EJC 417
General Arrangement
Technical Specification
T06417-1
1/12
9.8 ft.
(3.0 m)
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Note: All vertical dimensions are for an empty unit.
Dimensions are in inches, dimensions in brackets
are in millimetres.
Optional ROPS canopy shown.
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Technical Specification
T06417-1
Standard Unit Specifications
2/12
General Information
Main Dimensions
Total length
Total width
7010 mm
2235 mm
Over all height 2286 mm
Height of dump box 2184 mm
Dump height 3912 mm
Operating Weights
Total front axle rear axle
15014 kg
9609 kg
5405 kg
276 in
88 in
90 in
86 in
154 in
33100 lb.
21184 lb.
11916 lb.
Loaded Weights
Total front axle rear axle
30436 kg
10653 kg
19806 kg
67100 lb.
23436 lb.
43664 lb.
Capacities
Payload
Box volume
15.4 tonnes
8.4 m³
Dump Box Motion Times
Discharging time
Dumping angle
14 sec.
75 sec.
17 tons
11.0 yd³
Driving Speeds Forward and Reverse
(Loaded)
1st gear
2nd gear
3rd gear
4th gear
4.7 km/h
9.8 km/h
16.9 km/h
29.1 km/h
2.9 m.p.h.
6.1 m.p.h.
10.5 m.p.h.
18.1 m.p.h.
Frame
Rear and front frame Welded steel box construction
Material G40.21 - 50wt Cat. #3
Central hinge full plate, clevis type with spherical bearings
Dump box
Material
Welded steel box construction
G40.21 - 50wt Cat. #3
Power Train
Engine
Diesel engine
Output
Torque 705 Nm (520 lbf-ft) @ 1 500 rpm
Number of cylinders In line, 6
Displacement
Cooling system
Detroit Diesel Series 40E
156 kW (210 Hp) @ 2 200 rpm
7.64 l
Liquid cooled
466 in³
Combustion principle Turbo charged, after cooled, direct injected, 4 cycle
Air filtration
Electric system
Dry type
24 V
Exhaust system
Fuel tank capacity
Catalytic purifier with silencer
148 l 39 US gal.
Transverter
Dana SOH 13.7
LMHR 32421
4 speed forward and reverse, single stage converter, 2.13:1 stall torque ratio.
Axles
Front
Rear
Dana SOH 16D2149, standard differential, oscillating ±8°
Dana SOH 16D2149, standard differential, fixed
Tires
Tire size
Air pressure, front
Air pressure, rear
14:00 R24
552 kPa 5.52 bar 80 psi
552 kPa 5.52 bar 80 psi
Systems
Steering Hydraulics
Full hydraulic power steering, centre articulated with a double acting steering cylinder. Open centre system with a gear pump and pilot operated stick steer control.
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Technical Specification
T06417-1
3/12
Turning Radius
Inner
Outer
Turning angle
3175 mm
5893 mm
44 °
125 in
232 in
Main Components
Hydraulic pump
Control valve
Steering cylinder
Gear pump
Pilot operated
EJC 127 mm bore X 51 mm rod
(5.0" X 2.0")
Pressure Settings
Main relief
Port relief valves
13.8 MPa 138 bar
13.8 MPa 138 bar
2000 psi
2000 psi
Dump Box Hydraulics
Full hydraulic open-centre system with one gear pump.
Electric push button dump box control located on the steer stick.
Other Standard Equipment
• Electric shift
• Central hydraulic pressure test points
• Central manual lubrication system
• SAE hose fittings
Manuals
All manuals are delivered on CD-ROM in web based format with Adobe PDF output for printing.
Distribution
Manual Type Customer
Spare parts manuals 3 Copies
Operator’s manual
Service manual
3 Copies
3 Copies
Optional Equipment
Specifications
Market Area
1 Copy
1 Copy
1 Copy
Main Components
Dump cylinder
Hydraulic pump
Control valve
2 stage telescopic 184/152 mm
(7.25/6.0”)
Gear pump
Pilot operated
Pressure Settings
Main relief
Port reliefs
13.8 MPa 138 bar
13.8 MPa 138 bar
Hyd. oil tank capacity 125 l 33 US gal.
2000 psi
2000 psi
Standard Brakes
Service brakes are spring applied/hydraulically released, liquid cooled (LCB) multi-disc brakes on all wheels with two separate circuits for the front and rear axles. Service brakes also function as an emergency brake, when the emergency brake system is engaged.
Main Components
Pressure accumulators Piston type with charging valve
Brake pedal valve Modulated
Electrical Equipment
Alternator
Batteries
Starter
Driving lights
24V 60 A, min
2 x 12 V, 950 CCA
24 V, Heavy Duty
4pcs front, 2pcs rear
Available Alternative Equipment
Auto lube system Lincoln modular
Alternative Dump Box Options
Volume Width Side Height
6.9 m³ 9.0 yd³ 2134 mm 84” 1905 mm 75”
8.2 m³ 10.7 yd³ 2540 mm 100” 1981 mm 78”
Available Add-On Options
Dump box
Operator’s compartment
Fire suppression systems
Hand held fire extinguishers
Emergency steering system
Split dump box rework
Abrasion resistant box liners
SAE ROPS canopy
Enclosed operator’s cab with A/C
(solid mounts)
Manual - Ansul 6 nozzles, 1 tanks
Automatic (Checkfire II) - Ansul 6 nozzles, 1 tanks
4.5 kg
9.1 kg
10 lb.
20 lb.
SAE J-1511, electric
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Tractive Effort Curve (Metric Units)
Additional Information
T06417-1
4/12
220
200
EJC 417
ENGINE:
TRANSVERTER:
Detroit Diesel Series 40E
CLARK LMHR 32421
AXLES: 16D2149
TIRES:
Payload:
14.00 R24
15 422 kg
180
160
Rolling resistance (% )
EMPTY LOADED
0 2 4 6 8 0 2 4 6 8
140
120
100
80
60
40
20
0
0 2 4 6
30
25
30
25
20
15
10
5
20
15
10
5
8 10 12 14 16 18 20 22 24
Speed (km/h)
26 28 30 32 34 36 38 40 42 44 46
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Tractive Effort Curve (US Units)
Additional Information
T06417-1
5/12
50
45
40
35
30
25
EJC 417
ENGINE:
TRANSVERTER:
Detroit Diesel Series 40E
CLARK LMHR 32421
AXLES:
TIRES:
16D2149
14.00 R24
Payload: 34 000 lbs
Rolling resistance (% )
EMPTY
0 2 4 6 8
LOADED
0 2 4 6 8
20
15
10
5
30
25
20
15
10
5
30
25
20
15
10
5
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Speed (mph)
23 24 25 26
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Productivity Curve (Metric Units)
EJC 417 PRODUCTIVITY
Basic data for calculations:
Additional Information
T06417-1
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
0
0
Fixed cycle time includes the time for filling, dumping, turning and accelerating
Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20
Loaded speed (km/h)
8.8
20
6
20
4.4
20
500 1000 1500 2000 2500
ONE WAY DISTANCE IN METRES
3000
0% 10% 15% 20%
3500 4000 4500
6/12
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
80
60
40
20
0
0
160
140
120
100
EJC 417
Productivity Curve (US Units)
EJC 417 PRODUCTIVITY CURVE
Additional Information
T06417-1
Basic data for calculations:
Fixed Cycle time 4.0 min
Fixed cycle time includes the time for filling, dumping, turning and accelerating
Slope/Grade (%) Hor./0 1:10/10 1:7/15 1:5/20
5.5
3.7
2.7
12.4
12.4
12.4
2000 4000 6000 8000
ONE WAY DISTANCE IN FEET
0% 10% 15%
10000
20%
12000 14000
7/12
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
EJC 417
End Loading with EJC 145
Additional Information
T06417-1
8/12
11 cu.yd. Dump box
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Additional Information
T06417-1
Side Loading with EJC 145
9/12
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Additional Information
T06417-1
End Loading with EJC 116
10/12
6.9 m³ (9.0 yd³)
Side Loading with EJC 116
6.9 m³ (9.0 yd³)
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Additional Information
T06417-1
End Loading with EJC 90
11/12
6.9 m³ (9.0 yd³)
Side Loading with EJC 90
6.9 m³ (9.0 yd³)
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com
EJC 417
Additional Information
T06417-1
End Loading with Toro 151
12/12
44°
6.9 m³ (9.0 yd³)
Side Loading with Toro 151
44°
6.9 m³ (9.0 yd³)
Sandvik Mining and Construction Canada Inc.
4445 Fairview Street, Burlington Ontario, Canada L7L 2A4
Tel.: (905) 632-4940
Revision Date: 2006-2-08
Web: http://www.sandvik.com