Craftsman CVCS107 Instructions / Assembly
Below you will find brief information for storage shed 71-65035. The Craftsman 71-65035 storage shed is a great way to store your belongings and keep them safe from the elements. This shed is made of durable steel and can be assembled easily by following the instructions in this manual. It has a spacious interior that can accommodate a variety of items, and it features a double door for easy access.
Advertisement
Advertisement
722790217 01CI (CVS107) Owner’s Manual & Assembly Guide Model No. 71-65035 United States 10’ x 7’ Gloves must be worn at all times to reduce risk of injury! Nominal Size Customer Service: 1-800-851-1085 or [email protected] BUILDING DIMENSIONS Approx.† Size 10’ x 7’ 3,0 m x 2,0 m Storage Area 64 Sq. Ft. 432 Cu. Ft. 2 6,0 m 12,2 m3 * See Inside for Detailed Safety Information. Base Size For proper base construction see page 12 † Size rounded off to the nearest foot Exterior Dimensions (Roof Edge to Roof Edge) Width Depth Height 121” x 81” 307,3 cm x 205,7 cm Interior Dimensions (Wall to Wall) Width Depth Height Door Opening Width Height 123 1/4” 83 1/2” 90 5/8” 118 1/4” 78 1/4” 89 3/8” 59 1/2” 69 1/4” 313,1 cm 212,1 cm 230,2 cm 300,4 cm 198,8 cm 227,0 cm 151,1 cm 175,9 cm SAFETY PRECAUTIONS... 02H Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools. Keep children and pets away from the worksite during construction and until the building is completely assembled. This will help avoid distractions and any accidents which may occur. Do NOT attempt to assemble your building on a windy day. The large panels can catch the wind like a “sail”, causing them to be whipped around making construction difficult and unsafe. Do NOT attempt to assemble your building before double checking that you have all the parts indicated in the parts lists (page 8) as well as all hardware (page 7). Any building left partially assembled may be seriously damaged by even light winds. IMPORTANT NOTE ON ANCHORING NEVER concentrate your weight on the roof of the building. When using a step ladder make sure that it is fully open and on even ground before climbing on it. • Your building MUST be anchored to prevent wind damage. An anchoring kit is not supplied with your building and you have many options when it comes to anchoring. See anchoring page for more info. • You must also have a temporary anchoring system in place in case you need to take a break from assembly. See page 4 for more info. 2 ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer. Tools and Materials: Here is a list of some basic tools and materials you will need to assemble your building. Decide which method of anchoring and the type of base you will use to make a complete list of the materials you will need. WHAT YOU NEED RECOMMENDED TIME SAVERS BASE PREPARATION TOOLS • • • • • • • • Work Gloves Safety Glasses Step Ladder No. 2 Phillips Screwdriver (Magnetic Tip Preferred) Utility Knife or Scissors Pliers Carpenter’s Level Tape Measure • • • • • Power Drill (Cordless, Variable Speed) Nut Driver or Wrench Square String (for squaring the frame) Awl (to align holes) • • • • Lumber and/or Concrete Hammer and Nails Spade or Shovel Hand Saw or Power Saw How to Select and Prepare Your Building Site: Before you start to assemble your building, you will want to decide on a good location. The best location is a level area with good drainage. • Allow enough working space so it is not difficult to move parts into position for assembly. Be sure there will be enough space at the entrance for the doors to completely open. Also, there needs to be enough space outside the building to be able to fasten the panel screws from the outside. • Before assembling any parts, your base should be constructed and an anchoring system should be ready to use. 3 04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base. Refer to the clock icons on each product page on the website for specific time estimates. Q. How do I decide where to put my shed? A. The key to a successful assembly is to make sure the shed will be square and level when built. The shed can be assembled directly onto level ground (grass or dirt). If you have location options, choose one that is already flat, with good drainage to control moisture. If you don’t have a flat, well-drained area, you need to prepare the space. Level the area using cinder blocks, concrete, crushed gravel or other sturdy materials. Once level with good drainage, construct your base. Using a carpenter’s level, make sure your base is level and free of bumps or ridges to provide good support for your building. Q. What if I can’t finish my building in one session? A. If weather conditions change so that it becomes windy or rainy, it is recommended that you stop assembly until conditions improve. This is for your safety and for protection of the shed panels. However, do not leave your unfinished construction without first temporarily anchoring the corners of the shed to your base and placing weights, such as patio blocks or sandbags, on the floor frame. Failure to anchor the building if you leave it while partially assembled could result in irreparable damage or personal injury if the building collapses. Note: Most instruction manuals provide a warning note at the beginning of the installation step for corner panels, stating that the remainder of the building assembly requires multiple hours and more than one person. Do not continue beyond this point if you do not have enough time or help to complete the assembly that day. A partially assembled building can be severely damaged by even light winds. Q. Do I need to anchor my building? A. Yes! Fully assembled buildings should be anchored using a permanent anchoring system. If you need to leave your building before it is completely assembled, you will need to temporarily anchor the corners of the shed to your base, and place weights, such as patio blocks or sandbags, on top of the floor frame. Q. How do I temporarily anchor my building before it’s fully assembled? A. An incomplete building must be anchored before breaking for any period of time to prevent possible damage. •If the building is on a wood base, secure the frame with wood screws in the corners •If the building is on a concrete base, temporarily anchor the frame in the corners •Use patio blocks or sandbags on top of the floor frame as weights •Secure the floor frame to the ground with ground augers or rope the frame in the corners to the ground Q. How do I control condensation and prevent water from leaking in? A. To minimize condensation, install a continuous, unbroken plastic vapor barrier with a thickness of 6 mil. between exposed ground surface and the building’s base. Make sure that all weather stripping and washers are used throughout the assembly process. Make sure that the weather-stripping tape adheres to the panels when installing it along the main ridge beam. Do not stretch it. Apply it directly off the roll onto clean panels. Ensure that all washers are flush with the panels and do not over-tighten screws, as this can crack the washers. Silicone caulking may be used to create watertight seals at the washers and throughout the building. 4 05P Q. What kind of base do I use? A. You can: •Use a Craftsman Floor Frame Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Craftsman provides a floor frame kit accessory that is an option for most building sizes. If you are building a wood deck/floor, a Craftsman floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included). A continuous unbroken plastic vapor barrier with a thickness of 6 mil. between the ground and the building’s base is also recommended. Q. How should I measure for my base? A. Shed dimensions are provided in “nominal” size. Nominal sizes are roof-edge measurements rounded to the nearest foot and are not the measurements to use for constructing the shed base. So, carefully check the exact, recommended base size in the specifications for your shed model. Q. How do I align the holes in the wall panels with the holes in the floor frame? A. Make sure that the shed is level and square, with the correct floor frame size, and that the corner panels are installed correctly. Line up the large hole in the panel with the small holes in the floor frame. An awl can be used to help align the holes. Q. How do I align the holes in the roof panels with the holes in the roof beam and side wall angles? A. Your building must be level and square in order for the holes to align. It must be square at both the top and bottom. Check that the building is square by measuring diagonally. The two diagonal measurements will be equal. If your building is out of square, carefully rock and push the shed until it is square. Also, try loosening the roof beams to give more play and flexibility. Non-alignment can also occur if your building is not level. You can raise corners and shim under them to make it level. Check that the panels are installed in the proper location. The building should not be permanently anchored until the complete unit is assembled; otherwise, you will not be able to make adjustments for squareness during assembly. Do not attach the bottom of the roof panels to the side wall angles until all the roof panels are up. Note: If you have to stop assembly for any reason before it is complete, do not leave your unfinished construction without first temporarily anchoring the corners of the shed to your base and placing weights, such as patio blocks or sandbags, on the floor frame. Q. What kind of customer support is available? A. Our instruction manuals contain step-by-step assembly illustrations and guide you from preparation through assembly to care and maintenance of your finished building. Each part is marked with a factory number for easy identification. In addition, our assembly animation (located under the Customer Support menu at www.arrowsheds. com) provides helpful tips. But if you need to reach someone at Arrow, you can contact Arrow Customer Service, toll free, at 1-800-851-1085 (press 1) or via e-mail at [email protected]. Have your model number and instruction manual with you when you call. 5 Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06A frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A. This sequence is to be followed through the assembly process. However, this will typically happen once on the rear and once on each side wall (vertical wall units only) where there will be either two crimped ribs overlapping or two wide ribs overlapping. This may give it a tighter fit, but it will work. Q. Can the building be painted? A. The buildings can be painted with an exterior-grade paint designed for use on steel. Contact your local paint supplier for recommendations. Q. I heard that rust might be an issue with steel; is it? A. While steel can rust, with proper care this should not be an issue. For a long-lasting finish, periodically clean the exterior surface and apply spray-on car wax. Touch up scratches as soon as you notice them by immediately cleaning the area with a wire brush or emery paper, washing it and applying touch-up paint. This will minimize rust and maintain your shed’s attractive appearance for years. Q. How do I take care of dents in my shed? A. Proper selection of shed size, including a sufficient door-opening width, and proper placement of your shed should minimize the possibility of damage. If a dent does occur, carefully push the dent out from the opposite side. If the paint has been scratched or removed, touch up the area as soon as you notice it. Immediately clean the area with a wire brush or emery paper, wash it and apply touch-up paint. This will minimize rust and maintain your shed’s attractive appearance for years. Still have questions? Visit us online at www.arrowsheds.com to view lots of helpful tips and information regarding all of our available products. You can also contact our Customer Service team at 1-800-851-1085 (press 1), or via e-mail at [email protected]. Part No. ##### 5 At the top of each page you will see one or more Part Cues like the one to the left. These Part Cues are designed to help you quickly identify the parts needed for each step. Quantity Needed End View Part Name Part Name Confirm that all hardware and parts are present before attempting to assemble your building. Part Numbers For missing or damaged parts contact Customer Service. Do not return to store. Customer Service: 1-800-851-1085 or [email protected] Part Number 1. Each part has an identifying part number on it. 2. Part Numbers are referenced in each step. 3. Unpainted parts have a stamped in number and painted parts have a number that is inked on. Remove inked on numbers with soap and water after assembly. 6 HARDWARE LIST... Key Part No. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 65103 65923-61 65923-62 65923-06 65004-61 65004-62 65958 66783 66692 66646 66809 66054 66609 66183L 66183R 67545 66447 Part Description Qty. Hex Nut (#8-32) Small Bolt (Stone) (#8-32 x 3/8) (10 mm) Small Bolt (Vanilla) (#8-32 x 3/8) (10 mm) Small Bolt (Black) (#8-32 x 3/8) (10 mm) Small Screw (Stone) (#8AB x 5/16) (8 mm) Small Screw (Vanilla) (#8AB x 5/16) (8 mm) Long Bolt (#8-32 x 7/8) (22 mm) Flat Head Bolt (#8-32 X 1/2) (13 mm) Tapping Screw (#10ABx1) (25 mm) Washer Sheet Locking Handle Right Latch Hinge Left Roof Trim Cap Right Roof Trim Cap Weather Stripping Peak Cap 152 74 40 14 384 66 4 24 2 7 1 1 4 2 2 1 2 18 67236 Adhesive Pads (2 per sheet) 1 19 66684 Top Latch Spring 1 20 66808 Bottom Latch Spring 1 21 66810 Left Handle 1 22 66811 Handle Backplate 2 23 66812 Hinge Plate Decoration 4 24 6228 25 66859 Track Support Craftsman Logo 2 1 Hardware Views by Key No. List Various fasteners are used The fasteners used in each throughout the construction of your step are shown actual size at storage unit. In each step you will the top of each page. If you are see the abbreviations listed below unsure which fastener to use, used in the illustrations to help you hold it up to the picture and use identify which fastener to use. the one that matches. SB - Stone Bolt VB - Vanilla Bolt BB - Black Bolt SS - Stone Screw VS - Vanilla Screw FB - Flat Head Bolt QTY 18 TS - Tapping Screw LNB - Long Bolt 7 07CI 1 2 11/32 Hex. 4 BB #2 Phillips SB #2 Phillips 5 SS #2 Phillips 7 LNB #2 Phillips VB #2 Phillips 6 VS #2 Phillips 8 FB #2 Phillips TS 9 3 10 #2 Phillips 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 PARTS LIST... Key No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Part No. 5284 5285 5287 10778 8364 10786 6634 8189 9704 9703 9204 10702 10707 10718 10719 10720 10721 10780 10782 9344 10773 10774 10784 9338 10779 10775 10703 8827 10708 80069 80067 9339 10827 11044 9009 9496 10834 80125 9702 10777 69835 Part Description Right Corner Post Left Corner Post Rear Splice Post Roof Beam Side Roof Trim Ridge Cap Gable Brace Shelf Bracket Right Gable, Rear Left Gable, Rear Roof Beam Brace Ramp Front Inner Header Horizontal Door Brace Door Handle Brace Diagonal Door Brace Door Stop Right Door Jamb Door Siding Stud Side Siding Right Roof Panel Side Floor Frame Right Rear Wall Angle Side Wall Angle Rear Siding Front/Rear Floor Frame Front Siding Front Outer Header Left Door Jamb Left Roof Panel Left Rear Wall Angle Door Jamb Angle Right Gable, Front Gable Brace Gable Brace Front Wall Channel Left Gable, Front Roof Panel Roof Beam Edge Trim (Green) Qty. 2 2 1 8 2 1 4 4 1 1 2 1 1 4 2 8 1 1 2 24 6 2 2 1 2 6 4 6 2 1 2 1 2 1 2 4 2 1 2 2 4 68 08CI List Selected End Views by Key No. 1&2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 20 23 24&32 25 27 29 30 33 35 37 40 41 ASSEMBLY BY KEY NO. NOTE: Double Wall Studs are used on side and back walls to support Siding Panels. 09R 24 25 32 29 21 8 20 20 2 25 8 28 Walls 1 26 13 29 26 26 21 3 2 21 28 37 26 21 26 28 30 21 33 28 33 18 37 27 23 26 28 1 21 28 27 27 12 23 Floor 27 9 ASSEMBLY BY KEY NO. 5 31 39 6 22 Roof 4 4 36 7 38 7 39 9 31 4 4 41 22 41 36 35 11 10CI 40 40 11 35 4 4 4 5 10 7 41 36 4 7 34 36 41 14 14 19 19 16 16 16 15 17 16 16 16 14 Doors 10 16 15 16 14 ASSEMBLY OVERVIEW 11CI Build the Floor Frame Erect Post, Studs, and Door Jambs Install Siding Panels Attach Gables and Roof Beams Install Roof Panel, Ridge Cap, Side Trim, Corner Cap Install Doors Shed is now complete. 11 CONSTRUCTING A BASE... 12R No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Craftsman has a simple kit available to provide a floor inside the shed to keep stored items off the ground. This kit can be used to support a plywood floor (wood not included) or be filled with sand/rock to provide a solid surface. (Sears Order No. 68384 (CFBS109)) Allow 1 - 2 hours for construction. OPTION 2: Wood Platform If you decide to build your own base, be sure to select the appropriate materials. These are the recommended materials for your base: • 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber • 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade • 10 & 4 penny Galvanized Nails • Concrete Blocks (optional) NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corrosion. If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided. The platform should be level and flat (free of bumps, ridges etc.) to provide good support for the building. The necessary materials may be obtained from your local lumber yard. 16 6 c "/24" m/6 1,0 c 40, m To construct the base follow instructions and diagram. Construct frame (using 10 penny galvanized nails) Measure 16"/24" (40,6 cm/61,0 cm) sections to construct inside frame (see diagram) Secure plywood to frame (using 4 penny galvanized nails) 1 307 21" ,3 c m FRONT (DOOR) Allow 6 - 7 hours for construction. OPTION 3: Concrete Slab The slab should be at least 4" (10,2 cm) thick. It must be level and flat to provide good support for the frame. The following are the recommended materials for your base. • 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures) • Concrete • Sheet of 6 mil plastic • We recommend for a proper strength concrete to use a mix of: 1 part cement • 3 parts pea sized gravel • 2 1/2 parts clean sand " 81 cm ,7 05 2 Note: Platform/Slab will extend 9/16" (1,4 cm) beyond floor frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a roofing cement (not included), or bevel this 9/16" (1,4 cm) of concrete when pouring, for good water drainage. Prepare the Site/Construct a Base 1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass). 2. Fill up to 4" (10,2 cm) in the square with gravel and tamp firm. 1 30 21" 3. Cover gravel with a sheet of 6 mil plastic. " 7,3 81 cm cm 4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm) FRONT , 57 lumber. 20 (DOOR) 5. Pour in concrete to fill in the hole and the frame giving a total of 4" (10,2 cm) thick concrete. Be sure surface is level. Note: Finished Slab dimensions, with lumber removed. Allow 3 - 5 hours for construction and a week for concrete curing time. 12 Step 1: You will need for this page: SB Floor Frame Pre-Assembly Washers are to be used on painted parts only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. 10703 4 Front/Rear Floor Frame (QTY: 8) 1 13R Join two (2) Front/Rear Floor Frames together by overlapping them as shown and secure the Frames with four (4) Stone Bolts and Nuts. Repeat this for the other two (2) Front/Rear Floor Frames. 10703 10703 BUILD TWO (2) ASSEMBLIES 2 Check the overall length of each set of Floor Frames to make sure they are at the proper length of 119 3/8” (303,2 cm). 119 3/8 ” (303,2 6 13 cm) Step 2: Frame Pre-Assembly 14R You will need for this page: SB (QTY: 1) 1 SS (QTY:2) 9339 Left Rear Wall Angle 1 9338 Right Rear Wall Angle 1 10707 1 10708 2 Front Inner Header Front Outer Header Connect the Front Inner Header to a Front Outer Header using one (1) Stone Screw as shown. Repeat this for the opposite end. 10708 10708 SS 10707 10707 Header 118 1/8” (300,0 cm) 10708 2 SS Join the Left and Right Rear Wall Angles using one (1) Stone Bolt and Nut as shown. 9339 9338 SB Rear Wall Angle 118 1/8” (300,0 cm) 3 Check the overall length of the Header and Rear Wall Angle sets to make sure they are at the proper length of 118 1/8” (300,0 cm). 6 14 Step 3: Stud Assembly You will need for this page: SS (QTY:72) 1 9344 24 Siding Stud Join two (2) Siding Studs together using six (6) Stone Screws as shown. BUILD TWELVE (12) ASSEMBLIES 9344 9344 Top view of Siding Studs. 35 9/16” (90,3 cm) 2 Repeat process to make eleven (11) more assemblies. Set assemblies aside for later use. 6 15 15R Step 4: Roof Beam Assembly 16R You will need for this page: SB Roof Beam (QTY: 20) 1 10778 8 10777 2 Roof Beam Place two (2) 2” (5,1 cm) Roof Beams back-to-back with small holes on top. Fasten together using four (4) Stone Bolts and Nuts. DO NOT FULLY TIGHTEN. BUILD FOUR (4) ASSEMBLIES End view of Roof Beam 10778 10778 2 Repeat process to make three (3) more assemblies. Set assemblies aside for later use. 3 Place two (2) 4” (10,2 cm) Roof Beams back-to-back with small holes on top. Fasten together using four (4) Stone Bolts and Nuts. DO NOT FULLY TIGHTEN. Set assembly aside for later use. 10777 10777 6 16 Side of Beams with small holes must face up. Step 5: Door Pre-Assembly You will need for this page: 1 TS SS (QTY: 2) (QTY: 24) 10782 2 Door Panel 10718 4 Horizontal Door Brace 2 Start assembly by sliding the Door Handle Brace into the middle of the Door and securing it with four (4) Stone Screws. Then attach the Horizontal Door Braces to each end of Door using two (2) Stone Screws on each brace. Once installed, attach Adhesive Pad between leg of Door Handle Brace and Door. 10718 10719 2 Door Handle Brace 10720 8 67236 2 Diagonal Door Brace Adhesive Pad 17P Place the ends of Diagonal Door Braces with small holes under Horizontal Door Braces as shown. Secure all Diagonal Door Braces to center of Door Handle Brace using one (1) Tapping Screw. Attach all Diagonal Door Braces under Horizontal Door Braces using four (4) Stone Screws at each corner as shown. Make sure holes in Door Handle Brace are on same side as holes in Door. 10719 67236 10720 10720 10782 10719 TS 107 10782 20 Large holes of Diagonal Door Braces go to center. 10720 10720 107 18 10718 3 Repeat this process for the other Door. Diagonal Door Braces attach from behind Horizontal Door Brace. 6 17 Step 6: Right Door Assembly You will need for this page: FB LNB (QTY: 2) (QTY: 6) BB (QTY: 6) 66609 2 Hinge 66809 1 66054 1 Locking Handle Right Latch 18P 66811 1 Handle Backplate 66812 2 Hinge Plate Decor 66609 FB 1 Attach Hinges to Door using six (6) Flat Head Bolts. 2 Install Locking Handle and Handle Backplate using two (2) Long Bolts. Secure Backplate using two (2) Black Bolts and Nuts. 3 Attach Latch Handle. 4 Tighten set screws in Latch. to 66811 Locking BB 66809 LNB BB 66054 66812 5 BB 6 18 Attach Hinge Plate Decor to Door by the Hinges using two (2) Black Bolts and Nuts for each Decor. When securing the Decor, be careful not to scratch the paint. Do not use a drill to tighten the Nuts. Instead, use a No. 2 Phillips Screwdriver to hold the Bolt in place and a Nut Driver or Wrench to tighten the Nut. Step 7: Left Door Assembly You will need for this page: FB LNB (QTY: 2) 66609 2 (QTY: 6) Hinge BB 66810 1 Left Handle 66811 1 Handle Backplate 19P 66812 2 Hinge Plate Decor (QTY: 6) 1 Attach Hinges to Door using six (6) Flat Head Bolts. 2 Install Locking Handle and Handle Backplate using two (2) Long Bolts. Secure Backplate using two (2) Black Bolts and Nuts. Attach Hinge Plate Decor to Door by the Hinges using two (2) Black Bolts and Nuts for each Decor. 3 66609 FB 66811 BB 66810 LNB BB When securing the Decor, be careful not to scratch the paint. Do not use a drill to tighten the Nuts. Instead, use a No. 2 Phillips Screwdriver to hold the Bolt in place and a Nut Driver or Wrench to tighten the Nut. 66812 BB 6 19 Step 7: Continued You will need for this page: SS (QTY: 8) 66808 1 Bottom Latch Spring 4 Remove two (2) Screws from left side of Door Handle Brace and far left Screw from both top and bottom Horizontal Door Brace. Screws will be reused. 5 Attach Door Stop and both Top and Bottom Latch Springs to left side of Door using the four (4) previous Screws as well as eight (8) additional Stone Screws. 10721 1 66684 1 Door Stop Top Latch Spring 20P 66684 Remove far left Screw from top and bottom Horizontal Door Brace to install Door Stop and Latch Springs. 10721 Remove Screws to install Door Stop. 66808 6 20 Step 8: Floor Assembly You will need for this page: SS 10784 2 Assemblies from Step 1: • (QTY: 8) 21R Floor Frame Assemblies (2) Side Floor Frame The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds. 1 Assemble the four (4) corners of the Floor Frame using two (2) Stone Screws at each corner as shown. 10784 10784 Overlap Floor Frames as shown. Set Floor Frame with large holes on top at each corner. 2 Measure the Floor Frame diagonally. When the diagonal measurements are equal, the Floor Frame is square. Level The Floor Frame must be BOTH square AND level or the holes will not line up properly. 6 21 Step 9: Posts/Frame You will need for this page: SS Right Corner Post (QTY: 22) 1 2 5284 2 5285 Left Corner Post 10779 2 Side Wall Angle Position Right and Left Corner Posts at the corner of the Floor Frame as shown. The angled end of each Post must be placed on top of all four (4) corners. Fasten the Corner Post to the Floor Frame using two (2) Stone Screws in each Post. 22R Assemblies from step 2: • • Header Assembly (1) Rear Wall Angle Assembly (1) 5284 5285 The Floor Frame must be square and level or holes will not align. 5285 Support the Corner Posts with stakes or other devices until Door Jambs are attached. 5284 Long leg of Rear Wall Assembly and Side Wall Angles faces down. Re ar 10779 He ad er As Wa ll An gle 2 As sem 3 bly sem bly 4 10779 Fasten Header Assembly to top of front Corner Posts through top holes using two (2) Stone Screws. Fasten Rear Wall Angle Assembly to top of back Corner Posts using two (2) Stone Screws in each Post. Fasten Side Wall Angles to top of side Corner Post using two (2) Stone Screws in each Post. Side Wall Angle on top Fro nt Leg of Header Assembly to inside of building and faces down. Wall Angles must face inside building. 6 22 Step 10: Splice Post/Door Jamb 23P You will need for this page: 10780 1 SS SB (QTY: 4) Right Door Jamb (QTY: 6) SS 1 80069 1 Left Door Jamb 5287 1 Rear Splice Post (QTY: 4) Position Splice Post at the center of the rear wall and fasten using two (2) Stone Screws into rear Floor Frame and four (4) Stone Bolts and Nuts into Rear Wall Angle Assembly. 5287 SB Support the Corner Posts with stakes or other devices until Door Jambs are attached. 5287 5287 Rear SS SS 2 Align top hole on notched side of one (1) Door Jamb with hole closest to center on the Header. Fasten Door Jamb to the Header and Frame using four (4) Stone Screws in Door Jamb. Repeat for other Door Jamb. 80069 Add Washers to Screws on holes closest to center. 10780 SS SS 10780 SS SS Front Notched edge must face center of building. 6 23 SS SS Step 11: Studs You will need for this page: 10834 2 SS SS (QTY: 2) (QTY: 16) Assemblies from step 3: • Front Wall Channel 24R Stud Assemblies (12) 1 Following dimensions, measuring from the end of angle, position a Stud Assembly inside top angle and fasten with one (1) Stone Screw through the lower hole of angle. 2 Place bottom of Stud Assembly over Floor Frame as shown. Do not fasten bottom at this time. Repeat procedure for the remaining Stud Assemblies around the building. 3 Place Front Wall Channels into poisiton behind Corner Post and Door Jamb. Fasten using three (3) Stone Screws as shown below. 49 59 39 ,0 c 150 ”( 6 1/1 m) 9” 2c 9, ” (9 6 1/1 m) 29 3/8 ” (1 3/1 6” (22 ,9 25 ,4 (74 ,1 cm ) cm ) cm Inside ) 19 1/16” (48,4 cm) Outside 10834 Washer 10834 Do not fasten at this time. 6 24 Step 12: Side Siding You will need for this page: SS (QTY: 24) Washers are to be used on painted parts only. Washers are not necessary on unpainted parts and there are not enough to use on every Screw and Bolt. 10773 6 VS 25R Side Siding (QTY: 36) 1 Slide bottom Side Siding into channels of Corner Posts as shown. Once in place, secure with five (5) Vanilla Screws. Screws going into bottom Floor Frame also secure Stud Assemblies. 2 Slide remaining Panels into channel, making sure Siding Panels overlap as shown. Once overlapped, fasten Panels using five (5) Vanilla Screws as before. 3 Secure both top Panels to Side Wall Angle using an additional three (3) Vanilla Screws per Panel. 4 From inside building, fasten all Side Siding Panels to Corner Posts using four (4) Stone Screws per Panel. 10773 10773 Be certain all Siding Panels are completely overlapped or holes will not line up. 10773 10773 SS SS 10773 Fasten all Panels from inside with four (4) Stone Screws per Panel. 10773 VS VS 6 25 VS Screws also secure Stud Assemblies to Floor Frame. Step 13: Rear Siding You will need for this page: SS (QTY: 24) VS (QTY: 30) 26R 10775 6 Rear Siding 1 Slide bottom Rear Siding Panels into channels of Corner Posts and Splice Post as shown. Once in place, secure with four (4) Vanilla Screws per Panel. Screws going into bottom Floor Frame also secure Stud Assemblies. 2 Slide remaining Panels into channels, making sure Siding Panels overlap as shown. Once overlapped, fasten each Panel using four (4) Vanilla Screws as before. 3 4 Secure the tops of Panels to Rear Wall Angle using an additional three (3) Vanilla Screw per Panel. From inside building, fasten all Rear Siding Panels to Corner Posts and Splice Post using four (4) Stone Screws per Panel. Be certain all Siding Panels are completely overlapped or holes will not line up. 10775 10775 10775 10775 VS 10775 VS SS 10775 Screws also secure Stud Assemblies to Floor Frame. SS 6 26 Step 14: Front Siding You will need for this page: SS (QTY: 24) 1 8827 27R 6 Front Siding Slide Front Siding into channels of Corner Posts and Door Jambs as shown. Once in place, secure Panels from inside the building to the Corner Posts and Door Jambs using four (4) Stone Screws per Panel. 8827 Be certain all Siding Panels are completely overlapped or holes will not line up. 8827 8827 8827 8827 8827 Inside 6 27 Step 15: Gables You will need for this page: VB 9704 2 Right Gable (QTY: 16) 9703 Left Gable 2 6634 28R 4 Gable Brace 9496 4 Gable Brace 69835 4 Edge Trim GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables. Failure to do so could result in injury. 1 Attach a short and long Gable Brace to all four (4) Gables using two (2) Vanilla Bolts and Nuts for each Brace as shown below. 9496 6634 9704 9703 6634 9496 Leg of Roof Beam Bracket must face center of Gable as shown. 6 28 Step 15: Continued You will need for this page: SS SB (QTY: 32) 2 (QTY: 5) 9009 2 67545 1 Weather Stripping Gable Brace 6228 29R 2 Track Support Working one (1) Gable at a time, lift Left and Right Gables into place on top of Rear Wall Angle. Gables must go under Side Wall Angles. Secure using seven (7) Stone Screws and one (1) Stone Bolt per Gable. Back Gables SB Front Gables Leave hole open Gables must go under Side Wall Angles. 3 4 5 Working one Gable at a time, lift Left and Right Gables into place on top of Header. Gables must go under Side Wall Angles. Secure using seven (7) Stone Screws per Gable. Do not insert Screws into the two (2) holes closest to the peak of each Gable. These will be used to attach the Track Support later. Join Left and Right Gables together using Gable Brace and securing with one (1) Stone Bolt and Nut in the second hole from the bottom. Apply Weather Stripping along the mating edge of the Left and Right Gable as shown. Cut the Weather Stripping to length. Repeat for opposite side. Position Track Support as shown. Secure Track Supports to Gable using one (1) Stone Bolt. Secure to Header using two (2) Stone Screws per side. Top View of Gables SB Attach Brace with Bolt thru second hole from bottom only. Tape should wrap around gap between Gables. Weather Stripping Tape 6 29 Install Track Support. Step 16: Roof Beams/Braces 30R You will need for this page: Assemblies from step 4: SB • Roof Beam Assembies (5) (QTY: 20) 1 Side of Beams with small holes must face up. Secure the Roof Beam Assemblies to the Gables as shown using two (2) Stone Bolts and Nuts on each end of each Roof Beam Assembly. Spread two (2) halves of Roof Beams 10778 10778 10777 10778 10778 IMPORTANT: At this time, take a moment to ensure the building is level and square. Measure the building diagonally again to make sure the building is square. The building should be square at the base and at the top. This will make Roof Panels fit better and holes will better align. 6 30 Step 16: Continued You will need for this page: 31R 9204 2 SB (QTY: 4) Beam Brace In the front, attach the Roof Beam Brace to the Track Support with one (1) Stone Bolt and Nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) Stone Bolt and Nut as shown. 2 3 In the rear, attach the Roof Beam Brace to the Gable with one (1) Stone Bolt and Nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) Stone Bolt and Nut as shown. Tab end attaches to Roof Beam. In Front, attach Brace to Track Supports and Main Beam. Angled end attaches to Gable. Attach Brace to Gable then rotate to align with Roof Beam. In Rear, attach Brace to lowest hole in Gable and Main Beam. 31 Step 17: Roof Assembly You will need for this page: SS VB (QTY: 12) (QTY: 24) 80067 1 10774 1 Left Roof Panel Right Roof Panel 67545 1 Weather Stripping 1 2 Attach Back Right Roof Panel to Top Roof Beam only using four (4) Stone Screws. 3 Continue fastening Roof Panel to Gable and Lower Roof Beams using six (6) Vanilla Bolts and Nuts and eight (8) Stone Screws. Do not fasten to Side Wall Angle at this time. 4 5 32CI Don’t focus weight on roof! Remove Edge Trim from the Left Gable under the Roof Panel. Install Back Left Roof Panel. Work one corner at a time. Be sure to finish a corner before moving on to the next one. While installing Roof Panels use Weather Stripping Tape to seal roof ridge. Front Follow the fastener sequence shown for proper alignment. 4 3 14 13 12 11 18 17 16 10774 15 Tape in a along roof. VB 7 VB VB VB 10 1 80067 VB VB Weather Stripping should be applied continuous strip the length of the 2 6 5 Back 8 Uncrimped Rib 9 Crimped Rib Whenever a crimped rib and an uncrimped rib meet, place the crimped rib UNDER the uncrimped rib. 6 32 ` Step 17: Continued You will need for this page: SS (QTY: 24) 9702 SB 2 67545 1 Weather Stripping RoofPanel (QTY: 2) 33CI 6 Attach two (2) Roof Panels, one at a time, to Roof Beams using twelve (12) Stone Screws. 7 Secure Roof Panels to Back Roof Panels using one (1) Stone Bolt and Nut per Panel as shown below. 8 Continue installing Weather Stripping Tape to seal roof ridge. Don’t focus weight on roof! Front SB 9702 9702 10774 80067 Back 6 33 ` Step 17: Continued You will need for this page: SS SB 80067 1 10774 1 66859 1 Left Roof Panel Right Roof Panel Craftsman Logo (QTY: 2) (QTY: 48) VB 34CI 67545 1 Weather Stripping BB (QTY: 12) Don’t focus weight on roof! (QTY: 2) 9 Attach Front Left and Right Roof Panels, one at a time, to Roof Beams using twelve (12) Stone Screws per Panel. 10 Insert Stone Bolt and Nut in middle hole where ribs overlap. 11 Secure Front Roof Panels to Gables using six (6) Vanilla Bolts and Nuts per Gable as shown below. 12 Attach Craftsman Logo to Gables using two (2) Black Bolts and Nuts (w/washers) as shown below. 10774 SB 80067 9702 SB 9702 80067 VB 10774 VB VB VB 66859 BB VB VB BB VB VB 13 Fasten the lower end of the Roof Panels to the Side Wall Angles using four (4) Stone Screws per Panel. 6 34 VB VB VB ` Step 18: Ridge Cap/Roof Trim 35CI You will need for this page: SS SS (QTY: 4) (QTY: 4) SB 10786 1 8364 Ridge Cap Side Roof Trim 2 66183 2 Left Corner Cap 2 3 Right Corner Cap 66447 2 Peak Cap Don’t focus weight on roof! (QTY: 8) 1 66183 2 Fully tighten Bolts and Nuts on Roof Beams. Install Peak Caps and Ridge Cap using eight (8) Stone Bolts and Nuts as shown. Install Side Roof Trim and Right and Left Corner Caps using eight (8) Stone Screws as shown. SB SS SB 66447 66183 SS SB 10786 SB 8364 SS SS SS 66183 66447 SS 8364 SS SS 66183 6 35 66183 ` Step 19: Door Installment 36CI You will need for this page: SS FB (QTY:12) (QTY:4) 10702 1 10827 2 Assemblies from step 5: • • Door Jamb Angle Ramp Right Door Assembly (1) Left Door Assembly (1) NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! 1 Place the Door Jamb Angles behind the Door Jambs. Using three (3) Flat Head Bolts and Nuts per Door Hinge, secure Doors and Door Jamb Angles to Door Jambs. End View Door Jamb Angle FB Door Jamb Hinge FB FB SS SS 10702 SS 2 Fasten Ramp to Floor Frame using four (4) Stone Screws. 6 36 ` Step 20: Shelf Brackets You will need for this page: SS 8189 38R 4 Shelf Bracket (QTY:8) 1 Choose which sides and Studs to mount the Shelf Brackets on. Shelf Brackets can be installed on side and / or rear walls. If installing on rear wall, Shelf Brackets must be placed on adjacent Studs. 2 Attach a Shelf Bracket to a Stud using two (2) Stone Screws as shown below. Repeat this for the other Shelf Brackets. 9344 Shelf Brackets can be installed on either side wall or either back wall section. 8189 VARIOUS LOCATIONS OF SHELVING SYSTEMS FASTEN SHELF TO BRACKET Makes 8” to 12” (20,3-30,5 cm) wide shelves in any length. Keep this Owner’s Manual and Assembly Instructions for future reference. 6 37 ANCHORING OPTIONS... 43A IMPORTANT: • • • • If you have swing doors, they must hang and swing level before anchoring building. Anchor your building at this time. See below for details on anchoring. If you have purchased a Floor Frame Kit, you should install it at this time. Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations. Anchoring Down The Building The entire floor frame MUST be securely anchored once the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring. Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instructions. 1. 2. OVER THE BEAMS AND INTO THE GROUND Anchoring into Concrete: Arrow Anchoring Kit: (Model No. AK100 or 68383) Recommended for use with the concrete base. Contains: Corner gussets, perimeter clips, hardware, 1/4" masonry drill bit and installation instructions. 1. For poured concrete slab or footing or patio blocks: Use 1/4" x 2" (6 mm x 51 mm) Lag Screws. 2. For Anchor Post of Concrete poured after building is erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws. 1. An Anchor Kit may be purchased online at www.arrowsheds.com You can also purchase one over the phone by calling 1-800-851-1085. See accessories page for details. 38 2. CARE & MAINTENANCE... 35P Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage. Corrosive chemicals such as fertilizers, pesticides and herbicides should be cleaned off the interior and exterior surfaces immediately. Rust caused by chemical damage is not covered by the warranty. DO NOT STORE POOL CHEMICALS IN YOUR SHED - THIS VOIDS YOUR WARRANTY Rust protection precautions may help to stop rust from developing, or stop it quickly as soon as it appears. • Avoid nicking or scraping the coating surface, inside and out. • Keep roof, base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture. These can do double damage since they give off acid as they decay. • Touch up scrapes or nicks and any area of visible rust as soon as possible. Make sure the surface is free of moisture, oils, dirt or grime and then apply an even film of high quality touch-up paint. • Various paint manufacturers provide products for rust treatment and coverage. If surface rust does appear on your shed we recommend treating those areas as soon as possible, following the paint supplier of your choice instructions. • Our customer service department can provide the paint tinting formula for matching the color of your shed. We also have touch-up paint available for repairing small nicks and scratches. Roof: Keep the roof clear of leaves and snow. Heavy amounts of snow on the roof can damage the building making it unsafe to enter. Doors: Keep doors closed and locked to prevent wind damage. Fasteners: Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by the screws. Regularly check screws, bolts, nuts, etc., and retighten as necessary. General: • A plastic sheet (vapor barrier) placed under the entire floor area may reduce condensation. • Wash off inked part numbers on coated panels with soap and water. • Silicone caulking may be used for watertight seals throughout the building. Please note, Manufacturer cannot be held responsible for any consequences due to buildings that are not installed per these instructions, or for damage due to weather conditions or acts of God. Keep these assembly instructions and owner’s manual for future reference. 39 Warranty... 36P CRAFTSMAN 20 YEAR LIMITED WARRANTY FOR TWENTY YEARS from the date of purchase, this product is warranted against defects in material and workmanship when product is installed, operated and maintained according to all supplied instructions. With proof of purchase, a defective part will be replaced free of charge. For warranty coverage details to obtain free part replacement, call the following toll-free number: 1-800-851-1085 All warranty coverage excludes part paint loss, discoloration, corrosion or surface rusting, which are conditions that can be the result of normal use, accident or improper maintenance. This warranty does not apply to a product that is damaged or altered through misuse, abuse, accident, neglect, modification or mishandling. Disclaimer of implied warranties; limitation of remedies Customer’s sole and exclusive remedy under this limited warranty shall be part replacement as provided herein. Implied warranties, including warranties of merchantability or fitness for a particular purpose, are limited to twenty years or the shortest period allowed by law. Sears shall not be liable for incidental or consequential damages. Some states and provinces do not allow the exclusion or limitation of incidental or consequential damages, or limitation on the duration of implied warranties of merchantability or fitness, so these exclusions or limitations may not apply to you. This warranty gives you specific legal rights, and you may also have other rights which vary from state to state. Sears Brands Management Corporation, Hoffman Estates, IL 60179 40 01Q Assembly Guide Accessorize Your Shed... VersaTrack™ Trackwall Wall Organization System SOLD SEPARATELY AT SEARS 41 Trackwall Assembly You will need for this assembly: • #10 x 1” (2,5 cm) length or 5 mm Screws (6 per trackwall) (QTY: 6) 1 Trackwall 02Q Tools Required: • • • • Pencil • Screwdriver Level • Countersink Drill • Tape Measure 1/8” (3 mm) Drill Bit SAFETY WARNINGS AND CAUTIONS 8x5 • Read and follow all Safety Warnings and installation instructions before use of this product. Trackwall Trackwall • Failure to follow Warnings and Instructions, which includes exceeding the stated load ratings on the Trackwall, may cause product to fail, resulting in personal injury or property damage. • Follow mounting instructions appropriate for this Front type of wall surface. Failure to do so will reduce the Trackwall’s capacity. • Be sure to use appropriate safety equipment when using power and hand tools. • Install Trackwall using appropriate hardware, and in Trackwall accordance with local building codes. • Trackwall must be mounted level. • DO NOT mount Trackwall on ceiling. 10x7 See diagrams to right for reference as to where Trackwall can be placed in each building. 1 Locate and mark the center of the Trackwall. 2 Position the Trackwall with the center mark by aligning with the center of the Wall Stud. 3 Use a level to position the Trackwall at the desired height. Front Trackwall must be attached to three (3) wall studs. Wall Studs 42 Trackwall Trackwall Assembly 4 03Q Mark and drill six (6) 1/8” (3 mm) pilot holes through the Trackwall. Then mark and drill six (6) 1/8” (3 mm) holes into the Wall Studs. Trackwall sections should be placed with Craftsman® logo in the lower left-hand corner with the interlocking tongue facing up. 5 Align pilot holes of Trackwall with holes of Wall Studs. Mount Trackwall to Wall Studs using six (6) Screws. Screws must be flush to surface. See figure below. Driving screws further into the Trackwall may reduce the capacity of the track. Hang accesories following manufacturer’s instructions. • Load Restrictions: 75 lbs (34 kg) per piece, 150 lbs (68 kg) per shed side. • Do not hang accessories to outside of outer screws. 43 ASSEMBLY NOTES 44 46A ASSEMBLY NOTES 45 46A ASSEMBLY NOTES 46 46A ASSEMBLY NOTES 47 46A 37P Product questions or problems? 1-800-851-1085 Customer Service Get answers to questions, troubleshoot problems, or order parts. ® Registered Trademark / TM Trademark of KCD IP, LLC in the United States, or Sears Brands, LLC in other countries ">
Download
Advertisement
Key features
Durable steel construction
Easy assembly
Spacious interior
Double door for easy access
Weatherproof
Frequently asked questions
Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Generally, you should plan on at least one day working with someone who can assist you.
The key to a successful assembly is to make sure the shed will be square and level when built. The shed can be assembled directly onto level ground (grass or dirt). If you have location options, choose one that is already flat, with good drainage to control moisture. If you don’t have a flat, well-drained area, you need to prepare the space. Level the area using cinder blocks, concrete, crushed gravel or other sturdy materials.
If weather conditions change so that it becomes windy or rainy, it is recommended that you stop assembly until conditions improve. This is for your safety and for protection of the shed panels. However, do not leave your unfinished construction without first temporarily anchoring the corners of the shed to your base and placing weights, such as patio blocks or sandbags, on the floor frame.
Yes! Fully assembled buildings should be anchored using a permanent anchoring system. If you need to leave your building before it is completely assembled, you will need to temporarily anchor the corners of the shed to your base, and place weights, such as patio blocks or sandbags, on top of the floor frame.
An incomplete building must be anchored before breaking for any period of time to prevent possible damage. •If the building is on a wood base, secure the frame with wood screws in the corners •If the building is on a concrete base, temporarily anchor the frame in the corners •Use patio blocks or sandbags on top of the floor frame as weights •Secure the floor frame to the ground with ground augers or rope the frame in the corners to the ground