Electrical Connections. Jacuzzi LNS6632BLXXXXW, LNS6632BRXXXXW

Add to My manuals
16 Pages

Jacuzzi LNS6632BLXXXXW offers a luxurious bathing experience with its advanced features. Equipped with a powerful motor, it delivers a soothing hydromassage to relieve stress and tension. Immerse yourself in tranquility as the adjustable jets target specific areas of your body, providing a customized massage. Enjoy a warm and inviting bath with the integrated heater that maintains the desired water temperature throughout your soak. Safety is prioritized with built-in safety features, including a GFCI circuit interrupter to prevent electrical hazards.

advertisement

Electrical Connections. Jacuzzi LNS6632BLXXXXW, LNS6632BRXXXXW | Manualzz

English

Installation

Framing and Support (

Continued

)

Subfloor

Prepare the subfloor for the drain and ensure that the area is level.

1. The drain/overflow of the bathtub extends below the bottom of the bathtub. The Technical Specifications can be found at www.jacuzzi.com/baths/support/.

2. Make appropriate cuts to the subfloor to accommodate the drain.

3. The Jacuzzi Tru-Level® base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface, no other preparation is necessary. Proceed to the “Electrical Connections” section.

4. If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or minimal expansion structural foam (having a density of a minimum 5 lbs/cubic foot). The bathtub must remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other.

Electrical Connections

DANGER

: RISK OF ELECTRIC SHOCK!

Connect only to a circuit protected by a GFCI (Figure 3).

CAUTION!

Electrical outlet must be mounted 4" (101 mm) above the floor line and 12" max (305 mm) inside from the edge of the bathtub (Figure 3), or in accordance with local building and electrical codes.

(101 mm)

CAUTION!

Risk of component overheat. Do not use electric extension cord to power this unit. Operating the pump without enough water in the bathtub can cause permanent damage to the pump/motor.

12˝

(305 mm)

If the GFCI unit indicates a malfunction, per manufacturer’s instructions, turn

OFF power and do not attempt to use the bathtub until the source of the problem has been identified and corrected.

NOTES:

When using electrical products, basic precautions should always be followed. Always follow local building and electrical codes. Grounding is required.

The unit should be installed and grounded by a qualified electrician.

CANADIAN MODELS ONLY:

The components must be hard wired in the

J-Boxes (supplied) that are located on the unit.

(101 mm)

12˝

(305 mm)

The Technical Specifications can be found at www.jacuzzi.com/baths/support/.

Shown: Pure Air®

Bath

Fig. 3

Shown: Whirlpool w/ optional heater

Page 6 www.jacuzzi.com

Installation

English

Fuzion

®

Specific Material

The additional design features of the Fuzion ® require that the following steps be completed prior to installing the bathtub in the constructed surround. The following steps must also be completed in the order specified:

1. Fuzion ® Faucet Installation

2. Fuzion ® Overflow/Drain Installation

3. Fuzion ® Wood Frame Installation

4. Fuzion ® Control Panel Installation

Fuzion

®

Faucet Installation

Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.) necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm) nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any assembly hardware.

Overflow Fitting

Fuzion

®

Overflow Drain Installation

Assemble in accordance with the local plumbing or building codes.

Apply sealant/caulking

(commercially available)

1. Identify drain overflow kit provided with your bathtub.

Remove and open the overflow package and confirm that all parts are present.

2. Remove washers and nuts from the overflow fitting.

3. Place a small bead of plumbers putty, silicone, or similar approved sealant around the underside of the top flange of the overflow fitting.

4. Place the overflow fitting into the overflow hole of the bathtub (Figure 4).

5. From the underside of the unit, place the rubber washer then locknut on the overflow fitting and tighten securely.

Be careful not to overtighten.

6. Assemble the remaining drain pieces as shown in the

illustration.

7. After the drain is fully installed, test for proper drainage.

If the unit does not drain properly, rectify this condition before proceeding with further bathtub installation.

Watertight installation of the drain and overflow is the installer’s responsibility. Drain leakage is excluded from the Jacuzzi Luxury Bath warranty of product.

OPTIONAL - If the Fuzion

®

Wood Frame is not being used, please proceed to Step 2 in the

Undermount Installation section on page 11.

Flat Rubber

Washer

Lock Nut

Direct Waste

Overflow Drain

Direct Waste Overflow Drain

Figure 4 - Overflow Installation

PVC Flex Pipe

PVC Flex Pipe

PVC 45 Elbow

PVC 45 Elbow Street

Overflow Drain

Assembly

PVC 45

Elbow Street

PVC 45 Elbow

PVC Flex Pipe

Fig. 4

Twist and Turn

Drain Assembly www.jacuzzi.com

PVC Pipe

PVC Pipe

Waste Elbow

Page 7

English

Fuzion

®

Specific Material (Continued)

Fuzion

®

Frame Installation

If you are installing a Fuzion ® bathtub with accessory frame, please refer to the Fuzion ® Frame Installation

Guide (#GL44000) before proceeding any further.

Complete the installation and assembly steps according to the Fuzion ® Frame Installation Guide.

Fuzion ® Frame

Fuzion

®

Control Panel Installation

The following cutouts must be clear and free of any dirt

or adhesive:

- Control panel cutout in the assembled wood frame

- Control panel cutout in the assembled counter

- Control panel cutout in the bathtub

1. Insert the wire connector into the back of the control panel

(Figure 5).

2. Sparingly apply adhesive around the base of the control panel (Figure 6).

3. Thread the wire through the cutout and to the control box.

4. Orient control panel in the following manner: the logo will be on the right side of the J4 control panel when you are sitting in the bathtub (the power button will be on the right side of the J5 LCD control panel).

5. Lower the control panel into the cutout and press firmly to embed the adhesive (Figure 7).

6. Connect the wire to the control box.

7. Please proceed to Step 3 in the Drop-In Installation

Installation

Fig. 5

Control Panel

Control Box Wire

(Black Wire)

Control Box Wire

(Adhesive)

Fig. 6

Adhesive Application

Fig. 7

Inside of Bathtub

Control Panel

Page 8 www.jacuzzi.com

advertisement

Key Features

  • Soaker Alcove Bathtub
  • Linea® Series
  • 66 x 32 in. Dimensions
  • Left Drain
  • Requires Qualified Installation
  • Safety Features
  • Detailed Installation Guide

Related manuals

Frequently Answers and Questions

What are the dimensions of the Jacuzzi LNS6632BLXXXXW bathtub?
The Jacuzzi LNS6632BLXXXXW is a Linea® 66 x 32 in. Soaker Alcove Bathtub.
What type of drain does the LNS6632BLXXXXW bathtub have?
It has a Left Drain.
What type of installation is required for the Jacuzzi LNS6632BLXXXXW bathtub?
A qualified technician is required for the installation.
Does the LNS6632BLXXXXW bathtub have any safety features?
Yes, the manual emphasizes safety during installation and includes safety instructions for use.