Responsibility of the installer. Sleipner SEP80/185T-24IP, SEP120/215T-24IP, SEP80/185T-12IP

Add to My manuals
32 Pages

advertisement

Responsibility of the installer. Sleipner SEP80/185T-24IP, SEP120/215T-24IP, SEP80/185T-12IP | Manualzz

Sleipner Motor AS

P.O. Box 519, Arne Svendsensgt. 6-8

N-1612 Fredrikstad, Norway

Contents

MC_0020

Failure to follow the considerations and precautions can cause serious injury, damage and will render all warranties given by Sleipner Motor as VOID.

MC_0411

Responsibility of the Installer

MC_0038

The installer must read this document to ensure necessary familiarity with the product before installation.

Instructions in this document cannot be guaranteed to comply with all international and national regulations. It is the responsibility of the installer to follow all applicable international and national regulations when installing Sleipner products.

The recommendations given in this document are guidelines ONLY, and Sleipner strongly recommends that advice is obtained from a person familiar with the particular vessel and applicable regulations.

This document contains general installation instructions intended to support experienced installers. If you are not skilled in this type of work, please contact professional installers for assistance.

If required by local regulation, electrical work must be done by a licensed professional.

Appropriate health and safety procedures must be followed during installation.

Faulty installation of Sleipner products will render all warranties given by Sleipner Motor AS.

Ensure appropriate access to Sleipner products during installation planning for service, inspection and component replacement.

General Installation Consideration and Precaution Guidelines

MC_0440

For thruster systems

MC_0425

• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support that may jeopardise the hull integrity without checking

with the boat builder this can be done safely.

• Paint the gear house and propellers with anti-fouling. (NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)

• There is only room for a thin coat of primer and two layers of anti-fouling between the tunnel and the props.

• Never run the thruster out of water without load.

For electric motor thrusters

MC_0031

• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.

(NB: Sleipner Ignition Protected systems are tested and rated accordance with ISO 8846 and can be installed in areas with possible explosive

gases.)

• When installing the thruster electric motor in small compartments, ensure the compartment is dry and well ventilated to allow for cooling of the

electric motor.

• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.

- If the electro motor is positioned more than 30 degrees off vertical, it must be supported separately.

- Beware of keeping installation within advised measurements. No part of the propeller or gear leg must be outside the tunnel.

• The electric motor, components and cables must be mounted so they remain dry at all times.

• Do not fi nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-

fouling between the tunnel and the props.

• Don’t install the electric motor close to easily flammable objects or equipment as it will reach over 100°C before the temperature switch is

activated.

• Do not store items close to the thruster motor. Any loose items near the thruster motor is a potential fi re hazard and can cause undesired short-

circuiting.

• Do not lift it by internal cable connections, main terminals.

• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.

• The electric/ hydraulic motor must be handled with care. Do not rest the thruster motor on its drive shaft as its weight can damage the shaft.

For DC electric motors

MC_0426

• The electro motor will generate some carbon dust so any storage compartments must be separated from the thruster to prevent nearby items

becoming dusty/ dirty. (NB: IP version motors generate dust but are enclosed.)

Lithium Batteries for on/off thrusters models SR, SE and SE-IP

MC_0501

• High capacity lithium batteries are capable of supplying a higher operating voltage to the thruster than SR, SE and SE-IP thrusters are rated for.

Running thrusters at higher than rated voltage will reduce operating time, increase wear and damage the thruster. Operating the thruster

outside specifi ed ratings will void warranty.

SEP IP 80 & SEP IP 120 4498 13 2023 3

General Installation Consideration and Precaution Guidelines

MC_0440

Lithium Batteries for proportional thrusters models MC_0502

• If a lithium battery system is installed for supply of proportional thrusters, ensure the battery is designed for continuous supply of the required

thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The

fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.

Operating the thruster outside specifi ed ratings will void warranty.

When installing an S-Link™ system connect ONLY original Sleipner S-Link™ products or other authorized control equipment directly to the S-Link™ bus.

Connecting non-authorized third-party equipment, it must always be connected through a Sleipner supplied interface product.

Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and responsibilities of all of the connected Sleipner products. If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated

Sleipner supplied interface, you are still required to install at least one original Sleipner control panel to enable efficient troubleshooting if necessary.

MC_0105

NEVER Disassemble any part of the Ignition Protected assembly. Tampering with the Ignition Protected assembly will cause it to lose this safety feature. If there is a problem with your Ignition Protected motor, please contact your dealer.

MC_0007

4 SEP IP 80 & SEP IP 120 4498 13 2023

General Installation Consideration and Precaution Guidelines

MC_0440

Lithium Batteries for proportional thrusters models MC_0502

• If a lithium battery system is installed for supply of proportional thrusters, ensure the battery is designed for continuous supply of the required

thruster current. Under-rated battery management system can suddenly disconnect the load which may lead to dangerous situations. The

fi rmware version of Proportional Power Controller (PPC) must be of version 1.033 or later if the PPC is to be connected to a lithium battery.

Operating the thruster outside specifi ed ratings will void warranty.

When installing an S-Link™ system connect ONLY original Sleipner S-Link™ products or other authorized control equipment directly to the S-Link™ bus.

Connecting non-authorized third-party equipment, it must always be connected through a Sleipner supplied interface product.

Any attempt to directly control or connect into the S-Link™ control system without a designated and approved interface will render all warranties and responsibilities of all of the connected Sleipner products. If you are interfacing the S-Link™ bus by agreement with Sleipner through a designated

Sleipner supplied interface, you are still required to install at least one original Sleipner control panel to enable efficient troubleshooting if necessary.

MC_0105

NEVER Disassemble any part of the Ignition Protected assembly. Tampering with the Ignition Protected assembly will cause it to lose this safety feature. If there is a problem with your Ignition Protected motor, please contact your dealer.

MC_0007

Measurement code

ID

H

W

L

WD

TL

TL (recommended)

T (min)

T (max)

Measurement description

Internal tunnel diameter

Motor Height

Width

Length

Water Depth

Minimum tunnel length

Recommended tunnel length

Minimum tunnel wall thickness

Maximum tunnel wall thickness

*Valid for SE IP & SEP IP

Product Dimensions

SE IP 80

12v

SE IP 80

24v

SE IP 120

24v mm inch mm inch mm inch

179

216

6

8

185

406

7,28

15,98

262 10,31

327 12,87

185 7,28

7,05

8,50

0,24

0,31

179

216

6

8

185

406

7,28

15,98

262 10,31

327 12,87

185 7,28

7,05

8,50

0,24

0,31

215

501

8,46

19,72

306 12,05

381 15,00

215 8,46

233 9,17

276 10,87

6

8

0,24

0,31

L W

H

ID

T

TL

MC_0131

WD

Propeller position will vary with each thruster model

Twin Propeller

The gear leg/ propeller(s) must never extend out of the tunnel

Tunnel centre line

MG_0076

SEP IP 80 & SEP IP 120 4498 13 2023 5