1 Install the metal drain/waste fitting (supplied with the tub) into the drain hole as illustrated
(Fig 2). Ensure that the drain opening on the waste fitting is situated in the integral overflow channel (Fig. 2).
2 Use clear silicone to adhere the bottom gasket to the underside of the integral overflow channel.
INTEGRAL OVERFLOW
CHANNEL
TOE-TAP DRAIN COVER
(SUPPLIED)
INTEGRAL OVERFLOW
CHANNEL
WASTE FITTING NUT
(SUPPLIED)
DRAIN OPENING
WASTE FITTING
TOP GASKET (SUPPLIED)
SILICONE ALL AROUND
3 Secure the waste fitting with the supplied waste fitting nut.
Apply thread sealant to the threads prior to inserting the nut. Overtightening the nut
SEE DRAIN DETAIL may cause shell damage.
Ensure the drain opening on the waste fitting is not exposed after tightening of the nut.
WASTE FITTING
BOTTOM GASKET
(SUPPLIED)
DRAIN
DETAIL
WASTE FITTING
(SUPPLIED)
1-1/2” FPT TO SLIP
ADAPTER (NOT
SUPPLIED)
4 Install a PVC thread adaptor (not supplied) to the metal waste fitting. This is to provide a PVC to PVC drain adapter connection protruding from the floor. Water test fitting for leaks before installation. NOTE: Use PVC Cement per ASTM D2564 on all PVC joints.
Installation Instructions for 1-Piece Tub
1 Set the tub in its place and position precisely with respect to the drain-overflow location. Verify where the indentation for the drain is in relation to the drain-overflow. Use a marker to outline the perimeter of the entire tub directly on the floor
(Fig. 3).
2 Mark a trough for the overflow drain location on the floor.
The drain/overflow extends below the bottom of the bath.
The drain/overflow requires a cutout of the floor for providing space to accommodate the extension. Do not exceed the dimensions of the tub perimeter. When the above locations have been marked on the floor, remove the tub, set it aside and continue with the installation process.
3 Prepare the drain/overflow trough according to the dimensions shown in the Technical Specifications section.
The depth of the trough depends on the vertical extension of the drain elbow at the bottom of the plumbing below the floor level. Install the drain/overflow according to the manufacturer’s instructions. Refer also to the Technical
Specifications section.
Watertight installation of the drain is the installer’s
responsibility. Drain leakage is excluded from the Jacuzzi
Luxury Bath warranty of this product.
Side
View
Silicone
Bottom
View
Units equipped with Whisper+
Technology
TM or Heated Soak only. Refer to supplied template for electrical connection location.
4 Before the tub may be secured to the floor, the following steps must be completed: Place the tub on the floor in relation to the drain/overflow. Place the tub on the floor and line up with the markings previously made on the floor.
Floor-mounted or wall-mounted faucetry can be used exterior
to the bath, this can be installed after the bath is installed into
the floor.
5 Clean up debris left over from the construction steps taken thus far. Also, remove the perimeter outline of the template on
the floor. Use silicone to attach tub to the sub floor. Make sure the tub is properly oriented according to the drain/overflow
end.
A bead of silicone sealant should be applied around the bottom of the tub. Carefully place the tub on the floor in the correct
position and press to the floor. Place weights around the perimeter and allow the adhesive to cure before proceeding.
Installation Instructions www.jacuzzi.com Page 5
advertisement
Related manuals
advertisement
Table of contents
- 1 Contents
- 2 Safety Instructions
- 4 Inspection and Testing
- 4 Sub Floor
- 4 Deck Mount Faucet Installation
- 5 Installation Instructions for 1-Piece Tub with Integral Overflow
- 5 Installation Instructions for 1-Piece Tub
- 6 Overflow Drain Hole Cutouts
- 6 Installation Instructions for 2-Piece Tub
- 7 Installation Instructions for Remote Blower
- 7 or Heated Soak
- 8 Installation Instructions for Bianca Whirlpool Drain Installation
- 9 Acylic Bathtub Maintenance
- 9 Solid Surface Care and Cleaning Instructions
- 10 Notes
- 11 Warranty Registration Card
- 13 Contenido
- 14 Instrucciones de seguridad
- 16 Inspección y prueba
- 16 Contrapiso
- 17 Instrucciones de instalación para bañeras de 1 pieza con desborde integral
- 17 Instrucciones de instalación para bañeras de 1 pieza
- 18 Instrucciones de instalación para bañeras de 2 piezas
- 19 Instrucciones de instalación para generadores de burbujas de aire con control remoto
- 19 o sistema de climatización constante
- 20 Instrucciones de instalación para el drenaje de Hidromasaje Bianca
- 21 Mantenimiento de bañeras de acrílico
- 22 Notas
- 23 Tarjeta de registro de la garantía
- 25 Table des matières
- 26 Consignes de sécurité
- 28 Inspection et essai
- 28 Sous-plancher
- 29 Consignes d’installation : baignoire 1 pièce avec trop-plein intégré
- 29 Consignes d’installation : baignoire 1 pièce
- 30 Consignes d’installation : baignoire 2 pièces
- 31 Consignes d’installation : baignoire 2 pièces avec système Whisper+ TechnologyMC ou Heated Soak
- 32 Directives d’installation du drain du bain tourbillon Bianca
- 33 Entretien des baignoires acycliques
- 33 Consignes de nettoyage et d’entretien des surfaces solides
- 34 Remarques
- 35 Fiche d’enregistrement de garantie