Freestanding Baths
Inspection and Testing
Visual Inspection
1 Remove the bathtub from the shipping carton. Be careful not to scratch the surface of the bathtub on exposed staples.
Remove the staples or fold them into the carton. Retain the carton until satisfactory inspection of the product has been made.
Do not lift the bathtub by the plumbing at any time; handle by the shell only.
2 Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage to any components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excluded from the warranty. Jacuzzi Luxury Bath’s responsibility for shipping damage ceases upon delivery of the products in good order to the carrier.
3 Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the published warranty information packed with the product.
Bathtub Water and Operational Test
All bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit must be retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have been discovered, repaired, or avoided by following this inspection and testing procedure:
1 Place the bathtub on a level surface, near appropriate water supply, and water drainage. A driveway is a suitable choice.
2 Seal the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole.
3 Allow bathtub to stand for 5 minutes.
4 Visually inspect all joints for leaks. Do not install the bathtub if leaks are detected.
5 Return bathtub to box or otherwise protect from damage until time of installation.
Sub Floor
Prepare the sub floor for the drain and ensure that the area is level.
1 The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical Specifications section that corresponds with your bathtub (available on www.jacuzzi.com).
2 Determine the location of the basin. The floor must be flat and level.
3 Make appropriate cuts to the Sub floor to accommodate the drain.
Please refer to the drawing(s) in the Technical Specifications section that correspond to your bathtub.
Deck Mount Faucet Installation
Faucet elements must be installed in the recommended area (Fig. 1). Please refer to the Technical Specifications that correspond to your bathtub model for the recommended faucet areas. Not all bathtub models are compatible with deck-mounted faucet installation. Before drilling, position faucet elements to make sure that they do not interfere with other components such as overflow, plumbing, or supply valves. Some bathtub models without the integrated overflow may required the Low-Profile Overflow
Kit (MU66000) for centerset faucet installation. This kit is included with bathtub models that require it.
Faucet elements must be attached to a 36” (914 mm) long ½” stainless steel braided hoses so you can lift the bathtub when needed.
Recommended Faucet Area
(Refer to Technical Specifications that correspond to your bathtub model)
Apply masking tape on the finished side of the bathtub deck prior to drilling to prevent chipping. Follow the installation instructions provided by the faucet manufacturer, mark the locations of the faucet elements on the deck and drill the holes directly on the finished side.
CAUTION
If installing the faucet on the same side as the overflow, make sure there is no interference between the two before drilling.
Fig. 1
Page 4 www.jacuzzi.com
Installation Instructions
advertisement
Related manuals
advertisement
Table of contents
- 1 Contents
- 2 Safety Instructions
- 4 Inspection and Testing
- 4 Sub Floor
- 4 Deck Mount Faucet Installation
- 5 Installation Instructions for 1-Piece Tub with Integral Overflow
- 5 Installation Instructions for 1-Piece Tub
- 6 Overflow Drain Hole Cutouts
- 6 Installation Instructions for 2-Piece Tub
- 7 Installation Instructions for Remote Blower
- 7 or Heated Soak
- 8 Installation Instructions for Bianca Whirlpool Drain Installation
- 9 Acylic Bathtub Maintenance
- 9 Solid Surface Care and Cleaning Instructions
- 10 Notes
- 11 Warranty Registration Card
- 13 Contenido
- 14 Instrucciones de seguridad
- 16 Inspección y prueba
- 16 Contrapiso
- 17 Instrucciones de instalación para bañeras de 1 pieza con desborde integral
- 17 Instrucciones de instalación para bañeras de 1 pieza
- 18 Instrucciones de instalación para bañeras de 2 piezas
- 19 Instrucciones de instalación para generadores de burbujas de aire con control remoto
- 19 o sistema de climatización constante
- 20 Instrucciones de instalación para el drenaje de Hidromasaje Bianca
- 21 Mantenimiento de bañeras de acrílico
- 22 Notas
- 23 Tarjeta de registro de la garantía
- 25 Table des matières
- 26 Consignes de sécurité
- 28 Inspection et essai
- 28 Sous-plancher
- 29 Consignes d’installation : baignoire 1 pièce avec trop-plein intégré
- 29 Consignes d’installation : baignoire 1 pièce
- 30 Consignes d’installation : baignoire 2 pièces
- 31 Consignes d’installation : baignoire 2 pièces avec système Whisper+ TechnologyMC ou Heated Soak
- 32 Directives d’installation du drain du bain tourbillon Bianca
- 33 Entretien des baignoires acycliques
- 33 Consignes de nettoyage et d’entretien des surfaces solides
- 34 Remarques
- 35 Fiche d’enregistrement de garantie