ADC Copper Cable Management Solution Installation Instructions
PDF
Έγγραφο
Διαφήμιση
Διαφήμιση
Active Platforms Copper Cable Management Solution Installation Instructions ADCP-80-376 • Issue 1 • 10/2008 Introduction The Copper Cable Management Solution provides cable management functions for active or passive electrical equipment mounted in a single frame or enclosure. The Copper Cable Management Solution is designed for use with the frame/ enclosure and active equipment specified in step 1. This publication provides instructions for installing and using the Copper Cable Management Solution. Verify cable management components Verify frame/enclosure and dimensions 1 The copper optic cable management solution is designed for installation with the frame/ enclosure and equipment specified below. Verify dimensions before starting the installation. Frame/Enclosure 2 The cable management components required for this procedure are shown below. Verify that all the components are available in the specified quantities. Active Equipment CCR* 700 series APC® Netshelter® SX CISCO® 6509 *Custom Cabinets and Racks, Inc. NOTE: Doors, side panels, and other accessories are not shown. Contact the frame/ enclosure manufacturer for details. FMX-SSRK-001 (1) Top Slack Storage Panel 28 INCHES MIN. 36 INCHES MIN. RGS-V0ACC0010 (4) Riser for CC&R Frame or RGS-V0ACC0011 (3) RGS-V0ACC0012 (1) Riser for APC Frame 42 RU MIN. FMX-SSRK-002 (1) Bottom Slack Storage Panel FGS-KTW4-W (1) FiberGuide® Raceway PP48AC6T (8) ADC® TrueNet® Patch Panel RGS-VC0012-B (3) Cable Ring FRONT 1438954 Rev A 22960-A FMX-6509VCG-01 (1) Vertical Cable Guide RGS-VC0011-B (14) Cable Ring 22770-A Page 1 © 2008, ADC Telecommunications, Inc ADCP-80-376 Issue 1 10/2008 3 Adust the frame/enclosure’s front and rear vertical mounting flanges. Adjust the front and rear mounting flanges to the dimensions specified in the table and drawings. Frame/Enclosure Dimension A Dimension B CCR* 700 series 9.00 in 16.25 in APC Netshelter SX 10.50 in 16.25 in ® ® 4 Install the right and left side riser panels Install the right and left side riser panels in the locations shown. Secure panels to frame/enclosure using the fasteners provided with the riser panel. Refer to the installation drawing provided with the riser panel for the mounting details. *Custom Cabinets and Racks, Inc. NOTE: The spacing for the front flanges is critical or it will be impossible to mount the front riser panels in the recommended location. In addition, the cable management, access, and fill capacity will be insufficient. RIGHT SIDE RISER PANELS RGS-V0ACC0010 for CC&R Frame RGS-V0ACC0011 for APC Frame REAR Top view of frame. Placement of active equipment shown in grey. REAR FLANGES B FRONT FRONT FLANGES A FRONT TOP LEFT SIDE RISER PANEL RGS-V0ACC0010 for CC&R Frame RGS-V0ACC0011 for APC Frame REAR MOUNTING FLANGES BOTTOM LEFT SIDE RISER PANEL RGS-V0ACC0010 for CC&R Frame RGS-V0ACC0012 for APC Frame FRONT MOUNTING FLANGES FRONT 22990-A FRONT Page 2 © 2008, ADC Telecommunications, Inc 22961-A ADCP-80-376 Issue 1 10/2008 5 Install the bottom slack storage panel. 6 Install the active equipment in the mounting space above the bottom slack storage panel. Place active equipment as close to storage panel as possible. Follow the mounting instructions provided by the manufacturer. Install the bottom slack storage panel in the lower part of the frame/enclosure. Adjust position of the panel to provide the spacing specified in the table and drawings. Use screws and washers provided to secure panel to mounting flanges. Frame/Enclosure Install the active equipment. Dimension A CCR* 700 series 11.25 in APC® Netshelter® SX 9.50 in *Custom Cabinets and Racks, Inc. ACTIVE EQUIPMENT INSTALLED IN THE FRAME/ENCLOSURE BOTTOM SLACK STORAGE PANEL FMX-SSRK-002 BOTTOM SLACK STORAGE PANEL FRONT 7 FASTENERS FOR PANEL 22992-A Install vertical cable guide Install the vertical cable guide (VCG) on the lower right side of the frame/enclosure. Remove screws and washers from the active equipment mounting bracket as needed. Use the screws and washers provided with the VCG to secure the VCG to the lower right mounting flange. DETAIL SHOWING INSTALLED VERTICAL CABLE GUIDE FMX-6509VCG-01 VERTICAL CABLE GUIDE A BOTTOM OF MOUNTNG FLANGE 22967-A FRONT 23015-A Page 3 © 2008, ADC Telecommunications, Inc ADCP-80-376 Issue 1 10/2008 8 Install patch panels 9 Install the eight patch panels in the mounting spaces directly above the active equipment. Use the screws and washers provided to secure each panel to the frame/enclosure mounting flanges. Install the top slack storage panel Install the top slack storage panel in the top part of the frame/enclosure. Use screws and washers provided to secure panel to the frame/enclosure mounting flanges. FMX-SSRK-001 TOP SLACK STORAGE PANEL PP48AC6T PATCH PANEL FASTENERS FOR PANELS FASTENERS FOR PANELS TOP SLACK STORAGE PANEL INSTALLED IN FRAME PATCH PANELS EIGHT PATCH PANELS INSTALLED IN FRAME ACTIVE EQUIPMENT Page 4 © 2008, ADC Telecommunications, Inc FRONT 23034-A FRONT 23036-A ADCP-80-376 Issue 1 10/2008 10 Installation and removal procedure for all cable rings. All cable rings mount on the riser panels. The drawings show how to install or remove the cable rings. Refer to this procedure when completing steps 11 through 13. NOTE: 11 Install upper front cable rings Install six cable rings on the upper left front riser next to patch panels 1, 2, 3, 4, 6, and 7. Install three cable rings on the upper right front riser next to patch panels 1, 4, and 7. Install each cable ring as close to the frame/enclosure mounting flange as possible. Mounting plate shown without cable retention feature for clarity. INSTALLATION PROCEDURE a UPPER LEFT FRONT RISER UPPER RIGHT FRONT RISER Align tabs in mounting plate with slots in riser panel. RGS-VC0011-B CABLE RING b Insert tabs into slots and rotate plate downward. RGS-VC0012-B CABLE RING c Snap mouting plate into riser panel making sure snapping feature on plate locks into slot in riser panel. SNAPPING FEATURE REMOVAL PROCEDURE 1 1 2 2 3 Insert screwdriver under snapping feature and push up until snapping feature is released from slot. Rotate plate upward and remove. 22704-B SNAPPING FEATURE 4 1 3 4 4 5 6 6 7 7 PATCH PANELS 7 8 FRONT 23037-A Page 5 © 2008, ADC Telecommunications, Inc ADCP-80-376 Issue 1 10/2008 12 Install lower front cable rings 13 Install four cable rings on the lower left front riser. Place the first two rings next to linecard slots 1 and 6. Place the third ring just below slot 9. Place the fourth ring even with the top edge of the bottom storage panel. Install each cable ring as close to the frame/enclosure mounting flange as possible. Install top rear cable rings Install four cable rings on the top left rear riser. Locate rings so they are equally spaced on the riser. Install each cable ring as close to the frame/ enclosure mounting flange as possible. UPPER LEFT REAR RISER RGS-VC0011-B CABLE RING LOWER LEFT FRONT RISER RGS-VC0011-B CABLE RING REAR LINECARD SLOTS SLOT 1 SLOT 2 SLOT 3 SLOT 4 SLOT 5 SLOT 6 SLOT 7 SLOT 8 SLOT 9 SPACE RINGS EQUALLY ON REAR RISER BOTTOM EDGE OF SLOT 9 TOP EDGE OF PANEL FRONT Page 6 © 2008, ADC Telecommunications, Inc 23040-A REAR 23043-A ADCP-80-376 Issue 1 10/2008 14 Install FiberGuide mounting brackets 15 Install the five FiberGuide mounting brackets on the top right riser. Threaded holes are provided on the front edge of the riser for attaching the brackets. Secure each bracket to the riser using the mounting screws provided. Install FiberGuide raceway Install the FiberGuide raceway on the FiberGuide mounting brackets. A threaded hole is provided on the tab that extends from each bracket for attaching theAraceway. Secure to the five Route Zone fiber cables to raceway frame/enclosure brackets using the cable screwsclamp provided. and secure with assembly Route the Zone A fiber cables to the top of the frame/enclosure and secure with the cable clamp assemblies. Use cables that are terminated with appropriate connectors. From the cable clamps, route the fiber cables downward through the center fiber rings and then upward to the clamp side of the Zone A fiber panel. THREADED HOLE THREADED HOLES ON EDGE OF RISER IN BRACKET MOUNTING BRACKET DETAIL OF BRACKET INSTALLATION DETAIL OF RACEWAY INSTALLATION UPPER RIGHT FRONT RISER 23039-C NOTE: Shown with right front edge of frame/enclosure removed for clarity. NOTE: Shown with right front edge of frame/enclosure removed for clarity. 23041-B FGS-KTW4-W FIBERGUIDE RACEWAY Page 7 © 2008, ADC Telecommunications, Inc ADCP-80-376 Issue 1 10/2008 Install flexible tubing 16 18 Install the flexible tubing for fiber optic patch cords at the top of the FiberGuide raceway. Slide the tubing into the holder at the top of the raceway. Route tubing to fiber optic equipment location. Connect linecard ports to patch panel ports with jumper patch cords Connect the linecard ports to the patch panel ports using 10 foot jumper patch cords. Observe the routing shown in the diagram. All patch cords route to the right from the linecards. Zone A patch cords (red) route to the top storage panel. Zone B patch cords (blue) route to the bottom storage panel. TUBING ZONE A STORAGE HOLDER DETAIL OF TUBING INSTALLATION PATCH PANELS ZONE A PATCH PANELS ZONE B 23042-B NOTE: Shown with right front edge of frame/enclosure removed for clarity. 17 Route optical fibers to supervisor card LINECARDS ZONE A LINECARD LINECARD LINECARD LINECARD LINECARDS ZONE B LINECARD LINECARD LINECARD LINECARD Route optical fibers through the FiberGuide raceway and VCG fiber tray to the supervisor card. RACEWAY SUPERVISOR CARD ZONE B STORAGE 23038-A ADC, ADC Telecommunications, TrueNet, and FiberGuide are registered trademarks of ADC Telecommunications, Inc.. APC and NetShelter are registered trademarks of American Power Conversion Corp. 23044-C VCG FIBER TRAY CISCO is a registered trademark of CISCO Technology, Inc. ADC Telecommunications, Inc. PO Box 1101, Minneapolis, MN 55440-1101, USA 1-800-366-3891, Ext: 73475 www.adc.com Technical Assistance Center (TAC) [email protected] © 2008, ADC Telecommunications, Inc. All Rights Reserved Page 8 ">
/
Λήψη
Μια φιλική υπενθύμιση. Μπορείτε να δείτε το έγγραφο εδώ. Αλλά το πιο σημαντικό, η AI μας το έχει ήδη διαβάσει. Μπορεί να εξηγήσει πολύπλοκα πράγματα με απλούς όρους, να απαντήσει στις ερωτήσεις σας σε οποιαδήποτε γλώσσα και να σας βοηθήσει να πλοηγηθείτε γρήγορα ακόμη και στα πιο μακροσκελή ή περίπλοκα έγγραφα.
Διαφήμιση