Elkay ERO28 C, RAC, C*C, RAC*C Refrigerated Fountain Installation/Care/Use Manual

Elkay ERO28 C, RAC, C*C, RAC*C Refrigerated Fountain Installation/Care/Use Manual

Below you will find brief information for ERO28C, ERO28RAC, ERO28CC, ERO28RACC. This document describes installing, caring for, and operating the Elkay ERO28C and ERO28RAC series of refrigerated fountains. The document includes installation instructions, parts list, troubleshooting, and maintenance information. The document also includes information on how to adjust the stream height of the bubbler.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Elkay ERO28C, ERO28RAC, ERO28C*C, ERO28RAC*C Installation/Care/Use Manual | Manualzz
ERO28C*C ERO28RAC*C
Installation/Care/Use Manual
Soft Sides™ Refrigerated Fountains with FLEXI-GUARD®
13
SEE FIG. 7
39
14
39
ERO28C
ERO28RAC
Installer
To assure you install this model easily and correctly,
PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE
INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH
PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave
these instructions inside the fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO
WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY
OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK
INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN
INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING
THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER
SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING
PLUMBING SYSTEM.
1/4" O.D. TUBE
WATER INLET
TO COOLER
3/8" O.D. UNPLATED
COPPER TUBE CONNECT
COLD WATER SUPPLY
NOTE: WATER FLOW
DIRECTION
FIG. 1
BUILDING WATER
INLET
SERVICE STOP
(NOT FURNISHED)
FIG. 2
97874C (Rev. H - 8/07)
97874C (Rev. H - 8/07)
LEGEND
A = 1/4" O.D. TUBE CONNECT (CHILLER WATER OUTLET)
B = 3/8" O.D. TUBE CONNECT (CHILLER WATER INLET) SHUT OFF VALVE BY OTHERS
C = 1-1/4" TRAP FURNISHED
D = ELECTRICAL INLET
ERO28C
FIG. 3
ERO28RAC
ERO28C*C ERO28RAC*C
PAGE 2
ERO28C*C ERO28RAC*C
INSTALLATION INSTRUCTIONS
1. Install mounting frame. See mounting frame instructions.
2. Install remote chiller. Remove front panel of chiller. Slide chiller onto the shelf and position it to the left within the guides on the shelf.
3. Attach solenoid valve assy to the underside of cross member of mounting frame on electric eye unit. See Figure 9.
4. Make water supply connections. Install a shut-off valve and union connection to building water supply (valve and union not provided). Turn on the
water supply and flush the line thoroughly.
5. Make connection between remote chiller and building supply line. Install the strainer on the chiller inlet tube. Install a 3/8" O.D unplated copper water
line between the valve and the cooler. Remove all burrs from the outside of the water line. Insert the 3/8" water line into the inlet side of the strainer
by pushing it in until it reaches a positive stop, approximately 3/4" (19mm). See Figures 2 and 4. DO NOT SOLDER TUBES INSERTED INTO THE
STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.
6. Make connection between remote chiller and solenoid valve assy. Install the 1/4" tee (provided) on the chiller outlet tube. Insert end of 1/4" O.D. poly
tubing (provided) into tee on the chiller and the other end into straight fitting on solenoid valve assy.
7. Hang the upper panel on the mounting frame hanger. Align holes in the panel with holes in the mounting frame. Be sure that panel is engaged with
hanger at top of frame before releasing it.
8. Install fountains. Remove bottom cover plates on underside of fountains and save the screws. Mount the fountains to the upper panel and the wall
frame with (4) 5/16" x 3/4" (19mm) long bolts and nuts (provided). Tighten securely.
9. Connect solenoid valve assy and regulator holder in fountain with sensor by inserting 1/4" O.D. poly tubing (provided). Connect fountain with
push button to chiller by installing 1/4" O.D. poly tubing (provided). Insert one end into remaining outlet of the 1/4" tee and the other end into the
regulator holder on push button fountain.
10. Remove elbow from end of p-trap and attach it to drain tube. Re-attach elbow to p-trap and cut waste tube to required length using plumbing
hardware and trap as a guide.
11. Connect power cord of sensor to solenoid valve by running it through the back panel and connecting it as shown in Fig. 5. Connectors may be
connected to either terminal on solenoid valve. Attach ground wire to solenoid valve bracket with green ground screw.
12. Turn on water supply. Release air from tank by interrupting infrared beam; steady stream of water assures all air is removed. The sensor has a 30
second maximum ON time. It may be necessary to step away from beam a few times to allow chiller tank to refill. Check for leaks.
13. These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator must be
installed in the supply line. Any damage caused by reason of connecting these products to supply line pressures lower than 20 PSIG or higher than
105 PSIG is not covered by warranty.
14. Make electrical connections to chiller. See chiller instructions.
15. Check stream height from bubbler. Stream height is factory set at 35 PSI . If supply pressure varies greatly from this, remove item 12 (bottom
cover plate) or by using a small screwdriver through the small hole in the push button item 29 (See Fig.8) and adjust the screw on the regulator
(item 8). Clockwise adjustment will raise stream height and counter-clockwise will lower stream height. For best adjustment stream height should
hit basin approximately 6-1/2" (165mm) from the bubbler.
16. Mount lower panel. Loosen the (2) #10-24 x 5/8" (16mm) screws at frame bottom lip. Slide upper tongue of lower panel under lower edge of already
installed upper panel. Tighten previously loosened screws securely.
17. Replace bottom cover plate to fountain basin using screws provided. Tighten securely.
( TO BUBBLER) 18
18 (TO BUBBLER)
24
38
7
23
26
19
18
18
37
31
18
36
20
17
8
16
CHILLER
OUTLET
35
27
CHILLER
INLET
28
25
32
34
22
FIG. 4
FIG. 5
PAGE 3
97874C (Rev. H - 8/07)
ERO28C*C ERO28RAC*C
PARTS LIST
TROUBLE SHOOTING AND MAINTENANCE
ITEM NO.
PART NO.
DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
A54874
56011C
55997C
75580C
LK464
15005C
50986C
61313C
28782C
28784C
55000661
55000665
26839C
27028C
26833C
112627543890
55996C
40045C
56092C
22525C
22526C
27057C
27240C
31272C
31376C
36028C
38417001
56082C
70016C
45662C
45663C
50203C
51409C
75672C
70208C
70256C
70817C
70682C
75507C
111008343890
111577243890
111577343890
56280C
Orifice Assy
Housing Assy
Pedestal
Bubbler Locknut
Drain
Retaining Nut
Regulator Holder
Regulator
Fountain Body-Short
Fountain Body-Long
Bottom Cover Plate-Short
Bottom Cover Plate-Long
Upper Panel - ERO28C
Upper Panel - ERO28RAC
Lower Panel
Screw - #10-24 X .50 PHTC
Strainer
Hex Nut
Poly Tubing (Cut To Length)
Regulator Mounting Bracket-Long Ftn
Solenoid Mounting Bracket
Regulator Mounting Bracket-Short Ftn
Sensor Support Mounting Bracket
Solenoid Valve Assy
Power Cord
Sensor - Clear
Screw - #8-18 X .37 HHSM
Nut - Regulator
Hex Nut #10-32
Push Button
Push Button Sleeve
Strain Relief
Spacer - 1/2 X .44
Cap Screw
Screw - #10-24 X .38 PHTC
Screw - 1/4-20 X .38 HHTC
Elbow - 1/4 X 1/4
Tee - 1/4
Fitting - 1/4 NPTF X 1/4 O.D.
Screw - #10-24 X .62 HHMS
Screw- 5/16-18 X .75
Hex Nut - 5/16-18
Edge Trim
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
1. Orifice Assy: Minerals deposits on orifice can cause water flow to spurt or not
regulate. Mineral deposits may be removed from the orifice with a small round
file not over 1/8" diameter or a small diameter wire. CAUTION: Do not file or
cut orifice materials.
2. Stream Regulator: If orifice is free of material deposits regulate water flow
according to instructions on page 3.
3. Sensor Control: The sensor has a 2 second delay time. If sensor fails to
operate valve mechanism or operates erratically, check the following:
a) Ensure there are no obstructions within a 40 inch radius from the front of
fountain.
b) Check wire connections at the solenoid valve and at the sensor.
CAUTION: Make sure unit is unplugged before checking any wiring.
c) Ensure proper operation of solenoid valve. If there is an audible clicking
sound yet no water flows, look for an obstruction in the valve itself or
elsewhere in the water supply line. WARNING: Do not expose sensor to
direct sunlight.
4. Sensor Range Adjustment: The electronic sensor used in this fountain is
factory pre-set for a "visual" range of 36 inches. If actual range varies greatly
from this, or a different setting is desired, follow the range adjustment
procedure below:
a) Remove bottom cover of fountain.
b) Remove sensor by removing washers and nuts that secure sensor on studs.
c) Locate range adjustment screw between the red lenses of the sensor, then
with a small tip screwdriver, rotate the range adjusting screw clockwise to
increase range or counter-clockwise to decrease range. 1/4 turn of screw is
equal to approximately 12 - 18 inches of range.
CAUTION: Complete range of sensor (24 - 46 inches) is only one turn of the
adjusting screw.
d) Remount sensor on studs and replace bottom cover.
9
18
SEE FIG. 8
40, 41
18
10
40, 41
SEE FIG. 5
2
3
1
17
30
FIG. 6
12, 15
5
11, 15
FIG. 7
4
29
42
NOTE: WHEN INSTALLING
REPLACEMENT BUBBLER
AND PEDESTAL, TIGHTEN
NUT (ITEM 4) ONLY TO HOLD
PARTS SNUG IN POSITION. DO
NOT OVER TIGHTEN.
6
8
7
23
26
ERO28C
FIG. 8
33
ERO28RAC
FIG. 9
21
REPAIR SERVICE INFORMATION TOLL FREE NUMBER 1.800.260.6640
FOR PARTS, CONTACT YOUR LOCAL DISTRIBUTOR OR CALL 1.800.323.0620
ELKAY MANUFACTURING COMPANY • 2222 CAMDEN COURT • OAK BROOK, IL 60523 • 630.574.8484
97874C (Rev. H - 8/07)
PAGE 4

advertisement

Key Features

  • Remote chiller
  • Solenoid valve
  • Push button operation
  • Adjustable stream height
  • Easy installation
  • Detailed instructions
  • Troubleshooting guide

Frequently Answers and Questions

How do I adjust the stream height of the bubbler?
You can adjust the stream height of the bubbler by removing the bottom cover plate or using a small screwdriver through the small hole in the push button, and then adjusting the screw on the regulator. Clockwise adjustment will raise stream height and counter-clockwise will lower stream height.
What is the purpose of the sensor?
The sensor has a 2 second delay time and controls the solenoid valve. Make sure there are no obstructions within a 40 inch radius from the front of fountain. You should also check the wire connections at the solenoid valve and at the sensor and ensure proper operation of solenoid valve.
What should I do if the orifice is clogged?
You can remove mineral deposits from the orifice with a small round file not over 1/8" diameter or a small diameter wire. CAUTION: Do not file or cut orifice materials.

Related manuals

Download PDF

advertisement