Dixon 25 TON RAM SEC08 Sample Forms Manual
PDF
દસ્તાવેજ
જાહેરાત
જાહેરાત
25 Ton Ram Operating Instructions Section 8 Sample Forms Dixon 800 High Street • Chestertown, MD 21620 ph: 877•963•4966 fax: 800•283•4966 dixonvalve.com DIXON® HOLEDALL TYPE PERMANENTLY ATTACHED COUPLING TEST ENGINEERING REPORT No.______________ SUBJECT: WORKING PRESSURE_________ TEST PRESSURE_____________ BURST PRESSURE__________ HOSE: "A" End "B" End HOSE O.D. (free) HOSE O.D. (over stem) STEM FERRULE DIE MULCORAM PUSHER FORCE (In PSI) REDUCED LENGTH HOSE WALL (free) HOSE O.D REDUCED STEM — MEAN O.D HOSE WALL REDUCED REDUCTION REMARKS: COUPLED BY _________________________________ DATE _____________________ APPROVED BY ________________________________ COMPANY ____________________________________ Section 8 877.963.4966 • dixonvalve.com 1 HYDROSTATIC TEST REPORT ENGINEERING REPORT No. .______________ SUBJECT: PRESSURE PSIG TIME MIN. COMMENTS "A" END "B" END REMARKS: TEST CONDUCTED BY _________________________________ DATE _____________________ APPROVED BY ________________________________ COMPANY ____________________________________ 2 877.963.4966 • dixonvalve.com Section 8 ">
/
ડાઉનલોડ કરો
માત્ર એક મૈત્રીપૂર્ણ રીમાઇન્ડર. તમે અહીં જ દસ્તાવેજ જોઈ શકો છો. પરંતુ સૌથી મહત્વપૂર્ણ બાબત એ છે કે, અમારા AI એ તેને પહેલેથી જ વાંચી લીધો છે. તે જટિલ બાબતોને સરળ શબ્દોમાં સમજાવી શકે છે, કોઈપણ ભાષામાં તમારા પ્રશ્નોના જવાબ આપી શકે છે અને તમને સૌથી લાંબા અથવા સૌથી જટિલ દસ્તાવેજોને પણ ઝડપથી નેવિગેટ કરવામાં મદદ કરી શકે છે.
જાહેરાત