Autoglide CABRI-35P User manual

Add to My manuals
29 Pages

advertisement

Autoglide CABRI-35P User manual | Manualzz

INSTRUCTIONS CABRI-20P

Page 1

SWING GATE OPENER

INDEX

Warnings 3. Control Box

1. Product Description and Application 4. Settings

1.1 Applications 4.1 Sw1 Dip Switch Setting

1.2 Description of the Automation. 4.1.1 Slowing Down Adjustment

1.3 Description of Devices

1.3.1 CABRI-20P Electromechanical

Gear Motors

1.3.2 Control Box

4.1.2 Over-Current Adjustment

4.1.3 Gate Auto Close Adjustment

4.1.4 Pedestrian Mode Adjustment

1.3.3 Photocells

1.3.4 Radio Transmitter

1.3.5 Flashing Light

1.3.6 Electric Latch with Stopper

2. Installation

2.1 Notes of Motors in Operation

2.1.1 Tools In Installing

2.1.2 Motors, Components and its

Installation in Illustration

4.1.5 Flashing Light Adjustment

4.2 Sw2 Dip Switch Setting

4.2.1 Photocell Adjustment

4.2.2 Close delay of Dual Gate

Operation Adjustment

4.2.3 Electric latch Adjustment

4.2.4 Deceleration Speed Adjustment

4.2.5 Operation Speed Adjustment.

4.2.6 Single and Dual Gate Adjustment.

2.2 Power connection

2.2.1 Notes for Power Connection

2.3 Installation 4.5 System Learning Process.

2.3.1 Preparation for Motor Installation 4.6 Gate Operation.

2.3.2 Installation of the Gear Motors

4.3 LED Indication

4.4 Transmitter Memorizing Process

2.3.3 Flashing Light

4.7 Gate Moving Logic.

4.8 Advanced Operation of the

Transmitter.

2.3.4 Photocells

2.3.5 Electric Latch and Stopper

5. Trouble Shooting.

6. Technical Characteristics.

INSTRUCTIONS CABRI-20P

Page 2

SWING GATE OPENER

Warnings

Please read this instruction manual carefully before the installation of gate-automated system.

This manual is exclusively for qualified installation personnel.

Autoglide

is not responsible for improper installation and failure to comply with local electrical and building regulations.

Keep all the components of CABRI-20P system and this manual for further

consultation

Be aware of the hazards that may exist in the procedures of installation and operation of the gate-automated system. Besides, the installation must be carried out in conformity with local standards and regulations

If the system is correctly installed and used following all the standards and regulations, it will ensure a high degree of safety

Make sure that the gates works properly before installing the gateautomated system and confirm the gates are appropriate for the application.

Do not let children operate or play with the gate-automated system.

Do not cross the path of the gate-automated system when operating.

Please keep all the control devices and any other pulse generator away from children to avoid the gate-automated system being activated accidentally.

Do not make any modifications to any components except that it is mentioned in this manual.

Do not try to manually open or close the gates before you release the gear motor.

If there is a failure that cannot be solved and is not mentioned in this manual, please contact qualified installation personnel.

Do not use the gate-automated system before all the procedures and instructions have been carried out and thoroughly read.

Test the gate-automated system weekly and have qualified installation personnel to check and maintain the system at least every 6-month.

Install warning signs (if necessary) on the both sides of the gate to warn the people in the area of potential hazards.

INSTRUCTIONS CABRI-20P

Page 3

SWING GATE OPENER

1. Product Description and Applications

1.1 Applications

CABRI-20P is applied for residential automation of single or dual leaf gate. CABRI-

20P has to be operated with electricity and it’s forbidden to be operated by back-up batteries for normal use. Back-up batteries are only allowed for emergent operation when there is a power failure, and the gear motors can be released by special keys to move the gate manually.

1.2 Description of the Automation

The following diagram of CABRI-20P typical installation describes some

terms and accessories of a gate automation system

Figure 1

1.3 Description of devices

CABRI-20P includes the accessories shown in figure 2. Please check the accessories the same as the package provided.

Attn: some accessories not included due to customization

2 CABRI-20P electromechanical gear motors with mounting brackets

1 pair of photocells.(one TX and one RX)

Figure 2

2 Radio transmitters, Flashing Light, Control Box, Electric Latch and Stopper

INSTRUCTIONS CABRI-20P

Page 4

SWING GATE OPENER

1.3.1 CABRI-20P Electromechanical Gear Motors

CABRI-20P consists of a worm screw reduction gear and a 24V DC motor.

The gear motor could be released manually by special release keys when there is a

power failure.

The gear motor is installed with two post brackets, one rear plate and one front plate for the installation

.

Figure 3

LIST OF SMALL PARTS CABRI-20P

Front Plate

Rear Plate

Post bracket

M8 *25L hex bolt

2pcs

2pcs

4pcs

4pcs

M8 self-locking nut

M12*25L hex bolt

M12 self-locking nut

Release key

4pcs

2pcs

2pcs

2pcs

1.3.2 Control Box

Control box consists of one control panel with incorporated receiver and one transformer. Provides the complete automation of the gear motors and other

accessories of CABRI-20P kit. To connect separate terminals on the control panel

and activate the gear motors and other accessories, the installation manual has to

be carefully read before handling.

Figure 4

LIST OF SMALL PARTS CABRI-20P

5*30 Screw

Nylon screw anchor

4pcs

4pcs

INSTRUCTIONS CABRI-20P

Page 5

SWING GATE OPENER

1.3.3 Photocells

The pair of Photocells has to be installed on the wall and connected to the control panel. The function of the photocells is to detect the obstacles found on the optical axis between the transmitter (TX) and the receiver (RX).

Figure 5

1.3.4 Radio Transmitter

Radio transmitter is used for the remote control of the gate movement. To use the transmitter, press and hold the button for 1 second. There are two buttons on the transmitter and (A) button is “open-stop-close mode” and (B) button is “pedestrian mode”.

1.3.5 Flashing Light

Flashing light is controlled by control box and blinks when the gate is moving.

The flashing light stops blinking when the gates finish opening or closing

Figure 7

INSTRUCTIONS CABRI-20P

Page 6

SWING GATE OPENER

1.3.6 Electric Latch and Stopper

Electric latch is used to lock the gate and it has to be used with stopper and installed

on the master gate.

Figure 8

LIST OF SMALL PARTS

M8*25L hex bolt

M8 self locking nut

Key

3pcs

3pcs

2pcs

2) Installation:

2.1 Notes of Motors in Operation

The

CABRI-20P gate openers are applicable to per leaf of 2.5 meters in width and

200 kg in weight which can be opened up to 110 degrees primarily for residential use; where the performance shall be influenced by the factors such as gate dimension, weight and climate that the driven torque is necessarily to be adjusted properly

.

2.1.1 Tools in Installing

Please make sure all tools and cables are ready and conform to the industrial

safety standard before installation. Please refer to Figure 9.

Figure 9

INSTRUCTIONS CABRI-20P

Page 7

SWING GATE OPENER

2.1.2 Motors, Components and Its Installation in Illustration

The installation procedure of CABRI-20P may be changed due to Various

accessories and quantities installed. The basic wiring diagram is shown in Figure 10.

No wiring cables for accessories are supplied with CABRI-20P.

Figure 10

2.2 Power Connection

CABRI-20P is required to connect two cores wires, which requires very low

voltage that no professionally trained personnel is required in installation; however, the

users are advised to read the installation manual carefully before going for it. After

getting to know all accessories and their positions, suggest starting from cable conduit

arrangement to prevent the cables from being broken or damaged.

2.2.1 Notes for Power Connection

1. The installation of power supply cable to the motor should be carried out by a qualified professional electrician.

2. The power supply cable of the motor should be equipped with short circuit protection and leakage protection.

3.

Please make sure to shut off the power before going installation or maintenance

.

2.3 Installation

2.3.1 Preparation for Motor Installation

CABRI-20P is not applicable to a gate which is inefficient or unsafe, neither to

solve the defects due to incorrect installation nor poor maintenance.

INSTRUCTIONS CABRI-20P

Page 8

SWING GATE OPENER

1)

Make sure the weight and dimensions of the gate conform to the operation range of

CABRI-20P. Don’t use CABRI-20P if the specifications do not meet the

requirements.

2). Make sure the gate structure conform to the criteria of automatic operation and

force regulations.

3). Make sure there is no serious friction existing in the opening or closing travel of the

gate leaves.

4). Make sure the gate is at horizontal level that the gate will not move aside at any

position.

5). Make sure the gate can bear the impact of the motor torque when it is installed on

any hole of the bracket which the surface is sufficiently sturdy.

6). Make sure the photo sensors are installed on flat surfaces to ensure the two ends of

receiving and transmitting corresponded to each other.

7). Check the dimensions of the motors as below.

Figure 11

8). Make sure to leave enough space when the gate is opening

Figure 12(Aerial View)

INSTRUCTIONS CABRI-20P

Page 9

SWING GATE OPENER

9).

If the gate is OPENED OUTWARD, please leave at least 70mm between the post

brackets and the gate.

Figure 13 (Aerial View)

Figure 14 (Aerial View)

10) Using the leaf-opening angle as criteria to make sure all criteria in Figure 15

can be met.

Figure 15

INSTRUCTIONS CABRI-20P

Page 10

SWING GATE OPENER

11). “C” value is 139mm.

12). “D” can be measured from the gate easily.

13). “A” = “C” + “D”

14). The value of “B” can be calculated from the value of “A” and the leaves opening

angle. Ex. If “A”=160mm with the leaves opening angle of 100 degrees, then the

value of “B” is approximate 190mm.

**Please make sure “B” and “A” are similar or the same in value that the leaves

can be operated smoothly, also to reduce the burden of the motor.

2.3.2 Installation of The Gear Motors

1. Choose the correct dimensions of the motors and position to be installed.

2. Check if the mounting surface the brackets to be installed is smooth, vertical

and rigid.

3. Arrange the cable conduit for power supply cable of the motors.

4. Loosen the screw and remove the cover of the motor as shown in Figure 16.

5. Place the leaves in the closed position

.

6. Refer to the distance of “B” in

Figure 17

, place the rear plate in the correct position on

the mounting surface.

Inspect if the distance is proper as shown in Figure 22 i.e. the

position the front plate of the motor to be installed.

7. Place two post brackets on the surface to be installed and mark the drilling points,

then drill minimum diameter of 8mm holes by four on the mounting surface to be

installed and fasten up the brackets with screws and washers.

8. Please make sure the front plate is completely installed horizontally.

INSTRUCTIONS CABRI-20P

Page 11

SWING GATE OPENER

.

9. Refer to Figure 20, the distance between front plate of the motor and rear plate is

798mm (CABRI-20P), the difference in height is 15.5mm (CABRI-20P).

10. Clamp and fix the motor front plate on the door temporarily

.

Figure 20

Figure 21

11. Lift up the motor and insert the screws into the front plate.

12

.

Lift the motor overhead and push the gate to the end until the screw holes of the

motor end matches the holes on the rear plate. Fasten the motor to the rear plate

with the bolt as shown in Figure22.

INSTRUCTIONS CABRI-20P

Page 12

SWING GATE OPENER

13. Fasten the nut tightly and loosen it for half round for motor supporting in rotating.

14. Fasten the motor front end to the front plate with the bolt (A) and nut (B) tightly.

Fully tighten the screw.

15. Use appropriate key to release the gear motor.

16. Try to push the released gate and make sure the motor can be manually moved

easily.

17. Make sure the motor front plate can be fastened on the gate to be installed

permanently.

18. Use appropriate Key to fasten the gear motor again.

19. Loosen the plastic nut under the power cable of the motor end, and penetrate the

power cable through the nut and screw it up.

20. Connect the motor power cable as shown in Figure23.

22. Close the gear motor cover by tightening the two screws as shown in Figure24

Figure 23 Figure 24

CABRI-20P

23.

Gear Motor Release

1). Insert the release key to the release slot Figure25.

2). Turn the release key anti-clockwise Figure26.

3). Pull out the release bar Figure27.

4). Turn the release key clockwise to fix the release bar, the release bar has to be in

pulled out position when you turn the release key clockwise Figure28.

5). The turning direction will be reversed for right motor

INSTRUCTIONS CABRI-20P

Page 13

SWING GATE OPENER

2.3.3 Flashing Light

1) Decide the installation position of the flashing light. The flashing light has to be installed near the gate and easy to be seen by users and passersby. The flashing light can be installed horizontally or vertically.

Figure 2.3.3 (1).

2) Unscrew the four screws on the light base and separate the base with the bottom as shown in

Figure 2.3.3 (2).

3) Connect the wires and penetrate the wires into the hole of the base.

Figure 2.3.3 (3).

4) Drill the holes in the wall and fix the bottom to the wall by three screws.

Figure 2.3.3 (4)

Figure 2.3.3(1) Figure 2.3.3(2) Figure 2.3.3(3) Figure 2.3.3(4)

5). Connect the two wires of the light to the PCB terminals and place the wires into the

conduit if necessary. See Figure 2.3.3 (5).

6). Tighten the four screws back on the light base. Figure 2.3.3 (6)

7). Replacing the bulb set. See Figure 2.3.3 (7)

7.1) Unscrew the flashing light wires from the PCB terminals and make sure the

power of the light is off.

7.2) Release the three screws (A) (B) (C) of the flashing light cover.

7.3) Separate the flashing light cover and replace the bulb set with a new one.

7.4) Tighten the three screws (A) (B) (C) of the flashing light cover.

Figure 2.3.3(5) Figure 2.3.3(6) Figure 2.3.3(7)

INSTRUCTIONS CABRI-20P

Page 14

SWING GATE OPENER

2.3.4 Photocells

1). Open the cover Figure 2.3.4 (1) .and connect wires Figure 2.3.4 (2).

2). Mounted the receiver and transmitter on the proper position Figure 2.3.4 (3)

3). Ensure there are no obstacles between receiver and transmitter. For optimal

efficiency, the receiver and transmitter should be properly aligned.

4). Power-up the photocells and make sure the LED light on receiver and

transmitter are ON

Figure 2.3.4(1) Figure 2.3.4(2)

Figure 2.3.4(3)

2.3.5 Electric Latch and Stopper

1.

Stopper

:

1). Before installing the stopper, please make sure the gates are in close positions and

the surface to be installed is flat.

2). Place the stopper on the ground using the bottom as reference, and mark the 3

drilling points.

See Figure 2.3.5 (1) for the gate opened inward.

See Figure 2.3.5 (2) for the gate opened outward.

INSTRUCTIONS CABRI-20P

Page 15

SWING GATE OPENER

Figure 2.3.5(1) Figure 2.3.5(2)

3

). Drill the 3 marked points, and then securely attach the stopper to the ground with

screws and washers.See Figure 2.3.5 (3)

Figure 2.3.5(3)

2. Electric Latch. (If the gate is opened outward)

1)

If the gate is opened outward, please change the spring inside and screw it in the

different place. See Figure 2.3.5(4),

Figure2.3.5(5),

Figure2.3.5(6), Figure2.3.5(7)

Figure 2.3.5(4) Figure 2.3.5(5) Figure 2.3.5(6)

Unscrew the screws Take the casing off The location of the spring

INSTRUCTIONS CABRI-20P

Page 16

SWING GATE OPENER

Figure 2.3.5(7)

Change the spring and screw in different place

2

). Weld the back plate of the electric latch to the surface on the master gate.

See Figure 2.3.5(8).

Please avoid melting the wires by the heat of the fixed plate

Figure 2.3.5(8)

For the gate opened inward

Figure 2.3.5(9)

For the gate opened outward

3). The gap between the bottom of electric latch and the stopper should be less than 7mm.

Figure 2.3.5(10).

4). Connect the wires of the electric latch to the terminal LAT (+) and LAT (-) on the PCB.

Figure 2.3.5(10)

For the gate opened inward.

Figure 2.3.5(11)

For the gate opened outward

INSTRUCTIONS CABRI-20P

Page 17

SWING GATE OPENER

AUTOGLIDE CABRI-20P

3) Control Box

Control Box Installation

1. Decide the installation position of control box first, it is suggested to be installed near the gate and should be protected from possible damage. Be aware of the motor cable length before deciding the installation position.

2. Remove the cover by unscrewing the four screws on the cover. Figure 1(1).

3. Use a screwdriver to puncture the holes beneath the bottom of the control box.

Figure 1(2).

4. Secure it on the wall. Figure 1(3).

Figure 1(1) Figure 1(2) Figure 1(3)

INSTRUCTIONS CABRI-20P

Page 18

SWING GATE OPENER

5. Wiring Connection:

Prepare all the wires of the accessories beforehand and connect the wires to the gear motors and accessories on the PCB as shown in Figure 1(4). All of the wiring connections of the accessories are not requested to distinguish the positive (+) and the negative (-) polarity.

1). Flashing light: Connect the two wires from the flashing light to the terminal

L+ and L- on the PCB.

2). Electric Latch: Connect the two wires from the electric latch to the terminal

Lo + and Lo- on the PCB.

3). Gate openers: Refer to Figure 1(4) and connect the wires separately to the

terminals on the PCB.

Motor 1:

Connect the motor wire (White +) to the terminals Mo1 +, and

(Yellow -) to the Mo1-.

Motor 2:

Connect the motor wire (White +) to the terminals Mo2 +, and

(Yellow -) to the Mo2 -.

Notes:

For gates opened outward.

Motor 1:

Connect the motor wire (Yellow -) to the terminals Mo1 +, and

(White +) to the terminals Mo1-.

Motor 2:

Connect the motor wire (Yellow -) to the terminals Mo2 +, and

(White +) to the terminals Mo2

-.

4). Photocells: See Figure 1(4)

(A) installed one set Photocell to FO1, SW3 setting as below:

3. Ph_conn1 > OFF and 4. Ph_conn2 > ON

(B) installed one set Photocell to FO2, SW3 setting as below:

3. Ph_conn1 > ON and 4. Ph_conn2 > OFF

(C) installed two sets Photocell, SW3 setting as below:

3. Ph_conn1 > OFF and 4. Ph_conn2 > OFF

(D) No Photocell has been installed, SW3 setting as below:

3. Ph_conn1 > ON and 4. Ph_conn2 > ON

INSTRUCTIONS CABRI-20P

Page 19

SWING GATE OPENER

Figure 1(4)

INSTRUCTIONS CABRI-20P

Page 20

SWING GATE OPENER

4. Settings

4.1 Sw1 Dip Switch Setting

4.1.1 Slowdown Adjustment (Dip 1.Slow)

ON: The gear motors do not slow down before the gates completely close or open.

OFF: The gear motors slow down before the gates completely close or open

.

4.1.2 Over-current Adjustment (Dip 2.Over C1 & Dip 3. Over C2)

OVER C1 OVER C2 Current (Amp)

Dip Switch 2 OFF Dip Switch 3 OFF 2A

Dip Switch 2 OFF Dip Switch 3 ON

Dip Switch 2 ON Dip Switch 3 OFF

Dip Switch 2 ON Dip Switch 3 ON

3A

4A

5A

INSTRUCTIONS CABRI-20P

Page 21

SWING GATE OPENER

4.1.3 Gate Auto close Adjustment

(Dip 4. Auto C1, Dip 5. Auto C2 & Dip 6. Auto C3)

Auto C1 Auto C2 Auto C3

Dip switch 4 OFF Dip Switch 5 OFF

Effect

Dip Switch 6 OFF No auto-close

Dip switch 4 OFF

Dip switch 4 OFF

Dip switch 4 OFF

Dip switch 4 ON

Dip Switch 5 OFF

Dip Switch 5 ON

Dip Switch 5 ON

Dip Switch 5 OFF

Dip Switch 6 ON

Dip Switch 6 ON

Dip Switch 6 OFF

Dip Switch 6 OFF

3 sec.

10 sec.

20 sec.

40 sec.

Dip switch 4 ON

Dip switch 4 ON

Dip Switch 5 OFF

Dip Switch 5 ON

Dip Switch 6 ON 60 sec.

Dip Switch 6 OFF 120 sec.

Dip switch 4 ON Dip Switch 5 ON Dip Switch 6 ON 360 sec.

Note : Auto-Close mode activates when the gates move to the end position or stopped manually. If the transmitter or push button is activated before the auto-close counting, the gate will close immediately.

4.1.4 Pedestrian Mode Adjustment (Dip 7.P Mode)

ON: Press button B on the remote to operate to pedestrian mode by open single gate to

45 degree

OFF: The pedestrian mode is disabled. Single gate will fully open and close

.

4.1.5 Flashing Light Adjustment (Dip 8.Light)

ON: The flashing light blinks for 3 seconds before the gate moves, and blinks

simultaneously during the movement.

OFF: The flashing light blinks and the gate moves simultaneously.

4.2 Sw2 Dip Switch Setting

4.2.1 Photocell Adjustment (Dip 1.Photo1, Dip 2.Photo2)

1. SW2_2, SW2_1: OFF OFF

Position of Gate When safety devices are activated

Type of Safety Device

Safety Device2: Safety Device1 :

Photocell-OPEN Photocell-CLOSE

FULLY CLOSED Open not allowed No effect

FULLY OPENED No effect

STOP DURING MOVING Open not allowed

Reload automatic closing time

Reload automatic closing time

CLOSING

OPENING

INSTRUCTIONS CABRI-20P

No effect

Close

Page 22

Open

No effect

SWING GATE OPENER

2. SW2_2, SW2_1: OFF ON

Position of Gate

Type of Safety Device

When safety devices are activated

Safety Device2 : Safety Device1 :

FULLY CLOSED

Safety Edge

Open not allowed

Photocell-CLOSE

No effect

FULLY OPENED

Reload automatic closing time

STOP DURING MOVING

Locks

Reload automatic closing time

CLOSING

Reverse to open for 2 seconds Open

OPENING

Reverse to clsoe for 2 seconds No effect

3. SW2_2, SW2_1: ON OFF

Position of Gate

Type of Safety Device

FULLY CLOSED

FULLY OPENED

STOP DURING MOVING

CLOSING

OPENING

When safety devices are activated

Safety Device2: Safety Device1 :

Opening Device

Open

Photocell-CLOSE

No effect

Reload automatic closing time

Open Reload automatic closing time

Open

No effect

Open

No effect

4. SW2_2, SW2_1: ON ON

Position of Gate

Type of Safety Device

Safety Device2:

FULLY CLOSED

When safety devices are activated

Safety Device1 :

Photocell-OPEN/CLOSE Photocell-CLOSE

Open not allowed No effect

FULLY OPENED

CLOSING

STOP DURING MOVING

Close not allowed, Open for 2 seconds when auto closing is ON

Close not allowed

Locks

Open

OPENING

Stop No effect

4.2.2

Close Delay of Dual Gate Operation Adjustment (Dip 3.Delay1, Dip 4.Delay2)

Close/Open delay of two leaves of gate can be adjusted from 2 to 6 seconds

Dip3. Delay 1

OFF

ON

OFF

ON

DIP switch

Dip4. Delay 2

Open Delay

OFF

OFF

ON

ON

2 sec

2 sec

3 sec

3 sec

INSTRUCTIONS CABRI-20P

Close Delay

3 sec

4 sec

5 sec

6 sec

Page 23

SWING GATE OPENER

4.2.3

Electric Latch Adjustment (Dip 5.Latch)

ON: The master leaf will move toward closing direction for 0.25 second once

command the remote, then unlock the latch to open the gate.

OFF: Once command the remote, the the latch will be unlocked to open the gate

immediately

4.2.4 Decelaration Speed Adjustment of the Gear Motors (Dip 6. D Speed

)

ON: The speed is70% output of the full speed.

OFF: The speed is 50% output of the full speed.

4.2.5 Operation Speed Adjustment of the Gear Motors (Dip 7.O Speed)

ON: The speed is 100% output of the full speed.

OFF: The speed is 70% output of the full speed

.

4.2.6

Single and Dual Gate Operation Adjustment (Dip 8.Ds/set)

ON: Dual Gates operation in system learning and normal operation.

OFF: Single Gate operation in system learning and normal operation

.

4.3 LED Indication

LED1 System Learning:

LED1 is always ON when the system learning in not completed.

LED1 blinks once when single-gate learning is completed ;

LED1 blinks twice when dual-gate learning is completed.

LED 2 RF :

If the switch of the transmitter, key selector, or the push button is activated, LED2 will be on.

LED 3 Photocells 1 :

LED3 will be on when the first pair of the photocells are activated.

LED 4 Photocells 2

: LED4 will be on when the second pair of the photocells are activated.

LED 5 RF Indicator :

LED5 will be on when RF signal is received.

INSTRUCTIONS CABRI-20P

Page 24

SWING GATE OPENER

4.4 Transmitter Memorizing Process

Press “RF-learn” button for 2 seconds, and the Blue LED is on; then press the

transmitter (A) button; the Blue LED will blink twice and then be off. The system

learning is complete.

4.5

System Learning Process

! CAUTION: Before proceeding to system learning, the transmitter memorizing

process has to be completed.

Press “SYS-learn” button for 2 seconds, after press button (A) on the remote. System

learning will be executed step by step as followings: Wait for the learning process to be

completed without any interruption.

A. Dual Gate:

1

Slave Gate Close

2

Master Gate Close

3

Master Gate Open

4

Slave Gate Open

5

Slave Gate Close

6

Master Gate Close

.

INSTRUCTIONS CABRI-20P

Page 25

SWING GATE OPENER

B. Single Gate:

1 Master Gate Close

2 Master Gate Open

3 Master Gate Close

! Beware: The system learning process for single gate takes more than dual gate for around 1 min, wait for the gate to complete the learning process.

4.6 Gate Operation

Press the button “A” on the transmitter for dual-gate operation.

Press the button “B” on the transmitter for single-gate operation in either single-gate or dual-gate installation

.

4.7 Gate-moving Logic

(A) In gate-opening phase: The gates stop if the transmitter/push button is activated, and close when the transmitter/push button is reactivated.

(B) In gate-closing phase: The gates stop if the transmitter/push button is activated, and open when the transmitter/push button is reactivated.

(C) In gate-opening or gate-closing phase: For safety purpose, the gate stop if

encountering obstacles

4.8 Advanced Operation of the transmitter (SW3 Dip1/2 Remote1 &

Remote 2)

INSTRUCTIONS CABRI-20P

Page 26

SWING GATE OPENER

5. Trouble Shooting

Overheated Back-up Batteries

The gate doesn’t move when pressing the button of the transmitter

Check the wiring connection of the batteries.

1. Check if LED3 or 4 is “ON”.

2. Check if the voltage of the batteries is below 22V.

3. Check if LED1 is “ON”.

4. Make sure all the wiring connections are firmly connected to the terminals on the PCB.

5. Make sure the fuse is workable

The gate only moves a little distance when pressing the button of the transmitter.

Make sure the wiring connection of the hall sensor is firm.

Transmitting distance is too short

The gear motors run very slowly

Make sure the connecting terminals of the Antenna is firm.

Check the dip switch setting of the speed adjustment.

The Flashing light does not work

The leaves shall be closed instead of opening

The leaves suddenly stop during moving

The leaves does not move or only move toward one direction if the wiring connection of the flashing light is correct

Change the polarity connection of the positive (+) with the negative (-) of the gear motors.

1. Check if the “RESET” socket is activated.

2. Make sure the wiring connection of the gear motors is firm.

3. Make sure the hall sensor wiring connection is firm.

4. The GND terminal of the photocells on the PCB must be short-circuited if no photocells installed.

5. Make sure the fuse is workable.

1. Check if the “RESET” socket is activated.

2. Make sure the wiring connection of the gear motors is firm.

3. Make sure the hall sensor wiring connection is firm.

4. The GND terminal of the photocells onthe PCB must be short-circuited if no photocells installed.

The master gate closes to the end first and the slave gate stops, the flashing light blinks fast for five seconds.

Cut off the AC input power and the output of the batteries. Release the master gate and slave gate manually, then open the master to the end and close the slave gate to the end by hand, then power the whole unit by connecting the AC and battery terminals.

The gear motors does not run and the relay is noisy when operating the gate opening and closing

Check if the fuse is burned.

INSTRUCTIONS CABRI-20P

Page 27

SWING GATE OPENER

6. Technical Characteristics

6.1 CABRI-20P

6

CABRI-20P

Motor

Gear type

24Vdc motor with mechanical release

Worm gear

Peak thrust

Nominal thrust

Stroke length

2000N

1500N

400mm

Power supply

Maximum operating current

Maximum gate weight

Maximum gate length

Duty cycle

Operating Temperature

Dimension

Weight

24Vdc

4.2A for maximum 10 seconds.

200 kg per leaf

2.5 meters

20%

-20

799mm * 98mm * 170mm

3.6kg

~+50

6.2 Control Box

Application

Main power supply

Back-up battery

Transformer

Receiver board

Installation

Operating Temperature

Dimension

6.3 Photocells

Detection type

Operating distance

Response time

Input voltage

Operating Temperature

Protection class

Dimension

6.4 Flashing Light

Application

Lamp

Operating Temperature

Installation

Dimension

INSTRUCTIONS CABRI-20P

For CABRI-20P power supply

230Vac/110Vac, 50Hz/60Hz

2pcs of batteries for emergency operation, 1.2A each

4.2A, 24V

Through beam

25 meters

100ms

IP54

-20

AC/DC 12~24V

-20

~+60

~+50

96mm * 45mm * 43mm

24Vdc Halogens bulb

205mm * 80mm * 75mm

horizontally or vertically installed

433.92MHz; 200 transmitters memory

Wall mounted vertically

-20

~+50

275mm * 195mm * 102mm

For warning purpose during leaves movement

Page 28

SWING GATE OPENER

6.5 Radio Transmitter

Application

Frequency

Coding

Buttons

Power Supply

Operating Temperature

Dimension

6.6 Electric Latch

Application

Power Supply

Operating Temperature

Operating Current

Dimension

Radio transmitter for remote control of CABRI-20P

433.92Mhz

24Vdc

-20

5A

Rolling code

~+50

2, for single-gate or dual-gate operation

3V with one CR2032 button type lithium battery

-20

~+50

71.5mm * 33mm * 14mm

For locking the gate.

61mm * 55mm * 120mm

Proprietary Intellectual Property, Do not Distribute without authorization.

All rights Reserved- Copyright@2015 Autoglide.

www.autoglideglobal.com

INSTRUCTIONS CABRI-20P

Page 29

SWING GATE OPENER

advertisement

Related manuals

advertisement