- Sports & recreation
- Camping, tourism & outdoor
- Above ground pools
- Above ground pool accessories
- Raypak
- 302B
- User's manual
advertisement
INSTALLATION & OPERATING
INSTRUCTIONS
Models 302B –902B
Types H, WH & P
L
W
WARNING: If these instructions are not followed exactly, a fire or explosion may result causing property damage, personal injury or death.
FOR YOUR SAFETY: Do not store or use gasoline or other flammable vapors and liquids or other combustible materials in the vicinity of this or any other appliance.
To do so may result in an explosion or fire.
WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
• Do not touch any electrical switch; do not use any phone in your building.
• Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions.
• If you cannot reach your gas supplier, call the fire department.
Installation and service must be performed by a qualified installer, service agency or the gas supplier.
This manual should be maintained in legible condition and kept adjacent to the heater or in another safe place for future reference.
CATALOG NO. 1000.501J
Effective: 03-29-11 Replaces: 06-18-10 P/N 240757 Rev. 11
Rev. 11 reflects the following:
Changes to: “Installations at Elevation” and low-lead certification on page 5, Table J on page 20, “Electrical Power
Connections” on page 22, Table T on page 40, Wiring Diagram on page 45, Igniter check (“As Required” Item #4) on page
53, Warranty on page 56, Fax number in Start-Up Checklist on page 57
Additions: Note on page 15, notes on page 16, Table R on page 39
Deletions: None
2
CONTENTS
WARNINGS
BEFORE INSTALLATION
Product Receipt
Model Identification
Ratings and Certifications
Installations at Elevation
Component Locations
General Information
GENERAL SAFETY
Time/Temperature Relationships in
Scalds
INSTALLATION
Installation Codes
Equipment Base
Stacking
Clearances
Combustion and Ventilation Air
Conventional Combustion Air Supply 13
Water Piping 14
Hydronic Heating
Gas Supply
Electrical Power Connections
16
20
22
9
10
12
9
9
8
9
6
7
8
5
5
4
5
5
5
Field Wiring Connection
Venting
Changing the Flue Outlet
Venting Installation Tips
Venting Configurations
23
25
27
28
28
Controls
Outdoor Installation
Heater Sequence of Operations
87%-Efficiency Boilers –
Special Instructions
Water Piping
Wiring Diagram
START-UP
Pre Start-up
Start-Up
OPERATION
Lighting Instructions
33
33
34
To Turn Off Gas To Appliance
TROUBLESHOOTING
MAINTENANCE
Suggested Minimum
Maintenance Schedule
50
51
52
Preventative Maintenance Schedule 52
APPENDIX 54
Inside Air Contamination
WARRANTIES
Type H and WH
54
55
55
Type P
Start-Up Checklist
Important Instructions for the
Commonwealth of
Massachusetts
52
56
57
58
40
40
45
46
46
47
50
50
3
WARNINGS
Pay Attention to These Terms
DANGER:
WARNING:
Indicates the presence of immediate hazards which will cause severe personal injury, death or substantial property damage if ignored.
Indicates the presence of hazards or unsafe practices which could cause severe personal injury, death or substantial property damage if ignored.
CAUTION:
Indicates the presence of hazards or unsafe practices which could cause minor personal injury or product or property damage if ignored.
NOTE:
Indicates special instructions on installation, operation, or maintenance which are important but not related to personal injury hazards.
DANGER: Make sure the gas on which the heater will operate is the same type as that specified on the heater rating plate.
WARNING: Should overheating occur or the gas supply valve fail to shut, do not turn off or disconnect the electrical supply to the heater. Instead, shut off the gas supply at a location external to the heater.
WARNING - CALIFORNIA PROPOSITION
65: This product contains chemicals known to the
State of California to cause cancer, birth defects or other reproductive harm.
WARNING: To minimize the possibility of improper operation, serious personal injury, fire, or damage to the heater:
• Always keep the area around the heater free of combustible materials, gasoline, and other flammable liquids and vapors.
• Heater should never be covered or have any blockage to the flow of fresh air to the heater.
WARNING: Do not use this heater if any part has been under water. Immediately call a qualified service technician to inspect the heater and to replace any part of the control system and any gas control which has been under water.
WARNING: This unit contains refractory ceramic fiber (RCF) insulation in the combustion chamber.
RCF, as manufactured, does not contain respirable crystalline silica. However, following sustained exposure to very high temperatures (>2192F), the
RCF can transform into crystalline silica
(cristabolite). The International Agency for Research on Cancer (IARC) has classified the inhalation of crystalline silica (cristabolite) as carcinogenic to humans.
When removing the burners or heat exchangers, take precautions to avoid creating airborne dust and avoid inhaling airborne fibers. When cleaning spills, use wet sweeping or High Efficiency Particulate Air
(HEPA) filtered vacuum to minimize airborne dust.
Use feasible engineering controls such as local exhaust ventilation or dust collecting systems to minimize airborne dust. Wear appropriate personal protective equipment including gloves, safety glasses with side shields, and appropriate NIOSH certified respiratory protection, to avoid inhalation of airborne dust and airborne fiber particles.
WARNING: Risk of electrical shock. More than one disconnect switch may be required to deenergize the equipment before servicing.
CAUTION: Operation of this heater in lowtemperature systems requires special piping.
Harmful internal condensation will occur if the inlet water temperature does not exceed 105°F. Warranty claims will be denied when condensation occurs.
CAUTION: If this heater is to be installed above radiation level, it must be provided with a low water cut-off device at the time of heater installation.
CAUTION: If this heater is to be installed in a negative or positive pressure equipment room, there are special installation requirements. Consult factory for details.
4
BEFORE INSTALLATION
Raypak strongly recommends that this manual be reviewed thoroughly before installing your Hi Delta heater. Please review the General Safety information before installing the heater. Factory warranty does not apply to heaters that have been improperly installed or operated. (Refer to the warranty at the back of this manual.) Installation and service must be performed by a qualified installer, service agency or gas supplier.
If, after reviewing this manual, you still have questions which this manual does not answer, please contact the manufacturer or your local Raypak representative.
Thank you for purchasing a Raypak product. We hope you will be satisfied with the high quality and durability of our equipment.
Product Receipt
On receipt of your heater it is suggested that you visually check for external damage to the shipping crate. If the crate is damaged, make a note to that effect on the
Bill of Lading when signing for the shipment. Remove the heater from the shipping packaging. Report any damage to the carrier immediately.
On occasion, items are shipped loose. Be sure that you receive the correct number of packages as indicated on the Bill of Lading.
Claims for shortages and damages must be filed with the carrier by consignee. Permission to return goods must be received from the factory prior to shipping.
Goods returned to the factory without an authorized
Returned Goods Receipt number will not be accepted.
All returned goods are subject to a restocking charge.
When ordering parts, you must specify the model and serial number of the heater. When ordering under warranty conditions, you must also specify the date of installation.
Purchased parts are subject to replacement only under the manufacturer’s warranty. Debits for defective replacement parts will not be accepted and will be replaced in kind only per Raypak’s standard warranties.
number will have the form H9 1262B or similar depending on the heater size and configuration. The letter(s) in the first group of characters identifies the application (H = Hydronic Heating, WH = Domestic
Hot Water (DHW), P = Pool). The number which follows identifies the firing mode (1 or 4 = on-off, 3 =
2-stage, 8 = 3-stage and 9 = 4-stage). The second group of characters identifies the size of the heater
(four numbers representing the approximate MBTUH input), and, where applicable, a letter, indicating the manufacturing series. An “E” suffix indicates 87% efficiency (Category II or IV venting) (“H” stamped boilers only).
Ratings and Certifications
Standards:
• ANSI Z21.13 · CSA 4.9 - latest edition, Gas-Fired
Hot Water Boilers
• CAN 3.1 - latest edition, Industrial and
Commercial Gas-Fired Package Boilers
• ANSI Z21.56 · CSA 4.7 - latest edition Gas-Fired
Pool Heaters
• ANSI Z21.10.3 · CSA 4.3 - latest edition Gas
Water Heaters
• Low-lead content (<.25%) CSA-certified
All Raypak heaters are National Board Approved, and design-certified and tested by the Canadian Standards
Association (CSA) for the U.S. and Canada. Each heater is constructed in accordance with Section IV of the American Society of Mechanical Engineers
(ASME) Heater Pressure Vessel Code and bears the
ASME stamp. The heater also complies with the latest edition of ASHRAE 90.1 Standard.
WARNING: Altering any Raypak pressure vessel by installing replacement heat exchangers, tube bundle headers, or any ASME parts not manufactured and/or approved by Raypak will instantly void the ASME and CSA ratings of the vessel and any Raypak warranty on the vessel.
Altering the ASME or CSA ratings of the vessel also violates national, state, and local approval codes.
Model Identification
The model identification number and heater serial number are found on the heater rating plate located on the lower right outside jacket of the heater. The model
Installations at Elevation
Rated inputs are suitable for up to 4,500 ft elevation without de-rating. Consult the factory for installations at altitudes over 4,500 ft above sea level.
5
Component Locations
Fig. 1: Component Locations – Back
Fig. 2: Component Locations – Left Side
Panels removed for clarity
Fig. 3: Component Locations – Front
6
General Information
Model
No.
Burners
Quantity of
Gas
Valves
Vent Size
(in.)
Blowers Flue Intake
302B
402B
502B
652B
752B
902B
6
8
10
13
15
18
1
1
2
2
2
3
1
1
1
1
1
1
5
6
6
8
8
8
6
6
6
6
6
6
Table A: Basic Data
Model
No.
302B
402B
502B
652B
752B
902B
7
8
6
6
8
5
# Burners per
Valve
1 2 3
5
6
7
6
1
Stages
2
% Fire at
1
Stage
2
1
1
100
100
1 1, 2 50 100
1
1
1,2
1,2
54
53
100
100
6 1, 2 1, 2, 3 66 100
Table B: Manifold Data
Model
No.
# Burners per Valve
1 2*
Valve
Staging
1 2
% Firing at Stage
1 2
302B
402B
4
5
2
3
1
1
1, 2
1, 2
66
63
100
100
* Valve 2 is inside the air plenum on H3/WH3 302B-402B
Table C: 2-Stage Design Option
7
GENERAL SAFETY
To meet commercial hot water use needs, the high limit safety control on this water heater is adjustable up to 210°F. However, water temperatures over 125°F can cause instant severe burns or death from scalds.
When supplying general purpose hot water, the recommended initial setting for the temperature control is
125°F.
Safety and energy conservation are factors to be considered when setting the water temperature on the thermostat. The most energy-efficient operation will result when the temperature setting is the lowest that satisfies the needs of the application.
Water temperature over 125°F can cause instant severe burns or death from scalds. Children, disabled and elderly are at highest risk of being scalded.
• Feel water before bathing or showering.
• Temperature limiting valves are available.
Water temperature over 125°F can cause instant severe burns or death from scalds.
Children, disabled, and elderly are at highest risk of being scalded.
See instruction manual before set- ting temperature at water heater.
Feel water before bathing or show- ering.
Temperature limiting valves are available, see manual.
NOTE: When this water heater is supplying general purpose hot water for use by individuals, a thermostatically controlled mixing valve for reducing point of use water temperature is recommended to reduce the risk of scald injury. Contact a licensed plumber or the local plumbing authority for further information.
Time/Temperature
Relationships in Scalds
Maximum water temperatures occur just after the heater’s burner has shut off. To determine the water temperature being delivered, turn on a hot water faucet and place a thermometer in the hot water stream and read the thermometer.
The following chart details the relationship of water temperature and time with regard to scald injury and may be used as a guide in determining the safest water temperature for your applications.
Water
Temp.
120°F
125°F
130°F
135°F
140°F
145°F
150°F
155°F
Time to Produce Serious
Burn
More than 5 minutes
1-1/2 to 2 minutes
About 30 seconds
About 10 seconds
Less than 5 seconds
Less than 3 seconds
About 1-1/2 seconds
About 1 second
Table courtesy of The Shriners Burn Institute
Table D: Time to Produce Serious Burn
8
The temperature of the water in the heater can be regulated by using the temperature controller. To comply with safety regulations, the temperature controller is set at the lowest setting when shipped from the factory.
To adjust the water temperature, insert a small straight screwdriver into the adjustment screw on the front of temperature controller and turn the wheel to the desired setting (See Fig. 4.).
Equipment Base
The heater should be mounted on a level, structurally sound surface. The heater is approved for installation on a combustible surface but must NEVER be installed on carpeting. Gas-fueled equipment installed in enclosed parking garages must be located at least
18 in. above the floor.
Stacking
Hi Delta units can be stacked two units high with an optional stacking rack. A stacking kit is available from
Raypak for this type of installation.
CAUTION: The heaters should be located in an area where water leakage will not result in damage to the area adjacent to the appliances or to the structure. When such locations cannot be avoided, it is recommended that a suitable catch pan, adequately drained, be installed under the appliance. The pan must not restrict air flow.
Fig. 4: Temperature Controller
INSTALLATION
scalding! There is a hot water scald potential if the thermostat is set too high.
INSTALLATION
Installation Codes
Installations must follow these codes:
• Local, state, provincial, and national codes, laws, regulations and ordinances
• National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition (NFGC)
• National Electrical Code, ANSI/NFPA 70 - latest edition (NEC)
• Standard for Controls and Safety Devices for
Automatically Fired Boilers, ANSI/ASME CSD-1, when required (CSD-1)
• For Canada only: CAN/CSA B149 Installation
Code (B149) and CSA C22.1 C.E.C. Part 1
(C22.1)
REQUIRES OPTIONAL VENT TEE.
REQUIRES OPTIONAL VENT TEE IF VENTED OUT BACK
OF HEATER.
Fig. 5: Typical Stacked Installation
9
In addition, the heater shall be installed such that the gas ignition system components are protected from water (dripping, spraying, rain, etc.) during appliance operation or service (circulator replacement, control replacement, etc.).
Clearances
Indoor Installations
Heater
Side
Floor*
Rear
Water Side
Other Side
Top
Front
Vent
Minimum Clearance
from Combustible
Surfaces
Recommended
Service
Clearance
0”
6”
24”
24”
6”
24”
2”
* DO NOT install on carpeting.
0”
1”
12”
1”
1”
Open
2”
Table E: Clearances – Indoor Installations
When installed according to the listed minimum clearances from combustible construction, these heaters can still be serviced without removing permanent structural construction around the heater. However, for ease of servicing, we recommend a clearance of at least 24 in. in front, and at least 12 in. on the water connection side. This will allow the heater to be serviced in its installed location without movement or removal of the heater.
Service clearances less than the minimums may require removal of the heater to service either the heat exchanger or the burner tray. In either case, the heater must be installed in a manner that will enable the heater to be serviced without removing any structure around the heater.
Outdoor Installations
These heaters are design-certified for outdoor installation. Heaters must not be installed under an overhang that is less than 3 ft from the top of the heater. Three sides must be open in the area under the overhang.
Roof water drainage must be diverted away from heaters installed under overhangs.
Heater
Side
Front
Rear
Water Side
Other Side
Top
Vent
Min. Clearance from Combustible
Surfaces
Recommended
Service
Clearance
Open
12”
36”
36”
Unobstructed
N/A
24”
24”
36”
36”
Unobstructed
N/A
Table F: Clearances – Outdoor Installations
TOP VIEW
These clearances are required when the outdoor vent cap is used. If installing the heater outdoors with a vent stack, the indoor clearances may be utilized.
The combustion air intake hood MUST be used for outdoor installations. The hood is shipped loose and installed on the side of the heater over the filter box at the jobsite.
FRONT VIEW
Venting not shown for clarity. Heater must be vented per instructions in this manual
Fig. 6: Minimum Clearances from Combustible
Surfaces – Indoor Installations
10
Fig. 7: Minimum Clearances from Vent/Air Inlet Terminations – Indoor and Outdoor Installations
U.S. Installations 1
A
Clearance above grade, veranda, porch, deck, or balcony
1 ft (30 cm)
B
Clearance to window or door that may be opened
C Clearance to permanently closed window
D
Vertical clearance to ventilated soffit located above the terminal within a horizontal dis- tance of 2 ft (61cm) from the centerline of the terminal
E Clearance to unventilated soffit
F Clearance to outside corner
G Clearance to inside corner
4 ft (1.2m) below or to side of opening; 1 foot (30 cm) above opening
*
5 ft (1.5m)
*
*
6 ft (1.83m)
H
Clearance to each side of center line ex- tended above meter/regulator assembly
*
Canadian Installations 2
1 ft (30 cm)
3 ft (91 cm)
*
*
*
*
*
3 ft (91 cm) within a height 15 ft above the meter/regulator assembly
I
J
K
Clearance to service regulator vent outlet
Clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other appliance
Clearance to mechanical air supply inlet
*
4 ft (1.2m) below or to side of opening; 1 ft (30 cm) above opening
3 ft (91 cm) above if within
10 ft (3m) horizontally
6 ft (1.83m)
3 ft (91 cm)
6 ft (1.83m)
L
M
Clearance above paved sidewalk or paved driveway located on public property
Clearance under veranda, porch, deck or balcony
7 ft (2.13m)
*
7 ft (2.13m)
12 in. (30 cm) t
TT
1
2
In accordance with the current ANSI Z223.1/NFPA 54 National Fuel Gas Code
In accordance with the current CAN/CSA-B149 Installation Codes t Vent terminal shall not terminate directly above sidewalk or paved driveway located between 2 single family dwellings that se rves both dwellings
TT Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor and top of term inal and underside of veranda, porch, deck or balcony is greater than 1 ft (30cm)
* Clearances in accordance with local installation codes and the requirements of the gas supplier
Table G: Vent/Air Inlet Termination Clearances
11
Fig. 8: Minimum Clearances from Combustible
Surfaces – Outdoor Installations
Combustion and Ventilation Air
NOTE: Use of the heater in construction areas where fine particulate matter, such as concrete or drywall dust, is present may result in damage to the heater that is not covered by the warranty. If operated in a construction environment, a clean source of combustion air must be provided directly to the heater.
Indoor Units
The heater must be supplied with sufficient quantities of non-contaminated air to support proper combustion and equipment ventilation. Combustion air can be supplied via conventional means where combustion air is drawn from the area immediately surrounding the heater, or via direct vent, where combustion air is drawn directly from outside. All installations must comply with the requirements of the NFGC (U.S.) and
B149 (Canada), and all local codes.
CAUTION: Combustion air must not be contaminated by corrosive chemical fumes which can damage the heater and void the warranty. (See the Appendix.)
NOTE: It is recommended that the intake vent be insulated to minimize sweating.
Reversing Air Filter
Follow these instructions to change the air duct connection from the left-hand side (standard) to the right-hand side:
1. Remove the four screws and the dust cover from the right-hand side of the heater.
2. Remove the four screws and the air filter bracket from the left-hand side of the heater.
3. Reverse the components and reattach in the new location, making sure that the air filter locking bracket is on the bottom. (The air filter locking bracket is reversible.)
Direct Vent
If outside air is drawn through the intake pipe directly to the unit for combustion:
1. Install combustion air direct vent in accordance with Fig. 26 (horizontal) or Fig. 27 (vertical) of this manual (pages 31 and 32, respectively).
2. Provide adequate ventilation of the space occupied by the heater(s) by an opening(s) for ventilation air at the highest practical point communicating with the outdoors. The total cross-sectional area shall be at least 1 in.
2 of free area per 20,000 BTUH (111 mm 2 per kW) of total input rating of all equipment in the room when the opening is communicating directly with the outdoors or through vertical duct(s). The total cross-sectional area shall be at least 1 in.
2 of free area per 10,000 BTUH (222 mm 2 per kW) of total input rating of all equipment in the room when the opening is communicating with the outdoors through horizontal duct(s).
3. In cold climates, and to mitigate potential freezeup, Raypak highly recommends the installation of a motorized sealed damper to prevent the circulation of cold air through the heater during the non-operating hours.
Direct-Ducted Combustion Air
In certain applications it may be desirable to duct the combustion air directly to the heater. This should be done with PVC, CPVC or single-wall galvanized ducting. The duct will attach directly to the collar on the air filter housing located on the side of the heater. The ducting is attached to the air filter housing collar using
12
three or four sheet metal screws (not supplied) equally distributed around the circumference of the duct. All ducting should be self-supported. The filter housing is not designed to support the air duct.
CAUTION: Use TrueSeal combustion air if damaging airborne contaminants are or will be present in the heater area. See the Appendix regarding air contamination.
TruSeal™ Combustion Air
In certain applications it may be necessary to utilize the TruSeal option (sales order option D-21 or D-22) and duct the combustion air directly to the blower.
Combustion air may be ducted directly to the heater by using PVC, CPVC or sealed single-wall galvanized ducting. The duct will attach directly to the air collar located on the side of the heater, using three or four sheet metal screws (not supplied) equally positioned around the circumference of the duct. The screws and duct connection point must be sealed with RTV (not supplied). An in-line intake air filter kit (sales order option D-17) must be installed in the combustion air duct. TruSeal is generally used when damaging contaminants are present in the mechanical room.
TruSeal heater connection points are available as follows:
302B & 402B Right side only
502B to 902B Left side - standard
Right side - optional
CAUTION: This type of installation is recommended if damaging airborne contaminants are or will be present in the heater area. See the
Appendix regarding air contamination.
Conventional Combustion Air
Supply
U.S. Installations
All Air from Inside the Building
The confined space shall be provided with TWO permanent openings communicating directly with an additional room(s) of sufficient volume so that the combined volume of all spaces meets the criteria for a room large in comparison (NFGC). The total input of all gas utilization equipment installed in the combined space shall be considered in making this determination. Each opening shall have a minimum free area of
1 in.
2 per 1,000 BTUH (2,225 mm 2 per kW) of the total input rating of all gas utilization equipment in the confined space, but not less than 100 in.
2 (645 cm 2 ). One opening shall commence within 12 in. (305 mm) of the top, and one opening shall commence within 12 in.
(305 mm) of the bottom of the enclosure. The minimum dimension of air openings shall be not less than
3 in. (76 mm) in any direction.
All Air from Outdoors
The confined space shall communicate with the outdoors in accordance with one of the methods below.
The minimum dimension of air openings shall not be less than 3 in. (76 mm) in any direction. Where ducts are used, they shall be of the same cross-sectional area as the net free area of the openings to which they connect.
1. Two permanent openings, one commencing within 12 in. (305 mm) of the top, and one commencing within 12 in. (305 mm) of the bottom of the enclosure, shall be provided. The openings shall communicate directly, or by ducts, with the outdoors or spaces (crawl or attic) that freely communicate with the outdoors.
a. Where directly communicating with the outdoors or where communicating to the outdoors through vertical ducts, each opening shall have a minimum free area of 1 in.
2 per
4,000 BTUH (550 mm 2 per kW) of total input rating of all equipment in the enclosure.
b. Where communicating with the outdoors through horizontal ducts, each opening shall have a minimum free area of 1 in.
2 per 2,000
BTUH (1,100 mm 2 per kW) of total input rating of all equipment in the enclosure.
2. One permanent opening, commencing within 12 in. (305 mm) of the top of the enclosure, shall be permitted where the equipment has clearances of at least 1 in. (25 mm) from the sides and back and
6 in. (152 mm) from the front of the appliance. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces that freely communicate with the outdoors, and shall have a minimum free area of: a. 1 in.
2 per 3,000 BTUH (740 mm 2 per kW) of the total input rating of all equipment located in the enclosure, and
13
b. Not less than the sum of the areas of all vent connectors in the confined space.
WARNING: Do not use one permanent opening method if the equipment room is under negative pressure conditions or the equipment is common vented with other gas-fired appliances.
Canadian Installations
CAUTION: All combustion air must be drawn from the air outside of the building; the mechanical equipment room must communicate directly with the outdoors.
1. Ventilation of the space occupied by the heater shall be provided by an opening(s) for ventilation air at the highest practical point communicating with the outdoors. The total cross-sectional area of such an opening(s) shall be at least 10% of the area required in 2. and 3. (below), but in no case shall the cross-sectional area be less than 10 in.
2
(65 cm 2 ).
2. For heaters using a barometric damper in the vent system there shall be a permanent air supply opening(s) having a cross section area of not less than 1 in.
2 per 7,000 BTUH (320 mm 2 per kW) up to and including 1 million BTUH, plus 1 in.
2 per
14,000 BTUH (160 mm 2 per kW) in excess of 1 million BTUH. This opening(s) shall be either located at or ducted to a point not more than 18 in.
(450 mm) nor less than 6 in. (152 mm) above the floor level. The duct can also “goose neck” through the roof. The duct is preferred to be straight down and terminated 18 in. (450 mm) from the floor, but not near piping. This air supply opening requirement shall be in addition to the air opening for ventilation air required in 1. (above).
WARNING: Care must be taken to ensure that the equipment room is not under negative pressure conditions or that the equipment is not commonvented with other gas-fired appliances.
3. For heaters not using a barometric damper in the vent system, and when air supply is provided by natural air flow from outdoors for a power burner and there is no draft regulator, drafthood or similar flue gas dilution device installed in the same space, in addition to the opening for ventilation air required in 1., there shall be a permanent air supply opening(s) having a total cross-sectional area of not less than 1 in.
2 for each 30,000 BTUH mm 2 per kW) of total rated input of the burner(s), and the location of the opening(s) shall not interfere with the intended purpose of the opening(s) for ventilation air referred to in (1). This opening(s) can be ducted to a point not more than 18 in. (450 mm) nor less than 6 in. (152 mm) above the floor level. The duct can also “goose neck” through the roof. The duct is preferred to be straight down 18 in. (450 mm) from the floor, but not near piping.
4. Refer to the B149 Installation code for additional information.
Water Piping
NOTE: For 87%-efficiency boilers, see special instructions on page 40.
General
The heater should be located so that any water leaks will not cause damage to the adjacent area or structures.
CAUTION: This heater requires forced water circulation when the burner is operating. See Table H and Table I for minimum and maximum flow rates and water pump selection. The pump must be interlocked with the heater to prevent heater operation without water circulation.
NOTE: Minimum pipe size for in/out connections is
2 in. Verify proper flow rates and ∆T as instructed in this manual.
Reversing Water Connections
Follow these instructions to change the water connections from the left-hand side (standard) to the right-hand side.
1. Disconnect all electrical power from the heater (if applicable).
2. Label all electrical connections and conduit lines.
This may include the flow switch, low water cut-off probe and/or pump.
3. Disconnect or isolate the main gas pipe from the heater (if applicable).
4. Remove both in/out and return header access panels by removing all sheet metal screws.
14
5. Remove all plumbing fittings to the header. This will include both inlet and outlet water pipe unions and the pressure relief valve and drain piping.
6. Remove limits, control bulbs and/or thermocouples.
7. Remove the six flange nuts and the in/out header from the left-hand side.
8. Remove the six flange nuts and the return header from the right-hand side.
9. Remove the header stud bolts from each tube sheet.
10. Reverse the headers and stud bolts to the new location.
11. Install NEW red beveled O-rings flush against both tube sheets with the bevel facing outward.
12. Push the header firmly against the O-rings. Install and tighten the flange nuts onto the stud bolts until finger tight.
13. Slowly tighten the flange nuts, starting from the center nut (number 1) in Fig. 9 and working sequentially around the header as indicated. Torque all nuts to 25 ft/lb. DO NOT OVER-TIGHTEN.
14. Re-route the capillary(s), wiring etc. to the new location, adding thermal paste and shim to the capillary well.
Hydrostatic Test
Unlike many types of heaters, this heater does not require hydrostatic testing prior to being placed in operation. The heat exchanger has already been factory-tested and is rated for 160 psi operating pressure.
However, Raypak does recommend hydrostatic testing of the piping connections to the heater and the rest of the system prior to operation. This is particularly true for hydronic systems using expensive glycolbased anti-freeze. Raypak recommends conducting the hydrostatic test before connecting gas piping or electrical supply.
Leaks must be repaired at once to prevent damage to the heater. NEVER use petroleum-based stop-leak compounds.
To perform hydrostatic test:
1. Connect fill water supply. With bleed valve open, fill heater with water. When water flows from bleed valve, shut off water. Close bleed valve. Carefully fill the rest of the system, making sure to eliminate any entrapped air by using high-point vents. Close feed valve. Test at standard operating pressure for at least 24 hours.
2. Make sure constant gauge pressure has been maintained throughout test.
3. Check for leaks. Repair if found.
Cold Water Operation
CAUTION: Damaging internal condensation may occur if the heater inlet water temperature does not exceed 105ºF (41ºC) within 7 minutes of start-up.
NOTE: See Raypak Catalog No. 1000.57 for information on Cold Water Protection.
Fig. 9: Torque Sequence
Relief Valve Piping
WARNING: Pressure relief valve discharge piping must be piped near the floor and close to a drain to eliminate the potential of severe burns. Do not pipe to any area where freezing could occur. Refer to local codes.
15
A heater operated with an inlet temperature of less than 105ºF (41ºC) must have a manual bypass or an approved low-temperature operation system to prevent problems with condensation. A manual bypass, shown in Fig. 15, must be piped into the system at the time of installation. This piping is like a primary/secondary boiler installation with a bypass acting as the secondary boiler piping. Raypak strongly recommends that thermometer(s) be placed into the heater piping next to the in/out header to facilitate temperature adjustment. Inlet water temperatures below 105ºF
(41ºC) can excessively cool the products of combustion, resulting in condensation on the heat exchanger and in the flue.
Failure to exceed 105ºF (41ºC) within 7 minutes may result in the premature failure of the hot surface igniter, remote flame sensor, burners and heat exchanger.
It can cause operational problems, bad combustion, sooting, flue gas spillage and reduced service life of the vent system. The bypass allows part of the heater discharge water to be mixed with the cooler heater return water to increase the heater inlet temperature above 105ºF (41ºC). This precautionary measure should prevent the products of combustion from condensing in most installations. Warranty claims will be denied when condensation occurs.
NOTE: Individual and multi-boiler Cold Water Start systems require the use of a 20°F ∆T boiler pump.
Cold Water Run
Cold water run differs from cold water start in that the system water entering the heater remains below 105ºF
(41ºC) continuously. Typically, this is the case in swimming pool heating and water source heat pump applications as well as some others. If the system water is kept in a narrow temperature range, a permanent manual bypass can be employed and manually adjusted to achieve an inlet temperature of 105ºF
(41ºC) or higher. An injector pump arrangement may also be utilized to keep the heater loop at or above
105ºF (41ºC). An injector pump approach has the added value of being able to adjust to changes in the system water coming back to the heater take-off.
Cold water operation issues are applicable to both cold water start and cold water run applications. Cold water operation for 7 minutes or less on start-up is acceptable. Where cold water starts will last longer than 7 minutes or where cold water operation is continuous, provisions must be made to mix higher temperature outlet water with the colder inlet water and thereby raise the inlet temperature to at least
105ºF (41ºC) within the 7-minute time limit.
NOTE: To ensure proper operation, use 20°F ∆T boiler flow rates when designing the heating system loop pump.
Cold Water Starts
Temperature & Pressure Gauge
Frequent (more than once a week) cold water starts, wherein the inlet water temperature remains below
105ºF (41ºC) for more than 7 minutes, must have cold water start protection. Known protection methods consist of mixing heated outlet water with the inlet water with a bypass to raise the inlet to 105ºF (41ºC) or higher. Once the system is heated up and has return water temperatures of 105ºF (41ºC) or higher, the mixing of outlet water with inlet water is no longer needed and the bypass can be shut off. If the bypass is not shut off as the system heats up, the outlet temperature may continue to climb and actuate the high limit, thereby shutting down the heater. Thus an automatic valve system, such as a three-way proportional valve or a modulating two-way valve to control the bypass, should be utilized.
The temperature and pressure gauge is factorymounted in the in/out header.
Hydronic Heating
Pump Selection
In order to ensure proper performance of your heater system, you must install a correctly sized pump. Raypak recommends using a 20°F ∆T as design ∆T. (∆T is the temperature difference between the inlet and outlet water when the heater is firing at full rate). If a ∆T of larger than 20°F is necessary, see Table H and
Table I for flow rate requirements.
Model 10°F T 20°F T 30°F T 40°F T Min. Flow Max Flow
No. gpm P (ft) gpm P (ft) gpm P (ft) gpm P (ft) gpm P (ft) T gpm P (ft) T
302B 50 3.3
402B 67 5.8
25
34
0.8
1.4
N/A
22
N/A
0.6
N/A
N/A
N/A
N/A
20
20
0.5
0.5
25 90
34 90
9.8
10.0
6
7
502B 84 9.1 42 2.3 28 1.1 21 0.6 21 0.6 40 90 10.4 9
652B N/A N/A 55 4.1 36 1.8 27 1.1 27 1.1 40 90 10.8 12
752B N/A N/A 63 5.7 42 2.6 32 1.5 32 1.5 40 90 11.3 14
902B N/A N/A 76 8.3 50 3.8 38 2.2 38 2.2 40 90 11.7 17
Notes: 1. Basis for minimum flow is 20 gpm or 40°F ∆T. Basis for maximum flow is 90 gpm. Flow switch will not operate if flow is less than 20 gpm.
2. Rear-mounted pumps may provide higher flow rates on smaller models than the system requirements.
Table H: Heater Rates of Flow and Pressure Drops
16
Pressure Drop in Feet of Head
Feedwater Regulator
Raypak recommends that a feedwater regulator be installed and set at 12 psi minimum pressure at the highest point of the system. Install a check valve or back flow device upstream of the regulator, with a manual shut-off valve as required by local codes.
Piping
All high points should be vented. Purge valves and a bypass valve should be installed. A heater installed above radiation level must be provided with a low water cut-off device (sales order option F-10). The heater, when used in connection with a refrigeration system, must be installed so that the chilled medium is piped in parallel with the heater with appropriate valves to prevent the chilled medium from entering the heater.
The piping system of a hot water heater connected to heating coils located in air handling units where they may be exposed to circulating refrigerated air, must be equipped with flow control valves or other automatic means to prevent gravity circulation of the heater water during the cooling cycle. It is highly recommended that the piping be insulated.
Air-Separation/Expansion Tank
All heaters should be equipped with a properly sized expansion tank and air separator fitting as shown in
Fig. 10.
heaters which are not subject to thermal shock.
Raypak offers a full line of electronic sequencers that produce direct reset of heater water temperature.
(Refer to the Controls section of the Raypak Catalog.)
SYSTEM SENSOR
(4:1 TURNDOWN
OR GREATER)
NOTE: BYPASS FOR
LOW TEMP SYSTEMS ONLY
SYSTEM SENSOR
(HEAT PUMP)
5’ MAX
5’ MAX
12” MAX
OR MIN FEASIBLE
Fig. 11: Single Heater - For Hydronic or Heat Pump
Primary/Secondary Piping
SYSTEM SENSOR
(LESS THAN
4:1 TURNDOWN)
SYSTEM SENSOR
(4:1 TURNDOWN
OR GREATER)
5’ MAX
5’ MAX
12” MAX
OR MIN FEASIBLE
Fig. 12: Dual Heaters (Reverse/Return) with Primary/Secondary Piping
Fig. 10: Air-Separation/Expansion Tank
Three-Way Valves
Domestic Hot Water
Valves designed to blend water temperatures or reduce water circulation through the heater should not be used. Raypak heaters are high-recovery, low-mass
When designing the water piping system for domestic hot water applications, water hardness should be considered. Table I indicates the suggested flow rates for soft, medium and hard water. Water hardness is expressed in grains per gallon.
17
Potable Water and Space Heating
CAUTION: When this heater is used for both potable water and space heating, observe the following to ensure proper operation.
1. All piping materials and components connected to the water heater for the space heating application shall be suitable for use with potable water.
2. Toxic chemicals, such as used for boiler treatment, shall not be introduced into the potable water used for space heating.
3. If the heater will be used to supply potable water, it shall not be connected to any heating system or components previously used with a non-potable water heating appliance.
TANK SENSOR
Fig. 13: Single Domestic Hot Water Heater and Storage
Tank
4. When the system requires water for space heating at temperatures higher than 140°F, a means such as a mixing valve shall be installed to temper the water in order to reduce scald hazard potential.
Pool Heating
CAUTION: Power to the heater should be interlocked with the main system pump to make sure the heater does not fire without the main system pump in operation. Improper flow control can damage the heater. Uncontrolled flow (too high) or restricted flow (too low) can seriously damage the heater. Follow these instructions to make sure your heater is properly installed.
The Hi Delta pool heater is equipped with an external pump and bypass arrangement as standard equipment. This arrangement blends outlet water with the inlet water to increase the inlet water temperature, thereby reducing the likelihood of condensation forming on the heat exchanger. The pump also serves to circulate water through the heater from the main system piping.
To complete the installation of the pool heater, the pool thermostat needs to be installed in the main return water line, upstream of the heater. This will ensure that the heater will be energized at the right time. If the main water line is too far away from the heater and the capillary bulb will not reach it, locate the pool thermostat adjacent to the main line and run wires back to the heater.
Model
No.
Soft (0-4 grains per gallon) Medium (5-15 grains per gallon) Hard* (16-25 grains per gallon)
∆T gpm ∆P MTS SHL ∆T gpm ∆P MTS SHL ∆T gpm ∆P MTS SHL
302B 13 40 2.0
402B 17 40 2.0
502B 21 40 2.1
652B 28 40 2.2
752B 30 42 2.6
902B 30 51 3.9
2
2
2
2
2
2
5.1
5.1
5.2
5.3
6.0
8.7
10
13
16
20
17
21
52
52
52
55
73
73
3.3
3.4
3.5
4.1
7.5
7.8
2
2
2
2
8.3
8.4
8.6
9.7
7
9
12
15
74
74
73
72
6.6
6.8
6.9
7.0
2
2
2
2
16.3
16.4
16.3
16.2
2 16.9
14 90 11.3
2 25.1
2 17.2
17 90 11.7
2 25.5
∆T = Temperature rise, °F
∆P = Pressure drop through heat exchanger, ft
SHL = System head loss, ft. Includes 50 eq ft of tubing each way (total 100 eq ft).
gpm = Gallons per minute, flow rate
MTS = Minimum tubing size
*Must utilize optional cupro-nickel tubes. If over 25 grains per gallon, a water softener/treatment system must be utilized.
Caution: For scale free operation with "Hard Water" (16-25 grains per gallon of total hardness), the operating control must NOT be set higher than 130 °F. For higher than 130 ° F operation, a water softener/treatment system must be utilized.
Table I: Domestic Water Heater Flow Rate Requirements
18
MIXING VALVE
Fig. 14: Single Pool Heater Application
Automatic Chlorinators and Chemical
Feeders
CAUTION: Combustion air must not be contaminated by corrosive chemical fumes which can damage the heater and void the warranty.
All chemicals must be introduced and completely diluted into the pool or spa water before being circulated through the heater. Do not place chlorine tablets or bromine sticks in the skimmer. High chemical concentrations will result when the pump is not running (e.g.
overnight).
Chlorinators must feed downstream of the heater and have an anti-siphoning device to prevent chemical back-up into the heater when the pump is shut off.
NOTE: High chemical concentrates from feeders and chlorinators that are out of adjustment will cause very rapid corrosion of the heat exchanger in the heater. Such damage is not covered under the warranty.
A thermostatically controlled mixing valve is used to mix the outlet water with the pool water. This mixed water is supplied as the inlet water to the pool heater.
The proper configuration is shown in Fig. 15. The active element of the valve adjusts the mixing ratio to maintain the inlet water above 105°F.
Winterizing Your Heater
Heaters installed outdoors in freezing climate areas should be shut down for the winter. To shut down heater, turn off manual main gas valve and main gas shut-off. Close isolation valves and remove water piping from the in/out header on the heater. Drain the heater and any piping of all water that may experience below-freezing temperatures.
Pool/Spa Water Chemistry
NOT E: Chemical imbalance can cause severe damage to your heater and associated equipment.
Fig. 15: Mixing Valve Configuration
Water Hardness
Water hardness is mainly due to the presence of calcium and magnesium salts dissolved in the water. The concentration of these salts is expressed in mg/l, ppm or grains per gallon, as a measure of relative hardness of water. Grains per gallon is the common reference measurement used in the U.S. water heater industry.
Hardness expressed as mg/L or ppm may be divided by 17.1 to convert to grains per gallon. Water may be classified as very soft, slightly hard, moderately hard or hard based on its hardness number. The salts in water will precipitate out when the water is heated and will cause accelerated lime and scale accumulation on a heat transfer surface.
19
Raypak water heaters can operate lime/scale-free using potable water with a hardness not exceeding 25 grains per gallon. Proper operation is achieved by setting the temperature rise/water flow per the guidelines in the installation instructions. If the hardness of the water exceeds the maximum level of 25 grains per gallon special measures must be taken to adjust flow and temperature rise. Water should be softened to a hardness level no lower than 5 grains per gallon. Water softened as low as 0 to 1 grain per gallon may be under-saturated with respect to calcium carbonate resulting in water that is aggressive and corrosive.
pH of Water pH is a measure of relative acidity, neutrality or alkalinity. Dissolved minerals and gases affect water’s pH.
The pH scale ranges from 0 to 14. Water with a pH of
7.0 is considered neutral. Water with a pH lower than
7 is considered acidic. Water with a pH higher than 7 is considered alkaline. A neutral pH (around 7) is desirable for most potable water applications. Corrosion damage and water heater failures resulting from water pH levels of lower than 6 or higher than 8 are non-warrantable. The ideal pH range for water used in a storage tank or a copper water heater system is 7.2 to
7.8.
Total Dissolved Solids
Total dissolved solids (TDS) is the measure of all minerals and solids that are dissolved in the water. The concentration of total dissolved solids is usually expressed in parts per million (ppm) as measured in a water sample. Water with a high TDS concentration will greatly accelerate lime and scale formation in the hot water system. Most high TDS concentrations will precipitate out of the water when heated. This can generate a scale accumulation on the heat transfer surface that will greatly reduce the service life of a water heater. This scale accumulation can also impede adequate flow of water and may totally block the water passages in the tubes of the heat exchanger. A heat exchanger that is damaged or blocked by lime/scale accumulation must be replaced. Failure of a water heater due to lime scale build up on the heating surface is non-warrantable. The manufacturer of the water heater has no control of the water quality, especially the TDS levels in your system. Total dissolved solids in excess of 2,500 ppm will accelerate lime and scale formation in the heat exchanger. Heat exchanger failure due to total dissolved solids in excess of
2,500 ppm is a non-warrantable condition. Raypak offers basic temperature guidelines for operation of a potable water heater on normal to moderate levels of hardness and solids but levels of hardness and total dissolved solids beyond normal limits for operation will require special setup and operation.
NOTE: Failure of a heat exchanger due to lime scale build-up on the heating surface, low pH or other chemical imbalance is non-warrantable.
Recommended Level(s)
Water Temperature
Fiberglass Pools
68-88°F (20-31°C)
Fiberglass Spas
89-104°F (31-40°C)
Other Pool and Spa
Types
68-104°F (20-40°C) pH 7.3-7.4
7.3-7.4
7.6-7.8
Total Alkalinity (ppm)
Calcium Hardness (ppm)
120-150
200-300
120-150
150-200
80-120
200-400
Salt (ppm) 3000 Maximum 3000 Maximum 3000 Maximum
Free Chlorine (ppm)* 2-3 2-3 2-3
Total Dissolved Solids
(ppm)
1500 Maximum** 1500 Maximum** 1500 Maximum**
*Free Chlorine MUST NOT EXCEED 5 ppm!
**In salt water chlorinated pools, the total TDS can be as high as 4500ppm
NOTE: The allowable concentrations of salt and of the Total Dissolved Solids are lower for the Hi Delta than for a typical residential pool heater, due to the higher water temperatures at which a Hi Delta operates.
Table J: Water Chemistry
20
Gas Supply
DANGER: Make sure the gas on which the heater will operate is the same type as specified on the heater’s rating plate.
Gas piping must have a sediment trap ahead of the heater gas controls, and a manual shut-off valve located outside the heater jacket. It is recommended that a union be installed in the gas supply piping adjacent to the heater for servicing. A pounds-to-inches regulator must be installed to reduce the gas supply pressure to a maximum of 10.5 in. WC for natural gas and 13.0 in. WC for propane gas. The regulator should be placed a minimum distance of 10 times the pipe diameter up-stream of the heater gas controls. Refer to Table K for maximum pipe lengths.
Gas Supply Connection
CAUTION: The heater must be disconnected from the gas supply during any pressure testing of the gas supply system at test pressures in excess of 1/2 psi
(3.45 kPa).
The heater must be isolated from the gas supply piping system by closing the manual shut-off valve during any pressure testing of the gas supply piping system
Fig. 16: Gas Supply Connection at test pressures equal to or less than 1/2 psi (3.45
kPa). Relieve test pressure in the gas supply line prior to reconnecting the heater and its manual shut-off valve to the gas supply line. FAILURE TO FOLLOW
THIS PROCEDURE MAY DAMAGE THE GAS
VALVES. Over pressurized gas valves are not covered by warranty. The heater and its gas connections shall be leak-tested before placing the appliance in operation. Use soapy water for leak test. DO NOT use an open flame.
CAUTION: Do not use Teflon tape on gas line pipe thread. A pipe compound rated for use with natural and propane gases is recommended. Apply sparingly only on male pipe ends, leaving the two end threads bare.
CAUTION: Support gas supply piping with hangers, not by the heater or its accessories. Make sure the gas piping is protected from physical damage and freezing, where required.
Reversing Gas Supply Connection
Reversing the standard fuel connection from the lefthand to the right-hand side is a simple field operation.
1. Disconnect all electrical power from the heater (if applicable).
2. Disconnect the main gas pipe from the heater (if applicable).
3. Remove the left and right front panels from the heater.
4. Locate the main gas line that traverses across the heater above the manifold risers.
5. Remove the pipe cap from the right-hand end of the main gas line.
Model
No.
N
3/4"
P N
1”
P N
1-1/4”
P N
1-1/2”
P N
2”
P
2-1/2”
N P
302B
402B
502B
652B
752B
902B
15 25 35 85 150 380 360 --
--
--
--
--
--
15
--
--
--
--
25
--
--
--
--
60
--
--
--
--
100 260 250 --
--
--
--
--
65 150 130 360 500 --
45
35
100
80
95
75
250
180
340
260
--
600
--
--
--
--
--
--
--
20 45 45 110 150 360 400 --
Natural gas – 1,000 BTU per ft 3 , .60 specific gravity at 0.5 in. WC pressure drop
Propane gas – 2,500 BTU per ft 3 , 1.53 specific gravity at 0.6 in. WC pressure drop
--
--
--
Table K: Maximum Equivalent Pipe Length
21
6. Reinstall the pipe cap on the left-hand end of the main gas line.
7. Remove plastic cap from the right-hand side panel and reinstall into the standard main gas opening located on the left-hand side of the heater.
8. Remove the rubber grommet from the left-handside panel and reinstall into the standard main gas opening, located on the right-hand side of the heater.
9. Install a coupling, nipple, union and sediment trap onto the right-hand end of the main gas line and then install the gas line, making sure that a manual shut-off valve has been installed within 10 ft of the heater.
10. Replace the left and right front panels on the heater.
Gas Supply Pressure
A minimum of 5.0 in. WC and a maximum of 10.5 in.
WC upstream gas pressure is required under load and no-load conditions for natural gas. A minimum of 11.0
in. WC and a maximum of 13.0 in. WC is required for propane gas. The gas pressure regulator(s) supplied on the heater is for low-pressure service. If upstream pressure exceeds 14.0 in. WC, an intermediate gas pressure regulator, of the lockup type, must be installed.
When connecting additional gas utilization equipment to the gas piping system, the existing piping must be checked to determine if it has adequate capacity for the combined load.
The gas valve pressure regulator(s) on the heater are nominally preset at 3.5 in. WC for natural gas, and
10.5 in. WC for propane gas. The pressure at the gas valve outlet tap, measured with a manometer, while in operation should be 3.5 ± 0.1 in. WC for natural gas and 10.5 in. ± 0.1 in. WC for propane gas. If an adjustment is needed, remove the adjustment screw cover and turn the adjustment screw clockwise to increase pressure or counter-clockwise to lower pressure.
CAUTION: For proper operation, no more than a
30% drop in gas supply pressure from no-load to fullload conditions is acceptable. Under no circumstances should the pressure be outside the listed operational range.
Electrical Power Connections
Installations must follow these codes:
• National Electrical Code and any other national, state, provincial or local codes or regulations having jurisdiction.
• Safety wiring must be NEC Class 1.
• Heater must be electrically grounded as required by the NEC.
• In Canada, CSA C22. 1 C.E.C. Part 1.
The heater is wired for 120 VAC, 8 amps in its basic configuration. Additional options may increase the amp draw of the unit. The voltage is indicated on the tie-in leads. Consult the wiring dia-gram shipped with the heater in the instruction packet. The remote tank control stat, thermostat, or electronic heater control (as applicable) may be connected to the stage selector terminal (See wiring diagram). 24 VAC is supplied to this connection through the heater trans-former. DO
NOT attach any voltage to the stage selector termi-
nals. Before starting the heater check to ensure proper voltage to the heater and pump.
Install a separate disconnect means for each load.
Use appropriately sized wire as defined by NEC, CSA and/or local code. All primary wiring should be at least
125% of minimum rating.
If any of the original wire as supplied with the heater must be replaced, it must be replaced with 105°C wire or its equivalent.
Field-Connected Controllers
It is strongly recommended that all individually-powered control modules and the heater should be supplied from the same power source.
NOTE: Field-supplied isolation relays should be installed when field-connected controllers are mounted more than 50 equivalent feet (18 Ga) from heater.
Fig. 17: Gas Valve
22
Check the Power Source
WARNING: Using a multi-meter, check the following voltages at the terminal block inside the unit. Make sure proper polarity is followed and house ground is proven. (See Fig. 18.)
BLACK CIRCUIT
BREAKER
WHITE
GREEN
GROUND
A B C
Fig. 18: Wiring Connections
Check the power source:
AC = 108 VAC Minimum, 132 VAC MAX
AB = 108 VAC Minimum, 132 VAC MAX
BC = <1 VAC Maximum
2. Turn off all power to the heater. Verify that power has been turned off by testing with a multi-meter prior to working with any electrical connections or components.
3. Observe proper wire colors while making electrical connections. Many electronic controls are polarity sensitive. Components damaged by improper electrical installation are not covered by warranty.
4. Provide overload protection and a disconnect means for equipment serviceability as required by local and state code.
5. Install heater controls, thermostats, or building management systems in accordance with the applicable manufacturers’ instructions.
6. Conduit should not be used as the earth ground.
Field Wiring Connection
NOTE: A grounding electrode conductor shall be used to connect the equipment grounding conductors, the equipment enclosures, and the grounded service conductor to the grounding electrode.
Fig. 19: Multi-meter
If the heater does not have a factory-wired stage controller, it is factory-wired in an on-off configuration with other stage terminals jumpered.
To field-connect a stage controller, remove factoryinstalled jumpers and wire stage controller as shown in
Fig. 21.
Making the Electrical Connections
Refer to Fig. 18-23.
1. Verify that circuit breaker is properly sized by referring to heater rating plate. A dedicated circuit breaker should be provided.
23
Fig. 20: Wiring Location
CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.
CAUTION: For pumps larger than 3/4 HP, a separate circuit breaker may be required.
DANGER: SHOCK HAZARD
Make sure electrical power to the heater is disconnected to avoid potential serious injury or damage to components.
Installer action is required to electrically enable your heater to operate after making the power connections.
You must make a closed contact connection on Stage
1 connector of the Central Point Wiring (CPW) board for temperature control connections. This will be done based on the controller option selected with your heater order.
1. For Pool and Closed-Loop Water-Source Heat
Pump applications, your heater should be configured to operate in an on-off firing mode. This means that you will connect a single-pole control to stage one of the CPW board. Then jumper the remaining firing stages. For example, if your heater is a Model 902B, you will jumper stages two, three and four. Then your heater will either be on at full fire, or it will be off.
2. For 2-stage controller connections, connect each stage of the control to the corresponding stage of the CPW board in the heater, i.e., stage 1 of the heater to stage 1 of the control; stage 2 of the heater to stage 2 of the control, as shown in Fig.
21 and 22. Set the operating control to the setpoint at which you want the heater to maintain.
Ensure that the sensing bulb of the control is at the point in the system that will best maintain the temperature you want. For example, when you are heating a tank of water, you want the operating control sensor bulb in the tank.
3. For single-stage controller connections, attach the stage 1 connections on heater 1 to the tankstat per
Fig. 23.
Heater must be electrically grounded in accordance with the NEC, and CSA C22.1 C.E.C. Part 1 in
Canada.
2-STAGE
TANKSTAT
Fig. 21: Wiring Connections
24
STAGE 1
CONNECTION
STAGE 2 CONNECTION OR
STAGE 1 CONNECTION
OF HEATER 2
ATTACH STAGE 1 CONNECTIONS ON HEATER
TO STAGE 1 CONNECTION ON TANKSTAT.
ATTACH STAGE 2 CONNECTIONS OR
STAGE 1 CONNECTION OF HEATER 2
TO STAGE 2 CONNECTIONON TANKSTAT
AS SHOWN IN THE DIAGRAM.
Fig. 22: 2-Stage Tankstat
STAGE 1
CONNECTION
Venting
SINGLE
STAGE
TANKSTAT
ATTACH STAGE 1 CONNECTIONS
ON HEATER TO THE SINGLE STAGE
TANKSTAT AS SHOWN IN THE DIAGRAM ABOVE.
Fig. 23: Single-Stage Tankstat
Consult the wiring diagram shipped with the heater in the instruction packet or at the end of this section. The stage-selector terminals are for the remote tank control through the heater’s 24 VAC transformer. DO NOT attach any voltage to the stage-selector terminals.
Before starting the heater, check to ensure proper voltage to the heater and pump.
NOTE: If any of the original wire supplied with the heater must be replaced, it must be replaced with similar sized 105°C wire or its equivalent.
Model Diameter Order Number
302B 5” 011838
402B-502B
652B, 752B,
902B
6”
8”
Table L: Flue Exhaust Tee Kits
011839
011840
Appliance Categories
Heaters are divided into four categories based on the pressure produced in the exhaust and the likelihood of condensate production in the vent.
Category I – A heater which operates with a non-positive vent static pressure and with a vent gas temperature that avoids excessive condensate production in the vent.
Category II – A heater which operates with a non-positive vent static pressure and with a vent gas temperature that may cause excessive condensate production in the vent.
Category III – A heater which operates with a positive vent pressure and with a vent gas temperature that avoids excessive condensate production in the vent.
Category IV – A heater which operates with a positive vent pressure and with a vent gas temperature that may cause excessive condensate production in the vent.
See Table M for appliance category requirements.
NOTE: For 87%-efficiency boilers, see special instructions on page 40.
CAUTION: Proper installation of flue venting is critical for the safe and efficient operation of the heater.
NOTE: For additional information on appliance categorization, see appropriate ANSI Z21 Standard and the NFGC (U.S.), or B149 (Canada), or applicable provisions of local building codes.
General
Flue Exhaust Tee
An optional Flue Exhaust Tee is available to facilitate horizontal venting. Any reference to horizontal venting that exits the back of the heater requires this tee. Refer to Table L for the appropriate kit for your model.
25
CAUTION: When condensate traps are installed, condensate must be routed to an appropriate container for neutralization before disposal, as required by local codes.
WARNING: Contact the manufacturer of the vent material if there is any question about the appliance categorization and suitability of a vent material for application on a Category III or IV vent system.
Using improper venting materials can result in personal injury, death or property damage.
Support of Vent Stack
The weight of the vent stack or chimney must not rest on the heater vent connection. Support must be provided in compliance with applicable codes. The vent should also be installed to maintain proper clearances from combustible materials.
Use insulated vent pipe spacers where the vent passes through combustible roofs and walls.
Vent Terminal Location
NOTE: During winter months check the vent cap and make sure no blockage occurs from build-up of snow or ice.
1. Condensate can freeze on the vent cap. Frozen condensate on the vent cap can result in a blocked flue condition.
2. Give special attention to the location of the vent termination to avoid possibility of property damage or personal injury.
3. Gases may form a white vapor plume in winter.
The plume could obstruct a window view if the termination is installed near windows.
4. Prevailing winds, in combination with below-freezing temperatures, can cause freezing of condensate and water/ice build-up on buildings, plants or roofs.
5. The bottom of the vent terminal and the air intake shall be located at least 12 in. above grade, including normal snow line.
6. Un-insulated single-wall metal vent pipe shall not be used outdoors in cold climates for venting gasfired equipment.
7. Through-the-wall vents for Category II and IV appliances and non-categorized condensing appliances shall not terminate over public walkways or over an area where condensate or vapor could create a nuisance or hazard or could be detrimental to the operation of regulators, relief valves, or other equipment. Where local experience indicates that condensate is a problem with Category
I and III appliances, this provision shall also apply.
Combustion
Air Supply
From Inside Building
(Non-Direct Venting)
From Outside Building
(Direct Venting)
Exhaust
Configuration
Vertical Natural
Draft Venting
Horizontal Throughthe-Wall Venting
Vertical Natural
Draft Venting
Horizontal Throughthe-Wall Venting
Heater Venting
Category
III
I
I
III
Certified
Materials
“B” Vent
Combustion Air
Inlet Material
Stainless Steel
(Gas Tight)
“B” Vent
Stainless Steel
(Gas Tight)
Galvanized Steel
PVC
ABS
CPVC
Table M: Venting Category Requirements
26
8. Locate and guard vent termination to prevent accidental contact by people or pets.
9. DO NOT terminate vent in window well, stairwell, alcove, courtyard or other recessed area.
10. DO NOT terminate above any door, window, or gravity air intake. Condensate can freeze, causing ice formations.
11. Locate or guard vent to prevent condensate from damaging exterior finishes. Use a rust-resistant sheet metal backing plate against brick or masonry surfaces.
12. DO NOT extend exposed vent pipe outside of building. Condensate could freeze and block vent pipe.
U.S. Installations
Refer to the latest edition of the National Fuel Gas
Code.
Vent termination requirements are as follows:
1. Vent must terminate at least 4 ft below, 4 ft horizontally from or 1 ft above any door, window or gravity air inlet to the building.
2. The vent must not be less than 7 ft above grade when located adjacent to public walkways.
3. Terminate vent at least 3 ft above any forced air inlet located within 10 ft.
4. Vent must terminate at least 4 ft horizontally, and in no case above or below unless 4 ft horizontal distance is maintained, from electric meters, gas meters, regulators, and relief equipment.
5. Terminate vent at least 6 ft away from adjacent walls.
6. DO NOT terminate vent closer than 5 ft below roof overhang.
7. The vent terminal requires a 12 in. vent terminal clearance from the wall.
8. Terminate vent at least 1 ft above grade, including normal snow line.
9. Multiple direct vent installations require a 4 ft clearance between the ends of vent caps located on the same horizontal plane.
Canadian Installations
Refer to latest edition of the B149 Installation code.
A vent shall not terminate:
1. Directly above a paved sidewalk or driveway which is located between two single-family dwellings and serves both dwellings.
2. Less than 7 ft (2.13 m) above a paved sidewalk or paved driveway located on public property.
3. Within 6 ft (1.8 m) of a mechanical air supply inlet to any building.
4. Above a meter/regulator assembly within 3 ft (915 mm) horizontally of the vertical centre-line of the regulator.
5. Within 6 ft (1.8 m) of any gas service regulator vent outlet.
6. Less than 1 ft (305 mm) above grade level.
7. Within the 3 ft (915 mm) of a window or door which can be opened in any building, any non-mechanical air supply inlet to any building or the combustion air inlet of any other appliance.
8. Underneath a verandah, porch or deck, unless the verandah, porch or deck is fully open on a minimum of two sides beneath the floor, and the distance between the top of the vent termination and the underside of the verandah, porch or deck is greater than 1 ft (305 mm).
Changing the Flue Outlet
Follow these instructions to change the flue connection from the standard top location to the rear of the heater (when the optional vent tee is ordered).
1. Disconnect all electrical power from the heater (if applicable).
2. Disconnect or isolate the main gas pipe from the heater (if applicable).
3. Remove the screws, gasket and dustcover from the rear of the heater.
4. Remove the screws, stainless steel flue cover and gasket from the branch side of the tee located in the flue box at the rear of the heater.
27
5. Remove the screws, retaining ring and rain gasket from top of heater.
6. Remove the screws, flue collar and gasket from the run side of the tee located in the flue box on top of the heater.
7. Reverse the components and reattach in the new location.
8. Make sure that the stainless steel cover, now located on the run side of the tee, is sealed to avoid any flue gas spillage.
The maximum and minimum venting length for Category I appliances shall be determined per the NFGC
(U.S.) or B149 (Canada).
The diameter of vent flue pipe should be sized according to the NFGC (U.S.) and B149 (Canada). The minimum flue pipe diameter for conventional negative draft venting using double-wall Type B vent is: 5 in. for
Model 302B, 6 in. for Models 402B and 502B, and 8 in.
for Models 652B, 752B and 902B.
NOTE: A vent adapter (field-supplied) must be used to connect Type B vent to the unit.
CAUTION: The silicone vent gaskets must be properly reinstalled to prevent flue gas leakage. Replace any torn or worn vent gaskets.
Venting Installation Tips
Support piping:
• horizontal runs - at least every 5 ft
• vertical runs - use braces
• under or near elbows
WARNING: Examine the venting system at least once a year. Check all joints and vent pipe connections for tightness, corrosion or deterioration.
Venting Configurations
For heaters connected to gas vents or chimneys, vent installations shall be in accordance with the NFGC
(U.S.), or B149 (Canada), or applicable provisions of local building codes.
Natural Draft Vertical Venting
(Category I)
Installation
Natural draft venting uses the natural buoyancy of the heated flue products to create a thermal driving head that expels the exhaust gases from the flue. The negative draft must be within the range of -.01 to -.08 in.
WC as measured 12 in. above the appliance flue outlet to ensure proper operation. Vent material must be listed by a nationally recognized test agency.
Fig. 24: Natural Draft Vertical Venting
(Category I)
The connection from the appliance vent to the stack must be as direct as possible and shall be the same diameter as, or larger than, the vent outlet. The horizontal breaching of a vent must have an upward slope of not less than 1/4 inch per linear foot from the heater to the vent terminal. The horizontal portions of the vent shall also be supported for the design and weight of the material employed to maintain clearances and to prevent physical damage or separation of joints.
28
Termination
The vent terminal should be vertical and should terminate outside the building at least 2 ft above the highest point of the roof that is within 10 ft. The vent cap should have a minimum clearance of 4 ft horizontally from and in no case above or below (unless a 4 ft horizontal distance is maintained) electric meters, gas meters, regulators and relief equipment. The distance of the vent terminal from adjacent public walkways, adjacent buildings, open windows and building openings must be consistent with the NFGC (U.S.) or B149
(Canada). Gas vents supported only by flashing and extended above the roof more than 5 ft should be securely guyed or braced to withstand snow and wind loads.
CAUTION: A listed vent cap terminal, adequately sized, must be used to evacuate the flue products from the heaters.
Common Venting System
Manifolds that connect more than one heater to a common chimney must be sized to handle the combined load. Consult available guides for proper sizing of the manifold and the chimney. At no time should the area of the common vent be less than the area of the largest heater exhaust outlet.
WARNING: Vent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under a positive pressure.
CAUTION: Vent connectors for natural draft venting systems must be Type B or better.
Common venting systems may be too large once an existing unit is removed. At the time of removal of an existing appliance, the following steps must be fol-
lowed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.
1. Seal any unused opening in the common venting system.
2. Visually inspect the venting system for proper size and horizontal pitch and verify there is no blockage, restriction, leakage, corrosion or other unsafe condition.
3. Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common vent system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, at maximum
Model
Certified
Venting
Material
Vent Size
Vertical Venting
Height*
Min.
Max.
Combustion Air
Intake Pipe
Material
Air Inlet
Max. Length**
6” 8”
302B
402B
502B
652B
752B
902B
Cat. I
(Type B
Equivalent)
5”
6”
8”
5’ 25’
Galvanized Steel,
PVC,
ABS,
CPVC
100’
75’
40’
N/A
100’
* Vent lengths are based on a lateral length of 2 ft. Refer to the latest edition of the NFGC for further details. When vertical height exceeds 25 ft, consult factory prior to installation.
** Subtract 10 ft per elbow. Max. 3 elbows.
Maximum combustion air duct length terminated at 100 equivalent ft.
Table N: Category I Vertical Venting
29
speed. Do not operate summer exhaust fan. Close fireplace dampers.
4. Place in operation the appliances being inspected.
Follow the manufacturer’s instructions for lighting each appliance. Adjust thermostat so appliance will operate continuously.
The total length of the horizontal through-the-wall flue system should not exceed 70 equivalent ft in length. If horizontal run exceeds 70 equivalent ft, an appropriately sized extractor must be used. Each elbow used is equal to 10 ft of straight pipe. This will allow installation in one of the four following arrangements:
5. Check the pressure at a pressure tap located 12 in. above the bottom joint of the first vertical vent pipe. Pressure should be anywhere between -0.01
and -0.08 in. WC.
6. After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and other gas burning appliances to their previous conditions of use.
7. Any improper operation of the common venting system should be corrected so that the installation conforms with the NFGC (U.S.) or B149 (Canada).
When re-sizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in Appendix G in the NFGC (U.S.) or B149 (Canada).
Horizontal Through-the-Wall Venting
(Category III)
• 70’ of straight flue pipe
• 60’ of straight flue pipe and one elbow
• 50’ of straight flue pipe and two elbows
• 40’ of straight pipe and three elbows
The vent cap is not considered in the overall length of the venting system.
The vent must be installed to prevent flue gas leakage.
Care must be taken during assembly to ensure that all joints are sealed properly and are airtight. The vent must be installed to prevent the potential accumulation of condensate in the vent pipes. It is required that:
1. The vent must be installed with a slight downward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal.
2. The vent must be insulated through the length of the horizontal run.
For installations in extremely cold climate, it is required that:
1. The vent must be installed with a slight upward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal. In this case, an approved condensate trap must be installed per applicable codes.
2. The vent must be insulated through the length of the horizontal run.
Termination
*Requires optional vent tee for rear discharge.
Fig. 25: Horizontal Through-the-Wall Venting
(Category III)
Installation
The flue direct vent cap MUST be mounted on the exterior of the building. The direct vent cap cannot be installed in a well or below grade. The direct vent cap must be installed at least 1 ft above ground level and above normal snow levels. The Raypak-approved stainless steel flue direct vent cap must be used (sales order option D-15).
These installations utilize the heater-mounted blower to vent the combustion products to the outdoors.
Combustion air is taken from inside the room and the vent is installed horizontally through the wall to the outdoors. Adequate combustion and ventilation air must be supplied to the equipment room in accordance with the NFGC (U.S.) or B149 (Canada).
30
WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants.
Model
No.
Certified
Venting
Material
Vent Size
Maximum
Equivalent
Vent Length*
Combustion
Air
Intake Pipe
Material
302B
402B
502B
652B
752B
902B
Category III
5”
6”
8”
* Subtract 10 ft per elbow. Max. 3 elbows.
70’
Room Air
40’
Ducted
Combustion
Air
Maximum combustion air duct length terminated at 100 equivalent ft.
Galvanized
Steel,
PVC,
ABS,
CPVC
Air Inlet
Max. Length
6” 8”
100’
75’
40’
30’
N/A
100’
80’
Table O: Category III Horizontal and Direct Venting
Use only the special gas vent pipes listed for use with
Category III gas burning heaters, such as the AL29-4C stainless steel vents offered by Heat Fab Inc. (800-
772-0739), Protech System, Inc. (800-766-3473),
Z-Flex (800-654-5600) or American Metal Products
(800-423-4270). Pipe joints must be positively sealed.
Follow the vent manufacturer’s installation instructions carefully.
Direct Vent - Horizontal Throughthe-Wall
Note: When vertical height exceeds 25 ft, consult factory prior to installation.
Fig. 26: Direct Vent - Horizontal Through-the-Wall
Installation
These installations utilize the heater-mounted blower to draw combustion air from outdoors and vent combustion products to the outdoors.
The total length of the through-the-wall flue cannot exceed 40 equivalent ft in length for the flue outlet.
Each elbow used is equal to 10 ft of straight pipe. This will allow installation in one of the three following arrangements:
• 40’ of straight flue pipe
• 30’ of straight flue pipe and one elbow
• 20’ of straight flue pipe and two elbows.
The total length of air supply pipe cannot exceed the distances listed in Table O. Each elbow used is equal to 10 ft of straight pipe. This will allow installation in any arrangement that does not exceed the lengths shown in Table O.
The flue direct vent cap is not considered in the overall length of the venting system.
Care must be taken during assembly that all joints are sealed properly and are airtight.
The vent must be installed to prevent the potential accumulation of condensate in the vent pipes. It is required that:
1. The vent must be installed with a slight downward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal.
2. The vent must be insulated through the length of the horizontal run.
31
For installations in extremely cold climate, it is required that:
1. The vent must be installed with a slight upward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal. In this case, an approved condensate trap must be installed per applicable codes.
2. The intake vent must be insulated through the length of the horizontal run.
Termination
The flue direct vent cap MUST be mounted on the exterior of the building. The direct vent cap cannot be installed in a well or below grade. The direct vent cap must be installed at least 1 ft above ground level and above normal snow levels.
The direct vent cap MUST NOT be installed with any combustion air inlet directly above a direct vent cap.
This vertical spacing would allow the flue products from the direct vent cap to be pulled into the combustion air intake installed above.
This type of installation can cause non-warrantable problems with components and poor operation of the heater due to the recirculation of flue products. Multiple direct vent caps should be installed in the same horizontal plane with a 4 ft clearance from the side of one vent cap to the side of the adjacent vent cap(s).
Combustion air supplied from outdoors must be free of particulate and chemical contaminants. To avoid a blocked flue condition, keep the vent cap clear of snow, ice, leaves, debris, etc.
WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants.
The stainless steel flue direct vent cap must be furnished by the heater manufacturer in accordance with its listing (sales order option D-15).
Use only the special gas vent pipes listed for use with
Category III gas burning heaters, such as the AL29-4C stainless steel vents offered by Heat Fab Inc. (800-
772-0739), Protech System, Inc. (800-766-3473),
Z-Flex (800-654-5600) or American Metal Products
(800-423-4270). Pipe joints must be positively sealed.
Follow the vent manufacturer’s installation instructions carefully.
Direct Vent - Vertical
Note: When vertical height exceeds 25 ft, consult factory prior to installation.
Fig. 27: Direct Vent - Vertical
Installation
These installations utilize the heater-mounted blower to draw combustion air from outdoors and force the heated flue products through the vent pipe under positive pressure. The vent material must be in accordance with the above instructions for vent materials. Vent material must be listed by a nationally recognized test agency.
The connection from the appliance flue to the stack must be as direct as possible and should be the same size or larger than the vent outlet.
See Table N for Category I venting guidelines.
It is recommended that the intake vent be insulated in colder climates.
Termination
The flue terminal should be vertical and should terminate outside the building at least 2 ft above the highest point of the roof within 10 ft. The vent cap should have a minimum clearance of 4 ft horizontally from and in no case above or below (unless a 4 ft horizontal distance is maintained) electric meters, gas meters, regulators and relief equipment. The distance of the vent terminal from adjacent public walkways, adjacent buildings, open windows and building openings must be consistent with the NFGC (U.S.) or B149 (Canada).
32
Flues supported only by flashing and extended above the roof more than 5 ft should be securely guyed or braced to withstand snow and wind loads.
The air inlet opening MUST be installed 1 ft above the roof line or above normal snow levels that might obstruct combustion air flow. This dimension is critical to the correct operation of the heater and venting system and reduces the chance of blockage from snow. The vent cap must have a minimum 3 ft vertical clearance from the air inlet opening.
Outdoor Installation
Outdoor models are self-venting when installed with the optional factory-supplied outdoor vent kit and require no additional vent piping. A special vent cap, flow switch cover and air intake hood are provided in accordance with CSA requirements, which must be installed directly on the heater. Correct clearances can be found earlier in this section.
Care must be taken when locating the heater outdoors, because the flue gases discharged from the vent cap can condense as they leave the cap.
Improper location can result in damage to adjacent structures or building finish. For maximum efficiency and safety, the following precautions must be observed:
1. Outdoor models must be installed outdoors and must use the outdoor vent cap, flow switch cover and air intake hood available from the manufacturer (sales order option D-11).
2. Periodically check venting system. The heater’s venting areas must never be obstructed in any way and minimum clearances must be observed to prevent restriction of combustion and ventilation air. Keep area clear and free of combustible and flammable materials.
3. Do not locate adjacent to any window, door walkway, or gravity air intake. The vent must be located a minimum of 4 ft horizontally from such areas.
4. Install above grade level and above normal snow levels.
5. Vent terminal must be at least 3 ft above any forced air inlet located within 10 ft.
6. Adjacent brick or masonry surfaces must be protected with a rust-resistant sheet metal plate.
NOTE: Condensate can freeze on the vent cap.
Frozen condensate on the vent cap can result in a blocked flue condition.
NOTE: The vent cap, flow switch cover and air intake hood must be furnished by the heater manufacturer in accordance with its listing (sales order option D-11).
Freeze Protection
When installing this heater in an outdoor location that is susceptible to freezing, sales order option B-22 must be ordered. The B-22 option energizes the heater pump at a preset temperature drop to circulate water and reduces the possibility of freezing and damaging the heat exchanger or headers.
Controls
WARNING: Installation, adjustment and service of heater controls, including timing of various operating functions, must be performed by a qualified installer, service agency or the gas supplier. Failure to do so may result in control damage, heater malfunction, property damage, personal injury, or death.
WARNING: Turn off the power to the heater before installation, adjustment or service of the CPW board or any heater controls. Failure to do so may result in board damage, heater malfunction, property damage, personal injury, or death.
CAUTION: This appliance has provisions to be connected to more than one supply source. To reduce the risk of electric shock, disconnect all such connections before servicing.
CAUTION: Risk of electric shock: More than one disconnect switch may be required to de-energize the equipment before servicing.
33
12. Power is applied to terminal P1-1 of the Universal
Diagnostics Board. 24 VAC power is then applied in series to all typically closed safeties wired into the heater. All safeties are verified to ensure that it is safe to operate the heater. The safety components wired into the diagnostic board are: low water cut-off (optional), blocked vent switch, manual vent temp switch (optional), manual reset high limit, low gas pressure switch (optional), high gas pressure switch (optional), and auto-reset high limit (optional).
Fig. 28: Status LED Indicator Decal
Heater Sequence of Operation
13. If any of the safeties do not close, a signal is sent to the Universal Diagnostics Board to indicate a safety fault.
Models 302B-902B
14. Power is applied to terminal TP-1 of the
Economaster pump delay to energize the circuit board.
1. The black (hot) wire lead goes directly to the main power switch. This black toggle switch is located at the middle front of the control compartment.
15. Once all safeties are closed and verified, a 24 VAC signal is output from the Auto High Limit to J5 pin
3 of the CPW board of the heater.
2. When the main power switch is placed in the “ON” position, 120 VAC is applied to the 120 VAC terminal block on the circuit board and the 120/24 VAC transformer is powered.
16. 24 VAC power is now sent to the coil of relay K-1.
3. 120 VAC is waiting at the N.O. contacts of the
Economaster pump delay.
17. Relay K-1 (N.C.) will now be energized, and opens the N.C. contacts to disable the alarm (optional) and turns off the red LED safety shutdown light on the front status board.
4. Terminals L1 and F1 of the ignition module are powered with 120VAC.
18. The common terminal of the Auto High Limit will now send a 24 VAC signal to pin 1 of the “panel switch”.
5. 120 VAC power is also applied to the control power connector on the circuit board.
6. 120 VAC power is waiting at the N.O. contacts of
K-3 relay to energize the heater blower.
19. The “panel switch” (rocker switch) located at the lower left front of the control compartment is now powered. If the switch is “ON” and there is no call for heat (CFH), the heater is in standby mode.
7. The 120/24 VAC transformer outputs 24 VAC.
8. 24 VAC is sent to pin L1 of the low water cut-off
(optional) and the red power light is energized.
20. After the standby switch is placed into the “ON” position, a 24 VAC signal is sent to the
“enable/disable” connection (normally jumpered).
9. 24 VAC is applied to the blue power light located on the status display board.
21. 24 VAC switched power is applied to the S24V terminal on the ignition module.
10. 24 VAC is also applied to the red LED safety shutdown light on the front status board until the safeties have been proven.
22. When the “enable/disable” contacts are closed, the 24 VAC signal travels to pin 1 of the stage 1 connection and waits for a CFH.
11. 24 VAC is applied to the alarm circuit (optional). If the E-5 sales option (Alarm) is included a 5 second time delay relay will not allow the alarm to sound unless a safety or limit circuit stays energized for more than 5 seconds.
34
23. When a CFH occurs, a 24 VAC signal is sent to the
CFH light on the status panel located on the lower left front of the control compartment.
Light
Power
Call For Heat
Safety
Ignition
Flow
Blower 1
Stage 1
Stage 2
External Lights
Color Indication
Blue
Yellow
Red
Red
Green
Green
Green
Green
Main power is on
Thermostat is closed
One or more safeties is inoperative
Ignition module is inoperative
Flow is present
Blower 1 is on
Stage 1 is on
Stage 2 is on nection to pin P1-3 of the universal diagnostic board.
Table P: Status LED Indicators
35. When the coil on relay K-3 is powered, the N.O.
relay contacts close and energizes the blower from the J8 connections on the CPW board.
25. Power is now sent to terminal TP4 of the
Economaster to energize the relay and close the contacts.
26. Power is waiting at the common terminal of the flow switch waiting for closure and sufficient water flow.
of the Economaster.
27. The heater pump is energized upon relay closure
28. Upon sufficient flow from the heater pump, the flow switch contacts will close.
36. After proper air pressure is received in the air plenum, the air pressure switch will close.
37. If there is insufficient air pressure and the air pressure switch does not close, a 24 VAC signal is sent to the Universal Diagnostics Board to indicate the fault.
38. A 24 VAC signal is now sent to the blower LED on the status board.
39. Power is applied to the optional equipment interlock connection J9 (normally jumpered).
29. If there is insufficient flow and the flow switch does not close, a 24 VAC signal is sent to the Universal
Diagnostics Board to indicate the fault.
40. The 24 VAC signal is then sent to the 24 VAC safety connector.
30. The flow light is energized; located on the front status panel.
41. 24 VAC is now sent to the pressure switch (P.S.) terminal on the ignition module.
31. A 24 VAC signal is also sent to the “TH” terminal located on the ignition module.
32. Once the 24 VAC “TH” signal is received at the ignition module, the internal contacts between F1 and F2 close sending a 120 VAC signal to the 120
VAC pilot duty terminals, located at J14 on the circuit board.
42. Once the pressure switch signal is received at the ignition module, the heater performs a 15-second pre-purge and then the hot surface igniter is energized by a 120 VAC signal from S-1 on the ignition module for approximately 30 seconds. (The hot surface igniter must draw greater than 3.1 amps while being energized or ignition lockout will occur after three tries.)
33. The 120 VAC signal continues to the coil of the blower relay K-3 (N.O.).
43. Once the ignition module determines that the hot surface igniter has heated up and operating properly, a 24 VAC signal is output from pin GV on the module.
34. The 120 VAC signal continues to the 120 VAC safety terminals located at J13 on the circuit board.
35
44. 24 VAC signal is received at gas valve 1 thus energizing it.
45. The stage 1 LED on the status display board is now illuminated.
46. The coil of relay K-2 is now energized with the
N.O. contacts closing downstream of the stage 2 connections.
47. The gas coming through the burners should ignite from the heat of the hot surface igniter and the flame should carry over from one burner to the other burners of stage 1. The remote sensor is now trying to sense the flame. If the flame is not sensed within 4 seconds, the ignition module will shut down gas valve 1 and retry the hot surface igniter. During ignition retry the heater must perform a 15-second pre-purge and an approximately
30-second igniter warm-up before opening gas valve 1 again. The standard ignition module will attempt ignition a maximum of three times prior to ignition lockout.
48. If the ignition module locks out, a signal will be sent to the Universal Diagnostics Board to indicate an ignition fault.
49. (Models 302B-402B only) 24 VAC is now waiting at pin 3 of the stage 2 connections on the CPW board.
50. (Models 502B-902B only) When power is sent to gas valve 1 it is also sent to time delay relay 1 (TD-
1) which starts a 5-second countdown.
51. (Models 502B-902B only) After the 5-second countdown from TD-1, 24 VAC is waiting at pin 3 of the stage 2 connections on the CPW board.
52. After closure of the stage 2 contacts Gas valve 2 is energized.
53. The stage 2 LED on the status display board is now illuminated.
54. The Heater is now operating at full fire.
Ignition Module
When additional heat is needed, the combustion air blower starts to purge air from the combustion chamber for about 15 seconds. On proof-of-air flow, the
Fig. 29: Ignition Module air-proving switch closes and the igniter is energized.
To ensure safe operation, the gas valve cannot open until the igniter is verified. The main burner is automatically lit when the device is powered and pre-purged.
The heater performs its own safety check and opens the main valve only after the igniter is proven to be capable of ignition.
The standard ignition module will attempt to light three times before locking out. To reset it, turn off power to the heater, wait 30 seconds and re-apply power. The optional single-try ignition module will lock out after failing to light one time. To reset it, press and release the small, recessed black push button located inside of the cut-out on the lower right-hand corner of the ignition module case. Turning off the power to the heater
WILL NOT reset the ignition module.
Code
On
Off
1 Flash
2 Flashes
3 Flashes
Condition
System OK;
No faults present
Possible control fault;
Check power
Low air pressure, brief flashing normal on start-up
Flame in combustion chamber; No call for heat
Ignition lockout
4 Flashes Low igniter current
5 Flashes
6 Flashes
Low 24VAC, check control supply voltage
Internal fault;
Replace control
Table Q: Ignition Module
Diagnostic LED Codes
36
High Limit (Manual Reset)
The heater is equipped with a manual reset high limit temperature device. Push the reset button and adjust the setting to 40 - 50°F above desired operating temperature.
Low Water Cut-Off (Optional)
The low water cut-off automatically shuts down the burner whenever water level drops below the level of the sensing probe. A 5-second time delay prevents premature lockout due to temporary conditions such as power fluctuations or air pockets.
Fig. 30: High Limit (Manual Reset)
Flow Switch
This dual-purpose control, mounted and wired in series with the main gas valve, shuts off heater in case of pump failure or low water flow.
Fig. 32: Low Water Cut-Off
High and Low Gas Pressure Switches
The low gas pressure switch (optional) connection mounts upstream of the gas valve to ensure that sufficient gas pressure is present for proper regulator performance. The low gas pressure switch automatically shuts down the heater if gas supply drops below the recommended setting of 5.0 in. WC for natural gas, and 10.0 in. WC for propane gas.
The high gas pressure switch (optional) connection mounts downstream of the stage-1 gas valve. If the gas pressure regulator fails, the high gas pressure switch automatically shuts down the burner. The high gas pressure switch automatically shuts down the heater if gas manifold pressure rises above the recommended setting of 5.0 in. WC for natural gas, and 11.5
in. WC for propane gas.
Fig. 31: Flow Switch
Operating Control
The heater may be equipped with different types of operating controls. Consult the individual control data sheets supplied with your heater paperwork. See the
General Safety Section for safety precautions concerning domestic hot water applications.
Fig. 33: High/Low Gas Pressure Switch
37
UDB Diagnostic Board
This heater is equipped with a diagnostic board which will indicate faults as they occur. Refer to the following section for instructions on accessing, reviewing and clearing these faults.
Fig. 34: Fan-Proving Switch
Fig. 37: UDB Diagnostic Board
UDB Fault History
Fig. 35: Blocked Vent Switch
Pump Time Delay
The Economaster is a fully enclosed solid state TDR with a white jumper that selects one of two time delays. See Fig. 36. If the jumper is on pins 6 and 7
(default) the delay time is 5 minutes. If the jumper is not on pins 6 and 7, the time delay is 10 minutes.
In a conventional system, when the Aquastat is satisfied, the main gas valve closes, but the pump continues operating. With the time delay relay the boiler pump is programmed to continue running for an optimum period of time in order to absorb the residual heat from the combustion chamber and use it in the system. The pump then shuts off until the next call for heat is received from the Aquastat.
1
6
2
Fig. 36: Economaster Time Delay Relay (TDR)
To view the fault codes in the UDB history file:
1. Press the UP or DOWN buttons on the membrane switch for 2 seconds to access the fault history.
2. Press either button to scroll through the recorded faults in history.
3. The most recent fault recorded will be the first fault displayed (the last 16 faults are stored in the history, on a rolling basis). There is no time or date stamp associated with these faults.
4. When the history of faults has been exhausted, pushing the UP or DOWN buttons again will roll the fault history over and it will start again.
5. To exit the fault history, wait for 10 seconds and the board will automatically exit the history mode.
To clear the fault history, press and hold both the UP and DOWN buttons for 5 seconds while the power is on.
NOTE: Once the history has been cleared, it cannot be recovered.
Diagnostic information is provided any time a fault is recorded. This information is intended to assist in locating the problem with the heater, but is not exhaustive.
38
If multiple fault conditions occur at the same time, only the fault that caused the heater to shut down will be recorded in the history.
Hi Delta
PVC Vent Limit-CHX
Manual High Limit
Auto High Limit
Low Water Cut-off
Vent Pressure
Low Gas Pressure
High Gas Pressure
Controller Alarm
Flow Switch
Blower Switch
Factory Option
External Interlock
CWS/CWR
2
Ignition Lockout
Field
Interlock #
Flashes
1
Fault
Low Air
Flame - No CFH
3
4
5
6
Ignition Lockout
Low HSI Current
Low 24VAC
Internal Cntrl Fault
Detection
Delay
1
1
1
LCD Display Readout With Fault
Cond Drain Blocked/Vent Temp Limit Err
Check Drain Switch, Check Drain/Check Vent System
Man Hi Limit Fault
Confirm Settings, Reset Hi Limit
Auto Hi Limit Fault
Confirm Settings, Check Pump
Lo Water Cutoff Err
1
1
Purge Air, Check Pump, Chk Isolation Valve,
Reset LWCO
Vent Pressure Fault
Blocked Vent, Check Vent System
Lo Gas Press Fault
1
1
1
3
3
Confirm Settings, Check Supply Gas, Reset LGPS
Hi Gas Press Fault
Confirm Settings, Check Supply Gas,
Controller Alarm
See Control Display
Water Flow Sw Fault
Check Boiler Pump, Purge Air, Replace Flow Switch
Blower Air Sw. Fault
Check Air Filter, Check Blower, Check Air Sw. Hose
Factory Option Fault
Check Factory Data, Check Wiring Diagram, Check
Freeze Control, Check Water Pressure
3
90
3
1
Field Interlock Err
Check Louvers, Check Comb. Damper, Check
Extractor Sw.
CWS/CWR Fault
Confirm Inlet Temp, Reset CWS/CWR Cntrl
Ignition Lockout
Display actual Fault Flash Code
Recycle/Reset Control, Push Reset Button
See Table Below
LCD Display Readout With Fault
Low Air Fault
Check Blower, Check Filter, Check Air Sw. Hose
Flame - No CFH
Shut Off Gas Supply, Recycle Power
Ignition Lockout
Recycle/Reset Cntrl, Push Reset Button
Low HSI Current
Check HSI Current, Replace HSI, Recycle Power, Replace Ign.
Low 24 VAC
Check Power Supply, Check Transformer
Internal Cntrl Fault
Recycle/Reset Cntrl, Replace Control
Condition
Power On / No CFH
Power On / CFH
LCD Display Without Fault
System Normal
Standby / WebSite*
System Normal
CFH Active / WebSite*
*Toggles Between /
Table R: UDB Fault Messages
39
87%-Efficiency Boilers –
Special Instructions
NOTE: The constructions of the 84%- (standard) and 87%-efficiency (optional) boilers are very similar, and they are installed to the same requirements, except as noted in this section.
ends that a thermometer be placed into the boiler inlet piping next to the in/out header to facilitate temperature adjustment. Inlet water temperatures below 120ºF
(49ºC) can excessively cool the products of combustion, resulting in condensation on the heat exchanger.
Venting
Water Piping
An 87%-efficiency boiler requires a minimum inlet water temperature of 120ºF (49ºC) to prevent excessive condensation in the combustion chamber. An
87%-efficiency boiler operated with an inlet temperature of less than 120ºF (49ºC) must have a manual bypass or an approved low-temperature operation system to prevent problems with condensation. A manual bypass, shown in Fig. 15, must be piped into the system at the time of installation. This piping is like a primary/secondary boiler installation with a bypass in the secondary boiler piping. Raypak strongly recomm-
CAUTION: Proper installation of flue venting is critical for the safe and efficient operation of the boiler.
Appliance Categories
See Table T for appliance category requirements for the 87%-efficiency Hi Delta.
NOTE: For additional information on appliance categorization, see appropriate code NFGC (U.S.) and B149 (Canada), or applicable local building codes.
Model
No.
10°F T 20°F T 30°F T Min. Flow Max Flow gpm P (ft) gpm P (ft) gpm P (ft) gpm P (ft) T gpm P (ft) T
302BE 52
402BE 69
502BE 87
652BE N/A
752BE N/A
902BE N/A
3.3
5.8
9.1
N/A
N/A
N/A
26
35
44
57
65
78
<1.0 N/A
1.5
2.5
4.4
6.1
8.9
23
29
38
44
52
N/A
<1.0
1.1
2.0
2.8
4.1
20
20
22
28
33
39
<1.0 26 90
<1.0 35 90
<1.0 40 90
Note: Basis for minimum flow is 20 gpm or 40°F ∆T. Basis for maximum flow is 90 gpm.
1.1 40 90
1.6 40 90
2.3 40 90
9.8 6
10.0 8
10.4 10
10.8 13
11.3 15
11.7 17
Table S: Heater Rate of Flow and Pressure Drop
Combustion
Air Supply
Exhaust
Configuration
From Inside Building
Vertical Natural Draft
Venting
(Non-Direct Venting) Horizontal Through- the-Wall Venting
From Outside Building
(Direct Venting)
Vertical Natural Draft
Venting
Horizontal Through- the-Wall Venting
Heater Venting
Category
II
Certified
Materials
Stainless Steel
(Gas Tight)
IV
II
IV
AL29-4C
Stainless Steel
(Gas Tight)
AL29-4C
Combustion Air
Inlet Material
Galvanized Steel
PVC
ABS
CPVC
Table T: Category Determination for Venting Purpose and Venting Arrangement
40
WARNING: Contact the vent material manufacturer if there are any questions about the appliance category or suitability of a vent material for Category
II, III or IV applications. Using improper venting materials can result in personal injury, death or property damage.
Vent Terminal Location
NOTE: During winter months check the vent cap and make sure no blockage occurs from build-up of snow or ice.
1. Condensate can freeze on the vent cap. Frozen condensate on the vent cap can result in a blocked flue condition.
2. Give special attention to the location of the vent termination to avoid possibility of property damage or personal injury.
3. Gases may form a white vapor plume in winter.
The plume could obstruct a window view if the termination is installed near windows.
4. Prevailing winds, in combination with below-freezing temperatures, can cause freezing of condensate and water/ice build-up on building, plants or roof.
5. The bottom of the vent terminal and the air intake shall be located at least 12 in. above grade, including normal snow line.
6. Un-insulated single-wall metal vent pipe shall NOT be used outdoors in cold climates for venting gas utilization equipment.
7. Through-the-wall vents for Category II and IV appliances shall not terminate over public walkways or areas where condensate or vapor could create a nuisance or hazard, or be detrimental to the operation of regulators, relief valves or other equipment.
8. Locate and guard vent termination to prevent accidental contact by people or pets.
9. DO NOT terminate vent in window well, stairwell, alcove, courtyard or other recessed area, unless previously approved by local authority.
10. DO NOT terminate above any door, window, or gravity air intake. Condensate can freeze, causing ice formations.
11. Locate or guard vent to prevent condensate from damaging exterior finishes. Install a rust-resistant sheet metal backing plate against brick or masonry surfaces.
12. DO NOT extend exposed vent pipe outside of building. Condensate could freeze and block vent pipe.
Condensate Management
Condensate must be routed from the condensate trap to an appropriate container for neutralization before disposal, as required by local codes.
Vertical Venting (Category II)
Note: When vertical height exceeds 25 ft, consult factory prior to installation.
*Requires optional vent tee for rear discharge.
Fig. 38: Vertical Venting (Category II)
CAUTION: A properly sized listed vent cap terminal must be used to evacuate the flue products from the boilers.
Common Venting System
Manifolds that connect more than one boiler to a common chimney must be engineered to handle the combined load. Consult available guides for proper sizing of the manifold and the chimney. At no time should the area of the vent be less than the area of the largest boiler exhaust outlet.
41
WARNING: Vent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under a positive pressure.
Horizontal Through-the-Wall Venting
(Category IV)
pressure reading must be between -0.01 and -0.1 in.
WC as measured 12 in. from the appliance flue outlet.
Each elbow used is equal to 10 ft of straight pipe. This will allow installation in one of the four following combinations:
• 70’ of straight flue pipe
• 60’ of straight flue pipe and one elbow
• 50’ of straight flue pipe and two elbows
• 40’ of straight pipe and three elbows
The vent cap is not considered in the overall length of the venting system.
The vent must be installed to prevent flue gas leakage.
Care must be taken during assembly to ensure that all joints are sealed properly and are airtight. The vent must be installed to prevent the potential accumulation of condensate in the vent pipes. It is recommended that:
*Requires optional vent tee for rear discharge.
Fig. 39: Horizontal Through-the-Wall Venting
(Category IV)
Installation
1. The vent must be installed with a slight upward slope of not more than 1/4 in per foot of horizontal run to the vent terminal.
These installations utilize the boiler-mounted blower to vent the combustion products to the outdoors.
Combustion air is taken from inside the room and the vent is installed horizontally through the wall to the outdoors. Adequate combustion and ventilation air must be supplied to the mechanical room in accordance with the NFGC (U.S.) and B149 (Canada).
The total length of the horizontal through-the-wall exhaust vent system should not exceed 70 ft in length. If horizontal run exceeds 70 ft, an appropriately sized extractor must be used. To maintain proper operation,
2. The vent must be insulated through the length of the horizontal run.
Common Venting System
Common venting of Category IV systems is not allowed.
WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants.
Model
Certified
Venting
Material
Vent Size
Maximum
Equivalent
Vent Length
Combustion Air
Intake Pipe
Material
302BE
402BE
502BE
652BE
752BE
902BE
Category II or IV
5”
6”
8”
70’
Room Air
40’
Ducted
Combustion
Air
Galvanized Steel,
* Subtract 10 ft per elbow. Max. 3 elbows.
Maximum combustion air duct length terminated at 100 equivalent ft.
PVC,
ABS,
CPVC
Table U: Category II and IV Venting
Air Inlet
Max. Length*
6” 8”
100’ N/A
75’
40’
30’
100’
80’
42
The stainless steel direct vent cap must be furnished by the boiler manufacturer in accordance with its listing (sales order option D-15).
Use only double-wall vent pipe and the special gas vent pipes listed for use with category II or IV gas burning boilers, such as the stainless steel Saf-T vent by
Heat Fab Inc. (800-772-0739), Protech Systems Inc.
(800-766-3473), Z-Flex (800-654-5600) or American
Metal Products (800-423-4270). Pipe joints must be positively sealed. Follow the vent manufacturer’s installation instructions carefully.
Direct Vent - Horizontal Throughthe-Wall
The flue exhaust direct vent cap is not considered in the overall length of the venting system.
Care must be taken during assembly that all joints are sealed properly and are airtight.
The vent must be installed to prevent the potential accumulation of condensate in the vent pipes. It is recommended that:
1. The vent must be installed with a slight downward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal.
2. The vent must be insulated through the length of the horizontal run.
For installations in extremely cold climate, it is recommended that:
1. The vent must be installed with a slight upward slope of not more than 1/4 inch per foot of horizontal run to the vent terminal. In this case, an approved condensate trap must be installed per applicable codes.
2. The intake vent must be insulated through the length of the horizontal run.
Common Venting System
Common venting of Category IV systems is not allowed.
Fig. 40: Direct Vent - Horizontal Through-the-Wall
Installation
These installations utilize the boiler-mounted blower to draw combustion air from outdoors and vent combustion products to the outdoors.
The total length of the direct vent through-the-wall exhaust vent cannot exceed 40 ft in length for the flue outlet. Each elbow used is equal to 10 ft of straight pipe. This will allow installation in one of the three following combinations:
• 40’ of straight flue pipe
• 30’ of straight flue pipe and one elbow
• 20’ of straight flue pipe and two elbows
The total length air supply duct cannot exceed the distances listed. Each elbow used is equal to 10 ft of straight pipe. This will allow installation in one of the three following combinations:
• 40’ of straight combustion air pipe
• 30’ of straight combustion air pipe and one elbow
• 20’ of straight combustion air pipe and two elbows
WARNING: No substitutions of flue pipe or vent cap material are allowed. Such substitutions would jeopardize the safety and health of inhabitants.
The stainless steel flue exhaust direct vent cap must be furnished by the boiler manufacturer in accordance with its listing (sales order option D-15).
Use only double-wall vent pipe and the special gas vent pipes listed for use with category II or IV gas burning boilers, such as the stainless steel Saf-T vent by
Heat Fab Inc. (800-772-0739), Protech Systems Inc.
(800-766-3473), Z-Flex (800-654-5600) or American
Metal Products (800-423-4270). Pipe joints must be positively sealed. Follow the vent manufacturer’s installation instructions carefully.
43
Direct Vent - Vertical
Note: When vertical height exceeds 25 ft, consult factory prior to installation.
*Requires optional vent tee for rear discharge.
Fig. 41: Direct Vent - Vertical
Model
Certified
Venting
Material
Vent Size
Vertical Venting
Height*
Min.
Max.
Combustion Air
Intake Pipe
Material
Air Inlet
Max. Length**
6” 8”
302B
402B
502B
652B
752B
902B
Category II or IV
5”
6”
8”
5’ 25’
Galvanized Steel,
PVC,
ABS,
CPVC
100’
75’
40’
N/A
100’
* Vent lengths are based on a lateral length of 2 ft. Refer to the latest edition of the NFGC for further details.
When vertical height exceeds 25 ft, consult factory prior to installation.
** Subtract 10 ft per elbow. Max. 3 elbows.
Maximum combustion air duct length terminated at 100 equivalent ft.
Table V: Category II or IV Vertical Venting
44
Wiring Diagram
45
START-UP
WHAT TO DO IF YOU SMELL GAS:
• Do not try to light any appliance.
Pre Start-up
Filling System (Heating Boilers)
Fill system with water. Purge all air from the system.
Lower system pressure. Open valves for normal system operation, and fill system through feed pressure.
Manually open air vent on the compression tank until water appears, then close vent.
Air Purge (Domestic Hot Water
Heaters)
Purge all air from system before lighting heater. This can be normally accomplished by opening a downstream valve.
• Do not touch any electrical switch; do not use any telephone in your building.
• Immediately call your gas supplier from a neighbor’s telephone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the fire department.
• Use only your hand to push in or turn the gas control knob. Never use tools. If the knob will not turn by hand, do not try to repair it, call a qualified service technician. Forced or attempted repair may result in a fire or explosion.
• Do not use this appliance if any part has been under water, immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.
NOTE: Boil-out information: The oils, grease and other contaminates found in some gas fired boilers are not present in the water side of a Raypak appliance. Most boil-out procedures require the use of an alkaline (high pH) cleaning agent that will damage the copper finned tubes of the heat exchanger. Heat exchangers damaged due to boilout are not covered under warranty.
• Check around unit for debris and remove combustible products, i.e. gasoline, etc.
Pre Start-up Check
Venting System Inspection
1. Verify heater is filled with water.
2. Check system piping for leaks. If found, repair immediately.
1. Check all vent pipe connections and flue pipe material.
3. Vent air from system. Air in system can interfere with water circulation.
2. Make sure vent terminations are installed per code and are clear of all debris or blockage.
For Your Safety
4. Purge air from gas line up to heater.
Initial Start-up
Tools Needed WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
• (1) 12-0-12, 24” scale U-tube manometer
This appliance has a hot surface igniter. It is equipped with an ignition device which automatically lights the burners. Do not try to light the burners by hand.
• (4) 6-0-6, 12” scale U-tube manometers (minimum)
• (1) Screwdriver
BEFORE OPERATING, smell all around the appliance area for gas. Be sure to smell near the floor because some gas is heavier than air and will settle on the floor.
• (1) Multi-meter
46
• (1) 3/16” Allen wrench
NOTE: Digital manometers are not recommended.
Preparation
WARNING: Do not turn on gas at this time.
Check Power Supply
With multi-meter at incoming power, check voltage between:
Hot - Common (≈120 VAC)
Hot - Ground (≈120 VAC)
Common - Ground (< 1 VAC)
WARNING: If Common - Ground is > 1 VAC,
STOP: Contact electrician to correct ground failure.
Failure to do this may burn out 120V-24V transformer, or may cause other safety control damage or failure.
Attach Manometers to Measure Pressures
1. Turn off main gas valve.
2. Attach 24” scale manometer to the first main gas shut-off valve pressure tapping.
3. Attach (1) 12” scale manometer to the outlet side of the second main gas shut-off valve pressure tapping.
4. Attach (1) 12” scale manometer near the fan-proving switch. Pull black cap from air pressure switch tee and connect the manometer. NOTE: Retain caps for reinstallation later.
Check Gas Supply Pressure
1. Slowly turn on main gas shut-off valve.
2. Read the gas supply pressure from the manometer; minimum supply pressure for natural gas is 5.0
in. WC, recommended supply is 7.0 in. WC, minimum supply pressure for propane gas is 11.0 in.
WC (dynamic readings, all stages firing).
3. If the pressure is > 14.0 in. WC, turn off the valve.
4. Check if the service regulator is installed and/or adjust the service regulator.
Start-Up
Blower Adjustment
1. Turn off power.
2. Unplug cap at pressure switches and connect manometer(s) to the tee.
3. Close all manual firing valves.
4. Turn power on.
5. Check manometers attached to fan pressure switch. The reading should be 1.4 ± .1 in. WC for propane gas and natural gas. If not, adjust the air shutter on the blowers to attain the correct value.
6. Turn power off.
7. Reconnect this cap.
Main Burner Adjustment
1. Turn off unit.
2. Open manual firing valves.
3. Turn on the unit, wait 15 seconds, and the igniter should glow. Look into sight glass located at each end of the heater to check igniter operation. Gas valves should open in 45-60 seconds.
4. If burner does not light on first trial. It will retry, up to three times.
5. Main burner ignition: Check manifold gas pressure at gas valve outlet pressure tap. This should read
3.5 ± 0.1 in. WC for natural gas and 10.5 ± 0.1 in.
WC for propane gas.
6. If the pressure reading differs by more than ± 0.1
in. WC, remove screw cover from the gas pressure regulator and adjust main burner manifold pressure. Replace the screw cover. Repeat steps
2 to 5 on other valves as necessary.
CAUTION: Special manifold and air settings may be required. Verify rating plate and blower housing.
47
Safety Inspection
1. Check all thermostats and high limit settings.
2. During the following safety checks leave manometers hooked up, check and record.
3. If other gas-fired appliances in the room are on the same gas main, check all pressures on the Hi
Delta with all other equipment running.
4. Check thermostats for ON-OFF operation.
5. Check high limits for ON-OFF operation.
6. While in operation, check flow switch operation.
7. Check the low gas pressure switch. (For proper adjustment, use the attached manometers, if available, to set pressure. The scales on the switch are approximate only.) Low gas pressure switch must be set at 5.0 in. WC for natural gas and 10.0 in. WC for propane gas.
8. Make sure that the high gas pressure switch (optional) is set to 1.0 in. WC above manifold pressure.
Follow-Up
Safety checks must be recorded as performed.
Turn heater on. After main burner ignition:
1. Check manometer for proper reading.
2. Cycle heater several times and re-check readings.
3. Remove all manometers and replace caps and screws.
4. Replace all gas pressure caps.
5. Check for gas leaks one more time.
Pilot Turn-Down Test
The Hi Delta heaters, depending on their size, have one to three burner sections. Each burner section is supplied gas by gas valves incorporated into a single valve body. A maximum of three burner sections may be controlled by a single hot surface ignition system.
The middle of the three burner sections is ignited directly with a hot surface ignition system.
The burner section that is ignited directly by the hot surface ignition system serves as a supervised pilot to light the burner sections on either side of it. The burner sections on either side of the supervised section
(pilot) are electrically interlocked with the supervised ignition system so as they are not energized unless flame is proven on the center section which is acting as a pilot to light the right and left-hand sections.
The pilot turn-down test is conducted as follows:
1. Turn off manual valves on non-supervised burner sections.
2. Turn on electrical power and adjust thermostat to call for heat.
3. Wait for completion of ignition sequence to light burner section being utilized as a pilot for those turned off in step 1 above.
4. Gradually reduce manifold pressure (flame) on supervised burner section by slowly closing manual gas valve. Watch for shut-down due to loss of supervised flame signal as pressure is being reduced. Flame signal should be lost before manifold pressure goes below 2.0 in. WC for natural gas and 6.0 in. WC for propane gas.
Leak Test Procedure: Dual-Seat Gas
Valves
Proper leak testing requires three pressure test points in the gas train.
Test point A is upstream of the automatic gas valve. On the first automatic valve, this is a bleedle valve. On the other valves, this is a plugged port. The bleedle valve on the first valve may be used for all the other valves as well.
Test point B is a bleedle valve located between the two automatic gas valve seats.
Test point C is located downstream of both automatic gas valve seats and upstream of the manual valve. On the manual valve, this is a bleedle valve. Identical readings will be found at the plugged port labeled as
Alternate C.
Refer to Fig. 42. The numbers on the diagram refer to the steps below:
These tests are to be conducted with the electrical power to the heater turned off.
48
1. Manually close the downstream leak test valve.
2. Open test point A and connect a manometer to it.
Verify that there is gas pressure and that it is within the proper range (NOTE: must not exceed 14.0
in. WC).
3. Open test point B and connect a rubber tube to it.
Connect the other end of the tube to a manometer and look for a build-up of pressure. Increasing pressure indicates a leaking gas valve.
4. Next, close the upstream manual gas valve and remove the manometer from test point A and from test point B. Connect a rubber tube from test point
A to test point B and open the upstream manual gas valve. Make sure that test points A & B have been opened so as to allow gas to flow. This will bring pressure to the second valve seat.
5. Open test point C and connect a second rubber tube to it. Connect the other end of the tube to a manometer and look for a build-up of pressure. Increasing pressure indicates a leaking gas valve.
6. Remove rubber tube and manometers. Close each test point valve as the tubes are removed.
7. Connect a manometer to each test point (one at a time) and look for a build-up of pressure. If a buildup of pressure is detected, check each test point valve to see if it is tightly closed. If leak persists, replace test point valve(s).
8. After no leakage has been verified at all valve seats and test valves, open downstream leak tests valve and restore electrical power to heater.
This completes leak testing for a single Hi Delta manifold riser. Repeat steps 1-8 for each riser.
Post Start-Up Check
Check off steps as completed:
1. Verify that the heater and heat distribution units or storage tank are filled with water.
2. Confirm that the automatic air vent (if used) was opened two full turns during the venting procedure.
3. Verify that air has been purged from the system.
4. Verify that air has been purged from the gas piping, and that the piping has been checked for leaks.
5. Confirm that the proper start-up procedures were followed.
6. Inspect burner to verify flame.
7. Test safety controls: If heater is equipped with a low water cut-off or additional safety controls, test for operation as outlined by manufacturer. Burner should be operating and should go off when controls are tested. When safety devices are restored, burners should re-ignite after pre-purge time delay.
8. Test limit control: While burner is operating, move indicator on high limit control below actual water temperature. Burner should go off while blower and circulator continue to operate. Raise setting on limit control above water temperature and burner should re-ignite after pre-purge time delay.
9. Test ignition system safety device: a. Turn on manual gas valve. Turn power on.
b. Set thermostat to call for heat.
c. When the heater is in operation, pull cap off of tee in air switch hose. The burner should go off immediately.
d. Wait 5 minutes.
e. Reattach cap on tee. Burner should re-ignite after pre-purge time delay.
Fig. 42: Leak Test
49
10. To restart system, follow lighting instructions in the
Operation section.
11. Check to see that the high limit control is set above the design temperature requirements of the system.
For multiple zones: Check to make sure the flow is adjusted as required in each zone.
12. Check that the heater is cycled with the thermostat. Raise to the highest setting and verify that the heater goes through the normal start-up cycle. Reduce to the lowest setting and verify that the heater goes off.
13. Observe several operating cycles for proper operation.
14. Set the room thermostat or tankstat to desired temperature.
15. Review all instructions shipped with this heater with owner or maintenance person, return to envelope and give to owner or place the instructions inside front panel on heater.
OPERATION
Lighting Instructions
1. Before lighting, make sure you have read all of the safety information in this manual.
2. Set the thermostat to the lowest setting.
3. Turn off all electrical power to the appliance.
4. This appliance is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.
5. Remove upper front panel.
6. Turn on main manual gas valve.
7. Wait 5 minutes to clear out any gas. Then smell for gas, especially near the floor. If you then smell gas, STOP! Follow the steps in the safety information on the front cover of this manual. If you do not smell gas, go to next step.
8. Turn on all electrical power to the appliance.
9. Set thermostat to desired setting. The appliance will operate. The igniter will glow after the prepurge time delay (15 seconds). After igniter reaches temperature (45 seconds) the main valve will open. System will try for ignition three times. If flame is not sensed, lockout will commence.
10. If the appliance will not operate, follow the instructions “To Turn Off Gas To Appliance,” and call your service technician or gas supplier.
11. Replace access panel.
12. If heater fails to start, verify the following: a. There are no loose connections or that the service switch is off.
b. High temperature limit switch is set above water temperature.
c. Thermostat is set above room temperature.
d. Gas is on at the meter and the heater.
e. Incoming gas pressure to the gas valve is
NOT less than 5.0 in. WC for natural gas, 11.0
in. WC for propane gas.
To Turn Off Gas To Appliance
1. Set the thermostat to lowest setting.
2. Turn off all electrical power to the appliance if service is to be performed.
3. Remove upper front panels.
4. Turn off main manual gas valve.
5. Replace access panel.
50
TROUBLESHOOTING
Step 1
Step 2
Step 3
Step 4
Ste p 5
Ste p 6
Ste p 7
Does the power switch provide power to the control panel? NO
Check the switch and/or line voltage
Replace ignition module
YES
YES
Is there a Call For
Heat?
NO
Unit is in standby mode.
Reattach.
Check all safety limit devices and voltage from the transformer to J10 on
CPW board.
Is Disable j um p er intact? ( J1 )
NO NO
YES
NO
Is there 120VAC at J8
Connecto r on the CPW board?
NO
Does F2 on ignition module have 120VAC?
Do the combustion air blowers come on?
YES
YES
Are the blower lights illuminated?
YES
YES
Is 24VAC at PS on ignition module? Is connecting plug secure?
Is 24VAC at present at TH (J3 & J12 on CPW board and orange wire on ignition module)?
NO
YES
NO
YES
Is air pressure switch(s) and
J2 of CPW board (N.O.) p owered?
NO
Check flow switch, all connectors on CPW board and controller.
Is there continuity from the fan relay to fan(s)?
Check the fan relay. Is there
120VAC at K3 relay?
YES
NO
Does air pressure switch(s) have correct pressure?
( 1.4” W.C. )
YES
YES
Re p lace fan
Re p lace fan rela y
Does i g niter p rove? NO
Replace air p ressure switch
NO
YES
Check Amp draw during heat-up for greater than
3.1 Am p s.
YES
Is air switch bouncing?
Correct the air settings or you may have to clean burners, heat exchanger and/or air filter.
Is the flame sensor signal to the ignition module greater than 1 uA DC?
NO
NO Replace HSI
Are the gas valve settings correct?
NO
NO
YES
Readjust to 3.5” W.C. gas.
Is the unit running?
YES
YES
NO
Is the unit runnin g ?
NO YES
Is static and dynamic inlet manifold gas pressure correct?
Is downdraft present?
YES
Replace gas valve
NO
Call our Technical Service Department
1-805-278-5300
The unit is oka y
Clean or replace flame senso r
51
MAINTENANCE
Suggested Minimum
Maintenance Schedule
Regular service by a qualified service agency and maintenance must be performed to ensure maximum operating efficiency.
Maintenance as outlined below may be performed by the owner.
Daily
1. Check that the area where the heater is installed is free from combustible materials, gasoline, and other flammable vapors and liquids.
2. Check for and remove any obstruction to the flow of combustion or ventilation air to heater.
Monthly
1. Check for piping leaks around circulators, mixing valves, relief valves, and other fittings. If found, repair at once. DO NOT use petroleum-based stop-leak compounds.
2. Visually inspect burner flame.
3. Visually inspect venting system for proper function, deterioration or leakage.
4. Check air vents for leakage.
Yearly (Beginning Of Each Heating
Season)
Schedule annual service call by qualified service agency.
1. Visually check top of vent for soot. Call service person to clean. Some sediment at bottom of vent is normal.
2. Visually inspect venting system for proper function, deterioration or leakage.
3. Check that area is free from combustible materials, gasoline, and other flammable vapors and liquids.
4. Check for and remove any obstruction to the flow of combustion or ventilation air to heater.
5. Follow pre-start-up check in the Start-up section.
6. Visually inspect burner flame. It should be light blue. Remove and visually inspect hot surface igniter and sensor for damage, cracking or debris build-up.
7. Check operation of safety devices. Refer to manufacturers’ instructions.
8. Follow oil-lubricating instructions on circulator if required. Over-oiling will damage circulator.
Water-lubricated circulators do not need oiling.
9. To avoid potential of severe burn, DO NOT REST
HANDS ON OR GRASP PIPES. Use a light touch; return piping will heat up quickly.
10. Check blower and blower motor.
11. Check for piping leaks around circulators, relief valves and other fittings. Repair, if found. DO NOT use petroleum-based stop-leak.
12. Clean air filter.
Periodically
1. Check relief valve. Refer to manufacturer’s instructions on valve.
2. Test low water cut-off, if used. Refer to manufacturer’s instructions.
3. Clean screen and air filter in intake.
Preventive Maintenance
Schedule
The following is required procedure in CSD-1 states and good practice for all Hi Delta installations.
Daily
1. Check gauges, monitors and indicators.
2. Check instrument and equipment settings. (See
“Post Start-Up Check” on page 49.)
3. Check burner flame. (Should see light blue flame).
52
Weekly
For low-pressure heaters, test low-water cut-off device. (With at least one stage of the appliance on, depress the low water cut-off test button, appliance should shut-off and ignition fault light should come on.
Depress reset button to reset).
Monthly
1. Check flue, vent, stack, or outlet dampers.
2. Test fan air pressure. (See “Blower Adjustment” on page 47.)
3. Test high and low gas pressure interlocks (if equipped). (See “Safety Inspection” on page 48.)
Semi-Annually
1. Recalibrate all indicating and recording gauges.
2. Check flame failure detection system components.
(See “Pilot Turn-Down Test Procedure,” page 48.)
3. Check firing rate control by checking the manifold pressure. (See “Main Burner Adjustment” on page
47.)
4. Check piping and wiring of all interlocks and shutoff valves.
5. Inspect and clean burners as necessary.
Annually
1. Test flame failure detection system and pilot turndown. (See “Pilot Turn-Down Test Procedure,” page 48.)
2. Test high limit and operating temperature. (See
“Post Start-Up Check,” page 49.)
3. Check flame sensors.
4. Conduct a combustion test at full fire. Carbon dioxide should be 7.5 to 8.5% at full fire for natural gas, and between 9.2 to 9.8% for propane gas;
Carbon monoxide should be < 150 ppm).
5. Check coils for 60 cycle hum or buzz. Check for leaks at all valve fittings using a soapy water solution. Test other operating parts of all safety shut-off and control valves and increase or decrease settings (depending on the type of control) until the safety circuit opens. Reset to original setting after each device is tested.
6. Perform leakage test on gas valves. (See Fig. 42.)
7. Test air switch in accordance with manufacturer’s instructions. (Turn panel switch to the “On” position until blower is proven, then turn the switch to
“Off”.
As Required
1. Recondition or replace low water cut-off device (if equipped).
2. Check drip leg and gas strainers.
3. Perform flame failure detection and pilot turndown tests.
4. Check igniter. (Resistance reading should be 40-
75 ohms at 77°F.)
5. Check flame signal strength. (Flame signal should be greater than 1 microamp).
6. Test safety/safety relief valves in accordance with
ASME Heater and Pressure Vessel Code Sections
VI and VII.
53
APPENDIX
Inside Air Contamination
All heaters experience some condensation during start-up. The condensate from flue gas is acidic.
Combustion air can be contaminated by certain vapors in the air which raise the acidity of the condensate.
Higher acidity levels attack many materials including stainless steel, which is commonly used in high efficiency systems. The heater can be supplied with corrosion-resistant, non-metallic intake air vent material. You may, however, choose to use outside combustion air for one or more of these reasons:
1. Installation is in an area containing contaminants listed below which will induce acidic condensation.
2. You want to reduce infiltration into your building through openings around windows and doors.
3. You are using AL29-4C stainless steel vent pipe, which is more corrosion-resistant than standard metallic vent pipe. In extremely contaminated areas, this may also experience deterioration.
Products causing contaminated combustion air:
• spray cans containing chloro/fluorocarbons
• permanent wave solutions
• chlorinated waxes/cleaners
• chlorine-based swimming pool chemicals
• calcium chloride used for thawing
• sodium chloride used for water softening
• refrigerant leaks
• paint or varnish removers
• hydrochloric acid/muriatic acid
• cements and glues
• antistatic fabric softeners used in clothes dryers
• chloride-type bleaches, detergents, and cleaning solvents found in household laundry rooms
• adhesives used to fasten building products
• similar products
Areas where contaminated combustion air commonly exists:
• dry cleaning/laundry areas
• metal fabrication plants
• beauty shops
• refrigeration repair shops
• photo processing plants
• auto body shops
• plastic manufacturing plants
• furniture refinishing areas and establishments
• new building construction
• remodeling areas
• open pit skimmers
Check for areas and products listed above before installing heater. If found:
• remove products permanently, OR
• install TruSeal direct vent
54
LIMITED PARTS WARRANTY
HI DELTA – TYPES H AND WH
MODELS 302B–902B
SCOPE
Raypak, Inc. (“Raypak”) warrants to the original owner that all parts of this heater which are actually manufactured by Raypak will be free from failure under normal use and service for the specified warranty periods and subject to the conditions set forth in this Warranty. Labor charges and other costs for parts removal or reinstallation, shipping and transportation are not covered by this Warranty but are the owner’s responsibility.
HEAT EXCHANGER WARRANTY
Domestic Hot Water
Five (5) years from date of heater installation. Includes copper heat exchanger with bronze and cast iron waterways.
Ten (10) years from date of heater installation. Includes only cupro-nickel heat exchanger with bronze or cast iron waterways.
Space Heating (Closed Loop System)
Ten (10) years from date of heater installation. Includes both cupro-nickel and copper heat exchanger with bronze or cast iron waterways.
Thermal Shock Warranty
Twenty (20) years from date of heater installation against “Thermal Shock” (excluded, however, if caused by heater operation at large changes exceeding 150°F between the water temperature at intake and heater temperature, or operating at heater temperatures exceeding 230°F).
ANY OTHER PART MANUFACTURED BY RAYPAK
One (1) year warranty from date of heater installation, or eighteen (18) months from date of factory shipment based on Raypak’s records, whichever comes first.
SATISFACTORY PROOF OF INSTALLATION DATE, SUCH AS INSTALLER INVOICE, IS REQUIRED. THIS WARRANTY WILL BE
VOID IF THE HEATER RATING PLATE IS ALTERED OR REMOVED.
ADDITIONAL WARRANTY EXCLUSIONS
This warranty does not cover failures or malfunctions resulting from:
1. Failure to properly install, operate or maintain the heater in accordance with our printed instructions provided;
2. Abuse, alteration, accident, fire, flood and the like;
3. Sediment or lime build-up, freezing, or other conditions causing inadequate water circulation;
4. High velocity flow exceeding heater design rates;
5. Failure of connected systems devices, such as pump or controller;
6. Use of non-factory authorized accessories or other components in conjunction with the heater system;
7. Failing to eliminate air from, or replenish water in, the connected water system;
8. Chemical contamination of combustion air or use of chemical additives to water.
PARTS REPLACEMENT
Under this Warranty, Raypak will furnish a replacement for any failed part. The failed part must first be returned to Raypak if requested, with transportation charges prepaid, and all applicable warranty conditions found satisfied. The replacement part will be warranted for only the unexpired portion of the original warranty. Raypak makes no warranty whatsoever on parts not manufactured by it, but Raypak will apply any such warranty as may be provided to it by the parts manufacturer.
TO MAKE WARRANTY CLAIM
Promptly notify the original installer, supplying the model and serial numbers of the unit, date of installation and description of the problem. The installer must then notify his Raypak distributor for instructions regarding the claim. If either is not available, contact Service
Manager, Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 or call (805) 278-5300. In all cases proper authorization must first be received from Raypak before replacement of any part.
EXCLUSIVE WARRANTY - LIMITATION OF LIABILITY
This is the only warranty given by Raypak. No one is authorized to make any other warranties on Raypak’s behalf. THIS WARRANTY IN
LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. RAYPAK’S SOLE LIABILITY AND THE SOLE REMEDY AGAINST
RAYPAK WITH RESPECT TO DEFECTIVE PARTS SHALL BE AS PROVIDED IN THIS WARRANTY. IT IS AGREED THAT RAYPAK
SHALL HAVE NO LIABILITY, WHETHER UNDER THIS WARRANTY, OR IN CONTRACT, TORT, NEGLIGENCE OR OTHERWISE,
FOR ANY SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGE, INCLUDING DAMAGE FROM WATER LEAKAGE. Some states do not allow limitations on how long an implied warranty lasts, or for the exclusion of incidental or consequential damages. So the above limitation or exclusion may not apply to you.
This Limited Warranty gives you specific legal rights. You may also have other rights which may vary from state to state. We suggest that you complete the information below and retain this certificate in the event warranty service is needed. Reasonable proof of the effective date of the warranty (date of installation) must be presented, otherwise, the effective date will be based on the rate of manufacture plus thirty (30) days.
Original Owner
Mailing Address
City State Zip Code
Daytime Telephone Number
Model Number
Serial Number
Date of Installation
Installation Site
Contractor/Installer
RAYPAK, INC 2151 Eastman Avenue Oxnard, CA 93030-9786 (805) 278-5300 Fax (800) 872-9725 www.raypak.com
55
LIMITED PARTS WARRANTY
HI DELTA – TYPE P
MODELS 302B–902B
SCOPE
Raypak, Inc. (“Raypak”) warrants to the original owner that all parts of this heater which are actually manufactured by Raypak will be free from failure under normal use and service for the specified warranty periods and subject to the conditions set forth in this Wa rranty. Labor charges and other costs for parts removal or reinstallation, shipping and transportation are not covered by this Warranty but a re the owner’s responsibility.
HEAT EXCHANGER WARRANTY
Five (5) years from date of heater installation. Includes cupro-nickel heat exchanger with bronze waterways.
Thermal Shock Warranty
Twenty (20) years from date of heater installation against “Thermal Shock” (excluded, however, if caused by heater operation at large changes exceeding 150°F between the water temperature at intake and heater temperature, or operating at heater temperatures exc eed- ing 230°F).
ANY OTHER PART MANUFACTURED BY RAYPAK
One (1) Year warranty from date of heater installation, or eighteen (18) months from date of factory shipment based on Raypak’s records, whichever comes first.
SATISFACTORY PROOF OF INSTALLATION DATE, SUCH AS INSTALLER INVOICE, IS REQUIRED. THIS WARRANTY WILL BE
VOID IF THE HEATER RATING PLATE IS ALTERED OR REMOVED.
ADDITIONAL WARRANTY EXCLUSIONS
This warranty does not cover failures or malfunctions resulting from:
1. Failure to properly install, operate or maintain the heater in accordance with our printed instructions provided;
2. Abuse, alteration, accident, fire, flood and the like;
3. Sediment or lime build-up, freezing, or other conditions causing inadequate water circulation;
4. High velocity flow exceeding heater design rates;
5. Failure of connected systems devices, such as pump or controller;
6. Use of non-factory authorized accessories or other components in conjunction with the heater system;
7. Chemical contamination of combustion air or use of chemical additives to water.
8. Misuse or neglect, including but not limited to freeze-ups, operating the heater with cabinet door off, having flow restrict ions or obstruc- tions between the heater outlet and pool/spa or not maintaining proper chemical balance (pH level must be between 7.2 and 7.8 a nd total alkalinity between 100 and 150 PPM. Total Dissolved Solids (TDS) must be no greater than 1500 PPM, or 4500 PPM in salt water chlorinated pools).
PARTS REPLACEMENT
Under this Warranty, Raypak will furnish a replacement for any failed part. The failed part must first be returned to Raypak if requested, with transportation charges prepaid, and all applicable warranty conditions found satisfied. The replacement part will be warranted for only the unexpired portion of the original warranty. Raypak makes no warranty whatsoever on parts not manufactured by it, but Raypak will apply any such warranty as may be provided to it by the parts manufacturer.
TO MAKE WARRANTY CLAIM
Promptly notify the original installer, supplying the model and serial numbers of the unit, date of installation and description of the problem. The installer must then notify his Raypak distributor for instructions regarding the claim. If either is not available, contact Service
Manager, Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 or call (805) 278-5300. In all cases proper authorization must first be received from Raypak before replacement of any part.
EXCLUSIVE WARRANTY - LIMITATION OF LIABILITY
This is the only warranty given by Raypak. No one is authorized to make any other warranties on Raypak’s behalf. THIS WARRANTY IN
LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MER-
CHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. RAYPAK’S SOLE LIABILITY AND THE SOLE REMEDY AGAINST
RAYPAK WITH RESPECT TO DEFECTIVE PARTS SHALL BE AS PROVIDED IN THIS WARRANTY. IT IS AGREED THAT RAYPAK
SHALL HAVE NO LIABILITY, WHETHER UNDER THIS WARRANTY, OR IN CONTRACT, TORT, NEGLIGENCE OR OTHERWISE,
FOR ANY SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGE, INCLUDING DAMAGE FROM WATER LEAKAGE. Some states do not allow limitations on how long an implied warranty lasts, or for the exclusion of incidental or consequential damages. So the above limitation or exclusion may not apply to you.
This Limited Warranty gives you specific legal rights. You may also have other rights which may vary from state to state. We suggest that you complete the information below and retain this certificate in the event warranty service is needed. Reasonable proof of the effective date of the warranty (date of installation) must be presented, otherwise, the effective date will be based on the rate of manufacture plus thirty (30) days.
Original Owner
Mailing Address
City State Zip Code
Daytime Telephone Number
Model Number
Serial Number
Date of Installation
Installation Site
Contractor/Installer
RAYPAK, INC 2151 Eastman Avenue Oxnard, CA 93030-9786 (805) 278-5300 Fax (800) 872-9725 www.raypak.com
56
START-UP CHECKLIST FOR FAN-ASSISTED
RAYPAK PRODUCTS
This start-up checklist is to be completely filled out by the service technician starting up the Raypak Boiler or Heater for the first time. All information may be used for warranty purposes and to ensure that the installation is correct.
Additionally this form will be used to record all equipment operation functions and required settings.
GAS SUPPLY DATA CLEARANCES
Regulator Model & Size
Gas Line Size (in room)
Length of Gas Line
Low Gas Pressure Setting
High Gas Pressure Setting
Gas Shut-Off Valve Type
( Ball, Lube cock)
Sediment Trap
Port
VENTING
_________ / ______CFH
________________In. NPT
________________Eq Ft
________________In. WC
________________In. WC
________________
________________Y/N
_______Std______Full
VISUAL INSPECTION OF COMPONENTS
Verify inspection was done and condition of components are in good working order with a “yes”
Wiring Harness
Burner/s (flame)
Refractory (visual)
Remote flame sense
Covers in place for outdoor
_________________ Y/N
_________________ Y/N
_________________ Y/N
_________________ Y/N
_________________ Y/N
Front Clearance
Right Side Clearance
Left Side Clearance
Rear Clearance
Overhead Clearance
ELECTRICAL
Voltage Supply (VAC)
Voltage -24 VAC
Voltage Com to Ground
Hot Surface Igniter
Auto High Limit Setting
Manual Reset High Limit Setting
Operating Control Setting
Sketch plumbing on reverse side
WATER SUPPLY
Vent Size: _____________ Stack Height:_______
Category: _________
Vent Material:
Vent Termination Type:
Combustion Air Openings:
Ventilation air
__________________
Low __________ in2
High __________ in2
Flow Rate in GPM or Delta T
Measure flow rate at full fire
Pump Economaster setting
Low Water Cutoff sketch vent on reverse side *** Number of Tanks and Size
__________________ Plumbing Size
Pump Size: _________ (boiler)
Impeller trim____________
Louvers __________________
_______________In.
_______________In.
_______________In.
_______________In.
_______________In.
No Load______ Load_____
_______________VAC
_______________VAC
_______________Ohms
_______________deg F
_______________deg F
_______________deg F
_______________If Avail
_______________Minutes
_______________Test
Qty____ _______Gallons
_______________
Pump HP: ______
Pump Model___________
Screens________________
EMISSIONS SETTINGS AND TEST INFORMATION
(AT FULL FIRE)
Nominal Factory Recommended Settings
Blower Pressure Setting
Supply Gas Pressure
Verify stable pressure static &
Pilot Gas Pressure
Manifold Gas Pressure
_________________In. WC
_________________In. WC
See manual or card tag
See manual or card tag dynamic condition
_________________In. WC See manual or card tag
_________________In. WC See manual or card tag
The following measurements must be obtained with a Combustion Analyzer.
NOX
Free Oxygen
CO
CO2
_________________PPM
_________________%
_________________PPM
_________________%
Model Number: ______________________________
*** Note: draw venting with details, such as extractors, barometric dampers, blast dampers or draft inducers
Less than 20 PPM (If required by Certifying Agency)
See manual
Less than 150 PPM
See manual
Serial Number: _______________________________
Site Altitude Above Sea Level __________________Ft.
Job Name _______________________________________________________________________________________
Address _________________________________________________________________________________________
Physical Location of Boiler: Indoors______; Outdoors______; Ground Level______; Roof______; Below Grade______
Mechanical Contractor / Installer _______________________________________________________________________
Date and Time of Start-up _____________Print Name and Signature of Start-up Technician_________________________
Information must be faxed to: (805) 278-5496 in order to ensure warranty consideration Attn: Service Manager
57
Important Instructions for the Commonwealth of Massachusetts
The Commonwealth of Massachusetts requires compliance with regulation 248 CMR 4.00 and 5.00 for installation of through – the – wall vented gas appliances as follows:
(b) EXEMPTIONS: The following equipment is exempt from
248 CMR 5.08(2)(a)1 through 4:
1. The equipment listed in Chapter 10 entitled "Equipment
Not Required To Be Vented" in the most current edition of
NFPA 54 as adopted by the Board; and
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.
1. INSTALLATION OF CARBON MONOXIDE DETECTORS.
At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors
(c) MANUFACTURER REQUIREMENTS - GAS EQUIP-
MENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system.
a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.
(d) MANUFACTURER REQUIREMENTS - GAS EQUIP-
MENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies "special venting systems", the following requirements shall be satisfied by the manufacturer: b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
1. The referenced "special venting system" instructions shall be included with the appliance or equipment installation instructions; and
2. The "special venting systems" shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be
ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL
OBSTRUCTIONS".
(e) A copy of all installation instructions for all Product
Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
GAS PRESSURE SUPERVISION
The Commonwealth of Massachusetts requires listed high and low gas pressure switches (manual reset) for any model with a maximum firing input greater than 1,000,000 Btu/Hr in accordance with 248 CMR 7.04(11)(d). 4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR
5.08(2)(a)1 through 4.
A gas pressure regulator (field supplied) is required in the gas train ahead of the heater, for heaters having input rates greater than 1,000,000 Btu/Hr, in accordance with 248 CMR
7.04 Figure 3B requirements.
58
59
www.raypak.com
Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 Fax (805) 278-5468
Litho in U.S.A.
60
advertisement
Related manuals
advertisement
Table of contents
- 4 WARNINGS
- 5 BEFORE INSTALLATION
- 5 Product Receipt
- 5 Model Identification
- 5 Ratings and Certifications
- 6 Component Locations
- 7 General Information
- 8 GENERAL SAFETY
- 8 Time/Temperature Relationships in Scalds
- 9 INSTALLATION
- 9 Installation Codes
- 9 Equipment Base
- 9 Stacking
- 11 Clearances
- 12 Combustion and Ventilation Air
- 13 Conventional Combustion Air Supply
- 14 Water Piping
- 16 Hydronic Heating
- 20 Gas Supply
- 22 Electrical Power Connections
- 23 Field Wiring Connection
- 25 Venting
- 27 Changing the Flue Outlet
- 28 Venting Installation Tips
- 28 Venting Configurations
- 33 Controls
- 33 Outdoor Installation
- 34 Heater Sequence of Operations
- 43 87%-Efficiency Boilers –
- 58 APPENDIX
- 58 Inside Air Contamination