- 11 Welcome to PMCS!
- 11 What is Power Management?
- 11 Benefits of Power Management
- 11 What is PMCS?
- 12 How Does PMCS Work?
- 12 Using This Guide
- 13 Chapter 1 – Introduction
- 13 1–1 Typical Systems
- 14 1–2 Master-Slave Organization
- 15 1–3 Required Hardware
- 15 Host Computer
- 15 RS-485 Interface Card or RS-232/RS-485 Converter
- 15 Ethernet Network Card
- 15 1–4 Compatibility & Interconnection with Existing Ethernet Networks
- 15 1–5 Operation During Power Outage
- 16 1–6 Time & Date Stamping
- 16 1–7 Remote System Operation
- 17 1–8 Supported IEDs
- 19 Chapter 2 – Network Design
- 20 2–1 Modbus Rules
- 21 2–2 Ethernet Configuration Rules
- 22 T
- 22 Table 3. Ethernet configuration rules2–3 Ethernet Network Considerations
- 23 10Base-T specifications and rules
- 23 10Base-FL specifications and rules
- 24 2–4 Commnet Configuration Rules
- 25 2–5 Modbus Wiring Rules – Diagrams
- 29 2–6 Commnet Wiring Rules – Diagrams
- 31 2–7 Performance Recommendations
- 31 The Ideal Network
- 31 Modbus performance recommendations
- 31 Commnet performance recommendations
- 31 2–8 Addressing the IEDs
- 35 2–9 Multiple RS-485 Networks – Addressing
- 35 2–10 System Expansion
- 35 2–11 Case Studies
- 35 Case Study One
- 37 Case Two
- 39 Case Three
- 40 Case Four
- 43 Case Five
- 47 Chapter 3. Network Wiring and Construction
- 48 3–1 Wiring Requirements
- 49 Type of Wire
- 49 Termination
- 49 Shield Grounding
- 49 3–2 Modbus – Commnet Integration
- 49 Wiring Concerns
- 51 3–3 Modbus – Ethernet Integration
- 51 3–4 Local Configuration of IEDs
- 51 3–5 Applying Power to the System
- 51 3–6 Software Loading and Startup
- 52 Chapter 4 –Trouble-Shooting
- 52 4–1 Communication Network Trouble-Shooting
- 53 4–2 Host Trouble-Shooting
- 53 4–3 IED Trouble-Shooting
- 53 4–4 Equipment Trouble-Shooting
- 53 4–5 Product Service Procedure
- 54 4–6 Trouble-Shooting Guide
- 59 Overview
- 59 239 Motor Protection Relay
- 59 269+ Motor Management Relay
- 60 565 Feeder Management Relay
- 60 735 Feeder Relay
- 61 MX200 (Microprocessor Controller)
- 61 Generator PLC (Series 90-70)
- 61 Electronic Power Meter EPM 7330