EWB 710 • Installation Guide
Overview
The Extron EWB 710 wall box is an
optional accessory for mounting
the TLP 710MV touchpanel onto
the surface of various wall types
(such as drywall, wood, or masonry)
where it is not possible to embed
the touchpanel in the wall. The
EWB 710 has knockouts that accept
raceways or conduit for running
cables over the surface of the wall to
the touchpanel.
Planning
The following items are required for
installation, but are not supplied:
Extron
EWB 710
zz Extron TLP 710MV
Wall Box
Extron
TLP 710MV
zz Four mounting screws (Extron
recommends a minimum length
of 1 inch)
Extron
TLP 710MV
Faceplate
zz Power drill
zz Drill bit that is appropriate for
wall type
zz Conduit or surface raceway to carry cables
zz Screwdriver
zz Level
Mounting Suggestions for Different Wall Types
Choose a type of screw or bolt that is appropriate for the wall on which you are
mounting the EWB 710 (see table below). The mounting holes in the back of the EWB 710
accommodate screws up to ¼ inch in diameter.
Wall Type
Fasteners
Min. Size
Fastener
Quantity
Drill Bit
Size
Notes
Drywall
Toggle bolts
3/16 inch
4
1/2 inch
Min. 3/8 inch
wall thickness
Wood
(solid wall
or stud)
Wood screws
#10 screw
with a
washer
4
1/16 inch
wood bit
Min. 3/8 inch
wall thickness
Masonry
Masonry
screws
1/4 inch
4
3/16 inch
masonry bit
Do not mount to
masonry joints
EWB 710 • Installation Guide (Continued)
Mounting the EWB 710
1. Decide where to mount the EWB 710. If
mounting to standard wood wall studs, locate the
center of the studs.
2. Place the EWB 710 against the wall at the
mounting location. Use a level to ensure the box
is horizontal and mark the position of the four
holes.
4
3. If required, drill four holes into the wall.
4. Insert four screws (see the table on the previous
page) and attach the EWB 710 to the wall.
Mounting
Screws (4)
5. Remove the required knockout and run conduit
or raceway to the EWB 710.
6. Run cables through the conduit and the EWB 710 knockout.
Mounting the TLP 710MV
1. Remove the faceplate from
the Touchpanel.
2. Attach the cables to the
back of the TLP 710MV
(see the TLP 710MV and
TLP 710TV User Guide).
3. Secure the TLP 710MV to
the EWB 710 using the four
6‑32 screws provided.
2
5
4. Configure the Touchpanel
as described in the
TLP 710MV and TLP 710TV
User Guide.
5. Snap the faceplate into
position (four clips on each
side).
Extron
EWB 710
Wall Box
3
Extron
TLP 710MV
Extron
TLP 710MV
Faceplate
Extron USA - West
Headquarters
Extron USA - East
Extron Europe
Extron Asia
Extron Japan
+800.633.9876
Inside USA and
Canada Only
+800.633.9876
Inside USA and
Canada Only
+800.3987.6673
Inside Europe Only
+800.7339.8766
Inside Asia Only
+81.3.3511.7655
+400.883.1568
+81.3.3511.7656 FAX Inside China Only
+1.714.491.1500
+1.919.863.1794
+31.33.453.4040
+65.6383.4400
+1.714.491.1517 FAX +1.919.863.1797 FAX +31.33.453.4050 FAX +65.6383.4664 FAX
Extron China
Extron Middle East
+971.4.2991800
+971.4.2991880 FAX
+86.21.3760.1568
+86.21.3760.1566 FAX
© 2011 Extron Electronics All rights reserved. www.extron.com
68-2151-01
Rev. A 09 11

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement