第1章 维修与拆卸

Add to my manuals
76 Pages

advertisement

第1章 维修与拆卸 | Manualzz

Test Contents Test Record

Visual Inspection

The case, display screen, buttons, power cord, wall mount, and accessories have no obvious signs of damage.

The external connecting cables are not frayed and the connector pins are not loose and bent.

The external connectors are not loose or their pins are not bent.

The safety labels and data plate are clearly legible.

Power-on test

The power-on test is passed. The power indicator works correctly and the monitor starts up properly.

Performance test

SpO

2

test

Measure SpO

2

on a healthy person’s finger and a PR value is displayed. The displayed SpO

2

value is within 95% and 100%.

NIBP test

The difference is within ±3 mm when 0, 50 or 200 mmHg is set for NIBP accuracy test.

There is no leakage with NIBP, or the manual leakage test result does not exceed 6 mmHg/min.

Temp test

The displayed Temp value on the monitor is within 37 ± 0.1

℃.

Electric safety tests

Refer to Appendix A Electrical Safety Inspection.

Battery Check

The monitor can operates correctly from battery power when an AC power failure accidentally occurs.

The monitor can operate independently on a single battery.

Test conclusion:

Tested by: Test date:

Test Result

(Pass/Fail)

4-12

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement

Table of contents