Digital AlphaServer 8200, AlphaServer 8400 Servers Site Preparation Guide
PDF
Dokument
Werbung
Werbung
AlphaServer 8200/8400 Site Preparation Guide Order Number EK–T8030–SP. A01 This guide is intended for use by Digital customer service engineers and customers in preparing a site for an AlphaServer 8200 or an AlphaServer 8400 system. digital equipment corporation maynard, massachusetts First Printing, May 1995 The information in this document is subject to change without notice and should not be construed as a commitment by Digital Equipment Corporation. Digital Equipment Corporation assumes no responsibility for any errors that may appear in this document. The software, if any, described in this document is furnished under a license and may be used or copied only in accordance with the terms of such license. No responsibility is assumed for the use or reliability of software or equipment that is not supplied by Digital Equipment Corporation or its affiliated companies. Copyright © 1995 by Digital Equipment Corporation. All Rights Reserved. Printed in U.S.A. The following are trademarks of Digital Equipment Corporation: AlphaGeneration, AlphaServer, DEC, DECchip, DEC LANcontroller, OpenVMS, StorageWorks, VAX, the AlphaGeneration logo, and the DIGITAL logo. OSF/1 is a registered trademark of the Open Software Foundation, Inc. Prestoserve is a trademark of Legato Systems, Inc. UNIX is a registered trademark in the U.S. and other countries, licensed exclusively through X/Open Company Ltd. FCC NOTICE: The equipment described in this manual generates, uses, and may emit radio frequency energy. The equipment has been type tested and found to comply with the limits for a Class A computing device pursuant to Subpart J of Part 15 of FCC Rules, which are designed to provide reasonable protection against such radio frequency interference when operated in a commercial environment. Operation of this equipment in a residential area may cause interference, in which case the user at his own expense may be required to take measures to correct the interference. Contents Preface ....................................................................................................... v Chapter 1 Site Preparation 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Pre-Installation Checklist ..................................................... 1-2 Cabinet Sizes .......................................................................... 1-4 Floor Space and Environmental Requirements ................... 1-6 Single-Phase AC Power Requirements ................................. 1-8 Single-Phase AC Power Cable and Receptacles ................. 1-11 Power Requirements for the 8400 with Battery Backup ... 1-12 AC Power Cable and Receptacles for the 8400 with Battery Backup .................................................................................. 1-14 Figures 1-1 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 8400 Sample System .............................................................. 1-4 8200 Sample System .............................................................. 1-4 Sample 8400 Configuration ................................................... 1-6 Sample 8200 Configuration ................................................... 1-6 8400 Single-Phase Power ...................................................... 1-8 8200 Single-Phase Power ...................................................... 1-9 Single-Phase AC Power Receptacles ................................... 1-11 Power System Components ................................................. 1-12 AC Power Receptacles .......................................................... 1-14 Tables 1 2 1-1 1-2 1-3 1-4 AlphaServer 8200 and 8400 Documentation .......................... vi Related Documents ................................................................ viii Shipping Dimensions and Weights ....................................... 1-3 Cabinet Dimensions and Weights ......................................... 1-5 Environmental Specifications ............................................... 1-7 AC Single-Phase Power Input Voltages ................................ 1-9 iii 1-5 1-6 1-7 iv AC Single-Phase Power Requirements ............................... 1-10 Three-Phase AC Input Voltages .......................................... 1-13 Three-Phase Power Requirements ...................................... 1-13 Preface Intended Audience This manual is written for Digital customer service engineers and customers preparing a site for AlphaServer 8200 or 8400 systems. Document Structure This manual uses a structured documentation design. Topics are organized into small sections for efficient reference. Topics begin with abstracts. You can quickly gain a comprehensive overview by reading only the abstracts. Next is an illustration or example, which also provides quick reference. Last in the structure are descriptive text and syntax definitions. This manual has one chapter, as follows: • Chapter 1, Site Preparation, provides pre-installation requirements and guidelines. v Conventions Used in This Document Icons. Icons similar to those shown below are used in illustrations for designating part placement in the system described. A shaded area in the icon shows the location of the component or part being discussed. Front Rear Documentation Titles Table 1 lists the books in the AlphaServer 8200 and 8400 documentation set. Table 2 lists other documents that you may find useful. Table 1 AlphaServer 8200 and 8400 Documentation Title Order Number Hardware User Information and Installation Operations Manual EK–T8030–OP Site Preparation Guide EK–T8030–SP AlphaServer 8200 Installation Guide EK–T8230–IN AlphaServer 8400 Installation Guide EK–T8430–IN Service Information Kit QZ–00RAC–GC Service Manual (hard copy) EK–T8030–SV Service Manual (diskette) AK–QKNFA–CA vi Table 1 AlphaServer 8200 and 8400 Documentation (Continued) Title Order Number Reference Manuals System Technical Manual EK–T8030–TM DWLPA PCI Adapter Technical Manual EK–DWLPA–TM Upgrade Manuals for Both Systems KN7CC CPU Module Installation Card EK–KN7CC–IN MS7CC Memory Installation Card EK–MS7CC–IN KFTHA System I/O Module Installation Guide EK–KFTHA–IN KFTIA Integrated I/O Module Installation Guide EK–KFTIA–IN Upgrade Manuals: 8400 System Only AlphaServer 8400 Upgrade Manual EK–T8430–UI BA654 DSSI Disk PIU Installation Guide EK–BA654–IN BA655 SCSI Disk and Tape PIU Installation Guide EK–BA655–IN DWLAA Futurebus+ PIU Installation Guide EK–DWLAA–IN DWLMA XMI PIU Installation Guide EK–DWLMA–IN DWLPA PCI PIU Installation Guide EK–DWL84–IN H7237 Battery PIU Installation Guide EK–H7237–IN H7263 Power Regulator Installation Card EK–H7263–IN H9F00 Power Upgrade Manual EK–H8463–UI KFMSB Adapter Installation Guide EK–KFMSB–IN KZMSA Adapter Installation Guide EK–KXMSX–IN RRDCD Installation Guide EK–RRDRX–IN Upgrade Manuals: 8200 System Only DWLPA PCI Shelf Installation Guide EK–DWL82–IN H7266 Power Regulator Installation Card EK–H7266–IN H7267 Battery Backup Installation Card EK–H7267–IN vii Table 2 Related Documents Title Order Number General Site Preparation Site Environmental Preparation Guide EK–CSEPG–MA System I/O Options BA350 Modular Storage Shelf Subsystem Configuration Guide EK–BA350–CG BA350 Modular Storage Shelf Subsystem User’s Guide EK–BA350–UG BA350-LA Modular Storage Shelf User’s Guide EK–350LA–UG CIXCD Interface User Guide EK–CIXCD–UG DEC FDDIcontroller 400 Installation/Problem Solving EK–DEMFA–IP DEC FDDIcontroller/Futurebus+ Installation Guide EK–DEFAA–IN DEC FDDIcontroller/PCI User Information EK–DEFPA–IN DEC LANcontroller 400 Installation Guide EK–DEMNA–IN DSSI VAXcluster Installation/Troubleshooting Manual EK–410AA–MG EtherWORKS Turbo PCI User Information EK–DE435–OM KZPSA PCI to SCSI User’s Guide EK–KZPSA–UG RF Series Integrated Storage Element User Guide EK–RF72D–UG StorageWorks RAID Array 200 Subsystem Family Installation and Configuration Guide EK–SWRA2–IG StorageWorks RAID Array 200 Subsystem Family Software User’s Guide for OpenVMS AXP AA–Q6WVA–TE StorageWorks RAID Array 200 Subsystem Family Software User’s Guide for DEC OSF/1 AA–Q6TGA–TE Operating System Manuals Alpha Architecture Reference Manual EY–L520E–DP DEC OSF/1 Guide to System Administration AA–PJU7A–TE Guide to Installing DEC OSF/1 AA–PS2DE–TE OpenVMS Alpha Version 6.2 Upgrade and Installation Manual AA–PV6XC–TE viii Chapter 1 Site Preparation This chapter provides site planning guidelines, cabinet sizes, space and environmental requirements, and system power requirements. Sections include: • Pre-Installation Checklist • Cabinet Sizes • Floor Space and Environmental Requirements • Single-Phase AC Power Requirements • Single-Phase AC Power Cable and Receptacles • Power Requirements for the 8400 with Battery Backup • AC Power Cable and Receptacles for the 8400 with Battery Backup Site Preparation 1-1 1.1 Pre-Installation Checklist Check off tasks when completed before system delivery. To facilitate the installation process, it is recommended that the customer plan ahead and coordinate the site planning and scheduling details with Digital. Planning the Site: b b b b b b b b b b b b 1-2 Plan the physical layout of the system cabinet, expander cabinets, console terminal, and other system units. Plan to place all equipment away from heavy traffic centers leaving enough room for airflow and maintenance. Do not place systems on carpets. Obtain cabinet weights and dimensions to check against floor loading restrictions. Determine the correct power requirements for the system to be installed. Determine the sizes of circuit breakers and the number of branch circuits required. Determine number, type, and location of required AC power outlets. Check the compatibility of different power sources. This must be checked when multiple types of power distribution transformers, or power conditioning equipment is used. Determine system power consumption to calculate the input line power requirement. Establish a system grounding scheme for the installation. Determine environmental cooling requirements. Check the location and requirements of cabling for communication devices such as Ethernet. Site Preparation Checking the Delivery Route: b b b b Check the height, width, and location of doors and passageways for adequate clearance. Check floor loading requirements along passageways. Check passageway restrictions such as corners, ramps, or obstructions. Check the size, capacity, and availability of elevators. Table 1-1 lists the shipping dimensions for both 8400 and 8200 system and expander cabinets. These dimensions include the width of the shipping pallet, the height of the shipping boxes, and the weight of the packing materials. Table 1-1 Shipping Dimensions and Weights Height cm (in) Width cm (in) Depth cm (in) Weight 1 kg (lbs) 8400 System 195 (76.8) 109.5 (43.1) 121 (47.5) 454–682 (1000–1500)2 8400 Expander 195 (76.8) 109.5 (43.1) 121 (47.5) 499–726 (1100–1600)2 8200 System 195 (76.8) 91.4 (36.0) 122 (47.9) 309–626 (680–1380)3 8200 Expander 195 (76.8) 91.4 (36.0) 122 (47.9) 309–626 (680–1380)3 Cabinet 1 Weights are based on a fully configured cabinet. 2 For systems with 4 batteries add 62 kg (137 lbs), for systems with 8 batteries add 124 kg (274 lbs), and for systems with 12 batteries add 186 kg (401 lbs). 3 For 8200 systems with battery backup add 29 kg (64 lbs) per power supply. For more information: Site Environmental Preparation Guide Site Preparation 1-3 1.2 Cabinet Sizes Include all cabinets and peripherals when laying out the installation site. A sample system could include a main cabinet, a maximum of two expander cabinets, and console devices. Figures 1-1 and 1-2 show samples of 8400 and 8200 systems. 8400 Sample System 170 cm (67 in) System Cabinet 170 cm (67 in) Expander Cabinet 80 cm (31.5 in) 80 cm (31.5 in) 170 cm (67 in) Figure 1-1 Expander Cabinet 80 cm (31.5 in) BX-0442-94 8200 Sample System 170 cm (67 in) System Cabinet 170 cm (67 in) Expander Cabinet 60 cm (23.6 in) 60 cm (23.6 in) Expander Cabinet 170 cm (67 in) Figure 1-2 60 cm (23.6 in) BX-0442A-94 1-4 Site Preparation Table 1-2 Cabinet Dimensions and Weights Height cm (in) Width cm (in) Depth cm (in) Weight 1 kg (lbs) 8400 System 170 (67) 80 (31.5) 87.5 (34.5) 408–635 (900–1400)2 8400 Expander 170 (67) 80 (31.5) 87.5 (34.5) 454–680 (1000–1500)2 8200 System 170 (67) 60 (23.6) 92.5 (36.4) 272–590 (600–1300)3 8200 Expander 170 (67) 60 (23.6) 92.5 (36.4) 272–590 (600–1300)3 Cabinet 1 Weights are based on a fully configured cabinet. 2 For systems with 4 batteries add 62 kg (137 lbs), for systems with 8 batteries add 124 kg (274 lbs), and for systems with 12 batteries add 186 kg (401 lbs). 3 For 8200 systems with battery backup add 29 kg (64 lbs) per power supply. Site Preparation 1-5 1.3 Floor Space and Environmental Requirements Table 1-3 lists system environmental requirements. Space for front and rear are the minimum required for airflow and maintenance. Figure 1-3 Sample 8400 Configuration Rear Clearance 100 cm (39.4 in) Expander Cabinet System Cabinet Expander Cabinet Width 240 cm (94.5 in) 87.5 cm (34.5 in) Depth 337.5 cm (132.9 in) Front Clearance 150 cm (59 in) BX-0430-94 Figure 1-4 Sample 8200 Configuration Rear Clearance 75 cm (29.5 in) Expander Cabinet System Cabinet Expander Cabinet Width 180 cm (71 in) 92.5 cm (36.4 in) Depth 267.5 cm (105.3 in) Front Clearance 100 cm (39.4 in) BX-0430A-94 1-6 Site Preparation Table 1-3 Environmental Specifications Operating (8400) Operating (8200) Storage Temperature1 15°–28° C (59°–82° F) 10°–35° C (50°–95° F) −40°–66° C (−40°–151° F) Relative humidity1 20–80% 10–90% 10–95% Altitude 0–2.4 km (0–8000 ft) 0–2.4 km (0–8000 ft) 0–9.1 km (0–30,000 ft) Environmental 1Recommended operating temperature is 18°–24° C (65°–75° F) and 40–60% relative humidity. The minimum amount of clearance space for the system front is 150 cm (59 in) and rear is 100 cm (39 in), as shown in Figure 1-3 for the 8400. For the 8200 these figures are 100 cm (40 in) for the front and 75 cm (30 in) for the rear. These clearances are needed for airflow and maintenance. 8400 Airflow Air is taken in through the top and bottom of the cabinet by a dual wheel blower. The air circulates through the card cages and power regulators and is vented at the middle of the cabinet front and rear. 8200 Airflow Air for the system cabinet to cool the TLSB card cage is brought in from the top and blown out at the back of the cabinet. Air to cool the options is brought in from the front of the cabinet and blown out the back. Air to cool the expander cabinet is brought in from the front and blown out the back. NOTE: Do not place anything on top of the cabinets, since this restricts airflow. Inadequate airflow can cause the system to shut down. For more information: Site Environmental Preparation Guide Site Preparation 1-7 1.4 Single-Phase AC Power Requirements Systems with single-phase AC input require a receptacle within 15 feet of the cabinet. The power system consists of an AC input box, a DC distribution box, power regulators, a cabinet control logic (CCL) module, and cables. Figure 1-5 8400 Single-Phase Power Disable Secure Left Expander Enable Restart Right Expander KeyOn Run Fault Console 0 1 Rear Front DC Distribution Box Control Panel DC Regulators with LEDs AC Circuit Breaker AC Power Line Cord to AC Input Box BX-0440A-94 1-8 Site Preparation 8200 Single-Phase Power Single Power Unit ON BATTERY BATTERY CHARGING REPLACE BATTERY 2 + 48VDC- 9 SIGNALS 1 10 ON BATTERY CURRENT SHARE BATTERY CHARGING + 48VDC- REPLACE BATTERY ON BATTERY 2 BATTERY CHARGING OVERVOLTAGE OVER TEMP MODULE OK 9 SIGNALS 1 10 REPLACE BATTERY CURRENT SHARE + 48VDC- OVERVOLTAGE 9 SIGNALS 1 10 + 48VDC- OVER TEMP + 48VDC- MODULE OK CURRENT SHARE OVERVOLTAGE + 48VDC- OVER TEMP Redundant Power MODULE OK Figure 1-6 2 Power Regulators 48 VDC Output Front 2 2 Rear AC Input Boxes 1 1 1 AC Power Line Cord 2 Circuit Breakers BX-0440B-94 Table 1-4 AC Single-Phase Power Input Voltages Country Input Voltage (nominal) Circuit Breaker Rating (amps) Frequency Range (Hz) North America 202–240 (208) 30 50–60 Europe/APA 202–240 (230) 32 50–60 Japan 202–240 (202) 30 50–60 Note: Each system and expander cabinet requires its own AC power connector. Site Preparation 1-9 Table 1-5 AC Single-Phase Power Requirements System Power (watts) Heat Dissipation (BTU/hr) 8400 system cabinet only 1,000 minimum1 4,600 maximum2 3,400 minimum1 15,700 maximum2 8400 system with two expander cabinets 9,000 maximum3 30,600 maximum2 8200 system cabinet only 930 minimum1 2,647 maximum4 3,200 minimum1 9,100 maximum4 8200 system with two expander cabinets 6,234 maximum5 21,300 maximum5 1 These figures are based on a minimum configuration consisting of one of each of the following: CPU module, memory module, KFTIA module, CD-ROM, and RZ28 disk drive. 2 Based on a fully configured system containing four CPU modules, three memory modules, two system I/O modules, a PCI PIU with two PCIs in it, three BA655-AB, CD-ROM, and 36 RZ28 disk drives. 3 Based on fully configured system cabinets (see note 2) and expander cabinets containing one DWLPA-AB, one DWLPA-BB, six KZPSZ-BB, five BA655-AB, and 60 RZ28 disk drives. 4 Based on a fully configured system containing two power supplies, one CPU module, two memory modules, two system I/O modules, one CD-ROM, 16 RZ28 disk drives, two PCI shelves, and two StorageWorks shelves. 5 Based on fully configured system cabinets (see note 2) and expander cabinets containing one PCI shelf, 14 StorageWorks shelves, and 84 RZ28 disk drives. NOTE: AC power receptacles are also required for console terminals and printers. 1-10 Site Preparation 1.5 Single-Phase AC Power Cable and Receptacles The AC power cable is 4.5 m (15 ft) in length. There are two receptacles, one used in Europe and the other used in the rest of the world. AC power connectors are shown in Figure 1-7. Figure 1-7 Single-Phase AC Power Receptacles 202/208 V NOMINAL (30A) U.S. & Japanese Version NEMA L6-30R (50 - 60Hz) 230 V NOMINAL (32 A) IEC 309 Type (50 - 60Hz) V V PHASE 1 X NEUTRAL Y GND GND BX-0441A-94 Site Preparation 1-11 1.6 Power Requirements for the 8400 with Battery Backup The battery backup power system requires three-phase AC input voltage. The receptacle must be within 15 feet of the system. The power system consists of an AC input box, a DC distribution box, power regulators, a cabinet control logic (CCL) module, 48V batteries, power distribution cables, and signal interconnect cables. Figure 1-8 Rear Power System Components CCL Module Front AC Input Box DC Distribution Box Power Regulators BX-0440-94 1-12 Site Preparation Table 1-6 Three-Phase AC Input Voltages Country Input Voltage Circuit Breaker 1 Rating (amps) Frequency Range (Hz) Japan 202 Delta 30 50–60 North America 120/208 Wye 30 50–60 Europe/APA 380–415 Wye 16 50–60 1Each system and expander cabinet requires its own AC power connector. Table 1-7 Three-Phase Power Requirements Cabinet Power (watts) Heat Dissipation (BTU/hr) System 1,000 minimum1 4,600 maximum2 3,400 minimum1 15,700 maximum2 System and two expander cabinets 9,000 maximum3 30,600 maximum3 1 These figures are based on a minimum configuration consisting of one of each of the following: CPU module, memory module, KFTIA module, CD-ROM, and RZ28 disk drive. 2 Based on a fully configured system containing four CPU modules, three memory modules, two system I/O modules, one DWLPA-AA, one DWLPA-BA, three BA655-AB, CD-ROM, and 36 RZ28 disk drives. 3 Based on fully configured system cabinets (see note 2) and expander cabinets containing one DWLPA-AB, one DWLPA-BB, six KZPSZ-BB, five BA655-AB, and 60 RZ28 disk drives. NOTE: AC power receptacles are also required for console terminals and printers. Site Preparation 1-13 1.7 AC Power Cable and Receptacles for the 8400 with Battery Backup The AC power cable is 2.8 m (9 ft) in length. It consists of threephase leads (X, Y, and Z) plus neutral (N) and ground (G). AC power connectors are shown in Figure 1-9. NOTE: Neutral and ground lines must both be connected from the bulk three-phase power to complete the Wye configuration. Otherwise, power components may be damaged. Do not power up the system until power checks are completed. Figure 1-9 AC Power Receptacles 202 V NOMINAL (50-60 Hz) NEMA L21-30R 120/208 V NOMINAL (50-60 Hz) NEMA L21-30R V V V V PHASE X PHASE X PHASE Y PHASE Y NEUTRAL GND GND PHASE Z PHASE Z V V 380-415 V NOMINAL (50-60 Hz) IEC 309 TYPE V V PHASE 3 PHASE 2 NEUTRAL PHASE 1 GND V BXB-0040A-92 1-14 Site Preparation Index A E AC power single-phase cables, 1-11 current ratings, 1-9 input voltages, 1-9 power requirements, 1-10 receptacles, 1-11 watts, 1-10 three-phase cables, 1-14 current ratings, 1-13 input voltages, 1-13 power requirements, 1-13 receptacles, 1-14 watts, 1-13 AC power outlets, 1-2 Air circulation, 1-7 Altitude, 1-7 Environmental specifications, 1-7 Expander cabinet specifications, 1-5 F Floor space, 1-6 Front clearance, 1-6 G Grounding, 1-2 H Heat dissipation, 1-10 Humidity, 1-7 O Operating characteristics, 1-7 B Backup batteries, 1-12 Branch circuits, 1-2 C Cabinet sizes, 1-4 Cables signal interconnect, 1-12 Communications devices, 1-2 P Power distribution cables, 1-12 sources, 1-2 watts, 1-10, 1-13 Pre-installation checklist, 1-2 R Rear clearance, 1-6 D DC distribution box, 1-12 Delivery route checking, 1-3 S Shipping dimensions, 1-3 weights, 1-3 Index-1 Site circuit breakers, 1-2 Site planning guidelines, 1-2 System cabinet specifications, 1-5 T Temperature, 1-7 Index-2 ">
/
Herunterladen
Nur eine freundliche Erinnerung. Sie können das Dokument direkt hier ansehen. Aber was am wichtigsten ist, unsere KI hat es bereits gelesen. Sie kann komplexe Dinge einfach erklären, Ihre Fragen in jeder Sprache beantworten und Ihnen helfen, auch in den längsten oder kompliziertesten Dokumenten schnell zu navigieren.
Werbung