Automatic Main Switch Wiring Diagram 24V IP Thruster. Sleipner SE50/140S-24IP, SE50/140S-12IP

Add to My manuals
30 Pages

advertisement

Automatic Main Switch Wiring Diagram 24V IP Thruster. Sleipner SE50/140S-24IP, SE50/140S-12IP | Manualzz

Automatic Main Switch Wiring Diagram 24V IP Thruster

The Top wiring diagram is for a single bow or stern thruster system

Refer to your control panel manual for detailed information on connecting the thruster system to your control device

Control panel

Automatic Main Switch

5-wire cable

ANL Fuse

++

12V

BATTERY

++

12V

BATTERY

Fuse 5A

4-wire cable

IP Thruster

The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation.

Automatic Main Switch 5-wire cable

Fuse

10A

++

12V

BATTERY

ANL Fuse

Fuse 5A

++

12V

BATTERY

4-wire cable

IP Thruster

24 SE IP 50 4526 15 2023

MG_0582

Automatic Main Switch Wiring Diagram 24V IP Thruster

The Top wiring diagram is for a single bow or stern thruster system

Refer to your control panel manual for detailed information on connecting the thruster system to your control device

Control panel

Automatic Main Switch

5-wire cable

ANL Fuse

++

12V

BATTERY

++

12V

BATTERY

Fuse 5A

4-wire cable

IP Thruster

The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation.

Automatic Main Switch 5-wire cable

Fuse

10A

++

12V

BATTERY

ANL Fuse

Fuse 5A

++

12V

BATTERY

4-wire cable

IP Thruster

MG_0582

Control Panel Installation

For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed.

MC_0398

Installation Guide

Control Panel

SLEIPNER MOTOR AS

P.O. Box 519

N-1612 Fredrikstad

Norway www.sleipnergroup.com

DOCUMENT ID:

REVISION:

DATE:

LANGUAGE:

SE IP 50 4526 15 2023 25

advertisement

Related manuals