CVHE, CVHF, and CVHG CenTraVac™ Chiller Start-up Tasks to be Performed by Trane . Trane CVHE-SVX02M-EN, CVHG, CVHF, CVHE
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Appendix C.
CVHE, CVHF, and CVHG CenTraVac™
Chiller Start-up Tasks to be Performed by Trane
de atth
•• F
•• P
•• R an d u n S ub yo u M
an d M
niin gss,, cca uttiio nss,, a
Inspect chiller for damage (shipping or rigging).
Verify and record unit nitrogen holding charge pressure.
Inspect water piping for proper installation.
Inspect strainers, flow sensing devices, isolation valves, pressure gauges, thermometer wells, flow balancing valves, vent cocks, and drains.
Inspect cooling tower piping.
Verify proper clearances.
Power wiring meets size requirement.
Verify proper voltage and amperage rating.
Verify proper foundation installation.
Verify unit isolator pads/springs have been installed.
Verify low voltage circuits are isolated from high voltage circuits.
Check equipment room for ventilation, refrigerant monitor, rupture disk piping, and
Personal Protective Equipment (PPE).
established requirements for unit installation
MUST be corrected prior to start-up. Any nonconforming condition which is not corrected prior to start-up must be noted in the
Non-
Compliance Form
(PROD-ADF001*-EN) by the start-up technician; this information must also be signed by responsible site personnel before start-up and the completed
Non-Compliance
Form
will become part of the start-up record, submitted with a
Start-up Check Sheet
and a
Chiller Service Report
.
Op erra
Verify nitrogen holding charge.
Calibrate the high pressure cutout control
(HPC).
Meg compressor motor.
Confirm proper oil pump operation.
Evacuate unit.
Check condenser installation.
Check evaporator installation.
urriin g e an d cco e--d a he n tth n u niittss w
Check electrical and controls.
Inspect motor starter and control panel.
Confirm all wiring connections are tight, free of abrasion and have no sharp bends in panel and on compressors.
Inspect contactors and relays.
Verify unit wiring (low and high voltage) is correctly isolated, phased, and properly grounded.
Connect external 120 Vac power to power up the control panel.
Run the oil pump to verify pump can provide
C–1 CVHE-SVX02M-EN
C–2
18 to 22 psid (124.1 to 151.7 kPaD) net pressure.
Verify and record control parameters.
Verify all control interlocks are installed and properly functioning.
Dry run starter (non-Adaptive Frequency™
Drive [AFD]).
Measure condenser pressures and flow.
Adjust condenser flow sensing device.
Measure evaporator pressures and flow.
Adjust evaporator flow sensing device.
Inspect motor starter panel and perform starter panel checkout procedures.
Confirm proper phase check incoming power.
Inspect control panel.
Apply separate source 120 Vac power to control to perform control panel checkout procedure.
Review and record unit configuration parameters.
Confirm oil pump pressure—regulating valve setting.
Verify vane operator is working properly and moves without binding.
Dry run test starter (non-AFD).
Remove separate source power and reconnect wiring.
ep attiio
Relieve nitrogen holding charge.
Evacuate and charge the system.
Apply power to the starter panel.
Verify current to the oil sump heater.
Set Purge mode to “On.”
Bump-start the compressor and verify compressor motor rotation.
Start chiller.
Verify no unusual noises or vibrations and observe operating conditions.
If necessary, adjust oil pressure regulator between 18 to 22 psid (124.1 to 151.7 kPaD) net.
Measure and verify refrigerant pump pressure.
When chiller is stable, take system log three times at 15-minute intervals.
Set Purge mode to “Adaptive.”
Reset the “Starter Energy Consumption” resettable.
Record a
Chiller Service Report
.
Review “AdaptiView Display Customer Training
Checklist.”
Equipment Description
Stopping/Starting Chiller Operation
Alarms
Reports
Data Graphs
Equipment Settings
Display Settings
Security Settings
Basic Troubleshooting
CVHE-SVX02M-EN
advertisement
Related manuals
advertisement
Table of contents
- 8 Unit Nameplate
- 9 Model Number Descriptions
- 10 Pre-Installation
- 10 ASHRAE Standard 15 Compliance
- 10 Unit Shipment
- 10 Installation Requirements and Contractor Responsibilities
- 12 Storage Requirements
- 14 Unit Components
- 15 Unit Clearances and Weights
- 15 Recommended Unit Clearances
- 16 General Weights
- 16 Weights (lb)
- 19 Weights (kg)
- 22 Installation: Mechanical
- 22 Operating Environment
- 22 Foundation Requirements
- 22 Rigging
- 22 Standard Chiller Lift
- 24 Special Lift Requirements
- 24 Unit Isolation
- 24 Isolation Pads
- 24 Spring Isolators
- 26 Leveling the Unit
- 27 Installation: Water Piping
- 27 Overview
- 27 Water Treatment
- 27 Pressure Gauges
- 27 Valves—Drains and Vents
- 27 Strainers
- 28 Required Flow-Sensing Devices
- 28 Paddle Switches
- 28 Water Flow Detection Controller and Sensor
- 30 Evaporator and Condenser Water Piping
- 31 Water Piping Connections
- 32 Waterbox Locations
- 32 Grooved Pipe Coupling
- 32 Flange-connection Adapters
- 33 Victaulic Gasket Installation
- 34 Bolt-Tightening Sequence for Water Piping Connections
- 35 Flanges with 4, 8, or 12 Bolts
- 35 Flanges with 16, 20, or 24 Bolts
- 35 Flanges with More than 24 Bolts
- 36 Evaporator Waterbox Covers
- 36 Pressure Testing Waterside Piping
- 37 Vent Piping
- 37 Refrigerant Vent Line
- 37 General Requirements
- 37 Purge Discharge
- 37 Vent Line Materials
- 37 Vent Line Sizing
- 38 Vent Line Installation
- 41 Vent Line Sizing Reference
- 44 Insulation
- 44 Unit Insulation Requirements
- 44 Insulation Thickness Requirements
- 44 Factory Applied Insulation
- 46 Installation: Controls
- 46 UC800 Specifications
- 46 Power Supply
- 46 Wiring and Port Descriptions
- 47 Communication Interfaces
- 47 Rotary Switches
- 47 LED Description and Operation
- 51 Installing the Tracer AdaptiView Display
- 52 Adjusting the Tracer AdaptiView Display Arm
- 53 Electrical Requirements
- 53 Installation Requirements
- 53 Electrical Requirements
- 54 Trane-supplied Starter Wiring
- 55 Customer-supplied Remote Starter Wiring
- 55 Current Transformer and Potential Transformer Wire Sizing
- 57 Power Supply Wiring
- 57 Three-Phase Power
- 57 Circuit Breakers and Fused Disconnects
- 57 Power Factor Correction Capacitors (Optional)
- 58 Interconnecting Wiring
- 59 Starter to Motor Wiring (Remote-Mounted Starters Only)
- 59 Ground Wire Terminal Lugs
- 60 Terminal Clamps
- 60 Wire Terminal Lugs
- 60 Bus Bars
- 61 Starter to Control Panel Wiring
- 62 10 to 13.8kV Medium Voltage Motor
- 62 Motor Terminal Box
- 63 Motor Supply Wiring
- 63 Motor Terminals
- 63 Ground Wire Terminal Lug
- 64 System Control Circuit Wiring (Field Wiring)
- 65 Water Pump Interlock Circuits and Flow Switch Input
- 65 Chilled Water Pump
- 65 Chilled Water Proof of Flow
- 65 Condenser Water Pump
- 65 Condenser Water Proof of Flow
- 65 Temperature Sensor Circuits
- 66 CWR—Outdoor Option
- 66 Optional Control and Output Circuits
- 66 Optional Tracer Communication Interface
- 66 Starter Module Configuration
- 66 Schematic Wiring Drawings
- 67 Operating Principles
- 67 General Requirements
- 67 Cooling Cycle
- 67 CVHE and CVHG 3-Stage Compressor
- 67 CVHF 2-Stage Compressor
- 68 Oil and Refrigerant Pump
- 68 Compressor Lubrication System
- 70 Motor Cooling System
- 70 Tracer AdaptiView Display
- 71 Start-up and Shut-down
- 71 Sequence of Operation
- 71 Software Operation Overview Diagram
- 72 Start-up Sequence of Operation—Wye-delta
- 76 Power Up Diagram
- 76 Ice Machine Control
- 78 Free Cooling Cycle
- 79 Free Cooling (FRCL)
- 79 Hot Gas Bypass (HGBP)
- 79 Hot Water Control
- 80 Heat Recovery Cycle
- 80 Auxiliary Condensers
- 80 Control Panel Devices and Unit-Mounted Devices
- 80 Unit Control Panel
- 80 User-Defined Language Support
- 81 Unit Start-up and Shut-down Procedures
- 81 Daily Unit Start-up
- 82 Seasonal Unit Start-up
- 82 Daily Unit Shut-down
- 82 Seasonal Unit Shut-down
- 83 Recommended Maintenance
- 83 Record Keeping Forms
- 83 Normal Operation
- 85 Recommended Compressor Oil Change
- 86 Purge System
- 86 Leak Checking Based on Purge Pump Out Time
- 86 Long Term Unit Storage
- 87 Refrigerant Charge
- 87 Leak Testing
- 87 Recommended System Maintenance
- 87 Condenser
- 88 Evaporator
- 88 Waterbox and Tubesheet Protective Coatings
- 88 Sacrificial Anodes
- 89 Waterbox Removal and Installation
- 89 Discussion
- 89 Procedure
- 90 Reassembly
- 90 Torque Requirements and Waterbox Weights
- 91 Connection Devices Information
- 92 Forms and Check Sheets
- 92 Unit Start-up/Commissioning
- 93 CenTraVac™ Chiller Installation Completion and Request for Trane Service
- 95 CVHE, CVHF, and CVHG CenTraVac™ Chiller Start-up Tasks to be Performed by Trane
- 97 CVHE, CVHF, and CVHG CenTraVac™ Chiller Annual Inspection List
- 98 CVHE, CVHF, and CVHG CenTraVac™ Chiller Operator Log