Transforming the Control of Hot Tubs
Revolution
Top-Side Panel Installation
TP600
(55673-05)
TP400T
(50260)
READY
AUX X
RANGE FLTR1
TIP
Choosing a Location for the Topside Panel t 4FMFDUBMPDBUJPOUIBUJTFBTJMZBDDFTTJCMF5IFVTFSTIPVMECFBCMFUPSFBDIUIF panel without stretching or getting into an awkward position.
t 5IF mounting location should allow the user to see all of the visual indicators and display features of the topside panel without strain.
t #FGPSFESJMMJOHUIFDVUPVUPGUIFQBOFMUFTUUPTFFUIBUUIFPSJFOUBUJPOPGUIF topside panel is correct. Also, be sure that the cable reaches the control system without stretching or being forced against any sharp corners. t )PMEUIFUPQTJEFQBOFMBUUIFEFTJSFENPVOUJOHMPDBUJPOBOESPVUFUIF connecting cable toward the control system to determine that the cable is long enough to allow it to be connected inside of the unit. t5IF mounting area must be above the maximum water level of the spa and in an area with good drainage to prevent the accumulation of any water. The topside panel should not be submerged. t *GUIFUPQTJEFQBOFMNVTUCFNPVOUFEVOEFSOFBUIBTQBDPWFSTFMFDUB mounting location that will prevent the cover from resting directly upon the panel, but will allow the cover to seal when closed.
TP400W
(50259)
16
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,
834 b2, Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.
rill a .5 hole on the kerf of e center hole. his will clear chips from the hole saw nd speed the drilling of e first (center) hole.
Center to Center
1.7”
C/L
Center to Center
1.7”
3.5”
Pilot hole locations for optional fasteners
7.125”
1
2
Drill a .5” hole on the kerf of the center hole.
This will clear chips from the hole saw and speed the drilling of the first (center) hole.
2.5” hole saw for each overlapping hole.
3 Pilot hole locations for optional fasteners.
2.5” Hole S each overl
Transforming the Control of Hot Tubs
Revolution
Topside Panel Installation (cont.)
The topside panel is specifically designed to withstand the harsh spa environment and is intended to be mounted in a location on, or close to the spa, in order to provide the spa user with the greatest convenience when controlling the spa equipment.
1.
2.
3.
4.
5.
6.
7.
Cut a mounting hole as shown. (A more detailed view is shown on the following page.)
Fit the topside panel into the hole to make sure the hole is the proper size before proceeding.
Remove all dust and particles from the mounting surface around the hole. A clean smooth surface that is dry and oil free is required for the adhesive on the back of the panel to attain a good bond.
Remove the paper backing from the adhesive on the rear of the panel. All of the adhesive should be exposed.
Route the connecting cable through the opening and place the topside panel into the opening. Align the panel and press firmly onto the mounting surface. Route the cable to the control system.
Remove the top cover to the control system, and remove the cable retaining clamp.
Plug the cable connector into the connector labeled J33. Replace the connector clamp and secure the screw.
17
Manufactured under one or more of these patents. U.S. Patents: 5332944, 5361215, 5550753, 5559720, 5,883,459, 6253227, 6282370, 6590188, 6976052, 6965815, 7030343, 7,417,
834 b2, Canadian Patent: 2342614, Australian patent: 2373248 other patents both foreign and domestic applied for and pending. All material copyright of Balboa Water Group.