A technical specifications manual has been included with your bathtub. The Technical Specifications Manual will contain pertinent information regarding your Jacuzzi Luxury Bath product. Locate the Technical Specifications Manual at this time.

Frame out the space where the bathtub is to be located. The following should be taken into consideration when preparing the area:

Dimensions provided on rough-in diagrams are

nominal. Measure your actual unit upon receipt and

build according to the actual dimensions.

The floor structure beneath the bathtub must be able

bather.

The unit must be supported from the bottom of the

bathtub and not from the bathtub rim. For drop-in

installations, take into account the thickness of the

surround material and finishing material (marble, tile,

etc.).

Ensure the rim will rest on a level surface.

Per code, access must be provided to the blower

and motor/pump for your specific model. Primary

service access locations are shown in the rough-in

diagrams contained in the Technical Specifications

Manual. Figure 1 shows common access locations.

It is the responsibility of the installer, building contractor, or owner to provide access for service.

Jacuzzi is not responsible for any costs relating to obtaining access for repair. The owner shall bear such costs and, if appropriate, must seek recovery from the installer.

Provide adequate ventilation for cooling and supply

sufficient air for the blower and motor/pump. Do not

insulate around the equipment.

Your bathtub may have blower/motor parts that extend

beyond the rim of the bathtub. Refer to the rough-in

diagrams included in the warranty pack and

construction framing to correctly accommodate.

Common Access Locations

Figure 1

A

24˝

(609mm)

A

B

= Primary access

= Secondary access for equipment (optional)

Left hand unit access is on the opposite side (mirror).

12˝

(304mm)

Primary

Access 18˝

(457mm)

Blower

B

20˝

(508mm)

Blower

Figure 2

Installation and Operation www.jacuzzi.com

Page 7

Salon™ Spa Bath

Framing (con’t)

To ensure the installer has space to maneuver and install the bathtub, allow adequate wall and ceiling

clearance (Figure 3).

2-Wall Installation

BATHTUB

CUTOUT

Floor Cutout for

Drain/Overflow

(76mm)

Clearance Examples

BATHTUB

CUTOUT

Floor Cutout for

Drain/Overflow

32˝

(812mm)

48˝

(1219mm)

32˝

(812mm)

3-Wall Installation

BATHTUB

CUTOUT

Floor Cutout for

Drain/Overflow

(76mm)

10˝

(254mm)

BATHTUB

CUTOUT

Floor Cutout for

Drain/Overflow

32˝

(812mm)

48˝

(1219mm)

32˝

(812mm)

32˝

(812mm)

10˝

(254mm)

Figure 3

10˝

(254mm)

Subfloor

Prepare the subfloor for the drain and ensure that the area is level.

1 The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical

Specifications Manual that corresponds with your bathtub.

2 Make appropriate cuts to the subfloor to accommodate the drain.

3 Jacuzzi’s Tru-Level™ base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface, no other preparation is necessary. Proceed to the “Installation” section.

4 If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other.

Page 8 www.jacuzzi.com

Installation and Operation

Salon™ Spa Bath

Fuzion

Specific Material

The additional design features of the Fuzion™ require that the following steps be completed prior to installing the bathtub in the constructed surround. The following steps must also be completed in the order specified:

Fuzion™ Overflow/Drain Installation

Fuzion™ Wood Frame Installation

Fuzion™ Control Panel Installation

Fuzion

Faucet Installation

Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.) necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm) nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any assembly hardware.

Fuzion

Overflow Drain Installation

Overflow Fitting

1

Assemble in accordance with the local plumbing or building codes.

Identify drain overflow kit provided with your bathtub. Remove and open the overflow package and confirm that all parts are present.

2

3

Remove washers and nuts from the overflow fitting.

Place a small bead of plumbers putty, silicone, or similar approved sealant around the underside of the top flange of the overflow fitting.

4 Place the overflow fitting into the overflow hole of the bathtub (Figure 4).

5 From the underside of the unit, place the rubber washer then locknut on the overflow fitting and tighten securely. Be careful not to overtighten.

6 Assemble the remaining drain pieces as shown in the illustration.

7 After the drain is fully installed, test for proper drainage. If the unit does not drain properly, rectify this condition before proceeding with further bathtub installation.

Watertight installation of the drain and overflow is the installer’s responsibility. Drain leakage is excluded from the Jacuzzi Luxury Bath warranty of this product

Flat Rubber

Washer

Lock Nut

Direct Waste

Overflow Drain

PVC Flex Pipe

Overflow Drain

Assembly

PVC 45

Elbow Street

PVC 45 Elbow

Apply sealant/caulking

(commercially available)

Direct Waste Overflow Drain

PVC Flex Pipe

PVC 45 Elbow

PVC Flex Pipe

PVC 45 Elbow Street

Twist and Turn

Drain Assembly

OPTIONAL - If the Fuzion™ Wood Frame is not being used, please proceed to Step 2 in the Undermount Installation section.

Installation and Operation www.jacuzzi.com

PVC Pipe

PVC Pipe

Waste Elbow

Figure 4 - Overflow Installation

Page 9

Salon™ Spa Bath

Fuzion

Frame Installation

If you are installing a Fuzion™ bathtub with accessory frame, please refer to the Fuzion™ Frame Installation

Guide (#GL44000) before proceeding any further.

Complete the installation and assembly steps according to the Fuzion™ Frame Installation Guide.

Fuzion™ Frame

Fuzion

Control Panel Installation

The following cutouts must be clear and free of any dirt or adhesive:

- Control panel cutout in the assembled wood frame

- Control panel cutout in the assembled counter

1

- Control panel cutout in the bathtub

Insert the wire connector into the back of the control panel (Figure 5).

Control Box Wire

(Black Wire)

Figure 5 - Control Panel

Control Box Wire

Adhesive)

2 Sparingly apply adhesive around the base of the control panel (Figure 6).

Figure 6 - Adhesive Application

3 Thread the wire through the cutout and to the control box.

4 Orient control panel in the following manner: the logo will be on the right side of the J4 control panel when you are sitting in the bathtub (the power button will be on the right side of the J5 LCD control panel).

5 Lower the control panel into the cutout and press firmly to embed the adhesive (Figure 7).

6 Connect the wire to the control box.

7

Please proceed to Step 3 in the Drop-In Installation section.

Page 10 www.jacuzzi.com

Inside of Bathtub

Figure 7 - Control Panel

Installation and Operation

advertisement

Related manuals

Download PDF

advertisement

Table of contents