Epsolar MT50 Instruction Manual
Add to my manuals36 Pages
Epsolar MT50, your newly purchased device, offers advanced features for monitoring and controlling your solar power system. With a large-screen LCD display, it provides real-time data on battery voltage, current, and charge/discharge status, as well as PV power generation and load consumption. Easily navigate through the user-friendly interface using the six navigation buttons. The MT50 also boasts remote load control, parameter browsing, and modification capabilities, allowing you to optimize your system's performance.
advertisement
INSTRUCTION MANUAL
Remote Meter: MT50
Thank you very much for selecting our product!
This manual offers important information and suggestions with respect to installation, use and troubleshooting, etc. Please read this manual carefully before using the product.
Remote Meter
MT50
Remote meter (Model MT50) is available to connect with solar controller LSxxxxB(P)
,
VSxxxxBN and TracerxxxxBN(P).
Contents
1 Important Safety Instructions ............................................................... 1
2 General Information ............................................................................ 2
2.1 Features .............................................................................................. 2
2.2
Main functions ................................................................................... 3
2.3
Recommendations ............................................................................ 3
3 Installation........................................................................................... 4
4 Product Features ................................................................................ 8
5 Operation ......................................................................................... 12
5.1 Buttons ............................................................................................... 12
5.2 Main menu ......................................................................................... 13
5.3
Real-time monitoring ...................................................................... 14
5.4 Device information ........................................................................... 16
5.5
Test operation .................................................................................. 16
5.6
Control parameter ........................................................................... 17
5.7
Load setting ..................................................................................... 21
5.8
Device parameter ........................................................................... 24
5.9
Device password ............................................................................. 25
5.10
Factory reset ................................................................................... 25
5.11
Failure information .......................................................................... 26
5.12
Meter parameter ............................................................................. 27
6 Technical Specifications .................................................................... 28
1 Important Safety Instructions
SAVE THESE INSTRUCTIONS:
This manual contains important safety, installation and operating instructions for the Remote Meter.
General safety information
■ Please inspect the MT50 thoroughly after it is delivered. If any damage is seen, please notify the shipping company or our company immediately. A photo of the damage may be helpful.
■ Read all instructions and cautions in the manual before starting the installation.
■ Keep the MT50 away from rain, exposure, severe dust, vibrations, corrosive gas and intense electromagnetic interference.
■ Do not allow water to enter remote meter.
■ There are no user serviceable parts inside the controller. Do not disassemble or attempt to repair it.
1
2 General Information
2.1 Features
The new-generation remote display unit MT50 for LSxxxxB(P), VSxxxxBN and TracerxxxxBN(P) controllers is an associated display device which supports both the latest communication protocol and the voltage technology standard of solar controllers. The products have many excellent functions:
■ Automatic identify and display the type, model and relevant parameter data of controllers;
■ Real-time display the operational data and working status of the connection devices in digital, graphic and textual forms by a large-screen multifunction
LCD;
■ Direct, convenient and rapid operation of six navigation function keys;
■ Both data and power flowing on the same lead, no need for external power;
■ Real-time data monitoring and remote load switchover of the controllers, and data browse and modification of device parameters, charge control parameters and load control parameters;
■ Real-time display and acoustic alarm of failure information of the connection devices;
■ Longer communication distance based on RS485.
2
2.2 Main functions
Functions like the real-time monitoring of the operational data and working status of a controller, the browse and modification of charge/discharge control parameters, the setting of device parameters and load control parameters and the restoration of factory defaults, based on LCD display and functional key operation.
2.3 Recommendations
■ Please confirm that MT50 is only allowed to connect with our
LSxxxxB(P), VSxxxxBN and TracerxxxxBN(P) series controllers before purchase;
■ Please do not install MT50 in a situation with strong electromagnetic interference.
3
3 Installation
Frame Mount Dimensions( mm)
4
Mechanical parameter
Overall dimension
Parameter
114 x 114 x 48.2mm
Mounting
84x 84mm dimension
Terminal Φ5
Wall installation steps
:
Step1: Locate and drill screw holes based on the Frame Mounting dimension of the base, and erect the plastic expansion bolts;
Step 2: Use four ST4.2×32 self-tapping screws to fix the Frame;
Frame Mounting
5
Step 3: Use four M4×8 pan head screws to mount MT50 Surface on the
Frame;
Step 4: Mount the four associated screw plugs into the screw holes.
Surface Mounting
6
Steps of surface mounting:
Step 1: Locate and drill screw holes based on the installation size of the
Surface;
Step 2: Use four M4×8 cross recessed pan head screws with M4 nuts to mount MT50 Surface onto the panel;
Step 3: Mount the four associated white screw plugs into the screw holes.
Surface mounting
Note: Take full consideration of the plugging/unplugging space of the communication cable and the length of the cable during installation to see if they are appropriate.
7
4 Product Features
8
RS485 communication and power interface
Rear View
Failure indicator
Failure indicator flashes in case of failure of the connection devices.
For failure information please check the Controller Manual.
9
Alarm
Fault audible alarm, could be activated or deactivated.
Communication indicator
Indicate communication status when MT50 is connected with the controller.
Display screen
Man-machine interaction operation interface.
Buttons
The Meter buttons includes four navigation buttons and two operational buttons. See the specific directions in the Operational Manual.
RJ45 communication and power interfaces
Communication and power supply cable interfaces, used for communication connection with controllers.
Note: Please use the communication plug which is marked with
“MT” to connect MT50
Monitoring screen
10
Day and night icons
-Night
,
- Day: The threshold voltage is 1V. Higher than 1V is daytime.
Charge current icon
The icon is dynamically if there is charge current.
Battery icon
The battery capacity is dynamically displayed
Note: When the battery is in over discharge status, the icon displayed is“ ”.
Battery status icons
-Normal voltage, -Under voltage, -Over discharge.
Load current icon
The icon is dynamically if there is discharge current.
Load status icon
- Load On, - Load Off.
Note: In Manual Mode, pressing the "OK" button will switch the load status between "ON" and "OFF"
11
5 Operation
5.1 Buttons
The buttons are respectively (from left to right) “ESC”, “Left”, “Up”, “Down”,
“Right” and “OK “buttons, the operation is described in the schematic operation diagram below:
Schematic operation diagram
12
The default entry page is the browse mode. Pressing button and inputting the correct password to enter the modification mode; and buttons could be used to move the cursor, and buttons could be used to modify the parameter values when the cursor is located at the current place;
and buttons could be finally used to respectively confirm and cancel the modification of the control parameters.
5.2 Main menu
Enter the Main Menu by pressing "Esc".
“Up” and “Down” buttons are respectively used to move the cursor to select the menu items, “OK” and
“ESC” buttons are respectively used to enter or exit the corresponding pages of the menu items.
1. Monitoring
2. Device Info.
3. Test Operation
4. Control Para.
5. Load Set
6. Device Para
7. Device PSW.
8. Factory Reset
9. Failure Info.
10. Meter Para.
13
5.3 Real-time monitoring
There are 14 pages under real-time monitoring. Please check it as below:
17.5V 13.8V 13.8V
15.2A 5.2A 10.0A
LS****B
Jan-01-2013
02:34:33
Char. Energy
Day: 0.00kwh
Mon: 0.00kwh
Total: 0.00kwh
Battery
Vol: 0.0V
Cur: 0.0A
DisCh. Energy
Day: 0.00kwh
Mon: 0.00kwh
Total: 0.00kwh
Battery
Temp.: 22.4
℃
Max. Vol: 12.7V
Min. Vol: 12.7V
14
Battery
Charge: NoCharge
Energe: Normal
Fault: No
PV
Vol: 0.0V
Cur: 0.0A
Power: 0.0W
Controller
Temp.: 25.0
℃
Sta.: Normal
PV
Sta.: DisConnect
Fault: No
Char.: PWM/MPPT
Load
Vol: 0.0v
Cur: 0.0A
Power: 0.0W
Load
Sta.: OFF
Fault: No
Load Mode
Information
Load Mode
Information
Operational tips:
Move between rows by pressing "Up" or "Down" buttons. Move along a row by pressing "Right" or "Left" buttons .
15
5.4 Device information
The product model, parameters and SN code of the controllers are displayed below:
LS****B LS****B
Rate.Vol: 12V
Char.Cur: 10.0A
Disc.Cur: 2.6A
SN: 0002201301200045
Operational tips: and buttons are respectively used to turn the browse page upward and downward.
5.5 Test operation
Load switch test operation is conducted on the connection solar controller to see if the load output is normal. The test operation does not affect the working settings under actual load, which means that the solar controller will exit from the test mode when exiting the operational interface of the test.
Test Operation
LS****B: OFF
Operational tips: Enter the page and input correct password; use and buttons to modify the On/Off status values, while use and buttons respectively to confirm and cancel the test operation.
16
5.6 Control parameter
Browse and modification operations are conducted over the control parameters of solar charge controller. See the scope of parameter modification in control parameters table, and the page of control parameters in the diagram below:
Batt. Type
Sealed
Batt. AH
200AH
Temp Comp.Coeff
-3mv/ ℃ /2V
Rated Voltage
12V
Over Volt. Disc
16.0V
Charge Limit
15.0V
Equalize Time
120min
Boost Time
120min
Low Volt. Disc
11.1V
Discharge Limit
10.6V
Under Volt. Rect
12.2V
Under Volt. Warn
12.0V
17
Ooer Volt. Rec.
15.0V
Eugal. Charge
14.6V
Boost Charge
14.4V
Float Charge
13.8V
Boost Rec.
13.2V
Low Volt. Rect.
12.6V
Control parameters table
Parameters
Battery type
Battery Ah
Temperature compensation coefficient
Rated voltage
Default
Sealed
200Ah
-3mv/ ℃ /2V
Range
Sealed/Gel/Flooded/User
1~9999Ah
0~-9mv
Auto Auto/12V/24V/36V/48V
Battery voltage parameters
(Parameters is in 12V system at 25
℃
, please use X 2 in 24V, X 3 in 36 V, and X
4 in 48 V system)
18
Battery charging setting
Over voltage disconnect voltage
Charging limit voltage
Over voltage reconnect voltage
Sealed
16.0V
15.0V
Gel
16.0V
15.0V
15.0V
15.0V
Equalize charging voltage
Boost charging voltage
Float charging voltage
Boost reconnect charging voltage
Low voltage reconnect voltage
Under voltage warning reconnect voltage
Under voltage warning voltage
Low voltage disconnect voltage
Discharging limit voltage
Equalize duration
Boost duration
14.6V
14.4V
13.8V
13.2V
12.6V
12.2V
12.0V
11.1V
10.6V
120min
——
14.2V
13.8V
13.2V
12.6V
12.2V
12.0V
11.1V
10.6V
——
Flooded User
16.0V
15.0V
15.0V
14.8V
14.6V
13.8V
13.2V
12.6V
12.2V
12.0V
11.1V
10.6V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
9~17V
120min 0~180min
120min 120min 120min 10~180min.
19
Notes:
1. When the battery type is sealed, gel, flooded, the adjusting range of equalize duration is 0 to180min and boost duration is 10 to180min.
2. The following rules must be observed when modify the parameters value in user battery type (factory default value is the same as sealed type): a) Over Voltage Disconnect Voltage > Charging Limit Voltage ≥ Equalize
Charging Voltage ≥ Boost Charging Voltage ≥ Float Charging Voltage >
Boost Reconnect Charging Voltage. b) Over Voltage Disconnect Voltage > Over Voltage Reconnect Voltage c) Low Voltage Reconnect Voltage > Low Voltage Disconnect Voltage ≥
Discharging Limit Voltage. d) Under Voltage Warning Reconnect Voltage > Under Voltage Warning
Voltage ≥ Discharging Limit Voltage. e) Boost Reconnect Charging voltage > Low Voltage Disconnect Voltage.
NOTE: Please refer to user guide or contact with the sales for the detail of setting operation.
20
5.7 Load setting
The page of load setting could be used to set the four load working modes of the connection solar controller (Manual, Light on/off, Light on+timer, Time control)
√ Manual Control
◎ Light On/off
◎ Light On+Timer
◎ Time Control
Manual Control
Default : ON
◎ Manual Control
√ Light On/off
◎ Light On+Timer
◎ Time Control
◎ Manual Control
◎ Light On/off
√ Light On+Timer
◎ Time Control
Light On/Off
On 05.0V DeT 10M
Off 06.0V DeT 10M
Light On+Timer
On 05.0V DeT 10M
Off 06.0V DeT 10M
NightTime10H:00M
Light On+Timer
OnTime1 01H:00M
OnTime2 01H:00M
◎ Manual Control
◎ Light On/off
◎ Light On+Timer
√ Time Control
Time Control
■ Time1
OnTime 10:00:00
OffTime 19:00:00
Time Control
□ Time2
OnTime 19:00:00
OffTime 19:00:00
21
① Manual control
Mode
On
Introductions
Load is on all the time if battery capacity is enough and no abnormal conditions happen.
Off
Load is Off all the time.
② Light On/Off
Light On voltage(Night
When input voltage of solar module is lower than Light On voltage, it automatically turns on load output if battery capacity is enough and no abnormal conditions happen.
threshold)
Light Off voltage(Day
When input voltage of solar module is higher than Light Off voltage, it automatically turns off load output.
threshold)
Delay time
The confirmation time for Light signal. During the period, if light signal voltage continues matching Light On/Off voltage, it will carry out corresponding actions(The time adjustment range:0~99mins).
③ Light On+ timer
Working time 1
Load working period
( T1 ) after light control turns on load
Working time 2
( T2 )
Night time
Load working period before light control turns off load
Total night time controller get from calculation ( ≥3h )
Any of the working time is set as “0”, it means this time will stop working. The real working time of T2 depends on the Night time, and the length of T1, T2.
22
④ Time control
Working time1
( T1 )
Working time2
( T2 )
Control on/off time of load through real-time clock mode.
Realize the dual timer function of the load control through real-time clock mode.
Working time 1 is the compulsory load working time interval. Working time 2 is an optional.
23
5.8 Device parameter
The software version information of solar charge controller could be checked via the page of device parameters, and device data like device ID, device
LCD backlight time and device clock could be checked and modified. The page of device parameter in the diagram below:
Device Parameter
Ver: V01.00+V02.10
ID: 001
Device Parameter
Bklight:60S
Jan-01-2013
00:01:39
Note: the bigger the ID value of the connection device, the longer the Meter communication identification interval (the maximum interval<6 minutes).
Type Notes
Ver
ID
Bklight
Solar charger controller software and hardware version numbers.
Solar charger controller communication
ID numbers.
Solar charger controller LCD backlight working time.
Month-Day-Year H:M:S Solar charger controller internal clock.
24
5.9 Device password
The password of the solar charge controller could be modified via the page of device password; the device password is a 6-digit figure which is required before entering the modification mode of
“Control parameter”, “Load setting”,
“Device parameter”, “Device password”, “Factory reset” pages. The page of device password in the diagram below:
Device PSW
OriPsw:xxxxxx
NewPsw:xxxxxx
Note: Solar charge controller default password is”000000”
5.10 Factory reset
The default parameter values of solar charge controller could be restored via the Factory reset page, which means the
“Control parameter”, “Load setting”,
“Charge mode” and “Device password” of the devices could be restored to the factory defaults (the factory default password of the devices is “000000”).
Factory Reset
Yes No
25
5.11 Failure information
The current failure information of the solar charge controller could be checked via the Failure information page (a maximum of 15 failure messages could be displayed); when the failures of solar charge controller are eliminated, the corresponding failure information will also be automatically eliminated.
Failure Info
1.Over voltage
2.Over load
3.Short circuit
Failure information
Load MOS-Short
Load Circuit
Load O. cur.
Input O. cur.
RPP Short
RPP Break
Char.MOS-Short
Input O. Cur.
Disc.O.O.Ctrl.
Ctrler O.Temp.
Comm. Timeout
Details
The MOSFET of load driver is short.
The load circuit is short.
The load circuit is over current.
PV input current is over rate.
The MOSFET of reverse polarity protection is short.
The MOSFET of reverse polarity protection is break.
The MOSFET of charge driver is short.
Input current is over rate.
Discharge operation is out of control.
The controller is over temperature.
The communication is timeout.
26
5.12 Meter parameter
The meter model, software and hardware version, and SN NO. could be checked via Meter parameter page. And the three parameters (Switch pages,
Backlight, Audible alarm) could be browsed and modified as well.
Meter Para.
Taye: MT50
Ver: V1.00+V1.00
SN: ………………
Meter Para.
Sw-Pages:000S
Bklight:020S
AudiAlam: OFF
Note: When the set up is accomplished, the auto switch page cannot become effective until ten minutes later.
Parameters Default Range
Sw-Pages
BKlight
AudiAlam
Remark
0
20
OFF
0~120S
The automatic switchover inverter for real-time monitoring page
0~999S LCD backlight time
ON/OFF
Turn ON /OFF the acoustic alarm function in case of failure on solar charge controller
27
6 Technical Specifications
Electrical Parameter
Backlight and acoustic alarm ON<65mA
Self-consumption
Backlight ON<23mA
Backlight OFF<15mA
Mechanical Parameter
Faceplate dimensions
Frame dimensions
Connector type
Meter cable
Meter weight
98×98 mm
114×114 mm
RJ45
Standard 2m,Max 50 m
Simple package: 0.23 Kg
Standard package:0.32 Kg
Environmental Parameter
Ambient temperature -20 ℃ ~+70 ℃
28
Definitions of interface pins
Pin No.
1
2
3
4
5
6
7
8
Definition
Power+5~12V input
Power+5~12V input
RS485-B
RS485-B
RS485-A
RS485-A
GND
GND
Data cable pin definitions
29
REMOTE METER DIMENSIONS
(mm)
Any changes without prior notice! Version number : V2.1
30
BEIJING EPSOLAR TECHNOLOGY CO.,LTD.
Te l : +86-10-82894112 / 82894962
Fax: +86-10-82894882
E-mail: [email protected]
Website: http://www.epever.com/
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project