Manual Main Switch Wiring Diagram 24V S-Link IP Thruster
The Top wiring setup is for a single bow OR stern thruster system
Refer to the User and Installation Manual of the control panel to be installed for detailed installation instructions.
See S-Link System Description chapter for detailed information on installation of S-Link Power cable and additional S-Link components.
S-Link Backbone cable
ANL Fuse
Manual Main
Switch
S-Link Spur cable
Proportional Power
Controller (PPC)
PPC
Control panel
++
12V
BATTERY
B+ M- B-
8-lead cable
IP Thruster
++
12V
BATTERY
The top and bottom wiring setup is for a dual thruster system, For example bow and stern.
S-Link Backbone cable
S-Link Spur cable Proportional Power
Controller (PPC) Fuse 10A
ANL Fuse
++
12V
BATTERY
Manual Main
Switch
PPC
B+ M- B-
8-lead cable
++
12V
BATTERY
IP Thruster
24 SEP IP 80 & SEP IP 120 4498 13 2023
MG_0598