Safety Relay
Series UE 45-3 S 1
GB
1 S a f e t y
The UE 45-3 S 1 Safety Relay fulfils the specific Safety requirements up to Safety Category 4 (EN 954) for Stop Category 0 (EN 60 0204-
1) and Safety Category 3 (EN 954) for Stop Category 1 (EN 60 0204-
1).
1.1
Safety Regulations
!
Installation and electrical connection must be carried out solely by technically qualified technicians.
!
For use and installation of Safety Relays and for commissioning and routine technical checks , the National and International le gislative regulations shall apply, in particular
-
the Directive 98/37 EG on Machinery the Directive 89/655 EWG on the use of operational resources
-
the Low Voltage Directive 73/23/ EWG
Safety leg islation and enactments , plus
accident prevention Regulations and Safety Regulations
Manufacturers and operators of the machine , on which safety devices are used , are responsible for ensuring that all currently applicable Safety legislation and Safety Regulations are def ined for them by the Authorities responsible and are heeded and observed .
!
The instructions and test directives contained in this Operating
Instructions are to be heeded and maintained without fail.
!
The examinations and tests are to be carried out by technicians or by persons authorised and commissioned for this purpose inhouse, and the results are to be documented in a manner that enbles traceability to be effected at any time.
!
The Operating Instructions are to be made available to the operator of the machine on which the Safety Switch is used . The operator of the machine is to be given induction instructions by a skilled technician.
!
The Operating Manual is to be archived for later use and reference !
1.2
Application areas of the instruments
!
!
The UE 45-3 S 1 Safety Relay is used exclusively on potential-free safety sensors, such as:
!
Emergency Stop Switches (EN 418): single -channel and dualchannel
Safety interlocks ( EN 1088): single - channel and dual- channel
Electrical safety circuits to E N 60 204-1, such as for example on movable covers and guards
1.3
Use in accordance with the Regulations
In any other application or in the event of modifications to the unit, or if the unit has been opened, even as part of assembling or installation procedure, any claims against SICK shall become null and void.
1.4
Environmentally correct disposal
Unusable and irreparable units are, at all times, to be disposed of in accordance with the applicable waste disposal legislation specific to the country concerned. SICK will, if asked, gladly assist in disposing of units.
2 Product description
2.1
Construction and method of operation
The inputs of the UE 45-3 S 1 Safety Relays are prepared for connection to the safety sensors mentioned in the Section entitled
“Application areas of the instruments“. Two separate input circuits control the internal relays. The three electrical output circuits serve as safety outputs.
2.2
Functions of the unit
Opening the input circuits effects immediate opening of two electrical output circuits and a time lagged opening of a third electrical output circuit. The time delay can be infinitely set on the Safety Relay within the setting ranges.
Release delayed of the electrical output circuit: This electrical output circuit opens in respect to the two standard electrical output circuit having an adjustable time delay of 0,15 - 3 sec respectively 1,5 -
30 sec.
Manual reset: Closing of the input circuits does not effect an immediate closing of the three electrical output circuits. This is not accomplished until the Reset button has been activated. Depending upon the wiring, resetting is effected with a falling edge or with an rising edge.
Automatic reset: Closing the input circuits effects the immediate closing of the three electrical release circuits. This function is accomplished by means of applying the appropriate method of switch wiring.
Monitoring synchronisation: Simultaneous closing of the input circuits is monitored. Only if input circuit 2 closes at the very latest by 0.5 sec after input circuit 1 closes, do the electrical release circuits close too. If the input circuit 2 closes before input circuit 1, no monitoring for synchronisation occurs, and the electrical output circuits close.
Fig. 1: Internal circuitry UE 45-3
External Device Monitoring: The EDM-system monitors the switches (e. g. motor contactors) controlled by the electrical output circuits. By wiring of the alarm contacts of the actuators in series to the reset input, the electrical output circuits only close if all actuators are opened. This monitoring control is only activating upon resetting.
Cross connection detection: A cross connection is detected for dual-channel switching of the input circuits, when switching is effected with a variance in polarity.
2.3
Indicators
The LEDs, fitted in the cover of the unit, indicate the following conditions:
Description
SUPPLY
K 1 / K 2
K 3 / K 4
Colour
Green
Green
Green
Function
Supply voltage present
Relays K 1 and K 2 energised
Release delayed relays
K 3 and K 4 energised
3 A s s e m b l y
Danger: Operation only in the control cabinet!
The UE 45-3 S 1 Safety Switch is only suitable for installation in control cabinets having a minimum protective type of enclosure to
Class IP 54.
Fitting of the units is effected by snap-clipping on to a TS 35
(EN 50 022) mounting rail.
4 Electronical installation
Danger: Switch off the system!
In order to exclude any inadvertent starting up of the system or the creating an electrical hazard, the system is to be switched off and electrically isolated from any voltage supply.
Danger: Protection against electrocution to EN 50 178
In order to secure protection from electrocution in accordance with
EN 50 178, heed the instructions given in the Technical Data.
Instructions
!
Wiring of the monitoring system for monitoring the contactors
( alarm contacts of the switch elements) is to be effected in the same installation housing used for the Safety Switch -gear.
!
To prevent fusion of the contacts of the installed relays, an electrical current overload circuit inceptor (fuse ) rated to provide protection from short- circuiting to max. 6 A ( Operation
Class gG ) is to be incorporated in the electrical output circuitry
( refer to Fig. 2, fuses F 2 / F 3 / F 4).
!
In the case of subjection to capacitive or inductive loadings of the electrical output circuits , a protective activation system
( e. g . spark arrester ) is to be provided . In so doing, attention is to be paid to ensure that the response delay periods are appropriately extended to accommodate the type of protective activation employed .
!
The cables for carrying the input and output signals are to be wired externally of the installation housing to correspond to the
Category of Safety to be applied ( EN 954). For example, protected wiring , single sheathed cable with a screen protection, etc..
!
The details g iven in the Technical Data are to be heeded unconditionally without reservation
4.1
Wiring of connections
A 1
A 2
S 11
S 33
S 21
S 34
S 35
S 12
S 31
S 22
13 - 14
23 - 24
37 - 38
+ 24 V DC (voltage supply)
0 V DC (voltage supply)
+ 24 V DC (control voltage)
Supply for Reset
0 V DC (control voltage)
Resetting (evaluation of falling edge)
Resetting (evaluation of rising edge)
+ Input circuit 1 (K 1)
+ Input circuit 2 (K 2)
– Input circuit 2 (K 2)
Electrical output circuit 1
Electrical output circuit 2
Release delayed electrical release circuit
Automatic reset
A wire bridge is to be made between S 12 and S 35.
4.2.4
External Device Monitoring
Connecting the NC contacts of the external relay in series with the
Reset button, effects static monitoring of the contacts.
5 C o m m i s s i o n i n g
Danger: Monitor the danger zone!
Prior to commissioning, it must be ensured that nobody is in the danger zone. The Safety Regulations and test instructions as described above are to be heeded.
The following functional tests / checks are to be carried out during commissioning:
5.1
Functional testing using manual resetting
After applying the supply voltage (LED SUPPLY indicator illuminates), the electrical release circuits are opened. If the connected sensor is not activated (i. e. input circuits closed), then the electrical output circuits close upon pressing the Reset button (LED for K 1 / K 2 and
K 3 / K 4 indicators illuminate).
Activation of the sensor (opening of one or both input circuits) effects the immediate opening of both electrical output circuits
(13 - 14 / 23 - 24), and the delayed release of the electrical release circuit (37 - 38) in accordance with the period of delay set (LED K 1 /
K 2 inidcators illuminating immediately and K3 / K4 indicators illuminating after a delay). By the closing of the input circuits and subsequent pressing of the Reset button, the electrical output circuits close.
5.2
Functional testing using automatic resetting
After applying the supply voltage (LED SUPPLY indicator illuminates), the electrical output circuits remain open until the sensor closes the input circuits. The electrical output circuits then close (LED K 1 / K 2 and K 3 / K 4 indicators illuminate).
Activation of the sensor (opening one or both input circuits) causes the two electrical output circuits (13 - 14 / 23 - 24) to open immediately and effects the delayed release of the electrical output circuit (37 - 38) in accordance with the delay period set (LED K 1 /
K 2 indicators extinguish immediately and K 3 / K 4 indicators extinguish after a delay).
Upon the closing of the input circuits the electrical release circuits close.
L +
M
F 1
A 1
A 2
5.3
Regu traine
!
!
Inspect / accordanc
Following equipmen commissi
6 Mainte
The UE 45-3 S maintenance t
7 Techn
Refer to Table
8 Orderi
Version
24 V DC
With screw typ
(0,15 ... 3 s)
With exchanga
(0,15 ... 3 s)
With screw typ
(1,5 ... 30 s)
With exchanga
(1,5 ... 30 s)
9 Appen
9.1
BG, UL
Certif
9.2
Exam
F 2 F 3 F 4
13 23 37
+
UE 45-3 S 1
CH1 CH2
14 24 38
K
A
K
B
Fig. 2: Basic circuit: voltage supply, 3 channel output circuit, of which 1 is a release dela
S11 S33 S34 S35
+ 4.2
Operating Modes
4.2.1
Single channel operation
Wire bridges are to be made between S 12 - S 31 and S 21 - S 22.
The Safety sensor is connected between S 11 and S 12.
4.2.2
Dual- channel operation with cross connection detection system
A wire bridge is to be effected between S 11 - S 31. The two zero potential state switches of the Safety sensor are to be connnected between S 12 - S 31 and respectively between S 21 - S 22.
4.2.3
Reset
Manual reset
The Reset button having a NO contact is wired between contacts
S 33 and S 34 (resetting with a falling edge).
The Reset button having an NC contact is wired between contacts
S 33 and S 35 (resetting with an rising edge).
The Reset button is to be installed outside the danger zone in such a manner that it cannot be activated from the danger zone. In addition, the operator must be able to fully oversee the danger zone.
– CH1 CH2
S21 S12 S31 S22
Fig. 3: Single-channel Emergency Off with manual reset facility
K
A
K
B
S11 S33 S34 S35
+
Fig. 4: Dual-ch monitoring and
3.1
3.2
3.3
3.4
13 23 24 37
1.1
1.2
1.3
1.4
A1 S35
13 23
A1
24 37
S35
A1A2
+
S33 S34S35
RESET
CONTROL- LOGIC
K 1
K 2
K 3
K 4
+
S11
-
S21 S12 S31S22
S21 S22 A2
14 38
13 23 37
14 24 38
S31 A2
2.1
2.2
2.3
2.4
14 S11 S12 38
4.1
4.2
4.3
4.4
– CH1 CH2
S21 S12 S31 S22
Fig. 5: Dual-channel Emergency Off with short circuiting monitoring, automatic reset, and contactor monitoring system
Fig. 6: Dual-ch circuit monitor reset facility
he ng es), or is ut
and ease
K 1 /
5.3
Regular inspection / testing of the safety equipment by trained technical personnel
!
Inspect / test the system within the specified period in accordance with national applicable regulations!
!
Following major modification work to the machine or the safety equipment the system is to be examined in accordance with the commissioning specification given above.
6 Maintenance
The UE 45-3 S 1 Safety Relays operate without the need for any maintenance to be carried out.
7 Technical Data
Refer to Table
8Ordering data
Version
24 V DC
With screw type terminals
(0,15 ... 3 s)
With exchangable terminals
(0,15 ... 3 s)
Type Part No.
UE 45-3 S 1 2D3 3 6 024 911
UE 45-3 S 1 3D3 3 6 024 912
With screw type terminals
(1,5 ... 30 s)
With exchangable terminals
(1,5 ... 30 s)
UE 45-3 S 1 2D3 30 6 024 913
UE 45-3 S 1 3D3 30 6 024 914 tes), the
K 2 ses put
1 /
9 Appendix
9.1
BG, UL
Certification
9.2
Examples of circuitry ts
F 2 F 3 F 4
13 23 37
3 S 1
14 24 38
Technical Data
General System Data
Safety Classification (EN 50 178)
Voltage supply to A 1 / A 2
Output circuit > 25 V AC / 60 V DC
Output circuit < 25 V AC / 60 V DC
Safety category EN 954-1
Supply voltage U
V
Consumption
AC Ripple (within the limits of U
V
)
Control voltage for S 11 - S 33 and S 21
Control voltage
Control Current
Short-circuits between S 11 and A 2)
Fuse / Circuit breakers
Response time for short circuit
Activation time upon detection of short circuit
Electrical separation between A 1 / 2 and S 11 - S 21
Input circuits (S 12 und S 31 - S 22)
Input current S 12 - S 31
Release delay K 1 / K 2 (activation time in effecting protection)
Release delay K 3 / K 4 (release delayed electrical output circuit)
Units UE 45-3 S 1 xD3 3
Units UE 45-3 S 1 xD3 30
Input current S 33 /S 34 / S 35
Reset time
Trailing edge (S 34)
Leading edge (S 35)
Synchronisation time
Activation period for reset button (S 34)
Activation period for Reset button (S 35)
Line resistance at inputs
Output circuits (13 - 14, 23 - 24, 37 - 38)
Relay contacts
Contact type
Kontaktwerkstoff
Load capability of contacts
Switching voltage
Switching current
Total switching current
Application category to EN 60 947-5-1: 1991
K
A
K
B
K
C which 1 is a release delayed type (refer to Technical Data)
S11 S33 S34 S35
+
– CH1 CH2
S21 S12 S31 S22
Permitted switching frequency
Service life, mechanical (switch clearance tolerances)
Electrical service life
Operational data
Creepage and clearance distance between the electric circuits to DIN VDE 0110 Part 1:
Measured transient/surge voltage (UImp
.
)
Overload voltage category
Contamination rating of the unit (EN 50 178) external internal
Measured voltage
Test voltage U eff
(50 Hz) EN 60 439-1
Type of protective enclosure
Casing
Terminals
Interference emission to
Noise attenuation to
Ambient operating temperature
Storage temperature
Cross-sections of conductors
Solid core wire (2x, identical cross-section)
Solid core wire (1x)
Fine multi-stranded flex with terminal sleeves
(2x, identical cross-section)
Fine multi-stranded flex with terminal sleeves (1x)
Weight
IP 40
IP 20
EN 60 947-1 02/99
EN 60 947-1 02/99
– 25 °C
– 25 °C
0.14 mm 2
0.14 mm 2
0.25 mm 2
0.25 mm 2
0,2 kg min.
typ.
max.
Protection against electrocution as per EN 50 178
PELV to A 1 / A 2
PELV or SELV to A 1 / A 2
20.4 V DC 24 V DC
2.6 W
4
26.4 V DC
2.4 V
SS
24 V DC
60 mA
PTC-Widerstand
2 200 mA
2 s
3 s nein
0.15 s
1.5 s
25 mA
40 mA
100 mA
25 ms
3 s
30 s
50 mA
30 ms
600 ms
500 ms
200 ms
750 ms
85 Ohm
2 Output circuits (NO), Stop Cat. 0, Safety Cat. 4
1 Output circuit (NO), Stop Cat. 1, Safety Cat. 3
Positively guided
Silver alloy, gold-plated
10 V AC/DC
10 mA
230 V AC / 30 V DC
6 A
12 A
AC-15 Ue 230 V AC, I e
4 A (3600 c/h)
DC-13 Ue 24 V DC, I e
5 A (360 c/h)
DC-13 Ue 24 V DC, I e
3 A (3600 c/h)
3600 Sch/h
5 × 10 6
2 × 10 6
4 kV
III
3
2
300 V AC
2.0 kV
+ 55 °C
+ 75 °C
0.75 mm 2
2.5 mm 2
0.5 mm 2
2.5 mm 2
Fig. 4: Dual-channel safety door interlock monitoring with short circuit monitoring and synchronisation monitoring and manual reset facility
S11 S33 S34 S35
+
K
A
K
B
– CH1 CH2
S21 S12 S31 S22
93.5
71.5
22.5
75.5
55.5
76.5
ng, Fig. 6: Dual-channel safety door interlock monitoring with short circuit monitoring and synchronisation monitoring and automatic reset facility with external device monitoring