NLC‐100 User Manual
Now the NLC shows you the configuration for "Program 1". The first time you do this, most settings are blank, and the display will look like this:
Program / Name selector
Water days Total run time Active/Passive
Number of stations in program
Number of run times
First start time Water budget
The following sections walk you through everything you need to know in order to customize the 10 programs.
Configuring the stations
Each of the 10 programs can activate up to 100 stations in turn. The stations are run in turn according to their IDs, starting from ST01, ST02 etc
1
. To configure a program, simply set the run times of each station to the number of minutes you wish it to run.
Here's an example of an irrigation program:
1.
1
If you want the stations to run in a different order than this, you must assign sequence numbers to each station and the sequence number will determine the order instead.
20
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 9 The Controller
- 9 Irrigation Features
- 11 The Display
- 12 A standard display when idling in Auto mode
- 13 Button and Controls
- 13 The Seven Main Modes
- 14 OFF (Red)
- 14 MANUAL (Brown)
- 14 AUTO (Grey)
- 15 PROGRAM (Light blue)
- 15 SETUP (Dark blue)
- 15 ADVANCED (Black)
- 15 SOLENOID AMPS (Light green)
- 17 Basic Controller Configuration
- 17 Setting the date and time
- 18 Configuring Irrigation Programs
- 20 Configuring the stations
- 21 Configuring a station in a program
- 25 Setting Water Days
- 27 Selecting the water days
- 28 Setting Start Times
- 31 Adjusting Water Usage (Water Budget or ET)
- 35 Adjusting the ET (Water budget)
- 37 Activating/deactivating a Program
- 39 Adding a Booster Pump
- 41 Adding a Master Valve (Supply Pump)
- 41 Testing a Program
- 43 Running NLC in Auto Mode
- 45 Pausing a Running Program
- 46 Resuming a paused program
- 47 Running Extra Stations in Auto Mode
- 47 Running a station manually
- 49 Running Extra Programs in Auto Mode
- 51 Running NLC in Manual Mode
- 53 Alarms
- 53 Becoming aware of alarms on-site
- 55 Receiving alarm notifications on email
- 59 Viewing the alarm list
- 60 Alarms in the NLC
- 64 Monitor Data
- 67 Rain Shutdown
- 69 Intelliset
- 70 FloGuard
- 70 FloStack
- 70 Feature Manager
- 73 Example A.1
- 75 Example A.2.
- 76 Example A.3.
- 77 Configuring the Extended Rain Shutdown Feature
- 81 Examples using Different Parameters
- 81 Example A.4.
- 82 Example A.5
- 83 Example A.6
- 84 Example A.7
- 87 How ET Works with the NLC
- 88 Example B.1. ET calculation with rain shortage
- 88 Example B.2. ET calculation with excess rain
- 90 Example B.3. Calculating ET run time
- 91 Example B.4. How minimum ET value works
- 92 Examples
- 92 Example B.5. All parameters in use
- 93 Numbers
- 94 Table Explanation
- 95 Example B.6. No Min ET
- 96 Numbers
- 96 Table Explanation
- 97 Example B.7. No Max ET
- 98 Numbers
- 99 Explanation
- 99 Example B.8. No soil holding
- 100 Numbers
- 102 Example B.9. Max. hourly rain
- 102 Options for Getting ET Data
- 103 Using Historical ET Data
- 104 Configuring for Historical ET Data
- 109 Alarm Types
- 110 Setting Alarm Thresholds
- 110 Setting the alarm reaction delay
- 112 Setting the high flow threshold
- 114 Setting the Flow Deviation
- 116 Setting the unscheduled flow threshold
- 118 Setting the master pump failure threshold
- 120 Setting Alarm Actions
- 120 Configuring alarm action for MPF
- 121 Setting Expected Station Flow
- 121 Entering expected flow for a station
- 123 Running the "learn flow" feature
- 124 Viewing the Current Flow
- 126 Inspecting and Toggling Station Status
- 127 Managing station status
- 129 The Role of Moisture Sensors
- 130 Calculate
- 130 Communicate
- 131 Validate
- 132 How irrigation is adjusted by moisture sensors
- 135 How moisture sensor input affects ET
- 135 Abbreviations
- 136 VSM ranges for the different soil types
- 137 Example D.1. Dry start condition (stress point)
- 140 Example D.2. Optimal start condition
- 143 Example D.3.Wet start condition (field capacity)
- 151 Example E.1. Putting a new station in the middle of the run chain
- 152 Changing the station run sequence
- 153 Resetting station run sequences
- 155 Changing Station Output Mapping
- 155 Changing Station Output Mapping
- 156 Resetting Station Output Mapping
- 159 Configuring for Flow Management
- 159 How the Flow Management Works
- 160 Setting the System Flow Capacity
- 163 Example G.1. Skewed days with custom irrigation periods
- 165 Configuring the Irrigation Period
- 167 How is This Different from Regular Programs?
- 168 When the NLC Alters Your Program
- 169 How to Configure for Misting or Cycle & Soak
- 169 Full misting program example
- 170 Enabling Misting
- 172 Setting the Start Times With Count and End Time
- 175 Things to Keep in Mind
- 177 Glossary