Visual Wiring Diagram. Sleipner SE130/250T-12IP, SE130/250T-24IP, SE100/185T-24IP, SE100/185T-12IP

Add to My manuals
24 Pages

advertisement

Visual Wiring Diagram. Sleipner SE130/250T-12IP, SE130/250T-24IP, SE100/185T-24IP, SE100/185T-12IP | Manualzz

Model Size

System

Voltage

Nominal current

*Min. battery

CCA

Rec. fuse

Unit

20/110S

25/110S

30/125S

30/140

40/125S

40/140

50/140S

60/185S

60/140

80/185T

100/185T

120/215T

130/250T

150/215T

170/250TC

210/250TC

12V

12V

12V

12V

12V

24V

12V

24V

12V

24V

12V

24V

24V

12V

24V

24V

24V

24V

250/300TC

300/300TC

24V

24*2

48V

150 A

200 A

245 A

315 A

370 A

170 A

370 A

170 A

530 A

280 A

740 A

340 A

420 A

800 A

DIN: 200

SAE: 380

EN: 330

ANL 150

DIN: 200

SAE: 380

EN: 330

ANL 150

DIN: 200

SAE: 380

EN: 330

ANL 150

DIN: 300

SAE: 570

EN: 520

ANL 250

DIN: 350

SAE: 665

EN: 600

ANL 325

DIN: 175

SAE: 332

EN: 280

ANL 150

DIN: 350

SAE: 665

EN: 600

ANL 325

DIN: 175

SAE: 332

EN: 280

ANL 150

DIN: 550

SAE: 1045

EN: 940

ANL 400

DIN: 300

SAE:570

EN: 520

ANL 250

DIN: 750

SAE: 1425

EN: 1320

ANL 500

DIN: 400

SAE: 760

EN: 680

ANL 325

DIN: 450

SAE: 855

EN: 760

ANL 325

DIN: 750

SAE: 1425

EN: 1320

ANL 500

350 A

610 A

550 A

500 A

610-670 A

400-450A

(48V)

DIN: 400

SAE: 760

EN: 680

ANL 325

DIN: 560

SAE: 1064

EN: 940

ANL 500

DIN: 560

SAE: 1064

EN: 940

ANL 400

DIN: 560

SAE: 1064

EN: 940

ANL 400

DIN: 700

SAE: 1330

EN: 1170

ANL 500

DIN: 400

SAE: 760

EN: 680

ANL 325

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm² mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm²

AWG mm2

AWG mm²

2 mm²

AWG mm²

AWG mm²

AWG mm²

AWG

<7m total + & -

3/0

50

1/0

70

2/0

35

2

95

2/0

95

1/0

25

3

70

1/0

25

3

50

3

35

2

35

Min.

25

3

25

2

50

2/0

70

2/0

70

3/0

50

2

70

2/0

70

2/0

50

1/0

3/0

50

1/0

70

2/0

35

2

95

2/0

95

1/0

25

3

70

1/0

25

3

50

2

50

1/0

50

Rec.

35

2

35

1/0

50

2/0

70

2/0

70

3/0

50

1/0

70

2/0

70

2/0

70

2/0

Electrical Reference Guide

Cross Section Guide for Power Cables

15-21m total + & -

2 x 2/0

50

1/0

2 x 70

2 x 2/0

50

1/0

2 x 95

2 x 3/0

70

2/0

2/0

95

3/0

120

Rec.

70

2/0

70

4/0

2 x 70

2 x 3/0

50

1/0

2 x 120

2 x 4/0

70

2/0

70

2/0

2 x 120

4/0

35

2

2 x 95

4/0

35

2

120

2/0

70

2/0

95

Min.

50

1/0

70

3/0

120

4/0

95

3/0

95

2 x 4/0

70

2/0

120

3/0

120

4/0

70

2/0

NA

95

3/0

95

3/0

2 x 120

2 x 4/0

95

3/0

120

4/0

120

4/0

120

4/0

2 x 95

2 x 3/0

95

3/0

NA

95

3/0

95

3/0

NA

7-14m total + & -

4/0

35

2

2 x 70

2 x 2/0

50

1/0

70

2/0

2 x 95

2/0

25

3

120

2/0

25

3

70

1/0

50

1/0

70

Min.

35

2

50

2/0

70

3/0

70

2/0

70

2 x 2/0

50

1/0

95

2/0

95

3/0

50

1/0

2 x 2/0

50

1/0

2 x 95

2 x 3/0

70

2/0

70

2/0

2 x 95

3/0

35

2

2 x 70

3/0

35

2

95

1/0

70

2/0

95

Rec.

50

1/0

50

3/0

95

3/0

95

3/0

95

2 x 3/0

70

2/0

95

3/0

120

4/0

70

2/0

95

3/0

2 x 70

2 x 2/0

120

4/0

120

4/0

2 x 95

2 x 3/0

95

3/0

22-28m total + & -

2 x 2/0

35

2

2 x 70

2 x 2/0

35

2

2 x 120

2 x 4/0

70

2/0

3/0

95

3/0

120

Min.

70

2/0

95

4/0

2 x 70

2 x 3/0

50

1/0

2 x 95

2 x 3/0

50

1/0

2x 120

2 x 4/0

95

3/0

Rec.

95

3/0

95

3/0

120

4/0

2 x 70

2 x 2/0

2 x 95

NA

120

4/0

120

4/0

NA

120

4/0

2 x 95

2 x 3/0

2 x 95

2 x 3/0

2 x 70

2 x 2/0

2 x 95

2 x 3/0

120

4/0

MC_0044

28-35m total + & -

2 x 4/0

70

2/0

2 x 120

2 x 4/0

70

2/0

Rec.

95

3/0

120

4/0

2 x 70

2 x 2/0

2 x 95

2 x 3/0

2 x 120

2 x 3/0

50

1/0

2 x 95

2 x 3/0

50

1/0

2 x 120

2 x 4/0

95

3/0

Min.

95

3/0

120

4/0

120

4/0

2 x 95

2 x 3/0

2 x 95

NA

120

4/0

36-45m total + & -

2 x 4/0

70

2/0

2 x 120

2 x 4/0

70

2/0

Min.

120

2 x 4/0

2 x 70

2 x 2/0

2 x 70

2 x 2/0

2 x 120

2 x 4/0

2 x 120

2 x 4/0

70

2/0

2 x 120

2 x 4/0

70

2/0

Rec.

2 x 70

2 x 2/0

2 x 70

2 x 2/0

2 x 95

2 x 3/0

2x 120

2 x 4/0

2 x 120

NA

120

4/0

NA

2 x 95

2 x 3/0

NA

120

4/0

120

4/0

NA

NA

2 x 95

2 x 3/0

2 x 70

2 x 2/0

NA

NA

2 x 95

2 x 3/0

2 x 70

2 x 2/0

NA

NA

2 x 120

2 x 4/0

2 x 95

2 x 3/0

NA

120

4/0

2 x 95

2 x 3/0

2 x 95

2 x 3/0

2 x 70

2 x 2/0

2 x 95

2 x 3/0

120

4/0

2 x 70

2 x 2/0

2 x 120

2 x 4/0

2 x 95

2 x 3/0

2 x 95

2 x 3/0

2 x 120

2 x 4/0

120

4/0

2 x 95

2 x 3/0

2 x 120

2 x 4/0

2 x 120

2 x 4/0

2 x 95

2 x 3/0

2 x 120

2 x 4/0

140

4/0

2 x 95

2 x 3/0

2 x 120

2 x 4/0

2 x 120

2 x 4/0

2 x 120

2 x 4/0

2 x 120

2 x 4/0

NA

Wiring Diagram

Refer to your control panel manual for detailed information on connecting the thruster system to your control device

4-wire cable

Automatic

Main Switch

Control panel

Y-Connector

++

THRUSTER

BATTERY

B+

Fuse 5A

B-

Fuse 10A

Automatic

Main Switch

4-wire cable

4-wire cable

IP Thruster

++

THRUSTER

BATTERY

B+

Fuse 5A

B-

4-wire cable

IP Thruster

IMPORTANT

In dual thruster systems with dedicated batteries to each thruster, connect the negative poles of both batteries with a 10A fuse between the connection.

IMPORTANT

Check the following with the main switch in the off position

After all electrical connections have been completed check with an ohm meter that there is no electrical connection between electro motor body and positive terminal on the motor and between the electro motor body and the negative (A1) terminal on the motor. If you feel unsure about how to perform this check, contact skilled personnel for guidance

SE IP 100 & SE IP 130 2653 13 2022

MG_0036

19

Control Panel Installation

For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed.

MC_0398

Installation Guide

Control Panel

SLEIPNER MOTOR AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

20 SE IP 100 & SE IP 130 2653 13 2022

advertisement

Related manuals