Installation Instructions for 1-Piece Tub with Integral Overflow. Jacuzzi OSM6732BUXXXXG

Installation Instructions for 1-Piece Tub with Integral Overflow. Jacuzzi OSM6732BUXXXXG


Add to My manuals
36 Pages

advertisement

Installation Instructions for 1-Piece Tub with Integral Overflow. Jacuzzi OSM6732BUXXXXG | Manualzz

Freestanding Baths

Installation Instructions for 1-Piece Tub with Integrated Overflow

1 Install the metal drain/waste fitting (supplied with the tub) into the drain hole as illustrated

(Fig 2). Ensure that the drain opening on the waste fitting is situated in the integral overflow channel (Fig. 2).

2 Use clear silicone to adhere the bottom gasket to the underside of the integral overflow channel.

INTEGRAL OVERFLOW

CHANNEL

TOE-TAP DRAIN COVER

(SUPPLIED)

INTEGRAL OVERFLOW

CHANNEL

WASTE FITTING NUT

(SUPPLIED)

DRAIN OPENING

WASTE FITTING

TOP GASKET (SUPPLIED)

SILICONE ALL AROUND

3 Secure the waste fitting with the supplied waste fitting nut.

Apply thread sealant to the threads prior to inserting the nut. Overtightening the nut

SEE DRAIN DETAIL may cause shell damage.

Ensure the drain opening on the waste fitting is not exposed after tightening of the nut.

WASTE FITTING

BOTTOM GASKET

(SUPPLIED)

DRAIN

DETAIL

WASTE FITTING

(SUPPLIED)

1-1/2” FPT TO SLIP

ADAPTER (NOT

SUPPLIED)

4 Install a PVC thread adaptor (not supplied) to the metal waste fitting. This is to provide a PVC to PVC drain adapter connection protruding from the floor. Water test fitting for leaks before installation. NOTE: Use PVC Cement per ASTM D2564 on all PVC joints.

Installation Instructions for 1-Piece Tub

1 Set the tub in its place and position precisely with respect to the drain-overflow location. Verify where the indentation for the drain is in relation to the drain-overflow. Use a marker to outline the perimeter of the entire tub directly on the floor

(Fig. 3).

2 Mark a trough for the overflow drain location on the floor.

The drain/overflow extends below the bottom of the bath.

The drain/overflow requires a cutout of the floor for providing space to accommodate the extension. Do not exceed the dimensions of the tub perimeter. When the above locations have been marked on the floor, remove the tub, set it aside and continue with the installation process.

3 Prepare the drain/overflow trough according to the dimensions shown in the Technical Specifications section.

The depth of the trough depends on the vertical extension of the drain elbow at the bottom of the plumbing below the floor level. Install the drain/overflow according to the manufacturer’s instructions. Refer also to the Technical

Specifications section.

Watertight installation of the drain is the installer’s

responsibility. Drain leakage is excluded from the Jacuzzi

Luxury Bath warranty of this product.

Side

View

Silicone

Bottom

View

Units equipped with Whisper+

Technology

TM or Heated Soak only. Refer to supplied template for electrical connection location.

4 Before the tub may be secured to the floor, the following steps must be completed: Place the tub on the floor in relation to the drain/overflow. Place the tub on the floor and line up with the markings previously made on the floor.

Floor-mounted or wall-mounted faucetry can be used exterior

to the bath, this can be installed after the bath is installed into

the floor.

5 Clean up debris left over from the construction steps taken thus far. Also, remove the perimeter outline of the template on

the floor. Use silicone to attach tub to the sub floor. Make sure the tub is properly oriented according to the drain/overflow

end.

A bead of silicone sealant should be applied around the bottom of the tub. Carefully place the tub on the floor in the correct

position and press to the floor. Place weights around the perimeter and allow the adhesive to cure before proceeding.

Installation Instructions www.jacuzzi.com Page 5

advertisement

Related manuals

Download PDF

advertisement

Table of contents