Publicité
Publicité
ELEMENT Installation Steps Introduction Includes butterfly brackets that attach to the side of the housing and are vertically adjustable from below the ceiling with a wing nut. Also includes 16 gauge steel nailer bars. Integral gunsights for positioning with laser levels or string ensure consistent alignment during installation. Flangeless trim units include die cast crack-resistant plaster plate with no-fill collar that installs after the ceiling to prevent cracking by unifying the plate, ceiling, and housing. Plaster plate is to be mudded over directly up to the aperture for seamless appearance. Step 1 Install housing to the ceiling joists with the adjustable 16 gauge steel hanger bars (shown right). Step 2 Mount gypsum board to ceiling and walls. Step 3 Place plaster plate into the aperture. Screw in with supplied hardware. Easily attaches to housing with provided screws. Step 4 Skim coat around the plaster plate and up to the aperture for a seamless appearance. Step 5 Finished installation. ">
/
Télécharger
Juste un petit rappel. Vous pouvez consulter le document ici même. Mais surtout, notre IA l''a déjà lu. Il peut expliquer des choses complexes en termes simples, répondre à vos questions dans n''importe quelle langue et vous aider à naviguer rapidement même dans les documents les plus longs ou les plus compliqués.
Publicité