Preparing ThermoLazer

ProMelt

for Application

Preparing ThermoLazer

ProMelt

for Application

6.

Load bag of thermoplastic directly on kettle heat exchanger. Close cover with cover latches.

Keep all access covers closed and latched when equipment is in use.

Always secure the unit by chocking wheels when adding thermoplastic.

1.

Secure the unit by chocking wheels and applying parking brake. ti15951a

7.

Agitate thermoplastic until material is completely melted. To get best agitation results, use the agitator crank. Use the link-connected agitator actuator setup to agitate melted thermoplastic.

ti14603a

2.

Make sure kettle burners and screed box burners are lit.

3.

Set Kettle Temperature Control to maximum temperature recommended by thermoplastic manufacturer.

NOTE: If the kettle is empty do not allow the kettle to heat for more than five minutes before adding thermoplastic.

4.

If the kettle has 50 lb or more of thermoplastic already inside, allow the kettle to reach maximum melting temperature recommended by thermoplastic manufacturer.

5.

Unlatch kettle cover, raise cover, rotate agitator crank to 9 o’clock position and hold at this position using the cover latch.

ti15952a

(during melting) (after material is melted)

8.

Repeat steps 5 - 7 until kettle is filled with melted thermoplastic.

9.

Once material has been completely melted, lower temperature to recommended material application temperature to prevent material from overheating.

10. Start the box burner three minutes before filling screed box with material.

11. Use torch to heat screed box and chute to application temperature if screed box and chute temperatures are low.

12. Release parking break and remove wheel chocks. ti15950a

3A1319C 21

Preparing ThermoLazer

ProMelt

for Application

13. Move ControlFlow

Gate Valve Actuator (S) to raised position and fill screed box with melted thermoplastic material.

S

0.5 in.

ProMelt Overheating Protection

This unit has a built-in protective device to prevent damage from overheating. The kettle burners may automatically shut down if excessive temperatures are reached.

If this happens, allow the unit to cool down for 20-30 minutes or until main kettle burners (2) reignite and resume operation.

ti14123a

NOTE: The material gate is adjustable. The gate is factory set at a 0.5 in. (1.3 cm) gap. You can increase this gap for more material flow or decrease the gap for less material flow.

14. Do not overfill material in kettle. Overfill would be material higher than 5 in. (13 cm) below top of kettle.

5.0 in.

Overfill

Line ti14410a

15. Avoid bumping or impacting the unit to prevent spillage or splashing of hot material.