INSTALLATION

To be carried out by qualified personnel.

The installation must be in compliance with the stipulations of the law regarding the evacuation of combustion materials according to the REGULATIONS IN FORCE.

The gas fume evacuation must be effected with a pipe of a diameter not less than that required by the boiler and it must be connected to a flue pipe suitable for the capacity of the installation.

For connection of appliances to smoke conduits:

a) b) c) d)

they must be easy to dismantle; they must be sealed and of a material able to resist the products of combustion and their possible condensation; they must not have regulation devices (gate valves). If such devices are already in operation they must be eliminated; the connection itself must not protrude inside the flue pipe but stop before the internal face of the same.

GAS CONNECTION

Carry out the gas connection in accordance with the regulations in force.

The boiler must be connected to the installation with a rigid metal pipe or a flexible stainless steel pipe with continuous wall of the approved type. The flexible corrugated metal pipes must be installed in such a way that their length, in a state of maximum extension, is not greater than 2000 mm. The boilers are calibrated and tested to function with NATURAL GAS and LIQUID GAS, category II 2H3+, with rated pressures of 20 mbar,

28/30 mbar and 37 mbar respectively.

PUTTING THE BOILER INTO SERVICE

Proceed with the clearing out of air.

Check that there are no gas leaks (use a soapy solution or equivalent product).

START-UP

REFILLING INSTALLATION

Open the supply tap slowly until the pressure of the installation, indicated by the hydrometer, is raised to the value of 1.5 bar, then close it again. Verify that the automatic air bleed valve on the circulator has its cap loosened. Operate the circulator repeatedly to release any air remaining in the circuit.

SWITCHING ON

Open the gas tap and turn the selector switch to the desired position. The burner will ignite automatically.

Should the burner fail to ignite check the lock-out warning light to see whether it is on, and if so turn the selector switch to the RESET position so that the boiler repeats the ignition sequence.

Then, adjust heating and hot water temperatures as desired via the appropriate controls.

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Key Features

  • High efficiency and modulating unit for energy savings
  • Steel water heater for durability and long service life
  • Compact design for easy installation in tight spaces
  • User-friendly controls for simple operation
  • Safety features to prevent accidents and ensure peace of mind

Related manuals

Frequently Answers and Questions

What are the dimensions of the boiler?
The dimensions of the boiler are 700 x 400 x 270 mm.
What is the heating capacity of the boiler?
The heating capacity of the boiler is 24 kW.
What type of gas does the boiler use?
The boiler can be used with natural gas or LPG.
How do I install the boiler?
The boiler must be installed by a qualified technician in accordance with local regulations.
How do I operate the boiler?
The boiler is operated using the user-friendly controls on the front panel.
What are the safety features of the boiler?
The boiler is equipped with a range of safety features, including a flame failure device, overheat protection, and a pressure relief valve.