Juniper M5 Installation, Quick Start
Juniper M5 is a series of high-performance routers that offer a wide range of features and capabilities. These routers are designed for use in enterprise networks, data centers, and service provider networks. Some of the key features of the Juniper M5 routers include:
- High performance: The Juniper M5 routers are designed to deliver high performance, with throughput of up to 10 Gbps. This makes them ideal for use in demanding applications such as video streaming, cloud computing, and data center networking.
- Scalability: The Juniper M5 routers are scalable, allowing you to add additional capacity as your network grows. This makes them a good choice for networks that are expected to experience significant growth in the future.
Mainos
Mainos
Installation uick Start
M5 and M10 Internet Routers
Per form Initial Software Configuration
6
1. Turn on the power to the management device connected to the router.
2. Press the power switches on all power supplies to the ON position.
3. On the management device, monitor the star tup process to verify that the router boots properly.
4. Configure the router as shown in the following table. Text you enter literally is shown in bold, and variables for which you substitute specific values are shown in
italics.
CLI Step
1.
Log in as “root” user. There is no password.
2.
Star t the CLI.
3.
Enter configuration mode.
4.
Configure the name of the router. If the name includes spaces, enclose the entire name in quotation marks (“ ”).
5.
Configure the router’s domain name.
6.
Configure the IP address and prefix length for the router’s Ethernet management inter face.
7.
Configure the IP address of a backup router, which is used only while the routing protocol process is not running.
8.
Configure the IP address of a DNS ser ver.
9.
Set the root authentication password by entering either a clear-text password, an encr ypted password, or an ssh public key string
(DSA or RSA).
10. Optionally, display the configuration statements to verify that the configuration is correct.
11. Commit the configuration. This activates the configuration on the router.
12. Configure additional properties by adding the necessary configuration statements, then commit the changes to activate them on the router.
13. When you have finished configuring the router, exit configuration mode.
root# cli root@> cli > configure
[edit] root@#
[edit] root@# set system host-name host-name
[edit] root@# set system domain-name domain-name
[edit] root@# set interfaces fxp0 unit 0 family inet address address/prefix-length
[edit] root@# set system backup-router address
[edit] root@# set system name-server address
[edit] root@# set system root-authentication plain-text-password
New password: password
Retype new password: password
[edit] root@# set system root-authentication encrypted-password
“encr ypted-password”
[edit] root@# set system root-authentication ssh-dsa “public-key”
[edit] root@# set system root-authentication ssh-rsa “public-key”
[edit] root@# show system {
host-name host-name;
domain-name domain-name;
backup-router address;
name-server { address;
} interfaces {
fxp0 {
unit 0 {
family inet {
address address;
}
}
}
}
[edit] root@# commit
[edit] root@host-name# commit
[edit] root@host-name# exit
Safety Warnings
This is a summar y of safety warnings. For a complete list of warnings for this router, including translations, see the
M5 and M10 Internet Routers Hardware Guide at www.juniper.net/techpubs/hardware/.
■ Only trained and qualified personnel should install or replace the router.
■ Perform only the procedures illustrated on this poster or described in the M5 and M10 Internet Routers Hardware
Installation Guide. Other ser vices should be per formed by authorized ser vice personnel only.
■ Read the installation instructions before you connect the router to a power source.
■ Before installing the router, read the guidelines in the “Prepare the Site” section of the M5 and M10 Internet
Routers Hardware Installation Guide to make sure that the site meets power, environmental, and clearance requirements for the router.
■ When installing the router, do not use a ramp inclined at more than 10 degrees.
■ Manually installing the router requires two people to lift and a third person to secure the mounting screws. Before lifting the chassis, remove components and attach the installation lifting handle as described in the M5 and M10
Internet Routers Hardware Installation Guide. To prevent injur y, keep your back straight and lift with your legs, not your back. Do not attempt to lift the chassis by the handles on the power supplies.
■ When mounting the router in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack.
■ If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the router in the rack.
■ When installing the router, the ground connection must always be made first and disconnected last.
■ Be sure to halt the system using the CLI before powering down the router. Failure to do so might cause unpredictable effects on the system software.
■ When removing or installing an electrical component always place it component-side up on a flat antistatic sur face, or in an electrostatic bag.
■ Use copper conductors only.
■ Wire the DC power supply using the appropriate lugs. When connecting power, the proper wiring sequence is ground to ground, +RTN to +RTN, then –48 V to –48 V. When disconnecting power, the proper wiring sequence is –48 V to –48 V, +RTN to +RTN, then ground to ground. Note that the ground wire should always be connected first and disconnected last.
■ Do not work on the system or connect or disconnect cables during electrical storms.
■ Before working on equipment that is connected to power lines, remove jewelry, including rings, necklaces, and watches. Metal objects heat up when connected to power and ground and can cause serious burns or become welded to the terminals.
■ Failure to observe these safety warnings could result in serious physical injury.
For suppor t issues, contact the Juniper Technical Assistance Center (JTAC) at 1-888-314-JTAC (within the United States) or
408-745-9500 (from outside the United States). For other contact information, refer to www.juniper.net/contactus.html
.
Juniper Networks is registered in the U.S. Patent and Trademark Office and in other countries as a trademark of Juniper Networks, Inc. ERX, ESP, E-series, Internet Processor, J-Protect, JUNOS, JUNOScript, JUNOSe, M5, M7i, M10, M10i,
M20, M40, M40e, M160, M-series, NMC-RX, SDX, T320, T640, and T-series are trademarks of Juniper Networks, Inc. All other trademarks, ser vicemarks, registered trademarks, or registered ser vice marks are the proper ty of their respective owners. All specifications are subject to change without notice.
Copyright © 2003, Juniper Networks, Inc. All rights reser ved. Printed in USA.
Par t Number 530–010128–01 30 August 2003
Installation uick Start
M5 and M10 Internet Routers
OC-192c/STM-64 SONET/SDH
OC-48c/STM-16 SONET/SDH
OC-12c/STM-4 SONET/SDH
OC-12c/STM-4 SONET/SDH
OC-48c/STM-16 SONET/SDH
OC-12c/STM-4 SONET/SDH
OC-48c/STM-16 SONET/SDH
OC-12c/STM-4 SONET/SDH
High-speed
Access
Channelized OC-12 to DS-3
Fast
Ethernet
Gigabit Ether net
Gigabit Ether net
Fast
Ethernet
Hosting Sites
SONET ADM
DS-3
DS-3 DS-3
CPEs
DESCRIPTION Project 62 (Draft)
DOC REVISION
1 0
PAGE
1 of 1
DRAWN BY
Professional Services
Peers
OC-12/STM-4 A
OC-3/STM-1 A
OC-12/STM-4 SONET/SDH
TM
TM
ATM
Tools You Need to Install the Router
■
Phillips screwdrivers, numbers 1 and 2
■
Electrostatic discharge wrist strap
■
Open-end or socket wrench, 9/16-in.
(if you are front-mounting the router)
■
Wire cutters
■
Pliers
■
Antistatic mat
Rack Space Requirements
1
■
You can install the router into a center-mount, front-mount, or telco (4-post) rack or cabinet.
■
The holes in the mounting ears are spaced at 2 U (3.5 in./8.89 cm).
■
The rack must be large enough to hold the router and strong enough to suppor t its weight (up to 65 lb/29.5 kg).
Unpack the Router
2
1. Move the shipping car ton as close to the installation site as possible.
2. Position the box with the arrows facing up.
3. Open the top flaps of the shipping car ton.
4. Remove the accessor y box.
5. Verify that you have received all par ts on the packing list.
6. Pull out the packing material holding the router in place.
7. Save the shipping car ton and packing materials in case you need to move or ship the router.
M5 and M10 Internet Routers
Complete documentation available at www.juniper.net/techpubs/
Install the Router into the Rack
3
Lifting the chassis and mounting it into the rack requires two people to lift and a third person to secure the mounting screws. The chassis weighs up to 65 lbs/29.5 kg.
1. Make sure the rack is properly secured to the building in its permanent location.
2. Determine the type of rack (center-mount, front-mount, or four-post) into which the router will be installed.
3. If you are mounting the router into a front-mount or four-post rack:
■ Move the rack-mounting ears from the center to the front of the chassis, securing them to the chassis with the screws.
■ Install the mounting shelf as specified in Step 3b. (for front-mount racks) or Step 3c.
(for four-post cabinets) below.
4. One person at each side of the chassis grasps the front and side of the chassis under the card cage. Lift the chassis and position it in the rack.
5. Star ting at the bottom of the rack, align one of the mounting holes in the rack with the bottom mounting hole in the chassis rack-mounting ear.
6. Level the chassis so that the same mounting hole on the other rack-mounting ear is aligned with a hole on the opposite post of the rack.
7. From the front of the rack, install a mounting screw into each of the two aligned holes.
8. Moving up the rack-mounting ears, install screws in each mounting hole on the ear until you reach the top.
3a. Install the router into a center-mount rack:
Connect External Devices and PIC Cables
4
Connect to a network for out-of-band management:
1. Plug one end of the provided Ethernet cable into the MGMT por t on the craft inter face.
2. Plug the other end into the networking device.
Connect a management console:
1. Turn off the power to the management console.
2. Plug the provided
RS-232 (EIA-232) serial cable into the
CONSOLE por t on the craft inter face.
3. Tighten the screws on the connector.
Connect the PIC cables:
Do not look directly into the cable connector por ts on a PIC or into the ends of fiber-optic cables.
Fiber-optic cables emit laser light that can damage your eyes.
1. Locate the appropriate cable to be connected to each PIC.
2. Inser t the cable connector into the cable connector por t on the PIC.
3. Arrange the cables in the cable management system to protect them from dislodging or bending past their recommended bend radius.
3b. Install the router into a front-mount rack:
■
Before installing the router, install the mounting shelf onto the rack, attaching it to the rear of the front-mount post. The router rests on the shelf, which helps suppor t its weight.
■
Be sure to attach the shelf to the rear of the post, not the front. The shelf might be wider than the space between the posts of the rack.
Connect Ground and Power Cables
5
Connect AC power cords:
The figure shows a DC-powered router only.
1. Verify that the switch on the power supply faceplate is in the OFF position.
2. Locate the AC power cord provided, which should have a plug appropriate for your location.
3. Inser t the appliance coupler on the power cord into the faceplate and inser t the plug into a power source receptacle.
4. Repeat Steps 1 through 3 for the second power supply.
Connect DC power supplies:
1. Ensure that the voltage across the DC power source cables is 0 V and that the cable leads will not become active during installation.
2. Attach the grounding lug to the screw on the back of the chassis, next to the ground symbol. Be sure to attach the ground before connecting the power cables.
3. Verify that the switch on the power supply is in the OFF position.
4. If necessar y, strip the input and return ends of the power cables.
5. Thread the power cables through the cable holder on the right side of the power supply faceplate.
6. Push the exposed ends of the power cables straight into the quick connect terminals on the power supply:
■ Connect the positive (+) cable lugs to the RTN (return) terminals.
■ Connect the negative (–) cable lugs to the –48 V (input) terminals.
7. Tighten the screws directly above the attached power cables to secure the cables.
8. Repeat Steps 3 through 7 for the second power supply.
9. Verify that the power and ground cabling are correct.
See back cover for safety warnings.
3c. Install the router into a four-post cabinet:
■
Before installing the router, install the mounting shelf onto the cabinet or rack, attaching it to the rear post facing the front of the cabinet. The router rests on the shelf, which helps suppor t its weight.
Lataa
Mainos