CRP 1567 - 1574 - Asphalt Overlay

CRP 1567 - 1574 - Asphalt Overlay
RESOLUTION NO. :
BEFORE THE BOARD OF COUNTY COMMISSIONERS OF MASON COUNTY, WASHINGTON.
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized
to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.080, 36.80.070) (Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineers estimates are hereby made in the amount and for the purposes shown:
( 1)
(3)
(2) :
(4)
:(5):(6):
(7)
(8)
:DAY:
L
ANNUAL
ROAD
TYPE OF
0 A :COST ESTIMATE (THOUSANDS)
CONST.
ROAD NAME AND/OR
LOG
WORK
N B
ENG IN. :
CONSTRUCTION
PROG.
CRP
BRIDGE NUMBER
NO. .·----------------·. (see code): s 0 :-------------------------------: ITEM
NO.
M.P. to :
T R : CONST.
COUNTY
TOTAL : NO.
.
.
.
.
.
.
-----------------------·-------·----------------·------------·---·---·---------------------------------------------E
CRAIG ROAD
12080
0.00
0.14
X
14.6
14.6
1
1567
E
PICKERING ROAD
28850
2.39
3.35
X
90.6
90.6
1568
0.47
15.2
E
0.66
15.2
1569
HARSTINE BRIDGE ROAD
30000
X
39630
0.00
26.8
E
NORTH ISLAND DRIVE
X
1570
0.31
26.8
52210
0.00
0.57
X
51.7
51.7
E
MASON LAKE ROAD
1571
E
NORTH SHORE ROAD
70390
9.65
10.49
X
71.9
71.9
1572
125.7
E
BROCKDALE ROAD
90090
1.98
3.22
X
125.7
1573
E
97670
0.00
1. 80
X
107.5
107.5
1574
McREAVY ROAD
c
ITEM
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
(9)
11.
4. TYPE OF WORK CODE
A. Preliminary Engineering
F.
B. Right-of-Way
G.
C. Grading, Draining, SurfacingH.
D. Light Bit. Surf. Treatment I.
E. A.C. or P.C.C. Pavement
J.
Curbs & Gutters
Sidewalks
Traffic Facilities
Bridge Construction
Paths & Trails (RCW
47.301)
ADOPTED this 12th day of August, 1997.
ATTEST:
cc:
Co. Commissioners
Engineer
JOURNAL: Publ. 1t.:
scv h:\lotus\acpr-97.wk1
08-21-97 (Bill Road Dept.)
(5) The construction is to accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136.18.
BOARD OF COUNTY COMMISSIONERS OF
MASON COUNTY, WASHINGTON
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement