Preparing the machine for shipment. Krone BA EasyCut F 320 CV, BA EasyCut F 320 CV gez./ges.

Add to My manuals
154 Pages

advertisement

Preparing the machine for shipment. Krone BA EasyCut F 320 CV, BA EasyCut F 320 CV gez./ges. | Manualzz

9

9.3

Driving and Transport

Preparing the machine for shipment

For the “trailed” version

9.3

KMG000-083

„ Lift the machine into transport position,

see Page 86 .

„

Shut down and safeguard the machine, see Page 24

.

„ Lower the support jack (1) and secure it with the bolt,

see Page 84

.

„ Lower the machine,

see Page 86

.

„ For the “hydraulically folding side guards” version: Depressurise the tractor hydraulics.

„

Shut down and safeguard the machine, see Page 24

.

„ Loosen the guard cloth (4).

„ Remove the supporting chain (5) of the universal shaft on the tractor side.

„ Remove the universal shaft (6) from the tractor side and place it on the universal shaft bracket (7).

„ For version with "Lighting": Pull the 7-pin plug of the connection cable out of the 7-pin socket of the tractor and place it on the machine.

„ Uncouple the hydraulic hose(s) (2) from the tractor, mount the dust cap(s) and put them on the machine.

„ Detach the top link (3).

„ Unlock the lower link hooks of the tractor.

„ Continue to lower the front lifting device until the lower link pins are free.

„ Carefully drive away by reversing the tractor.

Preparing the machine for shipment

WARNING

Risk of accident due to unsecured machine parts

If the machine is not secured properly for transportation on a lorry or train, the parts may come loose unintentionally due to the airstream. This may result in serious accidents or damage to the machine.

„ Carry out the following measures to secure moving machine parts.

92

EasyCut F 320 CV

Original operating instructions 150000173_09_en-GB

advertisement

Related manuals

advertisement

Table of contents