Fujitsu 16FX MB2198-01 emulator system Installation Guide

Below you will find brief information for emulator system 16FX MB2198-01. This guide will help you to quickly start setting up the MB2198-01 Emulation Hardware for Fujitsu 16FX Family MCUs and its usage with the Softune Workbench V30L33R08 or higher. The basic devices which are required for setting up the 16FX emulation system for 416-pin MB96V300 Evaluation MCU: Emulator Main Unit MB2198-01, Adapter Board MB2198-500 BGA416, Probe Cable (here: MB2198-501 QPF100 NQPACK) (for MB96(F)34x), Evaluation chip (here: MB96V300), Target system (here: FLASH-CAN-100P-340 Starter Kit Board), RS232-, USB- or LAN-connection cable, Two Power supplies (12V DC).

PDF
Document
Fujitsu 16FX MB2198-01 Emulator System Installation Guide | Manualzz

Advertisement

Advertisement

/

Advertisement

Key features

  • Supports 16FX Family MCUs

  • Uses Softune Workbench V30L33R08 or higher

  • Includes Adapter Board MB2198-500 BGA416

  • Includes Probe Cable MB2198-501 QPF100 NQPACK

  • Includes Evaluation chip MB96V300

  • Supports FLASH-CAN-100P-340 Starter Kit Board

  • Requires Two Power supplies (12V DC)

  • Supports RS232-, USB- or LAN-connection cable

  • Includes Emulator Main Unit MB2198-01

Frequently asked questions

Emulator Main Unit MB2198-01, Adapter Board MB2198-500 BGA416, Probe Cable (here: MB2198-501 QPF100 NQPACK) (for MB96(F)34x), Evaluation chip (here: MB96V300), Target system (here: FLASH-CAN-100P-340 Starter Kit Board), RS232-, USB- or LAN-connection cable, Two Power supplies (12V DC).

The Emulator has three different communication interfaces: USB, RS232, LAN. Choose one of these communication interfaces.

Contrariwise to the power-on connection, the power on the target system has to be switched off first during power-down. The emulator has to be switched off at last.

You need to install the Softune Workbench Software environment from the CD-ROM.

Open the Softune Workbench. Then choose the Menu File/Open. Then choose the IO-Port-Workspace-File IOPort.wsp in the Open File Dialog Window. Then the Softune Workbench window will look like this: ... Then choose the Menu Project/Build or press Ctrl+F8. Now the complete project will be compiled and all object codes will be created. ... After a short moment, the Softune Workbench will go in its debugger state. ... Now choose the menu Debug/Run/Go or press F5 or click the button. ... To end debugging, choose Debug/End debug in the Softune Menu Bar. The emulator system will then halt.

Preparing document for printing…
0%