Electrical Connections (Soakers with Chromatherapy Only). Jacuzzi SOAKER BATH SERIES 48 Pages
Electrical Connections (Soakers with Chromatherapy Only). Jacuzzi SOAKER BATH SERIES
Add to My manuals48 Pages
advertisement
Soaker™ Bath Series
Subfloor
Prepare the subfloor for the drain and ensure that the area is level.
1 The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical
Specifications Manual that corresponds with your bathtub.
2 Make appropriate cuts to the subfloor to accommodate the drain.
3 Jacuzzi’s Tru-Level™ base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface, no other preparation is necessary. Proceed to the “Installation” section.
4 If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar, plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint or splice of subfloor should be level to each other.
Electrical Connections (Soakers with Chromatherapy Only)
Risk of electric shock. Connect only to a circuit protected by a GFCI.
When using electrical products, basic precautions should always be followed:
•
Always follow local building and electrical codes.
For soakers with chromatherapy, grounding is
required. The unit should be installed and
grounded by a qualified electrician.
Reset
A 120V, 15A, GFCI protected circuit is required. Install a duplex outlet to the wall stud underneath the bathtub, at least 4˝ (101mm) above the floor. The duplex outlet is not supplied.
Test
Chromatherapy Light Installation
Your bathtub comes with two lights, cables, and control box (pre-installed). The control panel requires installation in a location selected by the installer.
1 Plan the location of the control panel. A possible configuration is shown at right (Figure 2).
The panel cannot be immersed in the bathtub water. Select a location at least 1˝ above the level of the overflow drain.
The control panel must be installed on a flat surface at least 3˝ wide x 2˝ tall. You may mount on any flat surface on the bathtub shell, bathtub surround or on the adjacent wall.
The control cable has a length of 10’. If you plan to remote-mount the control panel (not on the bathtub deck), the control panel cannot be located more than 10’ from the control box.
Chromatherapy
Lights
Control Panel
Figure 2 - Possible Configuration
Installation and Operation www.jacuzzi.com
Page 7
2 Place masking tape over the entire area of the proposed hole to prevent chipping.
If you are installing the control panel on the acrylic surface of the bathtub, the holes must be drilled from the inside (glossy side) of the bathtub.
3
/
32 hole be located correctly or the control panel will not be centered and straight.
4
5
/
/ diameter hole.
/ 1
16
6 Use a 1 /
16
˝ hole saw to complete the hole for the control panel.
7 Sparingly, apply a bead of clear silicone to the back surface of the control panel, just inside the perimeter.
8 Insert the control panel into the hole and press firmly into place.
9
Do not allow the silicone to enter the plug housing on the back of the control panel; this could result in damage to the equipment.
Allow the silicone to fully cure according to the manufacturer’s instructions.
10
Attach the control cable from the control box
(Figure 5).
Water Line
Soaker™ Bath Series
Rim of Bathtub
Overflow Drain
Control Panel
Hole
1˝
4˝ (minimum)
Light Hole
Figure 3 - Hole Pattern
/
/
32
˝
½˝
Figure 4 - Hole Sizes
Control Panel
Control Cable
Page 8 www.jacuzzi.com
Figure 5 - Control Cable Attachment
Installation and Operation
Soaker™ Bath Series
Fuzion
™
Specific Material
The additional design features of the Fuzion™ require that the following steps be completed prior to installing the bathtub in the constructed surround. The following steps must also be completed in the order specified:
•
Fuzion™ Overflow/Drain Installation
Fuzion™ Wood Frame Installation
Fuzion
™
Faucet Installation
Selecting a faucet for rim mounting: The combined thickness at the rim of the bathtub shell and optional wood deck is 2˝ (50mm) nominal. The length of the faucet tailpiece(s) must be long enough to extend past this dimension and have ample clearance to assemble any hardware (i.e. locknut, water supply fittings, etc.) necessary for installation. For undermount units, the combined thickness of the bathtub shell is ½˝ (12mm) nominal and the undermount deck should not exceed the length of the faucet tailpiece(s), including any assembly hardware.
Fuzion
™
Overflow Drain Installation
Assemble in accordance with the local plumbing or building codes.
1
Identify drain overflow kit provided with your bathtub. Remove and open the overflow package and confirm that all parts are present.
Remove washers and nuts from the overflow fitting.
2
3 Place a small bead of plumbers putty, silicone, or similar approved sealant around the underside of the top flange of the overflow fitting.
4 Place the overflow fitting into the overflow hole of the bathtub (Figure 6).
5 From the underside of the unit, place the rubber washer then locknut on the overflow fitting and tighten securely. Be careful not to overtighten.
6 Assemble the remaining drain pieces as shown in the illustration.
7 After the drain is fully installed, test for proper drainage. If the unit does not drain properly, rectify this condition before proceeding with further bathtub installation.
Watertight installation of the drain and overflow is the installer’s responsibility. Drain leakage is excluded from the Jacuzzi Luxury Bath warranty of this product
Flat Rubber
Washer
Lock Nut
Direct Waste Overflow Drain
Figure 6 - Overflow Installation
Direct Waste Overflow
Drain
Overflow
Drain
Assembly
Overflow Fitting
Apply sealant/caulking
(commercially available)
PVC Flex Pipe
Twist and
Turn Drain
Assembly
PVC Tee
PVC Pipe
Waste Seal Gasket
Waste Elbow
PVC Pipe
You will not use all pieces provided.
OPTIONAL - If the Fuzion™ Wood Frame is not being used, please proceed to Step 2 in the Undermount Installation section.
Installation and Operation www.jacuzzi.com
Page 9
advertisement
Related manuals
advertisement
Table of contents
- 3 Contents
- 3 Product Information
- 4 Safety Instructions
- 5 Operational Safety Instructions
- 6 Inspection and Testing
- 6 Installation
- 6 Framing
- 7 Electrical Connections (Soakers with Chromatherapy Only)
- 7 Chromatherapy Light Installation
- 10 Drop-in Installation
- 11 3-Wall Alcove Installation
- 12 Skirt Installation
- 12 Undermount Installation
- 13 Cleanup
- 13 Operation
- 13 Maintenance
- 14 Authorized Service
- 15 Warranty
- 18 Contenido
- 18 Información del producto
- 19 Instrucciones de seguridad
- 20 Instrucciones de seguridad operacional
- 21 Inspección y prueba
- 21 Instalación
- 21 Estructura
- 22 Conexiones eléctricas (Sólo modelos Soaker con cromoterapia)
- 22 Instalación de luces para cromoterapia
- 24 Unstalacion del drenaje de rebusadero Fuzion
- 25 Instalación empotrada
- 26 Instalación en el hueco de 3 paredes (continuación)
- 27 Instalación del faldón
- 28 Instalación de montaje bajo cubierta
- 28 Limpieza
- 29 Funcionamiento
- 29 Mantenimiento
- 30 Servicio técnico autorizado
- 31 Warranty
- 34 Contenu
- 34 Renseignements sur le produit
- 35 Directives de sécurité
- 36 Instrucciones de seguridad operacional
- 37 Inspection et essai
- 37 Installation
- 37 Cadrage
- 38 Connexions électriques (baignoires de trempage avec chromothérapie seulement)
- 38 Installation des lumières de chromothérapie
- 40 Installation d l’évacuation du trop-plein Fuzion
- 41 Instalación empotrada
- 43 Installation de la jupe
- 44 Instalación de montaje bajo cubierta
- 44 Nettoyage
- 45 Utilisation
- 45 Entretien
- 46 Service autorisé
- 47 Warranty