advertisement
▼
Scroll to page 2
of
24
Submittal
20
Service Record
A permanent data sheet should be prepared on each refrigeration system at an installation, with a copy for the owner and the original for the installing contractorʼ s files.
If another firm is to handle service and maintenance, additional copies should be prepared as necessary.
System Reference Data
The following information should be filled out and signed by Refrigeration Installation Contractor at time of start-up.
Date System Installed:
Installer and Address:
_____________________________________________________
_____________________________________________________
_____________________________________________________
Condensing Unit
_____________________________________________________
Unit Model#: ________________________________________
Unit Serial #: ________________________________________
Compressor Model #: ____________________ Compressor Model #: _________________
Compressor Serial #: ____________________ Compressor Serial #: __________________
Electrical _________________ Volts __________________ Phase _______
Voltage at Compressor
Amperage at Compressor
L1__________ L2 ___________
L1__________ L2 ___________
L3 ___________
L3 ___________
21
Notes
22
Notes
23
Since product improvement is a continuing effort, we reserve the right to make changes in specifications without notice.
Visit us online at www.heatcraftrpd.com.
H
EATCRAFT
R
EFRIGERATION
P
RODUCTS
LLC
2175 W
EST
P
ARK
P
LACE
B
OULEVARD
• S
TONE
M
OUNTAIN
, GA 30087 USA
770-465-5600 • F
AX
: 770-465-5990
WWW
.
HEATCRAFTRPD
.
COM
advertisement
Related manuals
Download
PDF
advertisement
Table of contents
- 2 General Safety Information
- 2 Inspection
- 2 Warranty Statement
- 3 Requirements
- 4 Condensing Unit Rigging and Mounting
- 4 Ambient Fan Cycle Control
- 5 Condensing Unit Accessories
- 5 Suction Filters, Driers, Sight Glasses
- 6 Refrigerant Oils
- 7 Phase Loss Monitor
- 7 Recommended Refrigerant Piping Practices
- 7 Refrigeration Pipe Supports
- 8 Suction Lines
- 8 Suction Line Risers
- 8 Liquid Lines
- 11 Evacuation and Leak Detection
- 12 Refrigerant Charging Instructions
- 12 Field Wiring
- 12 Check Out and Start Up
- 13 Operational Check Out
- 13 System Balancing - Compressor Superheat
- 14 System Troubleshooting Guide
- 15 Preventive Maintenance Guidelines
- 15 Replacement Parts
- 16 Wiring Diagrams
- 20 Submittal