M-system AS4V

Инструкции и руководства для M-system AS4V. Мы нашли 3 инструкции доступные для бесплатного скачивания instruction manual

**M-system AS4V** The AS4V is a dual or quad alarm trip device that can be field-configured. It has a basic insulation class and complies with CE directives and UL standards. The AS4V is suitable for use in a Pollution Degree 2 environment and in Installation Category II, with a maximum operating voltage of 300V. Basic insulation is maintained between signal input, output, and power input. The AS4V has a power rating of 100 – 240V AC: 85 – 264V, 47 – 66 Hz, approx. 6VA (100 – 240V ±10% for UL) or 24V DC: 24V ±10%, approx. 3.5W or 110V DC: 85 – 150V, approx. 3.5W

Ключевые особенности

  • Dual or Quad Alarm Trip
  • Field-Configurable
  • Noise Filter
  • Warm-Up Period
  • Input Range Adjustment
  • Alarm Point Setting
  • DIN Rail and Wall Mounting
  • Protection Features
  • User-Friendly Interface

Страниц: 4 M-system AS4V instruction manual

Бренд: M-system Категория: Electrical equipment & supplies Размер: 80 KB

Языки: English

Открыть мануал

Другие мануалы и документы

5 Страниц

instruction manual

Языки: English

4 Страниц

instruction manual

Языки: English

Часто задаваемые вопросы

How to set up the alarm points for the AS4V?
The manual provides detailed instructions for programming the alarm setpoints using the ITEM UP/DOWN and DATA UP/DOWN keys. Consult the document for step-by-step guidance.
What are the environmental conditions for using the AS4V?
The AS4V is designed for indoor use. The optimal operating temperature is within -5 to +55°C (23 to 131°F) with relative humidity within 30 to 90% RH. Install it in proper housing with ventilation to prevent dust or metal particles from affecting performance. Avoid continuous vibrations and physical impact on the unit.
How to install the AS4V on a DIN rail?
First, detach the yellow clamps at the top and bottom of the unit, separating the body from the base socket. Position the base socket so its DIN rail adaptor is at the bottom. Place the upper hook on the DIN rail and push in the lower. To remove, push down the DIN rail adaptor using a minus screwdriver and pull.
How to install the AS4V on a wall?
Refer to the 'EXTERNAL DIMENSIONS' section of the instruction manual. The wall mounting instructions should be outlined in the document.
How to test the alarm operation?
The manual provides guidelines for checking the alarm operation. It involves connecting the unit according to the diagram, checking the power input voltage, input signal, and output load. Follow the procedures described in the manual to test the alarm functionality.

реклама