NSE8 NSE12 Installation manual


Add to my manuals
68 Pages

advertisement

NSE8 NSE12 Installation manual | Manualzz

Commission the system

Turning on the system for the fi rst time

Before starting the system for the first time, check the following;

Check radar is physically clear to rotate

Leave a HD pulse radar in standby for 30 minutes before transmitting for the first time

Check all personnel are clear of radar beam (HD Radar)

Check all wiring is correctly connected. Apply power to the breaker

To turn ON the display, press and release the PWR key.

To place display in to Standby, press PWR key and select stand by.

To turn OFF the display, press and hold PWR key for three seconds.

If you turn the unit ON when no external equipment is connected you will be asked to run in simulator mode.

Operating the menu system

In this manual you will see few direct text references to keys, menus and menu entries, and few step-by-step descriptions. By using graphics we will guide you to the key and the required menu selections.

In the illustrations throughout the commissioning section the following symbols are used:

Single short press on illustrated key

MENU WIN

3 s

MENU WIN

Press and hold on illustrated key with time indication x2

MENU WIN

Press twice on illustrated key

Rotate rotary knob

Single short press on rotary knob

PLOT

MARK

GO TO

VESSEL

PLOT

MARK

GO TO

VESSEL

References to keys on the operator panel are written in boldface, e.g. WIN key.

For further information on the operating the system refer to the Operation Manual

Commission the system | 39

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement

Table of contents

Languages