EnDuraLast EDL-BOIGNS Electronic Ignition System Installation Guide

The EnDuraLast EDL-BOIGNS Electronic Ignition System is a crank-mounted optical trigger designed specifically for use with BOSCH 3-phase alternators. It is a replacement for the stock points ignition system on BMW motorcycles from 1970 through 1995. The system includes a sensor and a module, either the EDL-310 or EDL-312, and is compatible with all known ignition modifications and aftermarket parts for these models. The new EnDuraLast Electronic ignition is superior to older units offering more robust packaging, better ignition curves, and crank-driven timing for greater accuracy.

PDF
Document
EnDuraLast Electronic Ignition System Installation Guide | Manualzz

Advertisement

Advertisement

/

Advertisement

Key features

  • Crank-mounted optical trigger

  • Designed for BOSCH 3-phase alternators

  • Compatible with all known ignition modifications and aftermarket parts

  • Superior to older units

  • More robust packaging

  • Better ignition curves

  • Crank-driven timing for greater accuracy

  • More reliable than standard points ignition

Frequently asked questions

It is a replacement for the stock points ignition system on BMW motorcycles from 1970 through 1995. The system includes a sensor and a module, either the EDL-310 or EDL-312, and is compatible with all known ignition modifications and aftermarket parts for these models. It is superior to older units offering more robust packaging, better ignition curves, and crank-driven timing for greater accuracy.

The EnDuraLast EDL-BOIGNS Electronic Ignition System is compatible with BMW motorcycles from 1970 through 1995.

The EnDuraLast EDL-BOIGNS Electronic Ignition System is more reliable, has better ignition curves, and is crank-driven for greater accuracy. The system is also compatible with all known ignition modifications and aftermarket parts.

The installation instructions are included in the document and should be followed carefully. It is important to disconnect the battery ground before starting any work on the electrical system.

Preparing document for printing…
0%