Cecilware CS2A Operation Manual
PDF
Dokumentas
Reklama
Reklama
CECILWARE
COFFEE BREWERS
* OPERATION MANUAL
CONTENTS
SPECIFICATIONS
INSTALLATION INSTRUCTIONS
OCS12 BREWING INSTRUCTIONS cs?
CLEANING INSTRUCTIONS
ADJUSTMENT INSTRUCTIONS
TROUBLE SHOOTING GUIDE
REPAIR PARTS LIST 4
>= WIRING DIAGRAMS SEA,
— Pon
OCS2000SWT TT CS3AWT
MODEL NO. GENERAL SPECIFICATIONS ELECTRICAL DATA
Ship. wt.
Width | Depth | Height | (bs) | Watts | volts | Amps
0CS12 17%" 9%" 2214" 20 Hoos о E
OCS1200, 2000S, 2000SWT | 17%" 9%" 25%" 29 SAO 5 В
+ = 1
cs? 16 10 20% 25 3500 e +
cs3 16" 10° | 21%" | № | 200 | 159 Be
"a "г 1. FE 1600 120 15
CS2A, 2AWT 16 10 20% 27 100 120
CS3A, 3AWT 16" | 10" | 21%" | 28 | 1700 | 120 es
CECILWARE CORPORATION
43-05 20th Avenue, Long Island City, NY 11105 * (718) 932-1414 * Fax (718) 932-7860
. 2551 Fernwood Avenue, Lynwood, CA 90262 * (213) 774-0770 * Fax (213) 774-1314
N257A 2/95
WARNING: MACHINE WARRANTY IS VOID IF MACHINE IS CONNECTED TO ANY VOLTAGE
OTHER THAN 120 VOLTS. (EXPORT UNITS SHOULD BE CONNECTED TO 220 VAC VOLTS).
**INSTALLATION INSTRUCTIONS**
NOTE: A SEPARATE CIRCUIT SHOULD BE SUPPLIED FOR EACH OF THESE BREWERS WITH A 15 AMP.
CIRCUIT BREAKER OR FUSE. CHECK LOCAL CODES FOR COMPLIANCE IN INSTALLATION.
CAUTION: DO NOT CONNECT BREWER TO POWER SOURCE UNTIL AFTER PRIMING. (INSTRUCTIONS BELOW).
WATER HOOK-UP (FOR AUTOMATIC BREWERS ONLY)—(CS2A, 3A, 2AWT, 3AWT, OCS2000S, OCS2000SWT)
Automatic Brewers should be hooked up by a plumber in compliance with local plumbling codes. The National
Sanitation Foundation (NSF) requires the following for an NSF approved hook-up:
1. A quick disconnect water connection or enough extra coiled tubing, (at least two times the depth of brewer) so
that brewer can be moved to clean underneath.
2. An Ebro flowback prevention device such as a double check value to be installed between brewer and water
supply.
Your automatic coffee brewer was shipped with a water hook-up kit consisting of a strainer, length of %" (outside
diameter) copper tubing and water valve fitting which connects to valve in rear of brewer. This fitting needs to be
finger tightened only. Connect the open end of the strainer to 4" O.D. tubing and a shut-off valve (supplied by others)
leading to cold water supply. 20-120 PSI water pressure, required for proper operation.
TO PRIME ALL BREWERS:
1, Remove sample filter pack from funnel and insert funnel back into machine.
2. Place an empty decanter on warmer plate directly under funnel.
3. Lift cover (1, Fig. 1, 2) and pour 3 decanters of cold water through the top opening at 3 minute intervals.
4.
After the third decanter is poured, water will flow through spray head and funnel and fill decanter beneath.
Plug line cord into receptacle and turn on power switch. The power light will light, indicating power is applied to
the tank heater. Wait approximately 15 minutes for the water to reach brewing temperature, at which point the
green light will light. You are now ready to brew coffee.
NOTE: In high altitude locations (at least 5000 ft. above sea level) thermostat setting may have to be lowered to
prevent boiling. Turn thermostat stem at back of brewer slowly counter-clockwise until boiling stops.
THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE REPEATED FOR
NORMAL OPERATION.
NOTE: If brewer is not to be used for an extended period, turn off power switch. This will prevent excessive
evaporation of the water reserve in the tank, (in models without water tap) and save on your electric bill.
BACK-UP SYSTEM (Automatic Models—CS2A, 3A, 2AWT, 3AWT, 0CS2000S, OCS2000SWT)
In case of solenoid or timer malfunction or water supply problems (clogged strainer), automatic models may be used
as pourover units simply by lifting cover.
AUXILIARY HOT WATER FAUCET (CS2AWT, CS3AWT, OCS2000SWT)
Automatic Brewers feature a hot water faucet and a solid state water level control which automatically replenishes
water used and maintains the proper water level inside the holding tank at all times,
The solid state level control has a built-in secondary control timer which shuts down the brewer in case of a
malfunctioning brew timer, level control or solenoid. A red (LED) indicator light will signal that service is required. In
such case, brewing of coffee can continue by use of back up system (manual pourover) until problem is solved.
**BREWING INSTRUCTIONS **
AUTOMATIC MODELS (MODEL NO. CS2A, 3A, 2AWT, 3AWT, OCS2000S, 2000SWT):
1. Make sure power switch and green ready light are on. (Wait for green ready light to come on if necessary).
2. Place paper filter in brew funnel. Open pack of fine grind coffee (as recommended by your coffee supplier) and
spread evenly on filter paper.
. Insert Brew funnel back into machine and place empty decanter under funnel.
. Turn on warmer switch beneath decanter and press brew switch. Coffee will be ready in 3% minutes.
. Adjust timer (if necessary to fill decanter to just below band on handle)—(refer to instructions for timer adjustment).
. Remove grounds and filter as soon as coffee has dripped through. Never pour coffee back through spent grounds.
OUR-OVER MODELS (OCS12, OCS1200, CS? & CS3):
1. Follow steps 1, 2 and 3 above.
2. Fill decanter with cold water to just below band on handle, lift cover (1, Fig. 1, 2), and pour water through top of
opening. Place empty decanter under funnel.
3. Turn on warmer switch beneath decanter. Coffee will be ready in 32 minutes.
4. Remove grounds and filter as soon as coffee has dripped through. Never pour coffee back through spent grounds.
**CLEANING INSTRUCTIONS **
. Wash brew funnel and decanter by hand as needed. Do not use dishwasher, which may cause decanter breakage.
. Clean plastic and stainless steel surfaces whenever necessary with a damp sponge or cloth and mild soap;
rinse thoroughly and wipe dry. CAUTION: Avoid using strong cleaners which may adversely affect the plastic parts.
Remove stains on stainless steel parts with a SCOTCHBRITE pad: Never use steel wool, as it will mar the finish.
. Remove and clean spray head (22, Fig. 1; 15, Fig. 2) once a week to prevent lime build-up and clogging.
FOR AUTHORIZED SERVICE PERSONNEL ONLY
**SERVICE INSTRUCTIONS **
HIGH TEMPERATURE SAFETY SHUTOFF-RED RESET BUTTON:
If unit runs dry due to extended periods of non-usage with the power on, safety shutoff will automatically turn off the
heating element. To put the brewer back in operation, refill the tank compartment with water (follow priming
instructions), push the red reset button, on the back of the machine, and wait for the water to heat. When the brew
light comes on, the machine is ready to brew coffee.
NOTE: In hard water areas, lime deposits may have to be removed before operating brewer again after it has
- run dry. Follow directions under “Cleaning Instructions” for deliming.
Dn ao
ACC Mm —
2
THERMOSTAT ADJUSTMENTS:
1. Remove hole plug (3, Fig. 1, 2) from the round hole on top of cover. Place a suitable thermometer in hole and immerse
bulb approximately 4 inches.
2. If water temperature is less than 197° F (92° C) slowly turn thermostat slot stem, on back of brewer, clockwise until ready
light goes out. When temperature of water approaches 197° to 203°F (92° to 95°C) slowly turn thermostat stem
counter-clockwise until the green ready light comes on. If water temperature cannot be increased when thermostat
shaft is turned fully clockwise, then proceed as follows:
Place a small screwdriver into the center of thermostat shaft. While observing green ready light and temperature on
thermometer, hold shaft and turn small adjustment screw in center counter-clockwise until green ready light goes out.
When temperature of water approaches 197° -203°F (92°-95° C), slowly turn screw clockwise until ready light comes on.
Turning screw clockwise lowers temperature; counter-clockwise raises it. After adjusting center screw, place nail polish or
glyptol on screw to set in position.
NOTE: As a final check, measure water temperature at Spray Head (22, Fig. 1; 15, Fig. 2). Temperature should be 197° to
203°F (92° to 95°C). ю ве) =
TIMER ADJUSTMENTS (Automatic Models Only):
To increase volume of water, turn knob of timer (24, Fig. 1; 48, Fig. 2) clockwise. To decrease, turn knob counter-
clockwise. Turn knob by small increments.
NOTE: Timer must go through a complete cycle before another adjustment can be made. Timer cannot be adjusted
once it has been initiated.
**TROUBLE SHOOTING GUIDE**
(For Qualified Service Persons Only)
CAUTION: DISCONNECT POWER BEFORE ATTEMPTING ANY ELECTRICAL REPAIRS.
PROBLEMS WITH WARMER ELEMENTS & SWITCHES:
If warmer plate (20, Fig. 1; 17, Fig. 2) fails to heat, first check power source. If power source is okay, check if light on
warmer switch (15, Fig. 1; 18, Fig. 2) is lit when in the "I" position. If warmer switch is lit, replace warmer plate by
unplugging brewer, removing the two hold down screws on plate and withdrawing warmer plate from brewer. Replace
with new warmer plate. If warmer switch does not light, replace it. To remove warmer switch press each tab behind
front plate of brewer down with screwdriver in turn. As each tab is pressed, pop that corner of warmer switch out of
the front of brewer. New switch snaps in from the front.
IF WATER FAILS TO HEAT:
1. If amber power light (39, Fig. 1, 2) and warmer switches do not come on, check power source. Replace fuse
or oe circuit breaker if necessary. If power is good, check brewer wiring for continuity and replace damaged
wire(s).
2. If amber power light is on, follow priming instructions; then press reset button on back of brewer and wait
approximately 15 minutes for water to heat and green ready light to come on. If water still fails to heat, disconnect
line cord and check out tank heater, (27, Fig. 1. 41, Fig. 2), thermostat (33, Fig. 1; 24, Fig. 2) and high temperature
safety shutoff (35, Fig. 1; 43, Fig. 2). Replace needed parts.
MAINTENANCE ON AUTOMATICS (CS2A, 3A, 2AWT, 3AWT, OCS2000S, OCS2000SWT)
IF NO WATER COMES FROM SPRAY HEAD: Check in the following order:
1. Water Supply Line 4. Timer (24, Fig. 1; 48, Fig. 2)
2. Line Fuse or Circuit Breaker 5. Level control (all WT brewers with spigots)
3. Solenoid (37, Fig. 1; 28, Fig. 2)
TESTING SOLENOID AND TIMER (OCS2000S, CS2A & CS3A):
Make sure brewer is properly primed. Turn on power switch; then press brew switch and hold for one minute. If
solenoid buzzes and water flows through spray head when brew switch is pressed and held, but stops when switch is
released, timer is defective. Replace it. If no water flows from spray head, and solenoid is inactive, first check brew
switch and wiring to solenoid and replace or repair as necessary. If brew switch and wiring are okay, solenoid is
at fault.
COFFEE BREWERS WITH HOT WATER SPIGOT (OCS2000SWT, CS2AWT 8 CS3AWT):
1. When hot water is drawn for purposes of making tea, decaffinated coffee or instant soup it is automatically
Meriva by means of a water level control built into the system. Proper water level inside the tank is maintained
at all times.
2. The outstanding feature of this water level control is its unique “Safe-Guard” circuit which prevents possible
flooding which may be caused by electrical component failure (i.e. switches, timer, level control sensor or solenoid,
see Trouble Shooting guide for diagnosis). Problems with any of the components will also be visually indicated by
the red (LED) light. To reset the safeguard system, simply shut the power switch OFF and then turn on again.
3. If there is no water coming out from the spray head when brew switch is depressed or if water does not refill when
hot water is drawn, check the following:
A) If LED light is on at the front, shut off the power switch and turn on again. This will reset the level control and
automatic refill cycle. If LED light goes off and there is no auto refill, proceed as follows:
1. Disconnect power.
2. Disconnect red wire from solenoid and also disconnect red wire from liquid level control (Terminal “Timer”
—2nd from right side) (46, Fig. 1; 30, Fig. 2), and connect this wire to solenoid, then perform solenoid test
described in “Testing Solenoid and Timer" after reconnecting power.
4. Disconnect power. If system operates but does not refill automatically, proceed as follows:
Connect the wire back to original wiring. Remove one wire on “Probe” terminal of water level control (Top one on
left side of control).
Reconnect power and turn on power switch. If solenoid activates, water level control is operating normally. If
Solenoid fails to activate, the water level control is probably defective. Check the wiring for proper connection &
continuity.
Jum comp
Cowra
WA
L arr
PA SEE EFF жет Вы
a 1
at il
al i
и Ph
i i!
ы L i"
1 ТН ны il
р Le |,
la A
N
;l Le
ОЙ вый
al ce dar D
я ATEN | |
N ? вена |7,
a | '
— de
if
+ i
rowed | Frid EE Sete E
зн псы Top mamo El
| бела из мати,
TELLO
mor ; TOP BOX
E
; ts
Lar =
=" BTA “= Pe
= OC5-1200 ONLY
RED WIRE
— WARE
— LAN WIRE
= ELE WIRE
CORD
LT
WARMER La
COST
FO OO
Ea WARMER
Li
WARMER
SWITCH
COFFEE STATION 3
a.
LEKW- 20V SO/60HZ | PW.
23Kw-220v S0/60HZ
E
=
Lors
HI=LIMIT
E PUR
| PEW OO НР
(LL - SEO Mr IPM
NEO WINE
— 5 WEA
«== СЯН ЖЕ
— ELE WEE
LINE
CORD
WARMER
PO
mov De WARMER
WARMER
LITEA
TAT
0 че
o E EE
— EE | EE
— o ey
FIGURE 1
COFFEE STATION
MODELS
CS3AWT (SHOWN)
REPLACEMENT PARTS LIST FOR COFFEE STATION AND OCS BREWERS
ITEM # ITEM #
CS/0C5 DESCRIPTION PART # MODELS CS/0CS DESCRIPTION PARTA MODELS
1/1 Lid Cover R128A 20/17 Warmer Element Assy. 120V GO97A
2/2 Cover Chain Р2ЗВА Warmer Element Assy 220V GD98A
3/3 Thermometer Hole Plug P221A 21/16 Element Mounting Screw P139A
4/- Stainless Cover 2 R321V CS? Series 22/15 Spray Head—Plastic E026A
Stainless Cover 3 R325V C53 Series 23/14 Spray Head Nut E007A
5/- Inside Tank Cover R123A All CS 24/48 Solid State Timer 120V L265A All Automatics
6/- Plastic Cover Screw P154A All CS Solid State Timer 220V L265E All Automatics
715 Water Trough R126A All CS 25/42 Tank Heater Gasket MO75A
8/7 Spray Tube Assembly H134A All Except WT 27/41 Tank Heater 120V/1400W GO46A
Spray Tube Assembly H159A All WT Tank Heater 220V/2000W G111A
9/8 Spray Head Gasket M121A 28/6 Thermostat Bulb Clip P1434
10/- Polysulfone Tank R122A All CS Except WT 29/9 Safety Shutoff Bulb Clip P1424
Polysultone Tank R122E All CS WT 30/46 Safety Shutolt Spacer М104А
i1/- Top Box (Less Components) R323V All CS Except WT 31/45 Safety Shutoff Tinnerman РОВВА
Top Box (Less Components) R337A All CS WT 32/47 Safety Shutoff Mig. Screw P030A
12/- Label №09А All CS 33/24 Thermostat LO25A
13/- Brew Funnel Runner—Right U490A All CS 34/26 Solenoid Mounting Screw P235A All Automatics
Brew Funnel Runner—Lefi U493A All CS 35/43 Safety Shutoff (Hi Limit) L111A
14/- Runner Screws P182A All CS 36/27 Solenoid Tinnerman P228A All Automatics
15/18 Warmer Switch L155A 37/28 Solenoid 120V L298A All Automatics
16/19 Bottom Cover R327A Solenoid 220V L308A All Automatics
17/20 Rubber Foot M134A 38/44 Solenoid Fill Tube М191А All Automatics
18/- Foot Mounting Screw Р14ВА All CS 39/- Power Warm Switch L286A CS3 Senes
19/35 Spacer, Warmer Dish P205A Power Switch LISSA C52 Series
49
FIGURE 2 —
ocs |
MODELS > - iS | Nu
OCS2000SWT (SHOWN) ) i am NS =
2 et A
= 4 Ч L (a
&) + | - 3
| à
| o ®
7 a5) 07)
a 4 =
Г [|
®- — PPS DD SENG ®
mo | & à
à Ia
a
REPLACEMENT PARTS LIST FOR COFFEE STATION AND DCS BREWERS, Continued
ITEM # ITEM #
CS/OCS DESCRIPTION PART # MODELS C5/0CS DESCRIPTION PART # MODELS
40/- Ready Brew Switch 120V L291A All CS Automatics -/22 Top Hold Down Screw P144A All OCS
Ready Brew Switch 220V L292A All CS Automatics -/23 Top Warmer Assembly R167A OCS-1200. 20005WT
Ready Light 120V L289A All CS Pour-Overs -/29 Top Cover Screw P148A
Ready Light 220V L290A All CS Pour-Overs -/35 On/Off Switch LO69A All Pour-Overs
41/31 Wire Shield Tube MOSBA On/Off Switch L299A All Automatics
42/32 Strain Relief 120V BO12A */39 Amber Power Pilot Light C5420 All OCS
Strain Relie{ 220V B043A -/149 Brew Switch L132A All Automatics
43/33 Line Cord 120V СВ14А -/50 Top Warmer Switch LO69A 0CS-1200. 2000SWT
Line Cord 220V C1120
44/34 Wire Bushing BOOJA NOT SHOWN:
45/11 Faucet DO42A All WT Henry Strainer E0020 All Automatics
46/30 Level Control 120V L296A All WT Brew Funnel VODIA
Level Control 220V L312A All WT Filter Pack VO2Z0A
47/51 LED C917A All WT Decanter. 2 Pack Y117A
48/25 Solenoid Fitting K1780 All Automatics Top Box Compl w/Components L295A C5-2
49/- Base and Tower Assembly Top Box Compl w/Components L293A CS-3
(Less Components) R2360 Top Box Compl. w/Components L297A CS-2A
“14 Top R127A All OCS Top Box Compl. w/Components L288A CS-3A
-10 Top Box R142A 0CS-12, 005-1200 Top Box Compl w/Components L310A CS-24WT
Top Box R383A 0CS-20005 Top Box Compl. w/Components L311A CS-3AWT
Top Box R384A OCS-2000SWT Top with Top Warmer R345A All Automatics
-/12 Runner For Brew Funnel U071A All OCS Top Box Compl w/Components 1900 0CS-12, 0CS-1200
-/13 Mounting Screw P140A All OCS Top Box Compl. w/Components L335A 0C5-20005
«121 Bumper Screw P139A Top Box Compl. w/Components L3404 OCS-20005WT
">
/
Atsisiųsti
Tiesiog draugiškas priminimas. Dokumentą galite peržiūrėti tiesiog čia. Bet svarbiausia, kad mūsų AI jau jį perskaitė. Jis gali paaiškinti sudėtingus dalykus paprastais terminais, atsakyti į jūsų klausimus bet kuria kalba ir padėti greitai naršyti net ilgiausius ar sudėtingiausius dokumentus.
Reklama