Framing. Jacuzzi FUZ7260CCR5CHY, FUZ7242CCR5IWW 77 Pages
Framing. Jacuzzi FUZ7260CCR5CHY, FUZ7242CCR5IWW
advertisement
Salon™ Spa Bath
Framing
A technical specifications manual has been included with your bathtub. The Technical Specifications Manual will contain pertinent information regarding your Jacuzzi Luxury Bath product. Locate the Technical Specifications Manual at this time.
Frame out the space where the bathtub is to be located. The following should be taken into consideration when preparing the area:
•
Dimensions provided on rough-in diagrams are
nominal. Measure your actual unit upon receipt and
build according to the actual dimensions.
•
The floor structure beneath the bathtub must be able
bather.
•
The unit must be supported from the bottom of the
bathtub and not from the bathtub rim. For drop-in
installations, take into account the thickness of the
surround material and finishing material (marble, tile,
etc.).
•
Ensure the rim will rest on a level surface.
•
Per code, access must be provided to the blower
and motor/pump for your specific model. Primary
service access locations are shown in the rough-in
diagrams contained in the Technical Specifications
Manual. Figure 1 shows common access locations.
It is the responsibility of the installer, building contractor, or owner to provide access for service.
Jacuzzi is not responsible for any costs relating to obtaining access for repair. The owner shall bear such costs and, if appropriate, must seek recovery from the installer.
•
Provide adequate ventilation for cooling and supply
sufficient air for the blower and motor/pump. Do not
insulate around the equipment.
•
Your bathtub may have blower/motor parts that extend
beyond the rim of the bathtub. Refer to the rough-in
diagrams included in the warranty pack and
construction framing to correctly accommodate.
Common Access Locations
Figure 1
A
24˝
(609mm)
A
B
= Primary access
= Secondary access for equipment (optional)
Left hand unit access is on the opposite side (mirror).
12˝
(304mm)
Primary
Access 18˝
(457mm)
Blower
B
20˝
(508mm)
Blower
Figure 2
Installation and Operation www.jacuzzi.com
Page 7
Salon™ Spa Bath
Framing (con’t)
•
To ensure the installer has space to maneuver and install the bathtub, allow adequate wall and ceiling
clearance (Figure 3).
2-Wall Installation
BATHTUB
CUTOUT
Floor Cutout for
Drain/Overflow
3˝
(76mm)
Clearance Examples
BATHTUB
CUTOUT
Floor Cutout for
Drain/Overflow
32˝
(812mm)
48˝
(1219mm)
32˝
(812mm)
3-Wall Installation
BATHTUB
CUTOUT
Floor Cutout for
Drain/Overflow
3˝
(76mm)
10˝
(254mm)
BATHTUB
CUTOUT
Floor Cutout for
Drain/Overflow
32˝
(812mm)
48˝
(1219mm)
32˝
(812mm)
32˝
(812mm)
10˝
(254mm)
Figure 3
10˝
(254mm)
Subfloor
Prepare the subfloor for the drain and ensure that the area is level.
1 The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical
Specifications Manual that corresponds with your bathtub.
2 Make appropriate cuts to the subfloor to accommodate the drain.
3 Jacuzzi’s Tru-Level™ base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface, no other preparation is necessary. Proceed to the “Installation” section.
4 If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other.
Page 8 www.jacuzzi.com
Installation and Operation
Salon™ Spa Bath
Fuzion
™
Specific Material
The additional design features of the Fuzion™ require that the following steps be completed prior to installing the bathtub in the constructed surround. The following steps must also be completed in the order specified:
•
Fuzion™ Overflow/Drain Installation
Fuzion™ Wood Frame Installation
•
Fuzion™ Control Panel Installation
Fuzion
™
Faucet Installation
Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.) necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm) nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any assembly hardware.
Fuzion
™
Overflow Drain Installation
Overflow Fitting
1
Assemble in accordance with the local plumbing or building codes.
Identify drain overflow kit provided with your bathtub. Remove and open the overflow package and confirm that all parts are present.
2
3
Remove washers and nuts from the overflow fitting.
Place a small bead of plumbers putty, silicone, or similar approved sealant around the underside of the top flange of the overflow fitting.
4 Place the overflow fitting into the overflow hole of the bathtub (Figure 4).
5 From the underside of the unit, place the rubber washer then locknut on the overflow fitting and tighten securely. Be careful not to overtighten.
6 Assemble the remaining drain pieces as shown in the illustration.
7 After the drain is fully installed, test for proper drainage. If the unit does not drain properly, rectify this condition before proceeding with further bathtub installation.
Watertight installation of the drain and overflow is the installer’s responsibility. Drain leakage is excluded from the Jacuzzi Luxury Bath warranty of this product
Flat Rubber
Washer
Lock Nut
Direct Waste
Overflow Drain
PVC Flex Pipe
Overflow Drain
Assembly
PVC 45
Elbow Street
PVC 45 Elbow
Apply sealant/caulking
(commercially available)
Direct Waste Overflow Drain
PVC Flex Pipe
PVC 45 Elbow
PVC Flex Pipe
PVC 45 Elbow Street
Twist and Turn
Drain Assembly
OPTIONAL - If the Fuzion™ Wood Frame is not being used, please proceed to Step 2 in the Undermount Installation section.
Installation and Operation www.jacuzzi.com
PVC Pipe
PVC Pipe
Waste Elbow
Figure 4 - Overflow Installation
Page 9
Salon™ Spa Bath
Fuzion
™
Frame Installation
If you are installing a Fuzion™ bathtub with accessory frame, please refer to the Fuzion™ Frame Installation
Guide (#GL44000) before proceeding any further.
Complete the installation and assembly steps according to the Fuzion™ Frame Installation Guide.
Fuzion™ Frame
Fuzion
™
Control Panel Installation
The following cutouts must be clear and free of any dirt or adhesive:
- Control panel cutout in the assembled wood frame
- Control panel cutout in the assembled counter
1
- Control panel cutout in the bathtub
Insert the wire connector into the back of the control panel (Figure 5).
Control Box Wire
(Black Wire)
Figure 5 - Control Panel
Control Box Wire
Adhesive)
2 Sparingly apply adhesive around the base of the control panel (Figure 6).
Figure 6 - Adhesive Application
3 Thread the wire through the cutout and to the control box.
4 Orient control panel in the following manner: the logo will be on the right side of the J4 control panel when you are sitting in the bathtub (the power button will be on the right side of the J5 LCD control panel).
5 Lower the control panel into the cutout and press firmly to embed the adhesive (Figure 7).
6 Connect the wire to the control box.
7
Please proceed to Step 3 in the Drop-In Installation section.
Page 10 www.jacuzzi.com
Inside of Bathtub
Figure 7 - Control Panel
Installation and Operation
advertisement
Related manuals
advertisement
Table of contents
- 3 Contents
- 3 Product Information
- 4 Safety instructions
- 5 Operational Safety instructions
- 6 Inspection and Testing
- 7 Framing
- 11 Electrical Connections
- 13 Drop-in Installation
- 15 Undermount Installation
- 15 Cleanup
- 16 General Operation Information
- 16 Blower Operation
- 18 Purging Air Channels
- 19 Whirlpool Operation
- 20 Controlling Whirlpool Direction and Flow
- 21 Purging the Whirlpool System
- 21 Bathtub Additives
- 22 Maintenance
- 23 Troubleshooting Procedures
- 24 Authorized Service
- 25 Warranty
- 29 Contenido
- 29 Información del producto
- 30 Instrucciones de seguridad
- 31 Instrucciones de seguridad operacional
- 32 Inspección y prueba
- 33 Estructura
- 37 Conexiones eléctricas
- 39 Instalación empotrada
- 41 Instalación de montaje bajo cubierta
- 41 Limpieza
- 42 Información general sobre el funcionamiento
- 42 Funcionamiento del generador de burbujas de aire
- 44 Depuración de canales de aire
- 45 Funcionamiento Whirlpool
- 47 Aditivos para baño
- 47 Purga del sistema Whirlpool
- 47 Mantenimiento
- 49 Procedimientos para la resolución de problemas
- 50 Servicio técnico autorizado
- 51 Warranty
- 54 Contenu
- 54 Product Information
- 55 Directives de sécurité
- 56 Instrucciones de seguridad operacional
- 57 Inspection et essai
- 58 Cadrage
- 62 Connexions électriques
- 64 Installation par le dessus
- 66 Installation en dessous
- 66 Nettoyage
- 67 Renseignements généraux sur l’utilisation
- 67 Fonctionnement du ventilateur
- 69 Purge des canaux d’air
- 70 Fonctionnement du bain tourbillon
- 71 Contrôle de la direction et du débit du bain tourbillon
- 72 Vidange du système du bain tourbillon
- 72 Additifs pour baignoire
- 73 Entretien
- 74 Procédures de dépannage
- 75 Service autorisé
- 76 Garantie