Legrand TracJack High Density Patch Panel Kit for 30 modules, Instruction Sheet
PDF
Document
Advertisement
Advertisement
TITLE Ey ORTRONICS 52 | FIBER/COPPER PATCH PANEL FAX: 660-405—2890 INSTRUCTION SHEET FIBER ROUTING: 1. MAINTAIN A MINIMUM BEND RADIUS OF 10 TIMES THE OUTSIDE DIAMETER OF THE FIBER JACKET. (SEE FIGURE 1). ILL Li LL. kn ı E ii LL. FIGURE 1 NOTE: KEEP FIBER AND COPPER CABLES SEPARATED (SEE FIGURE 1). COPPER WIKE ROUTING: 1. PULL CABLE THROUGH BEZEL WHERE THE MODULE WILL BE LOCATED. PLACE MODULE WITH FRONT FACE AGAINST THE NEAREST SUITABLE TERMINATION LOCATION (FIGURE 2). TERMINATE PER WIRING AND CABLING INSTRUCTIONS, THEN FLIP MODULE OVER AND SNAP INTO PLACE IN BEZEL. REPEAT FOR ALL MODULES. FIGURE 2 2. MAINTAIN A MINIMUM BEND RADIUS OF 4 TIMES THE OUTSIDE DIAMETER OF THE CABLE. CAD: 1:\716\011001 INSTRUCTION SHEET # | REV. | ECN $ SHEET DWN.BY: DATE 71601100 1 of 1 | WATROUS | 08/25/00 CHK.BY: DATE APP._BY: DATE ">
/
Download
Just a friendly reminder. You can view the document right here. But most importantly, our AI has already read it. It can explain complex things in simple terms, answer your questions in any language, and help you quickly navigate even the longest or most compilcated documents.
Advertisement