Triethylamine
Trimethylamine
Trimethylbutane
Vinyl Acetate
Vinyl Chloride
2.376
2.705
2.693
2.040
3.042
2.433
3.413
2.388
2.689
2.349
2.146
2.854
2.210
2.440
1.967
1.808
2.071
2.998
2.304
1.883
1.837
2.772
2.665
1.778
1.824
2.470
1.882
2.543
2.524
1.945
2.296
1.904
1.825
Table VI – Facteur de conversion pour gaz explosif (infra rouge)
Gaz
Acetone
Acetylene
Butane
Cyclohexane
Ethylacetate
Ethylene
Heptane
Hexane
PAGE 7 OF 8
© COPYRIGHT VULCAIN ALARME INC.
Facteur
0.025
0.050
0.900
0.800
0.600
0.010
0.800
0.750
Gaz
Hydrogen
Isopropyl Alcohol
Methane
Methylethyl Ketone
Octane
Pentane
Propane
Toluene
Unleaded petrol
Facteur
-0.800
0.350
0.400
0.600
1.000
1.000
0.150
0.550
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
CALIBRATION PROCEDURE VA301D2
PROCÉDURE D’ÉTALONNAGE VA301D2
KIT D’ÉTALONNAGE
Kit D’étalonnage Standard (Cylindre de 58L ou 103L)
Order Number
Description
SKCOMBEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 103L (CH4 20% LEL BAL AIR)
SKCH4EXPL2.5
STANDARD CAL KIT FOR VA201D, VA301D / D2IR COMBUSTIBLE, 103L (CH4 50% LEL BAL AIR)
SKH2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2, 103L (H2 1% BAL AIR)
SKO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 O2, 103L (O2 20% BAL N2)
SKCOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO, 103L (CO 200 ppm BAL N2)
SKH2SEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 H2S, 58L (H2S 25 ppm BAL N2)
SKHCLEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCL, 58L (HCL 25 ppm BAL N2)
SKHCNEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 HCN, 58L (HCN 25 ppm BAL N2)
SKCL2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 CL2, 58L (CL2 5 ppm BAL N2)
SKETOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 ETO, 58L (ETO 10 ppm BAL N2)
SKSO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SO2, 58L (SO2 5 ppm BAL N2)
SKNO2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO2, 58L (NO2 5 ppm BAL N2)
SKCOEXPL3K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO 3000 ppm, 103L (CO 3000 ppm BAL AIR)
SKNOEXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 NO, 58L (NO 5 ppm BAL N2)
SKO3Q1
STANDARD CAL KIT FOR VA301D2 O3 GENERATOR
SKF2EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 F2, 58L (CL2 2 ppm BAL N2)
SKSIH4EXPL
STANDARD CAL KIT FOR VA201D, VA301D / D2 SIH4, 58L (SiH4 5 ppm BAL N2)
SKHFEXPL
STANDARD CAL KIT FOR VA301D2 HF, 58L (NO2 5 ppm BAL N2)
SKCO2EXPL10K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 10000 ppm, 103L (CO2 1% BAL N2)
SKCO2EXPL25K
STANDARD CAL KIT FOR VA201D, VA301D / D2 CO2 30000 ppm, 103L (CO2 3% BAL N2)
Kit D’étalonnage « Low Cost » (Cylinder 17L)
Order Number
Description
LCCOMBEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 COMBUSTIBLE, 17L (CH4 20% LEL BAL AIR)
LCH2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 H2, 17L (H2 1% BAL AIR)
LCO2EXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 O2, 17L (O2 20% BAL N2)
LCCOEXPL
LOW COST CAL KIT FOR VA201D, VA301D / D2 CO, 17L (CO 200 ppm BAL N2)
PAGE 8 OF 8
© COPYRIGHT VULCAIN ALARME INC.
508619 VA301D2 CALIBRATIONPROCEDURE.PDF R03
90DM4 CALIBRATION PROCEDURE
Make sure that the unit has completed its warm up cycle (approximately 15 minutes) before beginning the
calibration.
CONNECTING THE HARDWARE
1. Plug the calibration adaptor onto the gas sensor inlet.
2. Screw the regulator to the calibration zero gas cylinder and adjust the flow rate to 0.5L/min.
3. Connect the regulator outlet to the calibration adaptor as shown on Figure I.
ADJUSTING THE ZERO (UNITS WITHOUT DISPLAY)
1.
2.
3.
4.
5.
6.
7.
Turn on the regulator.
The nitrogen Zero gas is now flowing into the unit.
Let the gas flow for a minimum of 10 minutes.
Press the left button once and wait for the red LED to begin flashing.
Press the left button again to confirm the start of calibration.
The red LED will then blink quickly during the entire calibration process.
The calibration procedure is finished when the red LED blinks normally.
ADJUSTING THE ZERO (UNITS WITH DISPLAY)
Access to the 90DM4 programming is achieved through push buttons located on the back of the device,
accessible through an oblong cut-out. The left hand button opens access to programming functions and
validates selections (equivalent to an Enter button). The right hand button scrolls through main
programming screens and increases values when in a specific programming screen.
ƒ
ƒ
Hold the unit (facing you) in both hands
Place both index fingers through the cut-out until they touch the left and right push buttons,
respectively.
Press the left button to access the programming menus.
ƒ
1. Turn on the regulator. The nitrogen is now flowing into the unit. Wait for 10 minutes minimum to allow
the reading to stabilize.
2. Press the left pushbutton to access the menu.
Password
3. Use the right pushbutton to change the letters one at a time; when the password
VA
* VA *
is displayed press the left pushbutton to confirm.
4. Use the right pushbutton button to scroll to the Set Zero option and press the left
MainProg
pushbutton to confirm.
Set Zero
5. When GoCalib is displayed, press the right pushbutton button to display Yes.
6. Press the left pushbutton to start the Zero calibration.
GoCalib?
7. A *Wait* message is displayed while the unit is being calibrated.
Yes
8. The calibration is complete when the display shows the Cal. Zero Complete
message. The display returns to the Menu Set Zero screen.
9. Use the right pushbutton button to scroll to the Quit field and press the left pushbutton to exit.
1
www.honeywellanalytics.com
510244 90DM4 CalibrationProcedure.PDF R02
90DM4 CALIBRATION PROCEDURE
CALIBRATING THE SPAN (UNITS WITH DISPLAY)
Access to the 90DM4 programming is achieved through push buttons located on the back of the device,
accessible through an oblong cut-out. The left hand button opens access to programming functions and
validates selections (equivalent to an Enter button). The right hand button scrolls through main
programming screens and increases values when in a specific programming screen.
ƒ
ƒ
ƒ
Hold the unit (facing you) in both hands
Place both index fingers through the cut-out until they touch the left and right push buttons,
respectively.
Press the left button to access the programming menus.
1. Turn on the regulator. The calibration gas is now flowing into the unit. Wait for 10 minutes minimum to
allow the reading to stabilize.
2. Press the left pushbutton to access the menu.
Password
3. Use the right pushbutton to change each letter until the password VA is reached.
* VA *
4. Press the left pushbutton to confirm each letter.
MainProg
5. Use the right pushbutton to scroll to the Menu Set Span screen.
Set Zero
6. Press the left pushbutton to select.
GoCalib?
7. In the GoCalib screen, press the right button to scroll to Yes and press the left
Yes
pushbutton to start the calibration.
8. Wait message appears, the transmitter will go into Span calibration.
9. The calibration procedure is finished when the Menu Set Span message appears.
10. Press the right pushbutton until the Quit screen is displayed and press the left pushbutton to exit.
Table I - Calibration Information
Gas
Scale
Warm-up
N2
0 - 2000 ppm
15 minutes
Notes
Figure I – Calibration equipment setup
CALIBRATION KIT
Standard Calibration Kit
Order Number
Description
SKCO290DM3
STANDARD CAL KIT FOR 90DM3/90DM4/IAQPoint CO2, 103L N2
Low Cost Calibration Kit
Order Number
Description
LCCO290DM3
LOW COST CAL KIT FOR 90DM3/90DM4/IAQPoint CO2, 17L N2
510244 90DM4 CalibrationProcedure.PDF R02
www.honeywellanalytics.com
2
PROCÉDURE D’ÉTALONNAGE 90DM4
Il est important d’attendre que le cycle de réchauffement soit complété (environ 15 minutes) avant de
démarrer l’étalonnage.
BRANCHER LES RÉGULATEURS
1. Brancher le régulateur de débit sur le cylindre de gaz
2. Ajuster le débit du régulateur à 0.5L/min.
3. Relier la sortie du régulateur à la sonde tel qu’illustré à la Figure III.
ÉTALONNAGE DU ZÉRO SANS AFFICHEUR
1.
2.
3.
4.
5.
6.
Ouvrir le régulateur
Laisser le gaz circuler pour 10 minutes minimum.
Appuyer sur le bouton gauche une fois et attendre que la lumière rouge clignote.
Appuyer de nouveau sur le bouton gauche pour lancer l’étalonnage du Zéro.
La lumière rouge clignote rapidement durant toute la durée de l’étalonnage.
L’étalonnage est terminé lorsque la lumière clignote normalement.
ÉTALONNAGE DU ZÉRO AVEC AFFICHEUR
La programmation du 90DM4 est effectuée depuis des boutons poussoirs situés à l’arrière de l’unité, dont
un trou oblong donne accès. Le bouton de gauche permet d’accéder aux menus et de valider les
sélections (équivalent à la touche Retour). Le bouton droit permet de naviguer les menus et d’augmenter
les valeurs affichées à l’écran.
ƒ
ƒ
ƒ
Tenir l’unité dans les 2 mains, face à vous.
Placer les deux index dans le trou et toucher les boutons droit et gauche.
Appuyer sur le bouton de gauche pour accéder aux menus de programmation.
1. Ouvrir le régulateur. Attendre un minimum de 10 minutes pour permettre à la lecture de se stabiliser.
2. Appuyer sur le bouton gauche pour accéder au menu.
3. Appuyer sur le bouton droit pour entrer le mot de passe VA, une lettre à la fois.
Password
* VA *
Appuyer sur le bouton gauche pour valider chaque lettre du mot de passe.
4. Appuyer sur le bouton droit pour afficher le message Set Zero. Appuyer sur le bouton
MainProg
Enter pour valider.
Set Zero
5. Dans le menu GoCalib, appuyer sur le bouton Scroll pour afficher le message Yes.
GoCalib?
6. Appuyer sur le bouton gauche pour lancer l’étalonnage du Zéro (GoCalib).
Yes
7. Le message Wait apparaît pour indique que l’étalonnage est en cours.
8. L’étalonnage est terminé lorsque l’écran Cal. Zero Complete est affiché. L’afficheur revient à l’écran
Menu Set Zero.
1. Utiliser le bouton droit pour afficher l’écran Quit, puis appuyer sur le bouton gauche pour quitter.
3
www.honeywellanalytics.com
510244 90DM4 CalibrationProcedure.PDF R02
PROCÉDURE D’ÉTALONNAGE 90DM4
ETALONNAGE DU GAIN (AVEC AFFICHEUR)
La programmation du 90DM4 est effectuée depuis des boutons poussoirs situés à l’arrière de l’unité, dont
un trou oblong donne accès. Le bouton de gauche permet d’accéder aux menus et de valider les
sélections (équivalent à la touche Retour). Le bouton droit permet de naviguer les menus et d’augmenter
les valeurs affichées à l’écran.
ƒ
ƒ
ƒ
Tenir l’unité dans les 2 mains, face à vous.
Placer les deux index dans le trou et toucher les boutons droit et gauche.
Appuyer sur le bouton de gauche pour accéder aux menus de programmation.
1. Ouvrir le régulateur. Attendre un minimum de 10 minutes pour permettre à la lecture de se stabiliser.
2. Appuyer sur le bouton gauche pour accéder au menu.
3. Appuyer sur le bouton droit pour entrer le mot de passe VA, une lettre à la fois.
Password
* VA *
Appuyer sur le bouton gauche pour valider chaque lettre du mot de passe.
4. Appuyer sur le bouton droit pour afficher le message Set Span. Appuyer sur le bouton
MainProg
gauche pour valider.
Set Span
5. Dans le menu GoCalib, appuyer sur le bouton Scroll pour afficher le message Yes.
GoCalib?
6. Appuyer sur le bouton gauche pour lancer l’étalonnage du gain.
Yes
7. Le message Wait apparaît pour indique que l’étalonnage est en cours.
8. L’étalonnage est terminé lorsque l’écran Cal. Span Complete est affiché. L’afficheur revient à l’écran
Menu Set Span.
9. Utiliser le bouton droit pour afficher l’écran Quit, puis appuyer sur le bouton gauche pour quitter.
INFORMATION D’ÉTALONNAGE
Gaz
Échelle
Temps de
réchauffement
N2
0 - 2000 ppm
15 minutes
Notes
Figure II – Configuration de l’équipement
TROUSSE D’ÉTALONNAGE
Trousse d’étalonnage standard
Numéro de commande
Description
SKCO290DM3
STANDARD CAL KIT FOR 90DM3/90DM4/IAQPoint CO2, 103L N2
Trousse d’étalonnage « Low Cost »
Numéro de commande
Description
LCCO290DM3
LOW COST CAL KIT FOR 90DM3/90DM4/IAQPoint CO2, 17L N2
510244 90DM4 CalibrationProcedure.PDF R02
www.honeywellanalytics.com
4
CALIBRATION PROCEDURE SP4
JULY 1ST, 2004
ST
IF YOUR TRANSMITTER WAS PURCHASED BEFORE APRIL 1ST 2004, CONTACT OUR TECHNICAL SUPPORT LINE AT 1-800-563-2967
CALIBRATION PROCEDURE
SAFETY PALM
1. CONNECTING THE HARDWARE
Plug the calibration adaptor into the gas sensor inlet.
Screw the regulator to the calibration span gas cylinder or zero gas cylinder.
Connect the regulator outlet to the calibration port (CO or CO2) with the 1/8” I.D. polymer tubing.
2. ADJUSTING THE ZERO (IF REQUIRED)
CO: This must be performed in a area where there’s no presence of carbon monoxide.
If you suspect the presence of CO in the area, inject nitrogen at a flow rate of 100ml/min (N2 gas bottle
available at Vulcain 103L: #500047 or 17L: #501038), let the gas flow for 1 minute before continuing on.
CO2: The zero calibration must not be done in ambient air, since there’s always carbon dioxide present. The
CO gas bottle is going to be used avoiding the expense of a nitrogen gas bottle.
Turn on the regulator.
The zero gas is now flowing into the unit.
Let the gas flow for a minimum of 1 minute.
Press the Mode/Esc key.
Using the Up and Down arrow keys, select the Zero menu.
Press the Enter key to confirm.
n2 is displayed on the screen to remind you to inject nitrogen.
Using the Up and Down arrow keys, select the CO or CO2 sensor.
Press the Enter key to start the zero calibration.
CAL is now displayed on the screen while the unit is calibrating itself.
Repeat the steps for the other sensor if necessary.
Press the Mode/Esc key to exit.
3. ADJUSTING THE GAS
Press the Mode/Esc key.
Using the Up and Down arrow keys, select the Gas menu.
Press the Enter key to confirm.
Using the Up and Down arrow keys, select the CO sensor.
Press the Enter key to confirm.
The value will flash.
Using the Up and Down arrow keys adjust the value to match your span gas cylinder value.
Press the Enter key to confirm.
Press the Mode/Esc key to exit.
4. ADJUSTING THE SPAN
Turn on the regulator.
The span gas is now flowing into the unit.
Let the gas flow for a minimum of 1 minute.
Using the Up and Down arrow keys, select the Span menu.
Press the Enter key to confirm.
Using the Up and Down arrow keys, select the CO sensor.
Press the Enter key to start the span calibration.
The value is now displayed on the screen while the unit is calibrating itself.
Press the Mode/Esc key to exit.
Note: Verify sensor calibration by re-emitting the calibration gas. If the value displayed is close the value of
your calibration gas, it means that your calibration was successful.
PAGE 1 OF 3
© COPYRIGHT VULCAIN ALARME INC.
DI0061
CALIBRATION PROCEDURE SP4
JULY 1ST, 2004
CALIBRATION INFORMATION
PAGE 2 OF 3
Gas
Sensor
Warm-up
CO
CO2
SCO-4BW
6004
5 min.
1 hour
© COPYRIGHT VULCAIN ALARME INC.
DI0061
CALIBRATION PROCEDURE SP4
JULY 1ST, 2004
EQUIPMENT REQUIRED DURING CALIBRATION
Gas
Calibration kit
Standard
Calibration Gas
Standard
Calibration kit
Low Cost
Calibration Gas
Low Cost
CO
SKSP4IAQ4 (504819)
CKCO200BN2103 (500988)
LCSP4IAQ (507072)
CKCO200BN217 (501025)
CALIBRATION KIT STANDARD INCLUDES:
Item number
Description
Calibration gas
CK-TUBE1/8 (501062)
CK-REG0.1LPM/103L/58L (502874)
Calibration gas.
1/8” I.D. polymer tubing.
0.1 lpm pressure reducing regulator for 103 litre cylinder.
CALIBRATION KIT LOW COST INCLUDES:
Item number
Description
Calibration gas
CK-TUBE1/8 (501062)
CK-REG0.1LPM/103L/58L (502874)
Calibration gas.
1/8” I.D. polymer tubing.
0.1 lpm pressure reducing regulator for 17 litre cylinder.
PAGE 3 OF 3
© COPYRIGHT VULCAIN ALARME INC.
DI0061
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement