Dunkirk Q95M-200 Modulating Condensing Boiler Installation & Operation Manual
Add to My manuals48 Pages
advertisement
Q95M-200
GAS-FIRED DIRECT VENT
MODULATING HOT WATER BOILER
DUNKIRK BOILERS
85 Middle Rd.
Dunkirk, NY 14048
www.dunkirk.com
An ISO 9001-2000 Certified Company
P/N 240006103D, Rev. A [05/08]
GaS-fIRED DIRECT vENT mODULaTING hOT waTER BOILER
INSTaLLaTION maNUaL
Printed in USA • Made In USA
TaBLE Of CONTENTS
I - Introduction
.....................................................2
II - Safety Symbols and Warnings
......................3
III - Rules For Safe Installation and Operation
...3
IV - Boiler Ratings and Capacities
......................4
v - before installing the boiler
..............................5
VI - Placing the Boiler
....................................... 11
VII - Near Boiler Piping
.....................................12
VIII - combustion air and vent pipe
...................14
IX - Gas Supply Piping
.....................................16
X - Electrical Wiring
..........................................18
XI - Controls and Accessories
..........................19
XII - Water Treatment & Freeze Protection
.....22
XIII - Putting the Boiler in Operation
.................25
XIV - maintenance and cleaning
.......................27
XV - Boiler Wiring Diagram
...............................29
XVI - Piping and Wiring Appendix
.....................30
ImPORTaNT: This boiler is to be installed by a qualified installer only.
I - INTRODUCTION
This appliance is a gas-fired direct vent modulating cast aluminum hot water boiler. A revolutionary cast aluminum monoblock heat exchanger means better heat transfer and thermal storage than similarly sized cast iron boilers, which results in higher efficiency. The heating system water absorbs large amounts of heat from the cast aluminum heat exchanger, cooling the flue gases and causing condensation. Sealed combustion, premix gas burner, and low flame temperature means drastically reduced CO and
NOx emissions, which contribute to a cleaner and healthier environment.
This appliance, unlike normal residential atmospheric and induced draft units, takes its combustion air directly from the outdoors (sealed combustion) and does not compete with building occupants for fresh air. Sealed combustion (also known as “direct vent”) is the safest and best way to obtain plenty of clean combustion air.
The forced draft fan draws in the outside combustion air to mix with gas, which flows into the pre-mix burner and burns. The fan then forces the resulting flue gases from the boiler unit and provides a positive removal of the flue gases from the building through inexpensive and readily available PVC and CPVC pipes. ULC S636 Material must be used in Canada.
Keep this manual near boiler and retain for future reference.
2
II - SafETy SymBOLS aND waRNINGS
The following defined symbols are used throughout this manual to notify the reader of potential hazards of varying risk levels.
!
DANGER
!
CAUTION
I ndicates an imminently hazardous situation which, if not avoided, will result in death, serious injury or substantial property damage.
Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury or property damage
.
!
WARNING
Indicates a potentially hazardous situation which, if not avoided, could result in death, serious injury or substantial property damage
.
NOTICE
Indicates special instructions on installation, operation or maintenance which are important but not related to personal injury hazards.
III - RULES fOR SafE INSTaLLaTION aND OPERaTION
!
WARNING
This appliance has been equipped for residential installations. If used for commercial applications, any and all additional code requirements must be adhered to for installation. This may require additional controls, including but not limited to an external water cut off, a manual reset high temperature limit, and wiring and/or piping modifications.
The manufacturer is not responsible for any field installation changes made to a boiler installation which are not described or acknowledged in this manual.
ImPORTaNT:
Failure to follow these instructions could cause a malfunction of the boiler and result in death, serious bodily injury, and/or property damage. For assistance or additional information, consult a qualified installer, service agency, or the gas supplier.
1.
Check all applicable state and local building codes and utility company requirements before installation. This installation must conform with these requirements in their entirety. In the absence of these codes, use NFPA installation codes and good industry practice.
2.
Before servicing the boiler, allow it to cool. Always shut off any electricity and gas supply connected to the boiler prior to servicing.
3.
Inspect gas line for leaks.
4.
Be certain gas input rate is correct. Overfiring may result in early failure of the boiler components. This may cause dangerous operation.
Underfiring may result in too much air for the premix burner causing poor or loss of combustion.
5.
Never vent the products of combustion from this boiler to an enclosed space. Always vent to the outdoors. Never vent to another room or to inside a building.
6.
Be sure there is adequate outdoor air supply to boiler for complete combustion.
7.
Follow a regular service and maintenance schedule for efficient and safe operation.
8.
Keep boiler area clean of debris and free of combustible and flammable materials.
9.
Proper through-the-wall or through-the-roof combustion venting shall be in accordance with the materials and methods described in this manual.
Installation must comply with local codes.
3
Iv - BOILER RaTINGS aND CaPaCITIES
10.
This boiler and related hot water heating systems are not do-it-yourself items. They must be installed and serviced by qualified professionals. Ratings above are for sea level applications.
The boiler automatically derates input at a rate of 2% for every 1000 feet above an elevation of 2000 feet (see Table 2). The boiler will also derate relative to the calorific value of the gas being used. Use the formula specified in “Measure The Natural Gas Input Rate” in Section VII of the Control Manual and Operating Instructions
(P/N# 240006104) to determine the proper rate due to derated gas. To ensure proper operation at 5,000 feet of altitude and above, the minimum
RPM setting; parameter 17, must be raised to
3,200. Instructions on how to change the parameters are included in the Parameter Guide, part number 240006105.
Boiler Input Rate
(mBh)
(1)
TaBLE 1: SEa LEvEL RaTINGS - NaTURaL aND PROPaNE GaSES heating Capacity
(mBh)
(1)(2)
Net I=B=R Rating (mBh)
(1) afUE
(2) flue Diameter Shipping wt.
high fire
200 190 165
95%
2” CPVC & 3” PVC 284 lbs.
Low fire
80 76 66
(1)
1 MBH = 1,000 Btuh (British Thermal Units Per Hour)
(2)
Heating Capacity and AFUE (Annual Fuel Utilization Efficiency) are based on DOE (Department of Energy) test procedures.
Boiler Input
Rate (mBh) high fire
TaBLE 2: 95m-200 hIGh aLTITUDE DERaTE ChaRT altitude (In feet)
3,000 (2) 4,000 (2) 5,000 (3)
6,000
196 192 177 174.5
7,000
172
8,000
169
9,000
168
10,000
167
Low fire
78.4
76.8
115 113.5
112 110 109 108
1) b oiler Input Rate is determined at minimum vent length. The rate will decrease as vent length increases.
2) Parameter 17 is set to 2,250 at elevations of 2,000 feet above and below.
3) Parameter 17 must be raised to 3,200 at altitudes or elevations of 2,000 feet and above.
These low pressure gas-fired hot water boilers are design certified by CSA International, for use with natural and propane gases. The boilers are constructed and hydrostatically tested for a maximum working pressure of
50 PSIG (pounds per square inch gauge) in accordance with ASME (American Society of Mechanical Engineers)
Boiler and Pressure Vessel Code Section IV Standards for heating boilers.
The Boilers are certified in accordance with ANSI (American National Standards Institute) Z21.13 standards as gas-fired, direct vent, condensing, hot water boilers.
The Heating Capacity indicates the amount of heat available after subtracting the losses up the stack. Most of this heat is available to heat water. A small portion is heat loss from the jacket and surfaces of the boiler, and it is assumed that this heat stays in the structure. The Net I=B=R
Rating represents the portion of the remaining heat that can be applied to heat the radiation or terminal units (i.e., finned tube baseboard, cast iron radiators, radiant floor, etc.) The difference between the Heating Capacity and the Net I=B=R Rating, called the piping and pickup allowance, establishes a reserve for heating the volume of water in the system and offsetting heat losses from the piping. The Net I=B=R Ratings shown are based on a piping and pickup factor of 1.15 in accordance with the I=B=R
Standard as published by the Hydronics Institute. The Net
I=B=R Rating of the boiler selected should be greater than or equal to the calculated peak heating load (heat loss) for the building or area(s) served by the boiler and associated hot water heating systems. The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup requirements.
4
v - BEfORE INSTaLLING ThE BOILER
Review the following before installing the boiler
This boiler product is a gas-fired, direct vent, condensing boiler and must be installed in accordance with all applicable federal, state and local building codes including, but not limited to the following:
United States
- Installation shall conform with National
Fuel Gas Code (NFPA-54/ANSI Z223.1- latest edition)
Canada
- Installation shall be in accordance with CSA-
B149.1 and .2 installation codes.
Where required by the authority having jurisdiction, the installation must conform to the ASME Safety Code for Controls and Safety Devices for Automatically Fired Boilers,
No.CSD-1.
The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1 - latest revision.
!
WARNING
INSTaLLERS - follow local regulations with respect to installation of Carbon monoxide Detectors. follow maintenance recommendations in this manual.
In the State of massachusetts, boiler installation must conform to state code 248 CmR which includes but is not limited to:
• This product must be installed by a licenced Plumber or Gasfitter.
• When flexible connectors are used, the maximum length shall not exceed 36 inches.
• When lever type gas shut-offs are used, they shall be
T-handle type.
For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting including but not limited to, decks and porches, the following requirements shall be satisfied:
1.
2.
3.
4.
Installation of carbon monoxide detectors:
At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.
A.
B.
In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.
In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period of thirty
(30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
approved carbon monoxide detectors:
Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
Signage
: A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, “GAS VENT DIRECTLY
BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.
Inspection
: The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.
5
v - BEfORE INSTaLLING ThE BOILER
5.
6.
Product-approved vent/air intake:
A product-approved vent terminal must be used and, if applicable, a product-approved air intake must be used. Installation shall be in strict compliance with the manufacturer’s instructions.
Installation instructions:
A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/ or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.
•
•
•
•
Supplied with a suitable electrical supply for all boiler motors and controls.
Connected to a properly located thermostat or operating control (not included with boiler).
Placed on level surface (must NOT be installed on carpeting).
Condensate drain line must be pitched down to floor drain or external condensate pump with reservoir at ¼” per foot (wood frame or blocks may be used to raise boiler).
•
•
Boiler Sizing
Check to be sure you have selected the boiler with the proper capacity before continuing the installation. The I=B=R Rating of the boiler selected should be greater than or equal to the calculated peak heating load (heat loss) for the building or area(s) served by the boiler and associated hot water heating systems. See
“Ta
ble 1: Sea Level Ratings - Natural and Propane
Gases”
in Section IV of this manual.
Heat loss calculations should be based on approved industry methods.
Considerations for Boiler Location
Before selecting a location for the boiler, the following should be considered. Each boiler considered for installation must be:
• Supplied with the correct type of gas (natural gas or propane).
•
•
•
Connected to a suitable combustion air intake piping system to supply the correct amounts of fresh (outdoor) air for combustion (15’ minimum equivalent length/100’ maximum equivalent length).
Connected to a suitable venting system to remove the hazardous products of gas combustion
(15’ minimum equivalent length/100’ maximum equivalent length).
Connected to a suitable hot water heating system.
1.
Locating the Boiler
Select a location which is level, central to the piping systems served and as close to the vent and air intake terminals as possible.
2.
Accessibility clearances, if more stringent (i.e. larger clearances) than required fire protection clearances, must be used for the boiler installation. Accessibility clearances may be achieved with the use of removable walls or partitions.
3.
The boiler is approved for installation in closets and on combustible floors. This boiler shall NOT be installed on carpeting.
4.
The clearances shown in
Table 3
indicate required clearances per CSA listing. A minimum 1” clearance must be maintained between combustible construction and each of the right, top and back surfaces of the boiler. Allow at least 24” at the front and left side and 8”at the top for servicing. No combustible clearances are required to venting or combustion air intake piping.
TaBLE 3: BOILER CLEaRaNCES*
Dimension
Combustible
Construction accessibility/
Cleaning
Top
Left Side
Right Side
Base
Front
1”
1”
1”
1”
0
8”
24”
-
-
24”
Back
Intake/Vent Piping
6”
0
-
-
Near Boiler Hot
Water Piping
1” -
* All distances measured from the cabinet of the boiler.
Service
-
-
8”
24”
-
-
24”
-
6
v - BEfORE INSTaLLING ThE BOILER
5.
Equipment shall be installed in a location which facilitates the operation of venting and combustion air intake piping systems as described in this manual.
6.
Advise owner of boiler to keep venting and combustion air intake passages free of obstructions. Both the venting and combustion air intake piping systems connected to the outdoors must permit flow through the piping systems without restrictions for the boiler to operate.
7.
The boiler shall be installed such that the automatic gas ignition system components are protected from water (dripping, spraying, rain, etc.) during operation and service (circulator replacement, control replacement, etc.).
8.
The boiler must be located where ambient room temperatures (minimum possible temperatures where boiler is installed assuming boiler is not in operation and therefore contributes no heat to the space) are always at or above 32°F to prevent freezing of liquid condensate.
Figure 2 - Sidewall Vent/Intake Terminations
OVERHANG
12" MINIMUM
VENT
90°
OVERHANG
VENT
12" MINIMUM
BRACKET
90°
3”
MAINTAIN 12" MINIMUM
CLEARANCE ABOVE HIGHEST
LESS THAN 12" CLEARANCE ABOVE GRADE
Combustion air and vent Pipe Requirements
This boiler requires a dedicated direct vent system. In a direct vent system, all air for combustion is taken directly from outside atmosphere, and all flue products are discharged to outside atmosphere.
Combustion air and vent pipe connections must terminate together in the same atmospheric pressure zone, either through the roof or sidewall (roof termination preferred).
See
figures 1 and 2
for required clearances. If necessary, use of screening no smaller than 1/2” hardware cloth is acceptable.
3"
SEPARATION
MAINTAIN 12" MINIMUM
ANTICIPATED SNOW LEVEL OR
12" OR MORE CLEARANCE ABOVE GRADE
If the concentric vent termination is being used, refer to
figure 3
for proper setup.
Figure 3 - Concentric Vent Terminations
Figure 1 - Roof Vent/Intake Terminations
1” MAX
.
3” MAX.
COMBUSTION AIR
VENT
8” MAX.
12” MIN ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
COMBUSTION AIR
EXHAUST
7
v - BEfORE INSTaLLING ThE BOILER
NOTE: IF THERE IS A POTENTIAL FOR EXCESSIVE WINDS, SPECIAL
CONSIDERATION SHOULD BE GIVEN TO LOCATE THE VENT TERMINATION
AWAY FROM THE WINDWARD SIDE OF THE BUILDING.
12”
MAX
VENT TERMINATION MUST BE AT LEAST
12” (31 CM) HORIZONTALLY FROM
ANY ELECTRIC METERS, GAS METERS
OR RELIEF EQUIPMENT.
LOCATE VENT TERMINATION TO ALLOW
12” (31 CM) MINIMUM ABOVE GRADE
MOUNT VENT TERMINATION AT LEAST
3 FT (92 CM) FROM INSIDE CORNERS
VENT TERMINATION MUST BE AT LEAST
3 FEET (92 CM) ABOVE ANY FORCED
AIR INLET LOCATED WITHIN 10 FT (305 CM)
VENT TERMINATION MUST BE INSTALLED WITH
A CLEARANCE OF AT LEAST 12 INCHES (31 CM)
FROM ANY AIR OPENING INTO A BUILDING.
Through the wall vents for Category II and IV appliances and non categorized condensing appliances shall not terminate over public walkways or over an area where condensate or vapor could create a nuisance or hazard or could be detrimental to the operation of regulators, relief vales, or other equipment. Where local experience indicates that condensate is a problem with
Category I and III appliances, this provision shall also apply.
When utilizing two or more boilers, each termination must have at least 12 inches of clearance from any adjacent termination.
See diagrams below.
8
!
CAUTION
Keep boiler area clean of debris and free of flammable and combustible materials, vapors, and liquids.
!
WARNING
v - BEfORE INSTaLLING ThE BOILER failure to follow these warnings could result in fire, property damage, personal injury, or death.
• when vent pipe is exposed to temperatures below freezing, such as when it passes through an unheated space or when a chimney is used as a chaseway, vent pipe must be insulated with ½”Armaflex or equivalent. In extremely cold climate areas, use ¾”Armaflex or equivalent.
•
Combustion air must be clean outdoor air. Combustion air must not be taken from inside the structure because that air is frequently contaminated by halogens, which include fluorides, chlorides, phos
phates, bromides and iodides. These elements are found in aerosols, detergents, bleaches, cleaning solvents, salts, air fresheners, paints, adhesives, and other household products.
!
WARNING
failure to follow these warnings could result in fire, property damage, personal injury, or death.
•
Locate combustion air inlet as far away as possible from swimming pool and swimming pool pump house. all combustion air and vent pipes must be airtight and watertight. Combustion air and vent piping must also terminate exactly as shown in figures
1 and 2. If a concentric vent termination is being used, refer to figures 3 through 5 for proper setup.
• vent connections serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under positive pressure.
•
Solvent cements are combustible. Keep away from heat, sparks, or open flame.
Use only in well ventilated areas. avoid breathing in vapor or allowing contact with skin or eyes.
Figure 4 - Concentric Vent w/ Dimensions
Concentric vent w/Dimensions
NOTES:
Condensate trap is integral to the boiler.
wood frame or concrete blocks may be used to raise the boiler to maintain drain pitch or to be above external condensate pump reservoir.
There is a 115 volt aC receptacle provided on the control panel to provide power for an external condensate pump (if needed).
3” Diameter PVC Vent/Exhaust
3” Diameter PVC Intake/Combustion Air
9
v - BEfORE INSTaLLING ThE BOILER
Figure 5 - Concentric Vent Roof Installation
foundation Requirements
Boiler must be placed on level surface. Boiler is
NOT
to be installed on carpeting.
NOTES:
1.
2.
If boiler is not level condensate drain lines will not function properly. Adjustable feet are located on the boiler to make up for minor surface irregularities or tilt.
Wood frame or blocks may be used to raise boiler to maintain drain pitch or to be above external condensate pump reservoir.
Condensate Drain Requirements
At the rear of the unit a ½” PVC pipe nipple with
NPT threads is provided for the attachment of the condensate drain line. Attach the ½” PVC tee in the parts bag to act as a vent as shown. Attach ½”
PVC from this point to either a drain or an external condensate pump (not furnished). If the drain level is above the condensate trap, a condensate pump must be used. The condensate pump must be designed for a flue gas condensate application.
The condensate drain line must be pitched down to the floor at a minimum of ¼” per foot and must be routed within the conditioned space to avoid freezing of condensate and blockage of the drain line. If the unit will be started immediately upon completion of installation, prime trap by filling with water until water is seen at the vent.
fOUND
Removal of Existing Boiler from Common vent
System
When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for proper venting of the appliances remaining connected to it. At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.
1.
2.
3.
Seal any unused openings in the common venting system.
Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restrictions, leakage, corrosion and other deficiencies which could cause an unsafe condition.
When it is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryer and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhaust, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.
10
4.
5.
6. v - BEfORE INSTaLLING ThE BOILER
Place in operation the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliances will operate continuously.
After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans and any other gas-burning appliance to their previous condition of use.
Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Code, NFPA-54/ANSI -Z223.1latest revision, or section 5 of CSA-B149 for Canadian standards. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables in the National Fuel Gas
Code, NFPA-54/ANSI- Z223.1-latest revision, or section 5 of CSA-B149 for Canadian standards.
vI - PLaCING ThE BOILER
!
WARNING
The boiler must be located on a surface that can support the weight of the installed boiler.
into position with an appliance dolly or 2-wheel hand truck.
The dolly or hand truck should be inserted under the right hand side of the boiler. It is possible to slide the boiler for a short distance on a smooth floor or surface.
The boiler should be placed to provide the most direct connections to the combustion air, vent and system piping as possible.
Place crated boiler as close to selected location as possible and uncrate boiler. The uncrated boiler may be moved
NOTE:
Refer to
“Locating The Boiler”
in Section V of this manual for required clearances for servicing and maintenance.
11
vII - NEaR BOILER PIPING
ImPORTaNT:
For piping examples using the Gas-Fired Direct Vent Modulating Hot Water Boiler, see the
Piping Appendix
in Section XVI of this manual.
!
CAUTION
Copper supply and return piping must NOT be installed directly into aluminum boiler section castings due to galvanic corrosion between dissimilar metals. Iron or steel bushings or pipe nipples should be used between copper system piping and boiler to make final connec
tion to boiler. also, the use of dielectric unions is acceptable. The packaged boiler is furnished with iron piping where necessary for the supply and return connections.
and per local codes. If a pressure reducing valve is used, adjust to match the system fill pressure. In connecting the cold make-up water supply to the boiler, make sure that clean water supply is available. When the water supply is from a well or pump, a sand strainer should be installed at the pump.
figure 6 - Diaphragm Type Expansion Tank Piping
AIR SCOOP
SUPPLY PIPING
When the installation of the boiler is for a new heating system, first install all of the radiation units (panels, radiators, baseboard, or tubing) and the supply and return mains. After all heating system piping and components have been installed, make final connection of the system piping to the boiler.
According to code, a hot water boiler installed above radiation level must be equipped with a low water cut off device. A periodic inspection is necessary, as is flushing of float type devices, per low water cut off manufacturers specific instructions.
This boiler is factory equipped with a manual reset probe-type low water cut off.
Expansion Tank & make-up water
!
CAUTION
Non-potable water only piped directly to boiler. DO NOT connect drinking water to heating system.
Determine required system fill pressure, system design temperature, and system water content. Boiler contains
2.6 gallons (US). Size expansion tank accordingly. Consult expansion tank manufacturer for proper sizing information.
Connect properly sized expansion tank (not furnished) as shown in Figure 6 for diaphragm type expansion tank.
For diaphragm type expansion tanks, adjust the tank air pressure to match the system fill pressure. Install air vent
(furnished) as shown for diaphragm type expansion tank system only. Install make-up water connections as shown
Check local codes for maximum distance from floor.
flOOr
PRESSURE
REDUCING VALVE
REDUCED PRESSURE
BACKFLOW PREVENTER
GATE VALVE
DIAPHRAGM TYPE
EXPANSION TANK
FEED
WATER
Figure 7 - Relief Valve Discharge Piping
PrEssurE rElIEf DEVICE
PrEssurE rElIEf DEVICE
12
vII - NEaR BOILER PIPING
Pressure Relief valve / Temperature Pressure Gauge
The boiler is furnished with a relief valve in the boiler parts bag. Provide ¾” piping from the supplied relief valve to a local floor drain, but leave an air gap between piping and drain. No shutoff of any description shall be placed between safety relief valve and the boiler, or on the discharge pipes between such safety valve and the atmosphere. Installation of the safety relief valve shall conform to ANSI/ASME Boiler and Pressure Vessel Code, Section IV. The manufacturer is not responsible for any water damage. Check local codes for maximum height from discharge piping to floor.
Supply & Return Lines
The packaged boiler unit is set up to receive 1¼” NPT return piping from the rear of the unit with an option for left or right return connections. 1¼” NPT supply piping exits the boiler jacket at the top of the unit.
NOTE:
On some boilers the circulator pump and isolation valves are furnished in a carton inside the boiler cabinet and can be installed at the installer preferred location.
A condensate pump with a reservoir (not furnished) may be used to remove condensate to a drain line
(sanitary line) above boiler if a floor drain is not available or is inaccessible.
filling the Condensate Trap with water
ImPORTaNT: On initial start up the condensate trap must be manually filled with water.
The following are the steps required to initially fill the condensate trap for start up, these steps are only required at the initial start up or if maintenance requires draining of the condensate trap:
1.
Pour about 1 cup of cold tap water into the vent drain line using the 1/2” PVC vent tee provided with the boiler.
2.
Excess water should go through the overflow and out through the condensate drain line. Verify proper operation of the drain line (or external condensate pump if used).
3.
Reinstall the vent drain line.
Condensate Drain Piping
The condensate trap is integral to the boiler. Use the supplied 1/2” PVC tee, then transition to ½” pipe and fittings for PVC condensate drain line. Condensate drain line to be pitched down to floor drain at a minimum of ¼” per foot.
The ½” diameter schedule 40 PVC condensate drain piping and pipe fittings must conform to ANSI standards and
ASTM D1785. Schedule 40 PVC cement and primer must conform to ASTM D2564. In Canada, use CSA or ULC certified schedule 40 PVC drain pipe and cement.
Chilled water Piping
The boiler, when used in connection with a refrigeration system, must be installed so the chiller medium is piped in parallel with the boiler with appropriate valves to prevent the chilled medium from entering the boiler.
The boiler piping system of a hot water boiler connected to heating coils located in air handling units where they may be exposed to refrigerated air circulation must be equipped with flow control valves or other automatic means to prevent gravity circulation of the boiler water during cooling cycle.
13
vIII - COmBUSTION aIR aND vENT PIPE
Connections & Terminations
For boilers connected to gas vents or chimneys, vent installations shall be in accordance with Venting Requirements of the National Fuel Gas Code, ANSI Z223.1-latest revision, CSA-B149.1 and B149.2, and applicable provisions of the local building codes.
Provisions for combustion and ventilation air must be in accordance with the National Fuel Gas Code, ANSI
Z223.1-latest revision, CSA-B149.1 and B149.2, or applicable provisions of the local building code.
These boilers require a dedicated direct vent system. All air for combustion is taken directly from outdoors through the combustion air intake pipe. All flue products are discharged to the outdoors through the vent pipe. Insulate lengths of combustion pipe in unconditioned areas.
1.
2.
3.
See Figures 1 through 5 for combustion air and vent pipe roof and sidewall termination (roof termination is preferred). Combustion air and vent pipes must terminate
together in same atmospheric pressure zone as shown
. Construction through which vent and air intake pipes may be installed is a maximum 24” and a minimum ¼” thickness.
Combustion air and vent pipe fittings must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards D1784 (schedule-40 CPVC),
D1785 (schedule-40 PVC), D2665 (PVC-DWV),
D2241 (SDR-21 and SDR-26 PVC), D2661 (ABS-
DWV), or F628 (schedule-40 ABS). Pipe cement and primer must conform to ASTM standards D2564
(PVC) or D2235 (ABS).
For Canadian installations all plastic venting material must be listed to ULC S636.
!
WARNING
Do not use cellular core PVC for venting flue gas.
PVC
CPVC
ABS
Radel-
A200
Combustion and vent Piping Length
TaBLE #4 material maximum allowable Temperatures
Of Typical Non-metallic vet material
°f hDT
°C °f
RTI
°C
Standard
158
210
70
100
–
–
–
–
ASTM F 891 *
ASTM D2665 **
ASTM D1785 **
ASTM D2241 **
ASTM D2846 **
ASTM F441 **
ASTM F442 **
180 82 – –
ASTM D2661 ***
ASTM F628 ***
414 212 – –
UL-1738
ULC S636
* Allowable temperatures based on Classifications covered in ASTM D4396
[Deflection Temperatures under Load
(264psi) (1819 KPa)].
** Allowable temperatures based on Classifications covered in ASTM D1784
[Deflection Temperatures under Load
(264psi) (1819 KPa)].
*** Allowable temperatures based on Classifications covered in
AsTM D3965
[Deflection Temperatures under Load(264psi)
(1819 KPa)]
.
3” Pipe min. venting 3” Pipe max. venting
15 ft. equivalent length 100 ft. equivalent length
The length of pipe is counted from the end of the supplied
2” CPVC pipe exiting the boiler. The termination is not counted in the “Total Equipment Length.” The combustion
Figure 8 - Combustion Air & Vent Piping
FIELD INSTALL 2” BY 3”
TRANSITION IN THE
VERTICAL POSITION ONLY
(2 REQ’D, NOT FURNISHED)
4.
Combustion air and vent pipe connections on boiler are 2” but must increase to 3”. Due to potential for flue gas temperatures above 155°F, the first 30” of supplied vent pipe is CPVC while the remaining vent pipe can be PVC. Any replacement of the first 30” of vent pipe must be made with CPVC.
NOTE:
The exhaust transition from 2” pipe to
3” pipe must be made in a vertical run. Transition pieces are not included.
(See Figure 8
for details.)
14
2” (50.8MM) COMBUSTION AIR
INTAKE PIPING (FURNISHED)
3 INCH INTAKE AND
EXHAUST TERMINATIONS
2” (50.8MM) CPVC
VENT PIPING
(FURNISHED &
REQUIRED)
vIII - COmBUSTION aIR aND vENT PIPE
air supply pipe must terminate at the same location as the exhaust pipe.
Reduce the maximum vent length by 5’ per each 90° elbow.
1.
Exhaust air piping to be pitched back to boiler at minimum ¼” per foot from vent terminals so that all moisture in vent piping drains to boiler. Pipes must be pitched continuously with no sags or low spots where moisture can accumulate and block the flow of flue gas. Combustion air and vent pipes must be airtight and watertight.
2.
Consideration for the following should be used when determining an appropriate location for termination of combustion air and vent piping:
• Comply with all clearances required.
• Termination should be positioned where vent vapors will not damage plants/shrubs or air conditioning equipment.
• Termination should be positioned so that it will not be effected by wind eddy, air born leaves, snow, or recirculated flue gases.
• Termination should be positioned where it will not be subjected to potential damage by foreign objects, such as stones, balls, etc.
• Termination should be positioned where vent vapors are not objectionable.
• Put vent on a wall away from the prevailing winter wind.
Locate or guard the vent to prevent accidental contact with people or pets.
• Terminate the vent above normal snowline. Avoid locations where snow may drift and block the vent. Ice or snow may cause the boiler to shut down if the vent becomes obstructed.
3.
• Under certain conditions, flue gas will condense, forming moisture, and may be corrosive. In such cases, steps should be taken to prevent building materials at the vent from being damaged by exhaust of flue gas.
The venting system shall terminate at least 3’ above any forced air inlet (except boiler’s combustion air inlet) within 10’. The venting system shall terminate at least 12” from any air opening into any building. The bottom of the vent shall be located at least 12” above grade. The vent terminal shall not be installed closer than 3’ from the inside corner of an “L” shaped structure. Termination of the vent should be kept at least 3’ away from vegetation. The venting system shall terminate at least 4’ horizontally from, and in no case above or below, electric meters, gas meters, regulators, and relief equipment, or under a deck or porch.
4.
Through the wall vents for Category II and IV appliances and non categorized condensing appliances shall not terminate over public walkways or over an area where condensate or vapor could create a nuisance or hazard or could be detrimental to the operation of regulators, relief vales, or other equipment.
Where local experience indicates that condensate is a problem with Category I and III appliances, this provision shall also apply. If multiple terminations are used, there must be a minimum of 12” between the exhaust of one termination and the air intake of the next termination. See
Figures 1-3
for illustrations.
Installation
ImPORTaNT:
When transitioning from CPVC to
PVC it is recommended to use Weld-On CPVC
724 or other cement approved for CPVC to PVC.
In Canada ULC S636 approved cement must be used.
1.
Attach combustion air intake piping to supplied 2” PVC
Intake Connector. Attach vent piping to furnished 2”
CPVC vent pipe. Use a 2” x 3” adapter in both air inlet and exhaust.
2.
3.
4.
5.
NOTE: All pipe joints are to be water tight.
Working from the boiler to the outside, cut pipe to required length(s).
Deburr inside and outside of pipe, and remove all shavings from pipe.
Chamfer outside edge of pipe for better distribution of primer and cement.
Clean and dry all surfaces to be joined.
6.
Check dry fit of pipe and mark insertion depth on pipe.
15
vIII - COmBUSTION aIR aND vENT PIPE
NOTE: It is recommended that all pipes be cut, prepared, and pre-assembled before permanently cementing any joint.
7.
After pipes have been cut and pre-assembled, apply cement primer to pipe fitting socket and end of pipe to insertion mark. Quickly apply approved cement to end of pipe and fitting socket (over primer). Apply cement in light, uniform coat on the inside of socket to prevent buildup of excess cement. Apply second coat.
NOTE: Primer and cement will discolor jacket.
Take precautions to protect jacket while cementing vent pipe.
8.
While cement is still wet, insert pipe into socket with a ¼ turn twist. Be sure pipe is fully inserted into fitting socket.
9.
Wipe excess cement from joint. A continuous bead of cement will be visible around perimeter of a properly made joint.
10.
Handle pipe joint carefully until cement sets.
11.
Support combustion air and vent piping a minimum of every 5’ using pre-formed metal hanging straps. Support combustion air and vent piping so no weight is resting on the boiler jacket. Do not rigidly support pipes. Allow movement due to expansion and contraction.
12.
Slope combustion air and vent pipes toward boiler a minimum of ¼” per linear foot with no sags between hangers.
13.
Use appropriate methods to seal openings where vent and combustion air pipes pass through roof or side wall.
IX - GaS SUPPLy PIPING
Check Gas Supply
The gas pipe to your boiler must be the correct size for the length of run and for the total BTU per hour input of all gas utilization equipment connected to it. See
Table 4
for proper size. Be sure your gas line complies with local codes and gas company requirements.
The boiler and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of ½ psig (3.5kPa).
The boiler must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or greater than ½ psig (3.5kPa).
In order for proper operation of the boiler, it is recommended that the line pressure be within the minimum and maximum values in
Table 5
.
Pipe Length
TaBLE 4: GaS PIPING SIZES
Natural Gas
Pipe Capacity - BTU/hr. Input Includes fittings
½” ¾” 1” 1¼”
20’
40’
60’
92,000
63,000
50,000
190,000
130,000
105,000
350,000
245,000
195,000
625,000
445,000
365,000
LP Gas
Pipe Capacity - BTU/hr. Input Includes fittings
Pipe Length Copper Tubing (O.D.) Iron Pipe
⅝”
¾” ½” ¾”
20’
40’
131,000
90,000
216,000
145,000
189,000
129,000
393,000
267,000
60’
72,000 121,000 103,000 217,000
The length of pipe or tubing should be measured from the gas meter or propane second stage regulator.
TaBLE 5: GaS SUPPLy PRESSURE
Natural Gas
LP Gas
4” min. w.c.
10” min. w.c.
Check line pressure while unit is running in high fire mode.
10” max. w.c.
14” max. w.c.
16
IX - GaS SUPPLy PIPING
Connecting the Gas Piping
Refer to
figure 9
for the general layout at the boiler, which shows the basic fittings you will need. As shipped, the gas line enters the boiler through the right side but, as an option, it can be routed through either the rear or left side panel.
Figure 9 - Gas Piping
1/2” GAS CONNECTION
*NOTE: 3/4” GAS SUPPLY
TO BOILER JACKET
REQUIRED TO FEED
THE BOILER.
2.
Use pipe joint compound suitable for liquefied petroleum gas on male threads only.
3.
Use ground joint unions.
4.
Install a sediment trap upstream of gas controls.
5.
Use two pipe wrenches when making the connection to the gas valve to keep it from turning.
6.
Install a manual shutoff valve in the vertical pipe about
5’ above floor outside the boiler jacket in addition to the shutoff valve supplied with the boiler.
7.
Tighten all joints securely.
8.
Propane gas connections should only be made by a licensed propane installer.
9.
Two stage regulation should be used by the propane installer.
10.
Propane gas piping should be checked out by the propane installer.
The boiler is equipped with a ½” NPT connection on the gas valve for supply piping and ½” NPT ball valve for manual shut off. The following rules apply for boiler piping:
1.
Use only those piping materials and joining methods listed as acceptable by the authority having jurisdiction, or in the absence of such requirements, by the
National Fuel Gas Code, ANSI Z223.1- latest revision.
In Canada, follow the CAN/CGA B149.1 and .2 Installation Codes for Gas Burning Appliances and Equipment.
Checking the Gas Piping
After all connections have been made, check immediately for leaks. Open the manual shutoff valve.
Test for leaks by applying soap suds (or a liquid detergent) to each joint. Bubbles forming indicate leak.
Correct even the smallest leak at once.
!
WARNING
Never use a match or open flame to test for leaks!!
17
X - ELECTRICaL wIRING
ImPORTaNT:
Wiring diagrams for the Gas-Fired Direct Vent Modulating Hot Water Boiler can be found in Section XIV of this manual.
!
WARNING
for your safety, turn off electrical power supply at service panel before making any electrical connections to avoid possible electric shock hazard. failure to do so can cause severe personal injury or death.
ImPORTaNT:
1. If original boiler wiring must be replaced, use only type 105°C wire or equivalent. Boiler must be electrically grounded as required by
National Electrical Code ANSI/NFPA 70 - latest edition.
Wiring must be N.E.C. Class
Codes
Installations must comply with National Electrical
Code, any other national, state, provincial, or local codes or regulations, and, in Canada, with CSA
C22.1 Canadian Electrical Code (Part 1) and any local codes. (L1, L2)
1.
Line voltage Connections
Connect 120 VAC power wiring to line voltage terminal strip on boiler control panel.
2.
Provide and install a fused disconnect or service switch (15 amp recommended) as required by code.
3.
Boiler circulator is shipped loose. Wire boiler circulator as shown in wire diagram label on boiler side panel. (CH L1, CH L2) CH = Control Heat
4.
When connecting a DHW circulator, connect wiring to line voltage terminal strip on boiler control panel.
(DHW L1, DHW L2) DHW = Domestic Hot Water
5.
Route all wires and conduits to the openings in the right jacket panel.
1.
Low voltage Connections
Connect low voltage wiring to low voltage terminal strip as shown in the boiler wiring diagram.
2.
1.
Route all low voltage wires through opening on the right jacket panel. Use shielded cable.
Thermostat
Connect room thermostat or end switch (isolated contact only) between terminals T1 and T2.
2.
Install thermostat on inside wall away from influences of drafts, hot or cold water pipes, lighting fixtures, televisions, sunrays, or fireplaces.
3. Thermostat anticipator (if applicable):
A.
If connected directly to boiler, set for 0.1 amps.
B. If connected to relays or other devices, set to match total electrical power requirements of connected devices. See device manufacturers’ specifications and thermostat instructions for details.
1.
Outdoor Temperature Sensor
Connect outdoor temperature sensor between terminals A1 and A2 to enable outdoor reset operation of the boiler. If fixed temperature operation is required, do not install outdoor sensor.
2.
Mount sensor on exterior wall, shielded from direct sunlight or flow of heat or cooling from other sources.
3.
If desired, install a summer/winter switch across terminals A1 and A2. When the switch is closed, the boiler
(space heating) circulator is disabled.
4.
Route sensor wires through the holes provided on the right jacket panel of the boiler.
Dhw aquastat
Connect storage indirect water heater (DHW) aquastat between terminals DHW T1 and DHW T2.
18
XI - CONTROLS aND aCCESSORIES
This section provides a brief description of the key controls and accessories found in this boiler. See the Repair Parts
Manual (P/N# 240006107) for illustrations and the Control
Manual and Operation Instructions (P/N# 240006104) for a detailed sequence of operation and troubleshooting procedures.
haust vent where the combustion products are discharged to the outdoors. The blower is designed to communicate with the modulating control to run at variable speeds dependent on the heat load experienced by the heating system. The variable speeds create pressures felt by the gas valve and gas/air mixer that dictate how much fuel is introduced to the combustion process.
aluminum heat Exchanger
This appliance employs a cast aluminum heat exchanger that features a monoblock design. The monoblock design eliminates the need for mating sections and therefore eliminates leaks between sections. Since the heat exchanger is cast of aluminum instead of iron, it has better heat transfer properties which in turn lead to higher efficiency and cooler exhaust temperatures. These cooler exhaust temperatures create condensation of the flue gas, which would cause corrosion in traditional cast iron heat exchangers.
Gas Control valve
The gas controls in this boiler have been developed for domestic heating appliances with premix burners and automatic direct burner ignition and are suitable for natural and LP gas. The gas controls perform all the functions required to safely regulate gas flow to the main burner of the boiler. The gas valve is directly connected to the gas/ air mixer.
Gas/air mixer
The venturi design of the gas/air ensures that there is always the correct mixture of air and gas.
main Power Switch
This appliance features a main power switch located on the display panel. The main power switch is illuminated when it is receiving power and in the ON position. The only time that the switch should not be illuminated once the boiler is ready for use is when the switch is in the OFF position.
modulating Burner
This burner is designed to operate over the full range of input for this boiler. The burner can operate under normal
(blue flame) and infrared conditions.
modulating Boiler Control
This appliance incorporates an integrated modulating control that senses the load necessary to heat a structure and therefore uses less fuel than a conventional fixed firing rate boiler when there is a lower than peak demand for heat. The control senses the supply water, return water, and outside air temperatures if the outside air sensor is connected and calculates the load on the system. It then adjusts the firing rate to deliver the amount of heat that is needed at that particular time.
Direct Spark Igniter (DSI)
This appliance uses a DSI to ignite the fuel/air mixture in the combustion chamber and sense flame during operation. The DSI is a durable, reliable component that resists breakage due to handling or inadvertent impact with other objects.
NTC Sensors
The NTC sensors used with this appliance for measuring supply water, return water, and outside air temperature are specially configured to operate with the modulating boiler control.
modulating Blower
The modulating blower provides a means of introducing the gas/air mixture through the burner and into the combustion chamber where combustion can begin and then out the ex-
manual Reset Low water Cut Off
This appliance employs a factory installed integral low water cut off (LWCO) that has to be manually reset if there is a low water condition. The LWCO senses water through a probe at the top of the boiler that sends a signal through the water to ground. If the signal is not sensed through the ground, the LWCO enters a lockout mode that disables the appliance. If the LWCO is in normal mode a red indicator light is illuminated on the LWCO panel in the boiler.
During a low water condition, the red light goes out and the LWCO and control reset buttons on the display panel must be depressed to reset the LWCO.
19
XI - CONTROLS aND aCCESSORIES
Normally Closed LwCO Switch
This round button switch located next to the digital display is normally closed and spring loaded so that, when depressed, it opens, and closes again when pressure is removed. The switch is used as the manual reset for the
LWCO. When tripped the LWCO will remain in lockout until the water level reaches the probe and the switch is depressed to an open state and then released to a closed state, which sends a signal to the LWCO to resume normal operation. The boiler control reset button must then be pressed to reset from a low water condition. The LWCO switch and control reset button are located on the display panel of the boiler.
high Limit aquastat Control
The high limit aquastat control is a redundant safety limit control that provides a means for protecting the boiler and heating system from unsafe operating conditions which could damage the boiler. The aquastat is mounted in the
½” NPT control well and ¾” x ½” bushing on the top of the front boiler section at the hot water outlet. The aquastat is tied in with the boiler control and is factory set at 200°F water temperature. The high limit setpoint is field adjustable and may be set anywhere between 100°F and 200°F, with the maximum high limit setpoint not exceeding 200°F.
The field high limit setpoint adjustment for each installation depends on heating system requirements. The aquastat automatically resets when the boiler water temperature decreases ten degrees below the high limit setpoint value. (Adjustable differential from 5°F to 30°F)
NOTE: Boiler operating temperature (temperature curve) is calculated and set in the parameters of the boiler control.
Casting Temperature Safety Switch
In the event of lack of or loss of water in the boiler, the casting temperature safety switch (230°F setpoint) installed on the top of the aluminum boiler section behind the supply piping shuts off the boiler by shutting off power to the boiler control and causes a failure code to be displayed on the digital readout. This fault requires manual reset of the casting temperature safety switch to restart the boiler and the reset to be pressed on the user interface panel.
Verify that the boiler is properly filled with water and no air is trapped in the top of the casting (check cap
20
Taco Pump Curve
Grundfos Pump Curve
Bell & Gossett Pump Curve
XI - CONTROLS aND aCCESSORIES
on Cam Vent at the heat exchanger) before resetting this switch.
!
WARNING
Never run cold water into a hot, empty boiler.
Circulator Pump
Every forced hot water system requires at least one circulating pump. The circulating pump imparts the necessary energy to move water through the closed loop supply and return piping systems, terminal heating equipment (finned tube radiators, etc.) and back through the boiler for reheating. To provide the required hot water flow rates, the circulator pump must be properly sized to overcome frictional losses (usually measured in feet of water, also referred to as “pump head loss”) of the supply and return piping systems and boiler. The circulator pump is furnished in a carton within the boiler cabinet. The circulator(s) should always be located on the downstream (“pumping away”) side of the expansion tank.
aSmE Rated Pressure Relief valve
Each boiler must have a properly sized and installed
American Society of Mechanical Engineers (ASME) rated pressure relief valve. Water expands as it is heated by the burner/boiler sections. If there is no place for the water to expand its volume, (i.e., a properly sized and properly functioning expansion tank) pressure on the inside of the boiler and heating system will increase. The furnished relief valve will automatically open at 30 psig pressure to relieve the strain on the boiler and heating system from the increasing pressure. The pressure relief valve discharge must be piped with the same size pipe as the valve discharge opening to an open drain, tub or sink, or other suitable drainage point not subject to freezing, in accordance with ASME specifications. Failure to provide the pressure relief valve with piping as herein described may cause water damage and/or serious bodily injury.
The boiler manufacturer is not responsible for any water damage or personal injury. Check local codes for maximum discharge height from floor.
air Proving Blocked vent Safety assembly
The air proving blocked vent safety assembly incorporates two pressure switches that are designed to discontinue operation of the appliance if there is a problem with the blower or venting system. The normally open switch closes upon the initiation of the blower and functions as an air proving switch. The normally closed switch opens if there is a blockage in the combustion air intake or exhaust vent pipes.
Drain valve
The manual drain valve provides a means of draining the water in the heating system, including the boiler and hot water supply and return piping systems installed above the drain valve. This drain valve is installed in the return piping at the bottom front of the boiler section. Any piping installed below the elevation of this drain valve will require additional drain valves to be installed at low points in the piping systems in order to drain the entire system.
External Condensate Pump (optional)
For installations where there is no floor drain or other appropriate drainage receptacle available to receive condensate from the boiler, an external float activated condensate pump with integral sump is required. The condensate pump can be piped to a remote tie in point to a sanitary sewer system. For this application, the boiler must be installed so that proper pitch of piping to the external condensate reservoir (sump) can be accomplished. Use wood frame or concrete blocks to raise boiler as required for proper installation.
Concentric vent/air Intake Termination (Optional)
The optional concentric vent/air intake termination utilizes a single opening per each appliance through the wall or roof of a structure.
21
XII - waTER TREaTmENT & fREEZE PROTECTION
When filling the boiler water is the preferred heating solution. Most potable water supplies may be used to charge and re-fill provided the chlorine and chloride ions levels are less than 100 ppm.
Antifreeze may be used in most applications provided all of the following conditions are met:
1.
Unless a strict schedule of sampling, analysis and maintenance of the antifreeze solution is followed, the boiler must be piped as a primary loop connected to secondary loop as shown in the Piping & Wiring Diagram Appendix.
Failure to perform regular maintenance to the antifreeze manufacturer’s instructions will result in damage to the heat exchanger and the voiding of boiler warranty.
2.
Only the antifreeze manufacturers listed below are selected.
3.
At installation of a new or replacement boiler and at least on an annual basis the system antifreeze must be analyzed by the antifreeze supplier or their recommended laboratory.
4.
Adjustments to the system antifreeze must be made according to the antifreeze manufacturers recommendations using only their recommended products.
5.
All existing systems MUST be flushed of ALL old system fluid. Failure to do so may void the boiler warranty if evidence of improper flushing is revealed.
Consult with your heating professional for recommendations.
•
•
•
Piping Recommendations
System leaks may not always be visible. An unseen system leak will become obvious if boiler pressure decreases when make up valve is closed.
All system leaks must be repaired immediately. Constant introduction of make up water will introduce dissolved oxygen, resulting in accelerated boiler corrosion.
Primary/Secondary piping must be used if any of the recommended antifreeze solutions found below are used.
See the
Piping & wiring Diagram appendix
.
water Chemistry:
•
•
This boiler is designed for a closed loop hydronic heat system ONLY! This boiler is not suitable for natural gravity type installations, or any other open type system.
System fluid pH must be maintained between 7.0 and 8.0.
•
•
•
•
Maintain water hardness below 7 grains hardness.
Filling with chlorinated fresh water should be acceptable since drinking water chlorine levels are typically less than
5 ppm. Do not fill boiler with water containing chlorine and chloride ions levels greater than 100 ppm.
Do not use inhibitors or other additives that are not specifically approved by the antifreeze manufacturer for this product.
Consult the antifreeze manufacturer if any of the above are outside the stated ranges.
Cleaning the hydronic System:
ImPORTaNT: Do not mix different manufacturers’ products. Doing so will void the warranty of the boiler.
Consideration MUST be given to cleaning the heating system, particularly in retrofit situations where a new boiler with an aluminum heat exchanger is being installed in an existing piping system.
All existing systems must be cleaned and flushed according to the antifreeze manufacturer’s recommendations.
Systems that have antifreeze that is not approved by the boiler manufacturer must be completely flushed to ensure no unapproved antifreeze remains according to the approved antifreeze manufactures recommendations. Evidence of an unapproved antifreeze in the system may void the boiler warranty.
In older systems obviously discolored, murky or dirty water; or a pH reading outside the boiler manufacturer’s stated acceptable range (pH 7.0 to 8.0) are indications that the system should be cleaned or treated.
1.
2.
3.
Measure total capacity of the system including the piping, tanks, boiler, collector plates, etc. The most accurate method of measuring fluid capacity is to fill the system and then completely drain it, volumetrically measuring the fluid drained.
Thoroughly flush the system with clean water to remove any sediment or contaminants. Sludge and iron oxide deposits can cause rapid breakdown of inhibitors.
Cleaning fluid – Flushing with clean water is preferred.
If cleaning fluid is used, only use cleaner specifically approved for use with aluminum boilers. Use only cleaning fluids and the procedure recommended by the antifreeze manufacturer.
22
XII - waTER TREaTmENT & fREEZE PROTECTION freeze Protection aluminum Safe antifreeze, Treatments and additive
Guidelines:
Antifreeze, if required, must be one of the antifreeze manufacturers listed below. See the “Approved Aluminum Antifreeze
& Inhibitor Suppliers” section of this manual for a list of boiler manufacturer approved products.
•
•
•
•
Always clean system prior to using antifreeze, refer to the
Cleaning the Hydronic System section of this manual for details.
Only use the antifreeze manufacturers’ products outlined in this document.
Use of antifreeze must be in accordance with local plumbing codes.
Dispose of old antifreeze and boiler system water in accordance with local authorities.
•
•
•
antifreeze will raise the ph of the hydronic solution in a heating system above the recommended level due to the corrosion inhibitors in the antifreeze.
The solution must be treated to maintain a pH within the boiler manufacturer’s recommended level to avoid damage to the heat exchanger. Follow antifreeze manufacturer’s instructions for details on how to adjust the pH.
If the system has leaked for some reason, the water and antifreeze chemistry will need to be adjusted. To avoid damage to the boiler, check the pH and chemistry of the boiler solution and consult the antifreeze manufacturer for recommendations.
It is recommended that a pH reading is taken annually, and adjusted as necessary. Follow antifreeze / inhibitor manufacturer’s instructions for details on how to adjust the pH.
NOTICE
Antifreeze solutions can breakdown over time. Failure to check antifreeze chemistry, including inhibitors, annually may result in accelerated corrosion of boiler and other system components. Consult with the antifreeze manufacturer for recommendations.
•
•
•
Use of antifreeze in any boiler will reduce heating capacity as much as 10-20%. This must be taken into consideration when sizing the heating system, pumps and expansion tank. Consult antifreeze manufacturer’s literature for specific information on reduced capacity.
Using the antifreeze manufacturer’s instructions to determine the freezing temperature needed and use the correct amount of antifreeze. Never exceed 50% antifreeze by volume.
The boiler operating pressure must remain below 15 psi for antifreeze solutions that specify a maximum of 250˚F
(121˚C).
23
XII - waTER TREaTmENT & fREEZE PROTECTION approved aluminum antifreeze
& inhibitor Suppliers
Interstate Chemical
2797 Freedland Road
P.O. Box 1600 Hermitage, PA 16148-0600 www.interstatechemical.com
Tel: 800-422-2436 Fax: 724-981-8383
Noble Company
PO Box 350 Grand Haven, MI 49417 www.noblecompany.com
Tel: 800-878-5788 Fax: 800-272-1519
Intercool NFP-30,40,50 AA
Intercool RPH-15*
approved Products
Noburst AL Antifreeze
Rhomar Water Management, Inc.
PO Box 229 Springfield, MO 65801 www.rhomarwater.com
Tel: 800-543-5975 Fax: 417-862-6410
Rhogard Antifreeeze
Pro-Tek 922 Inhibitor*
* These products may be used to adjust the pH level of the hydronic system, but on occasion may not resolve the pH issue. In these cases it is recommended to flush the system and refill with untreated water and new boiler manufacturer approved antifreeze suitable for Aluminum heat exchangers.
ImPORTaNT
: Regardless of antifreeze or inhibitors used, be sure to follow the antifreeze manufacturer’s instructions for use, safe handling and storage of their products. Refer to the MSDS (Material Safety Data Sheets) provided by the antifreeze manufacturer for potential hazards and first aid procedures for exposure or ingestion.
antifreeze Testing Services:
Each of the recommended antifreeze manufacturers have developed a sampling program available to the homeowner and contractor. Contact the antifreeze manufacturer regarding their sampling plan procedure. Consult the antifreeze manufacturer for details on sample requirements and recommendations.
ECR International reserves the right to make changes without notice.
24
XIII - PUTTING ThE BOILER IN OPERaTION filling boiler with water and purging air
(For each of the following systems, refer to the appropriate piping diagrams in the Installation
Manual P/N# 240006103.)
1. Systems with Diaphragm Type Expansion Tanks
A.
Close all zone service valves on the supply and return piping. Open the feed valve and fill boiler with water.
Make sure air vent is open. Hold relief valve open until water runs air free for five seconds to rapidly bleed air from boiler, then let the relief valve snap shut.
B. Open the zone service valve on the supply pipe for the first zone. Open the purge valve on the first zone.
Feed water will fill the zone, pushing air out the purge valve. Close the purge valve when the water runs air free. Close the zone service valve.
C. Repeat step 2 for all remaining zones.
D.
Open all service valves. Any air remaining trapped in the return lines between the service valves and the boiler will be pushed towards the air vent when the boiler is placed in operation.
E. Inspect piping system and repair any leaks immediately.
free. Close the zone service valve.
C. Repeat step 2 for all remaining zones.
D.
Open the expansion tank service valve and the tank vent. Fill the tank to the proper level and close the tank vent. Remove the handle from the expansion tank service valve so the homeowner doesn’t accidentally close it.
E. Open all service valves. Any air remaining trapped in the return lines between the service valves and the boiler will be pushed towards the expansion tank when the boiler is placed in operation.
F. Inspect piping system. Repair any leaks immediately.
NOTE: Do not use stop leak compounds. Leaks in threaded connections in the aluminum boiler sections must be repaired immediately. Aluminum threads will not seal themselves.
LIGhTING INSTRUCTIONS fOR yOUR SafETy REaD BEfORE OPERaTING!!
2. Systems with Conventional Closed Type Expansion Tanks
A.
Close all zone service valves on the supply and return piping and close the expansion tank service valve.
Drain expansion tank. Open the feed valve and fill boiler with water. Hold relief valve open until water runs air free for five seconds to rapidly bleed air from boiler, then let the relief valve snap shut.
B. Open the zone service valve on the supply pipe for the first zone. Open the purge valve on the first zone.
Feed water will fill the zone, pushing air out the purge valve. Close the purge valve when the water runs air
!
WARNING
If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life.
1.
This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light this burner by hand!!
2.
Before operating smell all around the appliance area for gas.
Be sure to smell next to the floor because propane gas is heavier than air and will settle to the floor.
25
XIII - PUTTING ThE BOILER IN OPERaTION
!
CAUTION
•
•
•
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switches; do not use any phones in your building.
Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. If you cannot reach your gas supplier, call the fire department.
Control Valve “ON”
3.
4.
Use only your hand to turn the gas ball valve. Never use tools. If the valve will not turn by hand, do not try to repair it, call a qualified service technician. Force or attempted repair may cause fire or explosion.
Do not use this appliance if any part has been under water.
Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water.
OPERaTING INSTRUCTIONS
STOP! REaD ThE SafETy INfORmaTION aBOvE
BEfORE OPERaTING ThIS aPPLIaNCE.
Control Valve “OFF”
7.
Turn gas ball valve to the “on” position. The handle on the valve should be parallel to the gas pipe.
8.
Replace the front jacket panel.
9.
Turn on all electrical power to the appliance.
10.
Set thermostat to desired setting.
11.
If the appliance will not operate, follow the instructions “To
Turn Off Gas To Appliance” (below) and call your service technician or gas supplier.
1.
Set the thermostat to the lowest setting.
2.
Turn off all electrical power to the appliance.
3.
This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light this burner by hand!
4.
Remove the front jacket panel.
5.
Turn off the gas ball valve. Valve handle should be perpendicular to the gas pipe.
6.
Wait 5 minutes for any gas to clear. Then smell for gas, including near the floor. If you smell gas, STOP! Follow instructions on this page under “What To Do If You Smell
Gas.” If you do not smell gas, go to next step.
1.
TO TURN Off GaS TO aPPLIaNCE
Set the thermostat to the lowest setting.
2.
Turn off all electric power to the appliance if service is to be performed.
3.
Remove the front jacket panel.
4.
Turn gas ball valve off, handle should be perpendicular to the gas pipe.
5.
Replace the front jacket panel.
6.
Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests specified in ANSI Z21.13-latest revision.
26
XIv - maINTENaNCE aND CLEaNING
The acidic nature of flue gases condensing on the aluminum boiler sections will cause the formation of aluminum oxide. This oxide formation is normal, is generally uniform throughout the boiler sections, and represents a negligible mass of aluminum that is consumed by oxidation during the life of the boiler. If left unchecked, this buildup may eventually cause blockage of the flue gas passages in the boiler sections, reducing efficiency, and ultimately shutting down the boiler due to lack of combustion air flow, or drainage of condensate.
Regular service and maintenance by a qualified service agency must be performed at least once every 12 months to assure safe, trouble free operation and maximum efficiency.
3.
Circulator pump and blower fan motor furnished with boiler are permanently lubricated from the factory and require no further lubrication. Additional or non-factory supplied pumps and/or motors should be lubricated according to the pump and/or motor manufacturer’s instruction.
1.
2.
Daily during heating season
Check for and remove any obstruction to the flow of combustion air or venting of flue gases.
Check that boiler area is free from combustible materials, gasoline, and other flammable vapors and liquids.
1.
Beginning of each heating season
Schedule an annual service call by a qualified service agency which includes:
• Examining flue passages in the heat exchanger, burner, and condensate lines, and cleaning (if necessary) by following the instructions in “Annual Examination and Cleaning of Boiler Components” in this section.
• Visually inspecting the venting and air intake system for proper operation, immediately repairing or replacing any sign of deterioration or leakage, and insuring proper reassembly and resealing of the system.
• Checking for and removing any obstruction to the flow of combustion air or venting of flue gases.
• Following the instructions in Sections V and VII of the Control Manual and Operating Instructions (P/N#
240006104), “Putting The Boiler In Operation” and
“Checkout Procedures And Adjustments.”
• Visually inspecting the condensate drain line for proper operation and checking for deteriorated or plugged condensate drain line.
• Checking all gasketed joints for leakage and tightening bolts or replacing gaskets as needed.
• Removing jacket front and top panels, checking for piping leaks around relief valve and other fittings, and repairing if found WITHOUT USING stop leak compounds.
2.
• Analyze the boiler fluid as instructed in Water Treatment and Freeze Protection section of manual 240006104.
Check that boiler area is free from combustible materials, gasoline, and other flammable vapors and liquids.
1. monthly during heating season
Remove jacket front and top panels and check for piping leaks around relief valve and other fittings. If found, contact a qualified service agency. DO NOT use stop leak compounds.
2.
Test relief valve. Refer to valve manufacturers instructions packaged with relief valve.
3.
Visually inspect the venting and air intake system for proper operation. If the vent or air intake show any signs of deterioration or leakage, contact a qualified service agency to repair or replace them immediately and to insure proper reassembly and resealing of the system.
4.
Visually inspect the PVC condensate drain pipe for proper operation. If the drain pipe shows any signs of blockage, leakage, or deterioration contact a qualified service agency to clean, repair, or replace it immediately.
5.
Check air vent(s) for leakage.
6.
1.
A periodic inspection of the low water cut off is necessary, including flushing of float type devices. Refer to low water cut off manufacturer’s specific instructions.
annual shut down procedure
Turn off gas to boiler as described
“To Turn Off Gas
To Appliance”
in Section V of the Control Manual and
Operating Instructions (P/N# 240006104).
27
XIv - maINTENaNCE aND CLEaNING
2.
If heating system is to remain out of service during freezing weather and does not contain antifreeze, drain system completely. If boiler will be exposed to freezing temperatures, drain condensate lines.
!
CAUTION
Debris rinsed away by this method will exit through the condensate drain. Be wary of drain lines getting clogged and causing water to back up in the bottom of the casting.
annual examination and cleaning of boiler components
!
WARNING
The following service procedures must be performed by a qualified service agency using the
Repair Parts manual (P/N# 240006107) for reference. The boiler owner should not attempt these steps.
1.
Before servicing, turn off electrical power to boiler at service switch. Close manual gas valve to turn off gas supply to boiler.
2.
Examine flue passages by removing blower/burner assembly from casting. The procedure for examining and cleaning the burner is described below.
3.
Any buildup of sediment or aluminum oxide (white powdery or flaky substance) in the flue passages must be cleaned as follows:
• Remove jacket front and top panels.
• Confirm that manual gas valve is closed and disconnect gas line to gas valve at union. Then disconnect pressure switch hoses to gas valve and air inlet.
• Disconnect wires to gas valve and igniter.
• Loosen but do not remove five nuts attaching blower adapter assembly to boiler.
• Remove two igniter screws and very carefully remove the igniter.
• Remove five nuts and remove blower adapter assembly, burner, and gaskets.
• Aluminum oxide deposits are water soluble and may be rinsed away by inserting a hose into the burner opening of the casting and slowly running water through the flue side of the boiler and out the condensate drain.
• Use a flexible handle nylon brush to loosen sediment and aluminum oxide on all accessible heating surfaces of the boiler. Be sure not to get brush stuck in heat exchanger!
• After brushing and rinsing, remove any remaining loosened sediment using a shop vacuum with a snorkel attachment.
• Inspect burner for any foreign matter in the flame ports or inside the burner. Any foreign matter should be removed by blowing with compressed air or vacuuming. If the burner cannot be cleaned, it must be replaced.
• Reinstall burner and gaskets and position blower adapter assembly over studs. Install five nuts but do not tighten.
Reinstall igniter and igniter gasket and fasten with two screws. Tighten five nuts holding blower adapter assembly.
4.
• Connect gas line to gas valve, pressure switch hose to gas valve and air inlet assembly, igniter wires, and gas valve wires.
Visually inspect the condensate trap. Any foreign material visible in the condensate lines needs to be cleaned out as described below:
• Inspect for sediment or blockage.
• Flush out with water or vacuum.
5.
• Follow the instructions in Section VII, “Filling The Condensate Trap With Water.”
Inspect the flue connector as follows:
• Loosen the clamp on the vent tee side of the 2” flexible coupling that connects the vent tee to the exhaust port.
• Inspect interior of vent tee. Any buildup of sediment on the inside surface must be cleaned.
• Reconnect 2” flexible coupling to vent tee.
28
Xv - BOILER wIRING DIaGRam
DHW PUMP 117 CH PUMP 117
ONTROL
OUT AIR OUT AIR
CAST SAFE
MODULATION BOILER C
HIGH LIMIT THERMOST
HIGH LIMIT THERMOST
CAST SAFE
REGISTRE DE LA CHEMINÉE C
29
T-STAT
XvI - PIPING aND wIRING aPPENDIX
Basic Wiring Diagram
BOILER CONTROL PANEL
CH T1
CH T2
DHW T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
L1
120 VAC
L2
OUTDOOR
AIR SENSOR
Note: The CH & DHW Circulator connections on the boiler will only support a pump with a 1 amp rating or less.
DHW CIRC
Single Zone system with domestic hot water priority
CH
CIRC
30
BOILER
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 1
CH CIRCULATOR
WATER INLET
EXPANSION
TANK
DHW
CIRCULATOR
PRIORITY ZONE
HOSE BIB
FLOW CONTROL
VAVLE
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
Single Zone system with domestic hot water priority
NOTE: NOT RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
Wiring Diagram 1
Hotline indirect water heater aquastat or thermostat
AR822-II
AR822-TT
TT
T-STAT
T
R
TORQUE TERMINAL
SCREWS
6 TO 7 INCH LBS
T
24V
W C 5
NO NC
6 6
CH T1
CH T2
DHW T1
DHW T2
A1
A2
Boiler Control Panel
L1
L2
CH C1
CH C2
DHW C1
DHW C2
L2
120
VAC
4
NO NC
4
OUTDOOR
AIR SENSOR
CH CIRC
L2 N
L1 (HOT)
120V AC
Single Zone system with domestic hot water priority
31
DHW CIRC
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 2
BOILER
WATER INLET
EXPANSION
TANK
CH & DHW
SYSTEM
CIRCULATOR
*USE FULL PORT ZONE
VALVE. FOR OPTIMUM TANK
PERFORMANCE, CONSIDER
USING ZONE CIRCULATOR
(SEE FIGURE 5)
ZONE 4
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
ZONE VALVE
AIR SEPARATOR
HOSE BIB
FLOW CONTROL
VALVE
Multizone piping with zone valves and domestic hot water priority
(with zone valve)
NOTE: NOT RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
32
XvI - PIPING aND wIRING aPPENDIX
SWITCH LEGEND
ON
OFF
Wiring Diagram 2
TANK
CONTROL
INDIRECT WATER
HEATER AQUASTAT
OR THERMOSTAT
Boiler Control Panel
CH T1
CH T2
DHW T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
120 VAC
N
L
ARGO AZ-4CUP
CONTROL
Yellow
Yellow
L
24VAC
N
T T
X X
Black
White
L
STATUS
PRIORITY ON
PRIMARY PUMP
PRIORITY PUMP
X-X CONTACT
ZR ON
ZC ON
LINE
IN
N
120 VAC
PRIMARY
PUMP
PRIORITY
PUMP
FROM BOILER
N L N L N L ZR ZC
T T
T-STAT
T-STAT
T T T T
ZONE VALVE/PUMP
PRIORITY
ZR-ZC
DPM-2
OPTION SWITCH
AZ-4CP
CH & DHW
SYSTEM
CIRCULATOR
PRI ZONE
1 2 3 4
ZONE 2
1 2 3 4
ZONE 3
1 2 3 4
ZONE 4
1 2 3 4
JUMPER
MOTOR
END
SWITCH
1 2 3 4
4 WIRE ZONE
VALVE ONLY
1
2
3
DO NOT USE
MOTOR
END
SWITCH
Note: Install wire jumper between terminals 3 and 4 when using zone valves without an end switch.
Multizone wiring with zone valves and domestic hot water priority
(with zone valve)
33
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 3
*USE FULL PORT ZONE
VALVE.
CH
CIRCULATOR
BOILER
WATER INLET
EXPANSION
TANK
DHW
CIRCULATOR
ZONE 4
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
FLOW CONTROL
VALVE
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
HOSE BIB
Multizone system with zone valves and domestic hot water priority (with circulator)
NOTE: NOT RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
34
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 3
SWITCH LEGEND
ON
OFF
TANK
CONTROL
INDIRECT WATER
HEATER AQUASTAT
OR THERMOSTAT
Boiler Control Panel
CH T1
CH T2
DHW T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
120 VAC
N
L
ARGO AZ-4CP
CONTROL
Yellow
Yellow
L
24VAC
N
T T
X X
Black
White
L
STATUS
PRIORITY ON
PRIMARY PUMP
PRIORITY PUMP
X-X CONTACT
ZR ON
ZC ON
LINE
IN
N
120 VAC FROM BOILER
N L N L N L ZR ZC
T T
T-STAT T-STAT
T T T T
ON
ZONE VALVE/PUMP
PRIORITY
ZR-ZC
DPM-2
OPTION SWITCH
AZ-4CP
CH
CIRCULATOR
DWH
CIRCULATOR
PRI ZONE
1 2 3 4
ZONE 2
1 2 3 4
ZONE 3
1 2 3 4
ZONE 4
1 2 3 4
JUMPER
MOTOR
END
SWITCH
1 2 3 4
4 WIRE ZONE
VALVE ONLY
1
2
3
DO NOT USE
MOTOR
END
SWITCH
Note: Install wire jumper between terminals 3 and 4 when using zone valves without an end switch.
Multizone system with zone valves and domestic hot water priority (with circulator)
35
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 4
CIRC 4
CIRC 3
CIRC 2
DHW CIRCULATOR
ZONE 4
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
WATER INLET
EXPANSION
TANK
BOILER
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
HOSE BIB
FLOW CONTROL
VALVE
Multizone system with circulators and domestic hot water priority
NOTE: NOT RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
36
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 4
NOTE: IN PLACE OF 115
VOLT ISOLATION RELAY,
OPTIONAL CONTROL
ARGO AR822II
TERMINAL 5 & 6 N.O.
TO DHW T1 & DHW T2
AR822-TT
TT
TORQUE TERMINAL
SCREWS
6 TO 7 INCH LBS
T T
R W
24V
NO
C 5 6
NC
6
Hotline indirect water heater aquastat or thermostat
DATA PORT
T-STAT
T-STAT
T-STAT
T
W
PRIORITY
ZONE
1
T
R
T
W
THERMOSTATS
ZONE 2 ZONE 3
2
T
R
T
W
3
T
R
ZONE 4
T
W
4
T
R
COMMON
24 VAC
@ 1VA
TO EXTRA
ZONE MODULE
X-X
ZR-ZC
L2
120
VAC
NO
4
NC
4
L1 & L2 TO ARM L &
N ON PRIORITY ZONE
ZONE 1 ZONE 2 ZONE 3 ZONE 4
PRIORITY ON
ARM-4P
CONTROL WITH
PRIORITY
X X
ISOLATED
SWITCH
ZC ZR
L
1
N L
2
N L
ZONE 2
3
ZONE 3
N L
4
ZONE 4
N
L N
120 VAC
CIRC 2
CIRC 3
CIRC 4
OUTDOOR
AIR SENSOR
CH T1
CH T2
DHW T1
DHW T2
A1
A2
Boiler Control Panel
L1
L2
CH C1
CH C2
DHW C1
DHW C2
115 V COIL / ISOLATION RELAY
NORMALY OPEN
DHW CIRC
L2 N
L1 (HOT)
120V AC
Multizone system with circulators and domestic hot water priority
37
WATER INLET
CIRC 4
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 5
ZONE 4
ZONE 3
CIRC 3
ZONE 2
CIRC 2
ZONE 1 (PRIORITY ZONE)
DHW
CIRCULATOR
12" MAX APART
(TO PREVENT FORCED
FLOW IN SECONDARY)
EXPANSION
TANK
CH & DHW
BOILER
CIRCULATOR
BOILER
ALTERNATE BOILER
CIRCULATOR
LOCATION
*SEE NOTE
FLOW CONTROL
VALVE
CIRCULATOR
PRESSURE
REDUCER VALVE
BALL VALVE
AIR SEPARATOR
SHUT-OFF
VALVE
CHECK VALVE
ZONE VALVE
HOSE BIB
Primary/secondary piping with circulators and domestic hot water
NOTE: RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
38
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 5
AR822-II
AR822-TT
TT
NOTE: IN PLACE OF 115
VOLT ISOLATION RELAY,
OPTIONAL CONTROL
ARGO AR822II
TERMINAL 5 & 6 N.O.
TO DHW T1 & DHW T2
AR822-TT
TT
TORQUE TERMINAL
SCREWS
6 TO 7 INCH LBS
T T
R W
24V
NO
C 5 6
NC
6
15 VA
L2
120
VAC
SILKSCREEN
L1 & L2 TO ARM L &
N ON PRIORITY ZONE
4
NO NC
4
TORQUE TERMINAL
SCREWS
6 TO 7 INCH LBS
T T
R W
24V
C
NO
5 6
NC
6
L2
120
VAC
4
NO NC
4
INDIRECT HOT WATER HEATER
AQUASTAT OR THERMOSTAT
DATA PORT
T-STAT
T-STAT
T-STAT
T
W
1
T
R
T
W
THERMOSTATS
ZONE 2 ZONE 3
2
T
R
T
W
3
T
R
T
W
ZONE 4
4
T
R
COMMON
24 VAC
@ 1VA
TO EXTRA
ZONE MODULE
X-X
ZR-ZC
ZONE 1 ZONE 2 ZONE 3 ZONE 4
PRIORITY ON
ARM-4P
CONTROL WITH
PRIORITY
X X
ISOLATED
SWITCH
ZC ZR
L
1
N L
2
ZONE 2
N L
3
L
ZONE 3
N
4
ZONE 4
N
L
120 VAC
N
CIRC 2
CIRC 3
CIRC 4
CH T1
CH T2
DHW T1
DHW T2
A1
A2
Boiler Control Panel
L1
L2
CH C1
CH C2
DHW C1
DHW C2
OUTDOOR
AIR SENSOR
BOILER CIRC (WILL RUN FOR ALL CH
AND DHW CALLS FOR HEAT)
115 V COIL / ISOLATION RELAY
NORMALY OPEN
DHW CIRC
L2 N
L1 (HOT)
120V AC
Primary/secondary wiring with circulators and domestic hot water
39
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 6
ZONE 4
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
SYSTEM
CIRCULATOR
*USE FULL PORT ZONE
VALVE. FOR OPTIMUM TANK
PERFORMANCE, CONSIDER
USING ZONE CIRCULATOR
(SEE FIGURE 13)
12" MAX APART
(TO PREVENT FORCED
FLOW IN SECONDARY)
WATER INLET
EXPANSION
TANK
BOILER
CIRCULATOR
BOILER
ALTERNATE BOILER
CIRCULATOR
LOCATION
*SEE NOTE
FLOW CONTROL
VALVE
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
HOSE BIB
Primary/secondary multizone system piping with zone valves and domestic hot water (with zone valve)
NOTE: RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
40
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 6
AR822-TT
TT
T T
R W
24V
C 5 6 6
N.O.
N.C.
SWITCH LEGEND
ON
OFF
INDIRECT WATER
HEATER AQUASTAT
OR THERMOSTAT
TANK
CONTROL
ARGO AZ-4CP
CONTROL
Yellow
Yellow
T T
X X
STATUS
PRIORITY ON
PRIMARY PUMP
PRIORITY PUMP
X-X CONTACT
ZR ON
ZC ON
Black
White
120 VAC
N L
PRIMARY
PUMP
N L
PRIORITY
PUMP
FROM BOILER
N L ZR ZC
T T
T-STAT
T T
T-STAT
T T
ON
ZONE VALVE/PUMP
PRIORITY
ZR-ZC
DPM-2
OPTION SWITCH
AZ-4CP
PRI ZONE
1 2 3 4
ZONE 2
1 2 3 4
ZONE 3
1 2 3 4
ZONE 4
1 2 3 4
JUMPER
MOTOR
END
SWITCH
1 2 3 4
4 WIRE ZONE
VALVE ONLY
2
3
1
DO NOT USE
MOTOR
END
SWITCH
Note: Install wire jumper between terminals 3 and 4 when using zone valves without an end switch.
RELAY
L1/3 FACTORY
INSTALLED
JUMPER
L2
120
VAC
N.O.
4
N.C.
4
*
SYSTEM
CIRC
*
BOILER
CIRC
*
BOTH CIRCULATORS WILL RUN
WITH ANY CALL FOR HEAT.
OUTDOOR
AIR SENSOR
Boiler Control Panel
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
Note: a priority loop zone valve is used with this configuration
Primary/secondary multizone system wiring with zone valves and domestic hot water (with zone valve)
41
CH CIRCULATOR
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 7
*USE FULL PORT ZONE
VALVE.
ZONE 4
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
DHW CIRCULATOR
12" MAX APART
(TO PREVENT FORCED
FLOW IN SECONDARY)
WATER INLET
EXPANSION
TANK
BOILER
BOILER
CIRCULATOR
ALTERNATE BOILER
CIRCULATOR
LOCATION
*SEE NOTE
FLOW CONTROL
VALVE
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
ZONE VALVE
AIR SEPARATOR
HOSE BIB
Primary/secondary piping with zone valves and domestic hot water
(with circulator)
NOTE: RECOmmENDED fOR aNTIfREEZE aPPLICaTIONS
42
SWITCH LEGEND
ON
OFF
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 7
INDIRECT WATER
HEATER AQUASTAT
OR THERMOSTAT
TANK
CONTROL
AR822-II
T T
R W
24V
C 5 6 6
N.O.
N.C.
ARGO AZ-4CP
CONTROL
Yellow
Yellow
T T
X X
STATUS
PRIORITY ON
PRIMARY PUMP
PRIORITY PUMP
X-X CONTACT
ZR ON
ZC ON
Black
White
120 VAC
PRIMARY
PUMP
PRIORITY
PUMP
FROM BOILER
N L N L N L ZR ZC
T T
T-STAT
T T
T-STAT
T T
ON
ZONE VALVE/PUMP
PRIORITY
ZR-ZC
DPM-2
OPTION SWITCH
AZ-4CP
PRI ZONE
1 2 3 4
ZONE 2
1 2 3 4
ZONE 3
1 2 3 4
ZONE 4
1 2 3 4
JUMPER
MOTOR
END
SWITCH
1 2 3 4
4 WIRE ZONE
VALVE ONLY
2
3
1
DO NOT USE
MOTOR
END
SWITCH
Note: Install wire jumper between terminals 3 and 4 when using zone valves without an end switch.
RELAY
L1/3 FACTORY
INSTALLED
JUMPER
L2
120
VAC
N.O.
4
N.C.
4
*BOILER
CIRC
*BOILER CIRCULATOR WILL RUN
WITH ALL CALLS FOR HEAT.
OUTDOOR
AIR SENSOR
Boiler Control Panel
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
CH
CIRC
DHW
CIRC
Note: a priority loop zone valve is used with this configuration
Primary/secondary piping with zone valves and domestic hot water
(with circulator)
43
WATER INLET
TO SYSTEM
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 8
FROM SYSTEM
EXPANSION
TANK
BOILER
ALTERNATE
CIRCULATOR
LOCATION
CIRCULATOR
PRESSURE
REDUCER VALVE
BALL VALVE
AIR SEPARATOR
SHUT-OFF
VALVE
CHECK VALVE
3 WAY MIXING
VALVE
HOSE BIB
Bypass piping (automatic mixing valve)
Piping Diagram 9
TO SYSTEM
FROM SYSTEM
V1 V2
SYSTEM
CIRCULATOR
WATER INLET
EXPANSION
TANK
BOILER
ALTERNATE
CIRCULATOR
LOCATION
CIRCULATOR
PRESSURE
REDUCER VALVE
BALL VALVE
SHUT-OFF
VALVE
CHECK VALVE
ZONE VALVE
Bypass piping (fixed low temp only)
44
AIR SEPARATOR
TO SYSTEM
WATER INLET
XvI - PIPING aND wIRING aPPENDIX
Piping Diagram 10
FROM SYSTEM
EXPANSION
TANK
BOILER
ALTERNATE
CIRCULATOR
LOCATION
CIRCULATOR
PRESSURE
REDUCER VALVE
BALL VALVE
AIR SEPARATOR
SHUT-OFF
VALVE
CHECK VALVE
4-WAY MIXING
VALVE HOSE BIB
FLOW CONTROL
VALVE
Bypass piping (4-way valve option with circulator on supply)
Piping Diagram 11
TO SYSTEM
FROM SYSTEM
12” MAX 12” MAX
WATER INLET
BOILER 1
CIRC
BOILER 2
CIRC
EXPANSION
TANK
BOILER
1
ALTERNATE
CIRCULATOR
LOCATION
BOILER 1
BOILER
2
ALTERNATE
CIRCULATOR
LOCATION
BOILER 2
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
3 WAY MIXING
VALVE
AIR SEPARATOR
HOSE BIB
Multiple Boiler Piping
45
XvI - PIPING aND wIRING aPPENDIX
Wiring Diagram 8: Multiple Boiler Wiring (AMB-4)
AMB-4
WATER SENSOR
OUTSIDE SENSOR
IF USING EXTERNAL DAY/NIGHT FEATURE
CONNECT HERE (DRY CONTACT)
IF USING REQ/ACK CONNECT HERE
(TT/THERMOSTAT DRY CONTACT)
TO PRIORITY IF USING
(DRY CONTACT)
Yellow
Yellow
WATER SENSOR
OUTSIDE SENSOR
IF USING EXTERNAL DAY/NIGHT FEATURE
CONNECT HERE (DRY CONTACT)
IF USING REQ/ACK CONNECT HERE
(TT/THERMOSTAT DRY CONTACT)
TO PRIORITY IF USING
(DRY CONTACT)
Black
White
BOILER
2
BOILER
1
TO
AUXILIARY
DEVICE
TO
BOILER T-T
(TERMINALS
1&2)
TO
BOILER
T-T
120 V
WHITE
BLACK
Wiring Diagram 9: Multiple Boiler Wiring (AMB-8)
AMB-8
Yellow
Yellow
Black
White
TO
BOILER
T-T
TO
BOILER
T-T
TO
BOILER
T-T
TO
BOILER T-T
(TERMINALS
1&2)
TO
BOILER T-T
(TERMINALS
1&2)
TO
BOILER
T-T
BOILER
2
BOILER
1
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
BOILER CONTROL PANEL
BOILER
1 CIRC
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
BOILER CONTROL PANEL
BOILER
2 CIRC
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
BOILER CONTROL PANEL
BOILER
1 CIRC
CH T1
CH T2
DWH T1
DHW T2
A1
A2
L1
L2
CH C1
CH C2
DHW C1
DHW C2
BOILER CONTROL PANEL
BOILER
2 CIRC
120 V
WHITE
BLACK
46
NOTES
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
__
SERvICE RECORD
For technical assistance with this product call toll free 1-800-325-5479
ECR International
PO Box 4729
Utica, NY 13504-4729 www.ecrinternational.com
advertisement
Related manuals
advertisement