Tuthill GlobalGear GG30

Manuals and User Guides for Tuthill GlobalGear GG30. We found 1 manuals for free downloads Manual

Below you will find brief information for GlobalGear GG15-30, GlobalGear GG120-210, GlobalGear GG250, and GlobalGear GG550. This module covers reassembly of the drive module, reinstalling it, adjusting end clearance, mechanical seal installation, relief valve troubleshooting and disassembly, along with high-temperature greased bearing maintenance, replacing bushings, and lubrication notes. The document provides detailed instructions and torque specifications for various components.

Key Features

  • Reassembly of Drive Module
  • Mechanical Seal Installation
  • Adjusting End Clearance
  • Relief Valve Troubleshooting
  • Servicing Greased Bearings
  • Replacing Bushings

Pages: 79 Tuthill GlobalGear GG30 Manual

Brand: Tuthill Category: Water pumps Size: 2 MB

Languages: English

Open manual

Frequently Answers and Questions

What are the locknut torque requirements for the GG15-30 pump?
The locknut torque requirements for the GG15-30 pump are 68-95 Newton-Meters.
How do I adjust the end clearance?
Loosen the set screws on the rear cover, slowly tighten the hex nuts until the rotor touches the pump cover. Then measure and adjust the gap at four points 90° apart. Apply the value from TPC 254 to the gap measurement for zero clearance to determine the target gap.
What should I do if the relief valve is chattering?
If the relief valve is chattering, it means the relief valve set is too low. The correction is to increase the setting for full bypass pressure. A higher-pressure spring may be required.

advertisement