Midmark 6271 - 6276 (Wall Mounted Units) Installation manual

Add to My manuals
3 Pages

advertisement

Midmark 6271 - 6276 (Wall Mounted Units) Installation manual | Manualzz
INS-6275-001 (Rev. F)
For OSHPD Regulated Installations, please go to
www.midmark.com to download the appropriate
OSHPD Approval and Installation documents.
6275-001 Installation Instructions
Attention!
6275-001 Installation Instructions
INS-6275-001 (Rev. F)
Installation Hardware
Tools required:
Parts Included:
Electric Drill with driver extension
Phillips head screwdriver/bit
1/2” Drill Bit
Punch
(1) Monitor Track Assembly
(6) 1/4-20 Hilti Snaptoggle Heavy-Duty Toggle Bolts (2 extra)
(4) 1/4-20 x 2” Long Phillips Drive Pan Head Machine Screws
(4) M4-0.7 x 10mm Long Phillips Drive Flat Head Machine Screws
(4) M4-0.7 x 16mm Long Phillips Drive Flat Head Machine Screws
Drilling Hole Preparation:
Toggler Bolt Installation:
1
a. Choose desired height position: sitting or
standing for Monitor Track Assembly.
2
a.
(1/2” Hole)
b. Compare level to top of monitor track to
ensure mounting template is perfectly plumb.
c. Using punch to locate holes in wall.
Install Toggler Bolts
Drill 1/2” size hole.
Hold metal channel
flat alongside plastic
straps and slide
channel through
the hole. Minimum
clearance beind wall:
only 1 7/8”
b.
Hold ends of straps
together between
thumb & forefinger
and pull toward you
until channel rests
behind wall. Rachet
cap along straps
with other hand until
flange of cap is
flush with wall.
c.
Place thumb between
straps at wall. Push
thumb side to side,
snapping off straps
level with flange
of cap.
Mounting Wall-Mount to Wall:
3
Align the four monitor track mounting holes
with holes in wall. Secure with (4) 1/4-20 x 2”
Long Phillips Drive Pan Head Machine Screws.
X”
Floor
Caution
Properinstallationoftoggleboltsrequired
toprovidesecurewallmounting.Minimum
drywallthicknesstobe½”.
Midmark Corporation | 60 Vista Drive | PO Box 286 | Versailles, Ohio 45380-0286 | USA | midmark.com
6275-001 Installation Instructions
INS-6275-001 (Rev. F)
Upper Cable Management:
Attach Monitor to Bracket:
4
a. Align VESA mounting hole pattern on
monitor with mounting pattern on
Monitor Bracket (See FIG. A).
5
b. Attach Monitor Bracket to Monitor.
Secure with either (4) M4-0.7 x 10mm or
(4) M4-0.7 x 16mm Long Phillips Drive
Flat Head Machine Screws (See FIG.B).
Upper Cable Management: For CPU’s, monitors:
For Monitor cables: Remove Cable Management
Cover (See FIG. A). Place in channel and zip-tie cables
at the top by monitor (See FIG. B).
Continue to run cables behind keyboard
pivot housing (See FIG. C).
Reinstall cable mangement cover when finished
(See FIG. A).
c. Attach monitor with Monitor Bracket to
Monitor Security Bracket Assembly.
Note: Monitor Bracket has a top slot which
the Monitor Security Bracket Assembly fits
into (See FIG. C).
For Upper CPU’s: Cables can be run arround the
cable management insert (See FIG. D). Additional
cables running out of upper cpu holder, can be
run down behind Height Adjustable Monitor
Bracket (See FIG. E).
d. Secure brackets with two (2) #10-24 x 1/2”
Long Phillips Drive Pan Head Machine
Screws (See FIG D).
FIG. B
FIG. C
Monitor Security
Bracket Assembly
FIG. A
Monitor
Bracket
FIG. C
FIG. A
FIG. B
FIG. D
FIG. D
FIG. E
Midmark Corporation | 60 Vista Drive | PO Box 286 | Versailles, Ohio 45380-0286 | USA | midmark.com

advertisement

Related manuals

advertisement