Gasboy MDE-4375 Owner's Manual

Add to My manuals
138 Pages

advertisement

Gasboy MDE-4375 Owner's Manual | Manualzz

CFN Series

Site Controller III Start-Up

Manual

MDE-4375

(formerly C35886)

Computer Programs and Documentation

All Gasboy International Inc. computer programs (including software on diskettes and within memory chips) and documentation are copyrighted by, and shall remain the property of, Gasboy International Inc. Such computer programs and documents may also contain trade secret information. The duplication, disclosure, modification, or unauthorized use of computer programs or documentation is strictly prohibited, unless otherwise licensed by Gasboy International Inc.

FCC Warning

This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy, and if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. Changes or modifications not expressly approved by the manufacturer could void the user’s authority to operate this equipment.

Approvals

Gasboy International, Greensboro, is an ISO 9001:2000 registered facility.

Underwriters Laboratories: New York City:

U. L. File# Products listed with U. L.

MH4314

MH6418

All dispensers and self-contained pumping units

Power operated Transfer Pump Models 25,

25C, 26, 27, 28, 72, 72S, 72SP, 72X, 73 and

1820

MH7404

MH10581

Hand operated Transfer Pump Models 1230

Series, 1243 Series, 1520 and 1720 Series

Key control unit, Model GKE-B Series

Card reader terminals, Models 1000, 1000P

Site controller, Model 2000S CFN Series

Data entry terminals, Model TPK-900 Series

Fuel Point Reader System

NYFD C of A #

4823

4997

5046

Product

9100A, 9140A, 9152A, 9153A,

9800A, 9840A, 9850A, 9852A,

9853A, 9140

9822A, 9823A

9100Q, 9140Q, 9152Q, 9153Q,

9800Q, 9840Q, 9852Q, 9853Q

California Air Resources Board (CARB):

Executive Order # Product

G-70-52-AM Balance Vapor Recovery

G-70-150-AE VaporVac

NCWM - Certificate of Compliance:

Gasboy pumps and dispensers are evaluated by the National Conference of Weights and Measures (NCWM) under the National Type Evaluation Program (NTEP).

NCWM has issued the following Certificates of Compliance (COC):

COC# Product Model # COC# Product Model # COC# Product

95-179A2

95-136A5

Dispenser

Dispenser

9100 Retail Series, 8700

Series, 9700 Series

91-019A2

9800 Series 91-057A3

Dispenser

Controller

9100 Commercial

Series

1000 Series FMS,

2000S-CFN Series

Model #

Patents

Gasboy products are manufactured or sold under one or more of the following U.S. patents.:

Dispensers

5,257,720

Point of Sale/Back Office Equipment

D335,673

Trademarks

Non-registered trademarks

Atlas™

Consola™

Infinity™

Registered trademarks

ASTRA ®

Fuel Point ®

Gasboy ®

Keytrol ®

Slimline ®

Additional U.S. and foreign trademarks pending.

Other brand or product names shown may be trademarks or registered trademarks of their respective holders.

Additional U.S. and foreign patents pending.

This document is subject to change without notice. · For information regarding Gasboy Literature, call (336) 547-5661

E-mail: [email protected]

· Internet: http://www.gasboy.com

 2005 Gasboy International Inc. · All Rights Reserved

Table of Contents

Table of Contents

List of Figures vii

Starting a Site Controller III System 1

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Start-Up Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

What You Need for Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Filling Out the Start-Up Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Using This Book . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Site Information 5

1. Communication Port Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

2. Authorize Users . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

3. Receipt Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

4. Broadcast Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

5. Load Product - Fuels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

6. Load Fuel Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

7. Load Tank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

8. Load Prices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

9. Load Fuel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

10. Load Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

11. Load Cutoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

12. Load Tax . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

13. Lockout Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

14. Authorization and Limitation Codes . . . . . . . . . . . . . . . . . . . . . . . . 13

15. CRON Commands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

16. Load Remote Host Phone Number . . . . . . . . . . . . . . . . . . . . . . . . . 14

17. Check Point Default Keyboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

18. Load Merchandise Prods/Depts . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

19. Load Merchandise Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

20. Load Price Lookup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

21. Profit Point Product Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

22. Profit Point Default Keyboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

23. Worksheet for Pump/CRIND

® Device (if used) . . . . . . . . . . . . . . . . 22

Begin Start-Up Form 23

Parts 1 through 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Physical System Layout 27

Site Controller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Island Card Reader Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Pump Control Unit(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Checkpoint Console (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Profit Point Console or SC III/POS WS (Optional) . . . . . . . . . . . . . . . . 30

Tank Monitoring System (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Current Loop Interface (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

CRIND Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Fuel Point Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Electronic Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page i

Table of Contents

Jumpers & Switch Settings 33

Site Controller COMM CPU Printed Circuit Board . . . . . . . . . . . . . . . . .33

Site Controller Memory I/O Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35

Pump Control Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .36

Island Card Reader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42

RS-232/RS-485 Converter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44

POS Distribution Box (D-Box) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .44

Fuel Point Reader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .45

Pumps and Dispensers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46

Standalone Star Printer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .46

System Power 47

Pump/Dispenser Manual Test 49

Verify General Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49

Manual Override Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .49

Component Power-Up and Configuration 51

Turning On AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51

Configuring the Checkpoint Console . . . . . . . . . . . . . . . . . . . . . . . . . . .52

Configuring the Profit Point Console . . . . . . . . . . . . . . . . . . . . . . . . . . .54

Okidata Printer/Logger . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56

Remote Terminal Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .57

Site Controller Configuration Changes . . . . . . . . . . . . . . . . . . . . . . . . . .57

Series 9800 Electronic Pumps and Dispensers . . . . . . . . . . . . . . . . . . .57

DC Power Measurement and Adjustment 59

Site Controller III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59

Pump Control Unit(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .59

Island Card Reader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .60

Checkpoint Console . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62

Fuel Point Reader (FPR) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .64

Profit Point Console . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65

Current Loop Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65

Electronic Pumps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .65

Communication Tests 67

Site Controller III or Remote Terminal . . . . . . . . . . . . . . . . . . . . . . . . . .68

Modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69

Tank Monitor (Serial Port) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .70

Pump/Dispenser Automatic Test 73

Island Card Reader - Pump Activation Test (optional) . . . . . . . . . . . . . .74

CheckPoint - Postpay Pump Activation Test (optional) . . . . . . . . . . . . .75

CheckPoint - Prepay Pump Activation Test (optional when using dual-stage solenoid valves) . . . . . . . . . . . . . . . . . . . . . . . . . . . .75

Profit Point or SC III/POS WS - Postpay Pump Activation Test

(optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .75

Profit Point or SC III/POS WS - Prepay Pump Activation Test

(optional when using dual-stage solenoid valves) . . . . . . . . . . .76

Before Using Fuel Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .76

Fuel Point Setup for Ground Loop Fueling . . . . . . . . . . . . . . . . . . . . . . .77

Fuel Point - Pump Activation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . .77

Page ii MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Table of Contents

Reader Entries and Fuel Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78

Obtaining a Receipt for Fuel Point Transactions . . . . . . . . . . . . . . . . . . 78

Master/Satellite Dispensers with Fuel Point . . . . . . . . . . . . . . . . . . . . . 78

Using the Chain Pump Feature with Fuel Point . . . . . . . . . . . . . . . . . . 78

Fuel Point - Gate Activation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79

Start-up Commands 81

Sign-on and Preliminary Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81

Receipt Header, Broadcast Messages . . . . . . . . . . . . . . . . . . . . . . . . . 82

Load Fuel Products, Pumps, Tanks, Prices, and Taxes . . . . . . . . . . . . 83

Card Lockout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

Card Authorizations, Limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87

Load Merchandise/Departments, Prices, Inventory . . . . . . . . . . . . . . . 88

Enable Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

Cash Drawer, Shifts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Optional Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91

Reset Transaction File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92

Diagnostics and History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

Verification and Backup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

Site Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94

Release, Applications, and System Data . . . . . . . . . . . . . . . . . . . . . . . 95

Standalone Profit Point Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95

SC III/POS WS Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96

Customer Training 99

Finish Start-up 103

Gasboy Motor Fuel Management System S-Form-1

CFN System Start-up Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-1

1. SITE IDENTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-1

2. SYSTEM IDENTIFICATION Site #: 1001 . . . . . . . . . . . . . S-Form-1

3. SYSTEM DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-2

4. COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-2

5. BREAKER NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-3

6. SYSTEM ENVIRONMENT . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-3

7. CONDUIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-3

8. SYSTEM POWER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-3

9. DC POWER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-4

10. SYSTEM APPROVALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-4

11. CUSTOMER KNOWLEDGE . . . . . . . . . . . . . . . . . . . . . . . . S-Form-4

12. ATTACH PRINTOUTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-4

13. PARTS USED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S-Form-4

14. SITE LAYOUT (include wiring distances) . . . . . . . . . . . . . . S-Form-5

Gasboy Motor Fuel Management System Form-1

CFN System Start-up Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-1

1. SITE IDENTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-1

2. SYSTEM IDENTIFICATION Site #: . . . . . . . . . . . . . . . . . . . . . Form-1

3. SYSTEM DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-2

4. COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-2

5. BREAKER NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-3

6. SYSTEM ENVIRONMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-3

7. CONDUIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-3

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page iii

Table of Contents

8. SYSTEM POWER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-3

9. DC POWER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-4

10. SYSTEM APPROVALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-4

11. CUSTOMER KNOWLEDGE . . . . . . . . . . . . . . . . . . . . . . . . . . Form-4

12. ATTACH PRINTOUTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-4

13. PARTS USED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form-4

14. SITE LAYOUT (include wiring distances) . . . . . . . . . . . . . . . . Form-5

Warranty Warranty-1

General Statements: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Warranty-1

Appendix: Trademark Information A-1

Index Index-1

Page iv MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Table of Contents

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page v

Page vi MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

List of Figures

Figure 2-1: Check Point Default Keyboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

Figure 2-2: Profit Point Default Keyboard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

Figure 5-1: SC III Comm CPU Board. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

Figure 5-2: SC III Memory I/O Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

Figure 5-3: Pump Control Unit Component Location . . . . . . . . . . . . . . . . . . . . . . . . 36

Figure 5-4: EXPMUX CPU Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

Figure 5-5: Pump Control I/O Cover Plate and PCB . . . . . . . . . . . . . . . . . . . . . . . . 40

Figure 5-6: Fuel Point Reader CPU Printed Circuit Board. . . . . . . . . . . . . . . . . . . . 45

Figure 6-1: AC Output Receptacle. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

Figure 9-1: PCU +5 VDC Measurement Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59

Figure 9-2: ICR +5 VDC Measurement Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

Figure 9-3: ICR +12 VDC Measurement Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

Figure 9-4: Checkpoint +5 VDC Measurement Point. . . . . . . . . . . . . . . . . . . . . . . . 62

Figure 9-5: Fuel Point Reader+5 VDC Measurement Point. . . . . . . . . . . . . . . . . . . 64

Figure 10-1: Sample of Creating TMTST.CMD File for TLS-350. . . . . . . . . . . . . . . 71

Figure 10-2: Sample Tank Monitor Printout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71

Figure 12-1: Example of SIGN ON Entry with Response . . . . . . . . . . . . . . . . . . . . 81

Figure 12-2: Example of AD SIG Command with Prompts . . . . . . . . . . . . . . . . . . . 82

Figure 12-3: Example of LO DA Command with Prompts . . . . . . . . . . . . . . . . . . . . 82

Figure 12-4: Example of LO H;IC Command with Prompts . . . . . . . . . . . . . . . . . . . 82

Figure 12-5: Example of LO ME;IC Command with Prompts . . . . . . . . . . . . . . . . . 83

List of Figures

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page vii

List of Figures

Figure 12-6: Example of REM PRO;A Command. . . . . . . . . . . . . . . . . . . . . . . . . . 83

Figure 12-7: Example of LO PRO;AC Command with Prompts . . . . . . . . . . . . . . . 83

Figure 12-8: Example of LO IN;C Command with Prompts . . . . . . . . . . . . . . . . . . 84

Figure 12-9: Example of RE PU Command with Prompt . . . . . . . . . . . . . . . . . . . . 84

Figure 12-10: Example of LO PU;C Command with Prompts. . . . . . . . . . . . . . . . . 84

Figure 12-11: Example of LO TA;C Command with Prompts . . . . . . . . . . . . . . . . 85

Figure 12-12: Example of LO F;C Command with Prompts . . . . . . . . . . . . . . . . . . 85

Figure 12-13: Example of LO CU;C Command with Prompts . . . . . . . . . . . . . . . . 85

Figure 12-14: Example of LO PR;IC Command with Prompts . . . . . . . . . . . . . . . . 86

Figure 12-15: Example of LO TAX Command with Prompts . . . . . . . . . . . . . . . . . 86

Figure 12-16: Example of U CA;A Command. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

Figure 12-17: Example of LOC CA;A Command . . . . . . . . . . . . . . . . . . . . . . . . . . 86

Figure 12-18: Example of LO A;IC Command with Prompts . . . . . . . . . . . . . . . . . 87

Figure 12-19: Example of LO LI;IC Command with Prompts . . . . . . . . . . . . . . . . . 87

Figure 12-20: Example of LO CR;IC Command with Prompts . . . . . . . . . . . . . . . . 88

Figure 12-21: Example of LO PH Command with Prompts . . . . . . . . . . . . . . . . . . 88

Figure 12-22: Example of LO PRO;AC Command with Prompts . . . . . . . . . . . . . . 88

Figure 12-23: Example of LO IN;C Command with Prompts . . . . . . . . . . . . . . . . . 89

Figure 12-24: Example of LO PLU;C Command with Prompts. . . . . . . . . . . . . . . . 89

Figure 12-25: Example of E PRO Command with Prompts . . . . . . . . . . . . . . . . . . 89

Figure 12-26: Example of E PC;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

Figure 12-27: Example of E PU;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Figure 12-28: Example of E RE;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Figure 12-29: Example of E CO;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90

Page viii MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

List of Figures

Figure 12-30: Example of RE TO;A Command with Prompt . . . . . . . . . . . . . . . . . . 90

Figure 12-31: Example of LO DR Command with Prompts . . . . . . . . . . . . . . . . . . . 90

Figure 12-32: Example of LO SH Command with Prompt . . . . . . . . . . . . . . . . . . . . 91

Figure 12-33: Example of REM AL;A Command . . . . . . . . . . . . . . . . . . . . . . . . . . . 91

Figure 12-34: Example of LO AL;C Command with Prompts . . . . . . . . . . . . . . . . . 91

Figure 12-35: Example of LO V;IC Command with Prompts . . . . . . . . . . . . . . . . . . 92

Figure 12-36: Example of Reset Transaction File Command Sequence. . . . . . . . . 92

Figure 12-37: Example of RE DI;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

Figure 12-38: Example of E HI;I Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

Figure 12-39: Example of RUN;I Command with Prompt . . . . . . . . . . . . . . . . . . . . 93

Figure 12-40: Example of P DI Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page ix

List of Figures

Page x MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Starting a Site Controller III System

1 – Starting a Site Controller III System

Introduction

This Start-Up Manual is provided to assist you in the start-up of a GASBOY CFN Site

Controller III System. The CFN Series System is a computerized data acquisition system. As the start-up person, you should already be familiar with all the CFN Site Controller III manuals. Proper installation according to the CFN Site Controller III Installation Manual is critical to ensure correct and trouble-free operation. The CFN Site Controller III System includes a one year parts and labor warranty against defective material and/or workmanship.

See the Warranty page at the back of this book for details.

Note: Noncompliance with the specifications of the CFN Site Controller III Installation

Manual and the checks in the accompanying Start-up Form could void the warranty.

As you are performing the start-up process, any deviations from the specifications listed in the

Site Controller III Installation Manual should be corrected. If any tests fail, correct the wiring or system problem and perform the test again. If you have any questions, cannot proceed to the next step, or you want authorization for exceptions, please contact GASBOY Technical

Service at:

1-800-444-5529

In addition to this manual, the customer should have these additional GASBOY CFN Series manuals:

• MDE-4298 Site Controller III Installation Manual, former C35880

Contains instructions, restrictions and guidelines for planning, laying out, and wiring the

Site Controller III System.

• MDE-4299 Profit Point Installation Manual, former C09156

Contains installation instructions for both the Profit Point Console and SC III/POS workstation.

• MDE-4315 Site Controller III Site Manager's Manual, former C35920

Contains detailed instructions for setting up or maintaining the Site Controller III. It also contains descriptions of system features, data terminal commands, transaction processing and system maintenance.

Depending on the site configuration, the customer may also have these manuals:

• CFN Card Encoding Manual, C01687

Describes the cards, field descriptions, layouts, and filling out the card encoding form.

Covers both encoding of mag cards and punching of optical cards.

• Debit and Credit Card Networks Manuals

Each manual describes one of the various network interfaces for the Site Controller III.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 1

Starting a Site Controller III System

See your GASBOY representative for information.

• CheckPoint Reference Manual, C09204

Describes the operation of the CheckPoint Console.

• Profit Point Reference Manual, MDE-4356

Describes the operation of the Profit Point.

• Profit Point Clerk's Manual, MDE-4355

Describes all point-of-sale operations for the Profit Point.

• Point of Sale and Shift Change Manual, C09215

Describes POS and shift change operations.

• Star ® Receipt Printer Manual , C08951

Describes the operation of the Star Receipt Printer.

• Series 9800A Installation/Operation Manual, 035235

Describes installation/operation for Series 9800 pumps/dispensers.

• Fuel Point Reader Installation and Retrofit Instructions Manual, C35628

• Fuel Point Dispenser and Hose Retrofit Manual, C35593

• Fuel Point Vehicle Module Installation Manual, C35699

• Fuel Point Vehicle Module Programming Manual, C35629

• Fuel Point Parts Manual, C35709

Start-Up Overview

Start-up for the CFN Site Controller III system consists of:

• gathering site information from customer for loading into system

• verifying the physical system layout

• making sure the system complies with the guidelines and restrictions outlined in the system Installation Manual and this manual.

• testing the system

• helping the system user execute the commands needed to start the system

• helping the system user back up release disks and explaining backup procedures

• making sure the system user understands how to use the system

• filling out the GASBOY CFN System Start-up Form (55F-066)

What You Need for Testing

To perform the testing portion of start-up, you will need:

• a digital voltmeter

• a 1/4 inch flat blade screwdriver

• a Phillips ® head #1 screwdriver

• a Phillips head #2 screwdriver

• a plastic 1/8 inch or smaller flat blade screwdriver

• socket handle 1/4" drive

Note:A socket bit #2, P/N C04479, for the island card reader is shipped with every CFN

Site Controller III System. This socket should be left with the end user.

• a tape measure

• diskettes (2-4 blank double-sided, high-density for the SC III; 2 blank high density for the

Profit Point)

We recommend that you bring all your tools and spare parts with you when doing a

Start-up.

Page 2 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Starting a Site Controller III System

Filling Out the Start-Up Form

A sample filled-out Start-up form appears at the end of this manual. You should already have blank copies of the Start-up form; however, if you do not, you can obtain more by calling

GASBOY Customer Service.

When you encounter an empty box on the form, fill in all the information requested. If an option is not used or does not apply, fill in N/A (not applicable) in that space. It may be helpful to have the terminal operator review the Site Controller III Manager’s Manual, if he or she has not already done so, while you are starting up the system.

The Start-up form must be filled out completely and sent, with the attachments noted in

Section 14 of this manual, to:

GASBOY

Technical Service Department

7300 West Friendly Avenue

P.O. Box 22087

Greensboro, NC 27420

IMPORTANT

If the Startup Form is not filled out completely, it will be returned to you for completion.

Be sure to keep a copy of the completed form for your own records.

Using This Book

This book is designed to be followed from start to finish. The procedures are listed in a logical order and correspond to the layout of the Start-up form. Please follow the step-by-step procedures in this manual.

Note: The Site Controller III can be equipped with a POS Workstation option. This enables it to work as a Profit Point, as well as control system activity. Throughout the manual, this configuration is referred to as the SC III/POS WS. If your site has a SC III/POS workstation, you will need to refer to both a Site Controller III Installation Manual and a Profit Point Installation Manual.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 3

Starting a Site Controller III System

Page 4 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

2 – Site Information

Before the Site Controller III system is operational, you must load in site information. This section provides a template for you to fill in the information needed to perform the start-up commands in the

Start-up Commands chapter. Do not perform the commands at this time.

Confirm with the customer and fill in the information that he or she will be using (e.g., fuel authorizations, limitations, etc.). Successful startup requires coordination between separate components of the system: installation, card encoding, and operation. Each item contains a manual reference where you can find additional information. For private-issue cards, the system identification, fuel authorization, fuel limitation codes, and price levels are encoded on the access cards and then entered into the system via commands. The commands you enter must match what is encoded on the cards. The Card Encoding Manual explains the encoding of these items.

The tables in this section are meant to be reused. Make a photocopy of this section before filling in table data.

1. Communication Port Settings

(Reference: Configuration Manual)

Indicate the device connected to each of the ports you will use and the baud rates, if known.

The baud rate must match the baud rate of the device that is being connected to the port. Port configuration assignments and baud rates are done through the site configuration. Port wiring is no longer set by jumpers. You must use the correct cable for the devices connected. Refer to the Installation Manual for cabling requirements.

Device Baud Rate

4

5

Port

1

6

COM1

COM2

COM3

COM4

COM5

COM6

LPT1 Printer (Y/N) N/A

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 5

Site Information

CAUTION

If a 2-wire device is connected to a loop that is set for 4-wire communication, the site controller will not operate correctly. 4-wire devices on a 2-wire loop may not communicate with the site controller.

Note: If your site uses Tokheim ® DPTs, 2-wire communication is used. Loop 2 is factory-set for 2-wire communications. Indicate the loop wiring used at the site. See C09146 Pump

Interface Manual for more information.

Loop 1

Loop 2

2/4 wire

2/4 wire

2. Authorize Users

(Reference: Site Manager’s Manual: AD SIG command)

Fill in the user name, user number, permission level (0 - 10) and sign-on code for each user who is authorized to use the data terminal or console (if required).

Note: If you communicate with a remote site using site-to-host protocol, you must identify the remote host (PC, network, etc.) as user 1, with a permission level of 10. This does not apply to remote hosts used for authorization only (BUYPASS, VISA, etc.).

User Name User # Permission Sign-on Code

Page 6 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

3. Receipt Messages

(Reference: Site Manager’s Manual: LO H command)

Receipt Heading and Footing Messages

(24 characters maximum)

Line #1

Heading Line

Line #2

Heading Line

Line #3

Heading Line

Line #4

Heading Line

Line #5

Heading Line

Line #6

Heading Line

Line #7

Heading Line

Line #8

Heading Line

Line #9

Heading Line

Heading

Information

Line #10

Footing Line

Line #11

Footing Line

Line #12

Footing Line

Line #13

Footing Line

Line #14

Footing Line

Line #15

Footing Line

Line #16

Footing Line

Footing

Information

Line #17

Footing Line

Line #18

Footing Line

Line #19

Footing Line

Line #0

Form Feed

Length (1)

Always 1 with Star Printer

Note: System can be configured with footing lines 10 - 29. Lines 10 - 19 will print on every receipt; lines 20 - 29

(which accomodate such things as customer signature lines, etc.) will print only on POS console receipts.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 7

Site Information

4. Broadcast Messages

(Reference: Site Manager’s Manual: LO ME command)

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Display Time in Seconds

Broadcast Message

(20 characters maximum)

Message # 1.

Message # 2.

Message # 3.

Message # 4.

Message # 5.

Message # 6.

Message # 7.

Message # 8.

Message # 9.

Message # 10.

5. Load Product - Fuels

(Reference: Site Manager’s Manual, LO PRO command)

Use the following table to list the site's fuel products. Use one product code for each different fuel product. These product codes can be linked to authorization codes when used with private-issue cards. They are also used to assign products to tanks and pumps. In addition to the product code, category, and name, three other prompts appear when you execute this command: minimum price, maximum price, and tax. These should all be set to zero for fuel products. If you need additional space, photocopy this chart.

Product Code Product Category Product Name

Page 8

Note: Fuel categories are usually 1 or 1 and 2.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

6. Load Fuel Inventory

(Reference: Site Manager’s Manual, LO IN command)

Use the following table to load the initial inventory amounts and the reorder levels for your fuel products. Once you have loaded the initial inventory amounts, you will use ADd

INventory to add to the inventory amount for the product. You will also use this command later when you load inventory for your merchandise products, but you need to define these products first.

Note: Normally fuel is tracked using the LOad TAnk command (see

7. Load Tank

below); however, this command can also be used.

Product Number Quantity Reorder Level

7. Load Tank

(Reference: Site Manager’s Manual, LO TA command)

Use this table to enter the initial tank inventory, product code and the reorder level for each

tank. See also 6. Load Fuel Inventory above.

Tank Number Quantity Product Code Reorder Level

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 9

Site Information

8. Load Prices

(Reference: Site Manager’s Manual, LO PR command; Card Encoding Manual, Price Level)

Use this table to lay out the site's price codes. Each price code may have multiple price levels.

The total number of prices allowed is configured in the Site Controller. See the explanation in the above referenced manuals for the maximum size of price level/price code tables. Levels 0 through 3 are usually Fallback, Cash, Credit, and Debit respectively. The fallback price is configurable. Additional price levels may be used for private-issue cards.

Price

Code

Level 0

(fallback)

Level 1

(cash)

Level 2

(credit)

Level 3

(debit)

Level 4

(additional)

Level 5

(additional)

Page 10 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

9. Load Fuel

(Reference: Site Manager’s Manual, LO F command)

Use this table to specify products, prices, and tanks for up to five hoses per pump. If you need additional space, photocopy this chart.

Pump Number Hose Number Product Code Price Code Tank Number

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 11

Site Information

10. Load Pumps

(Reference: Site Manager’s Manual, LO PU command)

Fill in the pump number, hose number (1 to 5 for each pump), the reading from the quantity totalizer and the reading from the dollar totalizer, if applicable.

Note: Quantity and $Amount are optional. Leave as 0 (zero) if desired. If you need more space, photocopy this table.

Pump Hose Quantity $Amount Pump Hose Quantity $Amount

11. Load Cutoff

(Reference: Site Manager’s Manual, LO CU command)

Use this table to note the amount the Site Controller will authorize or request authorization for when a customer requests a FILL. When you encode a limitation code on privately-issued cards, that code overrides the pump fill limit. Also indicate on this table, the slow cutoff point, at which the pump will slow prior to reaching the fill limit.

Pump Number Fill Limit Slow Cutoff

Page 12 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

12. Load Tax

(Reference: Site Manager’s Manual, LO TAX command)

Use the following table to enter the names of the tax accumulators. Tax accumulators keep a running total of taxes collected in up to eight categories. Tax formulas are specified in system configuration or by using the TAX command.

Tax # Name (up to 7 character)

13. Lockout Type

(Reference: Site Manager’s Manual, LOC CA or UN CA command)

Indicate type of lockout: Positive Negative

14. Authorization and Limitation Codes

(Reference: Card Encoding Manual, Site Manager’s Manual, LO A, LO LI commands)

If the customer is using private-issue cards, you may also need to load authorization codes and limitation codes for the cards. Values for these codes should have been assigned when the cards were encoded. Special templates for defining these codes appear in the Card Encoding

Manual.

15. CRON Commands

(Reference: Site Manager’s Manual, LO CR command)

Use the following table to define any cron commands you wish to have executed. You may find some crons already loaded.

Command # Command

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 13

Site Information

16. Load Remote Host Phone Number

(Reference: Site Manager’s Manual, and Debit and Credit Card Networks Manual, LO PH command)

Use the following table to indicate the phone number(s) of the remote CFN host (1 and 2), bank host (3 and 4), or auxiliary numbers (5 and 6).

3

5

Main

1

4

6

Backup

2

17. Check Point Default Keyboard

This drawing shows the default keyboard for the Check Point. The keyboard can be reconfigured to meet individual needs. See the Check Point Reference Manual and the Site

Controller III Configuration Manual.

Figure 2-1: Check Point Default Keyboard

Page 14 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

18. Load Merchandise Prods/Depts

(Reference: Site Manager’s Manual, LO PRO command)

Use the following table to list the site's merchandise products or departments. Use one product/department code for each different product/department. These codes can be linked to authorization codes when using private-issue cards.

Prd Dpt Cat Name (12)

$Min

(Floor)

$Max

(Ceiling) Tx Prod Attr

Prd/Dpt

Cat

Name

$Min

$Max

Tx

Prod Attr

= 2-digit product/department code

= 2-digit category

= 12 character department name

= minimum price for that department (corresponds to floor price on Profit Point)

= maximum price for that department (corresponds to ceiling price on Profit Point)

= tax code for items within that department

= product attribute value (see Site Manager’s Manual for values)

19. Load Merchandise Inventory

(Reference: Site Manager’s Manual, LO IN command)

Use the following table to load the initial inventory amounts and the reorder levels for your merchandise products. Once you have loaded the initial inventory amounts, you will use ADd

INventory to add to the inventory amount for the product.

Product Number Quantity Reorder Level

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 15

Site Information

20. Load Price Lookup

(Reference: Site Manager’s Manual, LO PLU command)

Use the following table to assign prices for merchandise products that do not have a minimum or maximum price or as a default price for products that do.

Product # Price Product # Price

21. Profit Point Product Layout

(Reference: Site Manager’s Manual, LO PRO command; Profit Point Reference Manual,

Prompts for PLU Fields)

Before configuring the Profit Point, your site controller should already be set up with the following: products/departments, prices (fuels only), tanks, pumps, and taxes. You can transfer this information directly to the Profit Point by using the POS.CMD command. This will make it easier to enter your MASTER.PLU information on the Profit Point.

The MASTER.PLU file contains three types of data: department numbers, UPC codes, and stock numbers. The charts on the following three pages will help you organize the information for each product.

Notes on Form Entries

The following descriptions are abbreviated versions of the entries used in the three worksheets that follow. See MDE-4356 Profit Point Reference Manual for detailed information on these input requirements.

Dpt = department number corresponding to the site controller’s department (Prd). See Step

19. Will always be present for departments if POS.CMD has been run.

Grp = optional group number assigned to each product.

Vnd = up to 255 vendor numbers can be defined.

Description = description (name) of department or product. See Step 19. Will already be present for departments if POS.CMD has been run.

Ceiling = corresponds to $MAX price on site controller. See Step 19. Will already be present for departments if POS.CMD has been run.

Page 16 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

Floor = corresponds to $MIN price on site controller. See Step 19. Will already be present for departments if POS.CMD has been run.

Retail Price = selling price of this product (on departments, default price)

Per = unit upon which price is calculated.

Cost + Markup = formula to calculate price: Retail = Cost + (Cost x markup %).

Rounding = no rounding or rounding up to 5 or 9.

Food Stamps = food stamps, enter Y for yes or N for no.

Disct = is discount allowed, enter Y for yes or N for no.

Cust ID = does purchase require ID, enter 1 or 2. See MDE-4356 Profit Point Reference

Manual for assigned values.

Prc Ovr = is price override allowed, enter Y for yes or N for no.

Taxes = tax code for this product (taken from codes defined in the site controller). Will already be present for departments if POS.CMD has been run.

UPC # = 6- to 12-digit UPC code which can be typed in or scanned in using the Profit Point or

PC (PC must be set up for scanning).

Stock# = 1- to 5-digit stock number (usually entered when no UPC is available).

Whole Cost = wholesale cost of item to you.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 17

Worksheet for MASTER.PLU File (Dept Entry)

Dpt

#

Grp

#

Vnd

# Description

Ceiling

($MAX)

Floor

($MIN)

Retail

Price Per

Cost +

Markup Rounding

Food

Stamps Disct

Cust

ID

Prc

Ovr

Note: Dpt, Description, Ceiling, and Floor information will be present on the Profit Point if the site controller POS.CMD has been run.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 18

Worksheet for MASTER.PLU File (UPC Entry)

UPC #

Dpt

#

Stock

#

Grp

#

Vnd

# Description

Whole

Cost Per

Retail

Price Per

Cost +

Markup Rounding

Food

Stamps Disct

Cust

ID

Prc

Ovr

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 19

Worksheet for MASTER.PLU File (Stock Entry)

Stock #

Dpt

#

Grp

#

Vnd

# Description

Whole

Cost Per

Retail

Price Per

Cost +

Markup Rounding

Food

Stamps Disct

Cust

ID

Prc

Ovr

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 20

Site Information

22. Profit Point Default Keyboard

This drawing shows the default keyboard for the Profit Point. The keyboard can be reconfigured to meet individual needs. See MDE-4356 Profit Point Reference Manual for more information.

Figure 2-2: Profit Point Default Keyboard

DEBIT is the default.

This key can be changed to another function, such as Food Stamps.

See MDE-4356 Profit Point Reference

Manual for details on how to redefine a key.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 21

Site Information

23. Worksheet for Pump/CRIND

®

Device - PC Interface (if used)

Page 22

11

12

13

14

7

8

9

10

5

6

3

4

Pump

Number

(Note 1)

1

2

Pump Type (Note 2)

(H111, MPD-3, etc.)

11

12

13

14

7

8

9

10

5

6

3

4

2-wire

Address

(Notes 1 & 3)

1

2

Number of Hoses

CRIND Address/

Reader Address

27

28

29

30

23

24

25

26

19

20

21

22

15

16

17

18

15

16

1

2

3

4

5

6

7

8

9

10

11

12

13

14

31

32

15

16

Notes:

1. Pumps 17 - 32 require a second gilpump.exe session on a separate serial port. In the parameter file for that session, set

FIRST_CHANNEL_LAST_ADDRESS = 16. Set up the gilpump.exe and crind.exe sessions using the release diskette for each. See the appropriate installation manual for each for more information.

2. Pump Type is determined automatically. This column is optional.

3. The Pump Number and the 2-wire Address are the same unless the

FIRST_CHANNEL_LAST_ADDRESS parameter is set. In this case, the 2-wire

Address is the Pump Number minus the FIRST_CHANNEL_LAST_ADDRESS setting.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Information

24. Worksheet for Pump/CRIND

®

Device - Current Loop Interface (if used)

11

12

13

14

7

8

9

10

5

6

3

4

Pump

Number

1

2

Pump Type

(H111, MPD-3, etc.)

2-wire

Address

PCU

Number

PCU

Slot

27

28

29

30

23

24

25

26

19

20

21

22

15

16

17

18

31

32

Price levels used at site: 0 1 2 3 4 5 (circle levels)

Price at level 0 is same as price at level 2: Yes No (circle one)

Price at level 0 is same as price at level 1: Yes No (circle one)

Price level for price bars: 1 2 Both None (circle one)

Number of Hoses

CRIND

Address

Reader

Address

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 23

Site Information

Page 24 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Begin Start-Up Form

3 – Begin Start-Up Form

Parts 1 through 6

This section covers Parts 1 through 6 of the Start-up form. Parts 7 through 13 are covered in subsequent sections. See

“CFN System Start-up Form” on page Form-1 for a blank copy of the

Start-up forms.

1. SITE IDENTIFICATION

Customer: The name of the company that owns the system.

Contact:

Customer Phone:

The name of the person who will manage the site operation.

The phone number where the contact person can be reached.

Site Location:

Electrician:

The address of the site where the system is located.

The name of the person who did the wiring for the site.

Date/Time of Arrival: Date and time of your arrival at the site.

Date/Time of Departure: Date and time you left the site.

Distributor/Phone:

Installer/Phone:

Start-up Person:

Co. Name/Phone:

The distributor involved with the sale of the system. Include phone number.

The firm that installed the system. Include phone number

Your name.

Your company name and phone number.

2. SYSTEM IDENTIFICATION

Site #: Number of the site.

Checkmark the components that this site has.

Indicate the serial number, program version number for each of the following:

Site Controller III: Site Controller III unit. Also indicate the program name and debug version.

PCU (s):

ICR (s):

Serial number of pump control unit; program version from PCU CPU PCB.

If pedestal pump control unit, program version from PCU CPU PCB.

Island Card Readers, program version from Reader CPU PCB.

Also indicate Y or N if the ICR has a receipt printer, has pedestal PCU, or is set up as a car wash or gate controller.

Console:

Profit Point:

Current Loop Driver: gilpump PC Driver:

CRIND PC Driver:

Standalone Receipt Printer:

(current loop replacement)

(current loop replacement)

PIN Pad:

Complete the following section only for Gasboy PC packages.

PC SOFTWARE:

PC Make and Model: if applicable, indicate the version number of the PC software assigned to this site.

Indicate the make and model of the PC being used at this site.

DOS Version: Indicate the DOS version that is running on the customer’s PC.

Note: The serial number for each system device can be found on the ID tag located on the outside cover of that device.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 25

Begin Start-Up Form

3. SYSTEM DESCRIPTION

PUMP #: Indicates the pump number.

HOSE #:

FUEL TYPE:

Indicates hose outlet number.

The type of fuel dispensed by that pump or dispenser (for example, No-Lead,

Regular, etc.).

FUEL CODE:

PUMP MAKE:

MODEL #:

SERIAL #:

RESET:

TYPE SUC/SUB:

The product code number (1 or 2 digits) assigned to that fuel type.

The name of the manufacturer of the pump or dispenser.

The model number of the pump or dispenser.

The serial number of the pump or dispenser.

PULSER RATE:

STARTER RELAY:

The type of reset used in the pump (Veeder-Root, Tokheim #77, etc.)

The type of pump used to dispense the fuel. Submersible pump (SUB) located in the tank or is it a suction pump (SUC) located in the pump housing? Circle one.

The pulser rate of the pulser used by that pump or dispenser (for example,

10:1, 100:1)

Is an external starter relay used to supply power to the pump? Circle Y for yes or N for no.

4. COMMUNICATIONS

Data Terminal/Logger: Circle the device or devices, if present, and indicate the make and model number of the data terminal or logger and which port to which it is connected.

Port # Baud Rate

1:

4:

5:

6:

COM1:

COM2:

Loop 1:

Loop 2:

Short Haul Modem:

Phone Modem: Port

Modem Phone #:

Network Name Port

Baud rate for port 1.

Baud rate for port 4.

Baud rate for port 5.

Baud rate for port 6.

Baud rate for COM1.

Baud rate for COM2.

2/4 wire.

2/4 wire.

The make and model number of the short haul modem that is connected to the system. If no short haul modems are used, indicate not applicable (N/A).

The make of the phone modem and the port to which it is connected. Remote dial-in, not network.

The area code and phone number for the external phone modem connected to the system. If a modem is not used, indicate not applicable (N/A).

The name of the network to which the site is connecting (if appliable) and the port through which it is communicating.

Page 26 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Begin Start-Up Form

5. BREAKER NUMBERS

Indicate the breaker number for each of the following. All breakers pertaining to the system should be in the OFF position.

Power conditioner:

AC Surge Protector:

(Profit Point)

Islander:

(N/A for SC III)

PCUs:

(pump control units)

ICRs:

(island card readers)

Hose/Brkr #:

(hose outlets 1 to 32)

Answer the following questions:

What components are on power conditioner? Fill in all that apply.

What components are on AC Surge Protector? Fill in all that apply.

Are all Gasboy components on same breaker? Answer Y or N.

Notes:

1. The AC Surge Protector Strip must be on its own separate breaker. The Site Controller, printer, and monitor must be plugged into the same AC Surge Protector Strip. The Profit Point must also be plugged into an AC Surge Protector Strip.

2. The optional power conditioner should be on the same breaker as the AC Surge Protector; however, if this is not possible, it must be in the same phase of power as the AC Surge Protector breaker. The Site

Controller III, modem, standalone receipt printer, and console should be connected to the output of the power conditioner, if used.

6. SYSTEM ENVIRONMENT

Describe the location and environment of each system component (for example, office, outside, air conditioned, heated). Make sure the Site Controller III is well ventilated. Nothing should rest on the top of the Site Controller or around its vents.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 27

Begin Start-Up Form

Page 28 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Physical System Layout

4 – Physical System Layout

When verifying physical system layout, be sure power to the system has not been applied and all power is off. All wiring and conduit runs must also conform with the National Electrical

Code (NFPA 70), the Automotive and Marine Service Stations Code (NFPA 30A), and State and Local Electrical Codes. See C35880 Site Controller III Installation Manual for more guidance.

Site Controller

1 Open up the PC. Perform a visual isnpection to verify that all boards are seated properly, all connections are tight, and there are no loose or unsecured components.

2 Verify that the Site Controller is located in an office-type environment and correctly installed according to the Site Controller III Installation Manual.

3 Verify that all data communication cables located on the back of the SC III/PC are correctly installed according to the Site Controller III Installation Manual. The Site Controller III has four RS-232 ports (1, 4, 5, or 6). All direct connect RS-232 cables over 15 feet must be installed in metal conduit separate from any AC wires.

Port 3 is used for communication to Tokheim pumps only; one of the RS-232 ports can be used for communication through a modem or to a computer. The others are additional and can be programmed according to the application. COM1 and COM2 can be programmed according to the application; LPT1 is a parallel port which is commonly connected to a printer.

RS-485 communication cables (C05670, 8-foot modular cable similar to a telephone cord) must be installed as follows:

LOOP 1 or 2 modular cable must be directly connected to either modular jack of the black

RS-485 junction box. Do not connect Loop 1 or 2 to the same RS-485 junction box. Loop 2 is factory-set for 2-wire for communication to Tokheim DPTs.

CAUTION

If a 2-wire device, such as DPT, is connected to a loop that is set for 4-wire communication, the site controller will not operate correctly. 4-wire devices on a 2-wire loop may not communicate with the site controller.

Note: If using Tokheim DPTs, consult C09146 Pump Interface Manual.

LOOP 3 modular cable must be directly connected to the modular jack on the rear of the

Check Point console labeled Site Controller or to the converter if connecting to a Profit Point.

See the Site Controller III Installation Manual and the Profit Point Installation Manual for remote console wiring considerations. If the SC III will be used as a SC III/POS WS, Loop 3 is used to connect to other POS terminals (Profit Point, CheckPoint) at the site.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 29

Physical System Layout

Island Card Reader Assembly

1 Verify that the island card reader is installed to allow adequate clearance for system maintenance. For systems with receipt printers or pedestal pump controls, a minimum of 18 inches is required between the post and any of the pumps or dispensers. This clearance meets the NFPA 30A and NFPA 70 requirements.

2 Remove the two tamper-proof screws from either side of the black bezel, located on the front of the island card reader head assembly. Unlock and lower the black bezel door.

3 Remove the six screws from the lower back side pedestal cover and remove the cover.

Note: No AC power should be present at TB6 in the island card reader head assembly.

4 Verify that the conduit and all system, pump, and dispenser wiring is installed according to the specifications detailed in the Site Controller III Installation Manual. Non-compliance with these specifications and the checks in the accompanying Start-Up Form could void the warranty.

Pump Control Unit(s)

1 Verify that the pump control unit(s) are installed in an area protected from direct contact with the weather according to the Site Controller III Installation Manual.

2 Verify that the conduit and all system, pump, and dispenser wiring is installed according to the specifications detailed in the Site Controller III Installation Manual. Non-compliance with these specifications and the checks in the accompanying Start-Up Form could void the warranty.

7. CONDUIT

All Metal Conduit:

AC and DC is Separate

Conduit:

Wiring Neatness:

Indicate if all conduit is metal and not PVC. Circle Y for yes (all metal) or N for no (not all metal conduit).

Indicate if all wiring is separated in the appropriate conduits according to the conduit specifications and exceptions detailed in the SC III Installation Manual.

Circle Y for yes if all AC and DC wiring is in separate conduits. Circle N for no if

AC and DC wiring is combined in conduits where it should not be.

Indicate the overall neatness of the installer’s wiring. Is the appearance of the wiring neat and orderly or is it very disorderly? Circle Good, Fair, or Bad.

Is shielded cable used?

Indicate if Gasboy C09655 or equivalent cable was used for communications wiring. Circle Y for yes or N for no.

Page 30 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Physical System Layout

Checkpoint Console (Optional)

1 Verify that the CheckPoint and any optional equipment is located in an office type environment and is correctly installed according to the Site Controller III Installation Manual.

2 Verify that the AC power cord for the CheckPoint and the standalone receipt printer is directly connected to the output of the AC Surge Protector Outlet Strip (C01218).

3 The RS-485 communication modular cable must be installed as described below. If you are locating the CheckPoint more than eight feet from the Site Controller, you must use two additional RS-485 junction boxes to connect the devices. See the Site Controller III

Installation Manual for remote console wiring.

SITE CONTROLLER port modular cable must be directly connected to the modular jack port on the back of the Site Controller labeled LOOP 3.

4 Optional equipment connection:

RECEIPT PRINTER connection depends upon the type of receipt printer ordered. The modular cable for an RS-485 printer is connected directly into the RS-485 jack on the rear of the CheckPoint; no internal cabling is required. For a parallel printer, the printer cable is connected to the D-type 25-pin female connector on the back of the CheckPoint. The cable from the D-type connector inside the CheckPoint must be attached to P12 of the CheckPoint

PCB.

CAUTION

Be sure that the printer cabling is correct before applying power to the system.

An incorrectly connected printer can cause damage to the printer, the CheckPoint, or both.

CASH DRAWER is connected via cable from the cash drawer which is terminated by a round

4-pin connector and connects to the round 4-pin connector which is keyed.

CUSTOMER DISPLAY must be installed according to the instruction sheet provided with it.

The round 5-pin connector must be threaded as shown in the instructions and must be connected to the 5-position connector on the back of the CheckPoint.

PIN PAD must be installed according to the Site Controller III Installation Manual. Verify that the PIN pad is securely connected to the 9-pin connector located on the back of the

CheckPoint.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 31

Physical System Layout

Profit Point Console or SC III/POS WS (Optional)

1 Verify that the Profit Point and any optional equipment is located in an office type environment and is correctly installed according to the Site Controller III Installation Manual.

2 Verify that the AC power cord for the Profit Point is directly connected to the output of the AC

Surge Protector Strip (C01218).

3 The RS-485 converter must be installed as described below. If you are locating the Profit

Point more than eight feet from the Site Controller, you must use two additional RS-485 junction boxes to connect the devices.

A modular cable must be directly connected to the modular jack port on the back of the Site

Controller labeled LOOP 3. The other end of the modular cable is connected to one of the modular jacks on the converter. The converter is connected to the Profit Point port SERIAL1 via a 25-pin to 9-pin cable. The converter power supply must be plugged into the same AC

Surge Protector Strip (C01218) as the Profit Point.

POS Distribution Box (POS D-Box) is connected via a 9-pin cable from the Serial2 port on the Profit Point (COM2 on the SCIII/POS WS) to the Serial2 port on the D-Box. If the site has a PIN Pad, the Serial3 port of the Profit Point (COM3 on the SCIII/POS WS) will be connected to the Serial3 port of the D-Box. The D-Box power supply must be plugged into the same AC Surge Protector Strip (C01218) as the Profit Point.

“Old” CASH DRAWER is connected via a 9-pin D-type connector from the cash drawer to the CASH DRAWER port on the back of the POS D-Box. “New” CASH DRAWER is connected connects to the receipt printer which connects to the minitower’s 4-port fan-out cable.

CUSTOMER DISPLAY must be installed according to the Profit Point Installation Manual.

Verify that the Customer Display is connected to the 9-pin CUSTOMER DISPLAY port on the POS D-Box.

4 Optional equipment connection:

RECEIPT PRINTER connection depends upon the type of receipt printer ordered. For a parallel printer, the printer cable is connected to the D-type 25-pin female connector

PRINTER on the back of the Profit Point (LPT1 on SC III/POS WS). For an RS-485 printer, the modular cable is connected directly into the RS-485 jack on the converter. The receipt printer must be plugged into the same AC Surge Protector Strip as the Profit Point.

PIN PAD must be installed according to the Profit Point Installation Manual. Verify that the

PIN pad is securely connected to the PIN PAD port located on the POS D-Box.

SCANNER must be installed according to the Profit Point Installation Manual. Verify that the scanner is securely connected to the 9-pin SCANNER port located on the POS D-Box. If a scanner is used that needs external power, it must be plugged into the same AC Surge

Protector Strip as the Profit Point.

Page 32 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Physical System Layout

Tank Monitoring System (Optional)

1 Verify that the tank monitoring system is correctly connected to the Site Controller according to the Site Controller III Installation Manual.

2 Refer to the tank monitoring system manufacturer’s installation instructions for specific connection information.

Current Loop Interface (Optional)

Note: Gilbarco pump and CRIND PC interfaces are recommended over the current loop interface.

1 Verify that the current loop interface unit is located in an office-type environment and is correctly installed according to its installation sheet.

2 Make sure the special RS-485 communication modular cable is directly connected between the current loop interface unit (slot labeled RS422) and the RS-485 junction box using the appropriate RS-485 modular jacks.

Note: The modular cable from the current loop interface unit to the RS-485 junction box is

GASBOY P/N C04500 (cross) modular cable. Other devices (Site Controller, Console to junction box, etc.) can use GASBOY P/N C05670 (1:1 cable).

3 Verify that the two wire current loop communications is correctly wired to the distribution box according to the Current Loop Interface Unit Installation Manual or Pump Interface Manual.

CRIND Connections (with Current Loop Interface only)

For CRIND devices, a universal distribution box must be used. Verify that the modular cable connects from the second RS-485/RS-422 port on the back of the current loop interface to an adaptor, and from there to a 9-pin connector on the distribution box. Refer to the Current Loop

Interface Unit Installation Manual or Pump Interface Manual.

Gilbarco Pump Interface Using PC COM Port

Install according the the Gilbarco Pump PC Interface Manual.

CRIND Interface Using PC COM Port

Install according the the Gilbarco CRIND PC Interface Manual.

Fuel Point Components

1 Verify that all the Fuel Point components are installed according to the applicable Fuel Point installation manuals (listed in section 1).

2 Make sure the N-ring wiring between the Fuel Point Reader and pre-amplifier is in conduit separate from non-intrinsic safe wiring.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 33

Physical System Layout

Electronic Pumps

All electronic pumps must be installed according to the manufacturer’s specifications. Make sure all interface connections are made according to the SC III Installation Manual or the

Pump Interface Manual.

Page 34 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

5 – Jumpers & Switch Settings

This section covers the jumper and switch settings for the various components of your Site

Controller III system.

IMPORTANT

It is important that the jumpers and switch settings be set properly to ensure correct operation.

Site Controller COMM CPU Printed Circuit Board

Figure 5-1: SC III Comm CPU Board

Jumpers, K3 to K12

Jumper

K3

K4

K5

K6

K7

Function

AC power fail sense

AC watchdog timer

SC - Comm CPU (testing only)

RS-485 loop 1, 2 to 4 wire

RS-485 loop 2, 2 to 4 wire

Setting

2 - 3 to enable

1 - 2 to disable

1 - 2 to enable

1 - 2 to reset

2 - 3 for 4 wire

1 - 2 for 2 wire

2 - 3 for 4 wire

1 - 2 for 2 wire

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 35

Jumpers & Switch Settings

Jumper

K8

K9

K10

K11

K12

Function

Rx clock from synchronous modem

(DB25-15)

ETC output to synchronous modem

(DB25-24)

Tx clock input from synchronous modem (DB25-17)

EPROM type

EPROM type

Setting

1 - 2 to connect

1 - 2 to connect

1 - 2 to connect

2 - 3 for 27256/25128

2 - 3 for 27256/25128

Switches, S1 and S2

Switch S1 - PC IRQ

Indicates the interrupt. Only one can be selected. SC3.EXE assumes interrupt 10. No other device can use this interrupt.

Switch

S1-1

S1-2

S1-3

S1-4

Function

IRQ-15

IRQ-12

IRQ-11

IRQ-10

Default

Open

Open

Open

Closed

Switch S2 - PC Address

Sets PC Dual RAM address. SC3.EXE currently assumes D0000.

Switch SW3 - Default Sign-On

Position 4 defaults to Open; Closed Normal setting.

Switch SW4 - Weights and Measures Switch

Set to Open for enable; Closed for disable.

Address

C0000

C3000

C6000

C7000

CC000

CF000

D0000

D3000

C

C

C

C

C

C

Switch

1 2

C C

C C

O

O

O

O

C

C

C

O

C

O

C

O

4

C

O

C

C

O

O

O

O

3

C

C

Address

D6000

D9000

DC000

DF000

E0000

E3000

E6000

E9000

O

O

O

O

O

O

Switch

1 2

O C

O C

O

O

O

O

C

C

C

C

O

O

O

O

3

C

C

C

O

C

O

C

O

4

C

O

Page 36 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Site Controller Memory I/O Board

Figure 5-2: SC III Memory I/O Board

Jumpers & Switch Settings

Jumpers

Jumper

K1

K2

K3

K5

Function

Date/Time Clock Speed

Enable A19 to RAM

RAM Size

Tokheim Reset Output

Switch

S1-1

S1-2

S1-3

S1-4

Switches, S1 and S2

Switch S1

Function

Boot to monitor after reset

Boot to OS after reset; default

Debug mode

Normal; default

Do not talk to PC while in monitor

Monitor I/O goes to PC also; default

Monitor I/O goes to SC port 1 also

No monitor I/O to SC port 1; default

Setting

1 - 2 for 4 wait state; default

2 - 3 for 1 wait state

2 - 3 for 128Kx8; default

1 - 2 for 512Kx8

2 - 3 for 128Kx8; default

1 - 2 for 512Kx8

Not used

Setting

Open

Closed

Open

Closed

Open

Closed

Open

Closed

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 37

Jumpers & Switch Settings

Switch S2

Switch

S2-1

S2-2

S2-3

S2-4

Function

Battery 1

Battery 2

N/A

N/A

Setting

Open = Disabled

Closed = Enabled; default

Open = Disabled; default

Closed = Enabled

Unused

Unused

Pump Control Unit

Figure 5-3

shows the pump control unit layout. Refer to this layout when performing steps 1 through 5 under

“Pump Control EXPMUX CPU Board” on page 39

.

Figure 5-3: Pump Control Unit Component Location

Page 38 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

Pump Control EXPMUX CPU Board

1 Unlock and open the front door of the pump control unit.

2 Make sure all override switches are in the AUTO position. See

Figure 5-3 .

3 Make sure the AC power and battery switches, located in the upper righthand corner of the power supply are turned OFF (down).

4 Loosen the screw for the card cage section, and swing out the card cage.

5 Remove the pump control EXPMUX CPU board (

Figure 5-4

), located in the rear portion of the card cage, by pulling on the top white tab.

Figure 5-4: EXPMUX CPU Board

6 Locate the K1 jumper patch and install the jumper. This jumper allows battery voltage to the

RAM. It should be installed for normal operation and removed for storage to prevent battery discharge.

7 Address: Verify that the pump control CPU board switch bank, SB (1 through 4), is set for the proper address. An address must be set to identify the pump control unit when it is connected to the CFN System. This address is a unique identifier for multiple PCU’s that are connected on the same RS-485 line. Addressing should start at 1 and continue sequentially through 16.

The physical wiring order does not have to correspond with the address order, that is, the first unit on the RS-485 line does not have to be address 1.

Switches 1 through 4 denote the address. This is factory set and may not have to be corrected.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 39

Jumpers & Switch Settings

The chart on the right gives the switch settings for the address selections.

12

13

14

15

16

8

9

10

11

6

7

4

5

2

3

Address

1

Open

Closed

Open

Closed

Open

Closed

Open

Closed

Open

SB-1

ADDR1

Closed

Open

Closed

Open

Closed

Open

Closed

Open

Closed

Closed

Open

Open

Closed

Closed

Open

Open

SB-2

ADDR2

Closed

Closed

Open

Open

Closed

Closed

Open

Open

Closed

Closed

Closed

Closed

Open

Open

Open

Open

SB-3

ADDR3

Closed

Closed

Closed

Closed

Open

Open

Open

Closed

Open

Open

Open

Open

Open

Open

Open

Open

SB-4

ADDR4

Closed

Closed

Closed

Closed

Closed

Closed

Closed

8 Pulser Type: Verify that switch SB-5 is set for the proper pulser type, single or dual. Settings are shown below.

The pulser select switch is set for either single or dual pulsers. If dual pulsers are selected, all pumps on the pump control unit must have dual pulsers.

Note: The dual pulser type feature requires a PPC Motherboard III and a PPC I/O PCB III.

Both are not yet available; therefore, this switch should be closed.

Pulser Type

Single

Dual

SB-5

DUAL

Closed

Open

9 Delay Time: The delay time is the period between activation of the submersible pump and the activation of the slow flow and fast flow valves. The delay time switches are set to accommodate a variety of leak detectors used in submersible pump applications. The time should be set according to the type of leak detector installed on the submersible pump to allow a normal leak test for each transaction. If different leak detectors are used on each pump, set the switches to the longest delay time required. Set the delay time to zero seconds for suction pumps.

Note: The leak detect delay time feature requires a PPC Motherboard III. The PPC

Motherboard III is not yet available; therefore, these switches should be closed.

Page 40 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

4

5

2

3

6

7

Delay Time

(seconds)

0

1

SB-6

RLY1

Closed

Open

Closed

Open

Closed

Open

Closed

Open

SB-7

RLY2

Closed

Closed

Open

Open

Closed

Closed

Open

Open

SB-8

RLY3

Closed

Closed

Closed

Closed

Open

Open

Open

Open

10 The settings for switch bank SC (1 through 4) determine when the pump control unit begins counting pulses for a particular pump. When a switch is open, the PCU begins counting pulses when the corresponding pump is activated. When a switch is closed, as it should be for most configurations using mechanical pumps, the PCU does not count pulses for the corresponding pump until the mechanical reset has completed. The switch should be closed when the pump is wired for postpay-prepay console operations.

Switch

SC-1

SC-2

SC-3

SC-4

Function

Mode pump 1

Mode pump 2

Mode pump 3

Mode pump 4

Open = Normal, Closed = Reset Complete

Open = Normal, Closed = Reset Complete

Open = Normal, Closed = Reset Complete

Open = Normal, Closed = Reset Complete

11 In switch bank SC, 5 through 8, only switch 6 and 8 are active. Switch SC-6 is the Deadman

Timer Switch. If enabled, the pump control unit must be polled at least every 15 seconds by the Site Controller. If it fails to sense a poll at that time, it turns all relays off. If Reset

Complete Mode is used on any pump on a particular PCU, the deadman timer should be disabled. Switch SC-8 enables the test mode allowing the basic PCU functions to be tested without the use of a site controller.

Switch

SC-5

SC-6

SC-7

SC-8

Function

DEAD

No function in on-line mode

Open - deadman timer enabled

No function in on-line mode

Open - Test mode; Closed - On-line mode TEST

12 Re-install the EXPMUX Pump Control CPU board.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 41

Jumpers & Switch Settings

Pump Control I/O Printed Circuit Board

The Pump Control I/O PCB, shown in

Figure 5-5 , consists of two parts: the PCB itself and a

cover plate. In order to set the jumpers and switches on the I/O PCB, you must remove all the connectors and the cover plate.

1 Remove the five green connectors from the front of the Pump Control I/O board. Remove the board from the card cage in the same manner as the EXPMUX Pump Control CPU board.

2 Remove the four Phillips screws securing the cover plate to the PCB and remove the cover plate.

Figure 5-5: Pump Control I/O Cover Plate and PCB

Page 42 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

3 Pulse Connection: Verify that the K1 through K4 jumpers (pulse type jumpers) match the type pulser being used for each pump position. Use the table below to determine your settings.

CAUTION

K1 to K4 jumpers must be set in the configurations shown before turning on power to the

PCU or damage to the system components may occur.

Jumper Pin Function

VR Reed Switch Pulser, 1871 Series

1

P Pulser signal input (sink)

+ No connection

2

K1 G DC ground for pulser

VR Electronic Pulser, 7871 Series

1

P Pulser signal input (sink)

+ +12 VDC supply voltage for pulser

2

K1 G DC ground for pulser

VR Totalizer Pulser, 7874 Series

1

P Pulser signal input (sink)

+ Voltage for opto-isolator from pulser

2

K1 G DC ground for pulser

Voltage

12 VDC signal when pulsing

DC ground

12 VDC signal when pulsing

+12 VDC

DC ground

Signal when pulsing

Voltage level of pulser

DC ground

4 Debounce Configuration: Verify that the K5 jumper (debounce) is set properly. The K5 jumper should remain jumpered for all Reed switch quantity pulsers and unjumpered for all electronic and money pulsers.

Jumper

K5 Jumpered

Speed

Slow

Function

10:1 quantity pulsers

K5 Open Fast 10:1 money pulsers

All electronic pulsers

5 Replace the cover plate on the pump control I/O board and re-install the board into the card cage.

6 Replace the five green connectors into the proper sockets on the front of the Pump Control I/O board.

7 Repeat all steps for both the EXPMUX Pump Control CPU and Pump Control I/O PCBs for each pump control unit.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 43

Jumpers & Switch Settings

Island Card Reader

DIP Switches

The island card reader has an S2 bank of 10 dip switches. Switches 1 through 6 provide functional settings; switches 7 through 10 are address settings. The settings and functions are shown in the following tables.

ICR Software

Switch

S2-1

S2-2

S2-3

S2-4

S2-5

S2-6

Function

DPT

DIS

INSRT

GATE

OPT

No function

Open = enables decimal point on the keypad.

Closed = the decimal point acts as a CLEAR key.

Open = two lines of display are displayed.

Closed = only one line of display is displayed.

Open = insertion magnetic card reader.

Closed = swipe magnetic card reader or optical reader.

Open = island card reader.

Closed = gate controller.

Open = optical reader.

Closed = magnetic card reader.

An address must be set up to identify the island card reader. This address is a unique identifier for when multiple ICRs are connected on the same RS-485 line. Up to 16 units can be used on the same line (there are 16 addresses). Addressing should start at 1 and continue sequentially through 16. The physical wiring order does not have to correspond with the address order (the first unit on the RS-485 line does not have to be address 1). The chart below gives the switch setting for the address selections.

Note: The standalone receipt printer (when used) is addressed as an island card reader; be sure to use an address different from any ICR.

6

7

4

5

8

2

3

Address

1

S2-7 S2-8 S2-9 S2-10

ADDR4 ADDR3 ADDR2 ADDR1

Closed Closed Closed Closed

Closed

Closed

Closed

Closed

Closed

Open

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Open

Open

Open

Open

Closed

Closed

Open

Open

Open

Closed

Open

Closed

Open

12

13

14

15

16

Address

9

10

11

S2-7 S2-8 S2-9 S2-10

ADDR4 ADDR3 ADDR2 ADDR1

Open Closed Closed Closed

Open

Open

Closed

Closed

Closed

Open

Open

Closed

Open

Open

Open

Open

Open

Closed

Open

Open

Open

Open

Open

Closed

Closed

Open

Open

Open

Closed

Open

Closed

Open

An S3 switch enables the diagnostic mode of the ICR. Diagnostic mode is enabled when the switch is in the down position.

Switch

S3

Function

Up = normal; Down = test mode

Page 44 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

Diagnostic tests can be started by keeping the face of the ICR open and pressing the START

OVER key on the keypad.

Note: If you have the island receipt printer, see C08951 Star Receipt Printer Maintenance

Manual for switch settings and other information.

CPU PCB Jumper Settings

Jumpers on the CPU PCB are used for very basic configurations on the PCB and usually do not need to be set in the field.

Note: When used with an optical reader, these jumpers can be removed or left at the factory settings.

Reader Type

Magnetic Card Reader

American Magnetics

Omron/Magtek

K4, 1 & 2

Jumpered

Open

K4, 2 & 3

Open

Jumpered

K5, 1 & 2

Jumpered

Open

K5, 2 & 3

Open

Jumpered

Disable Pumps PC Board Jumper Settings

The Disable Pumps PC Board is located within the head of the Island Card Reader. It is on the left side directly below the board labeled RS-485 Protection Board. If the site’s island card reader is equipped with an Disable Pumps button, check the K1 jumper on the Disable Pumps

PC Board. The Disable Pumps button attempts to shut off pumps regardless of the jumper setting, but the setting determines the following:

• If the jumper is on and the site is configured for emergency stop, when the Disable Pumps button is pressed, the pumps are shut down and the site logs an Emergency Stop condition.

It also shuts off pumps not connected to the RS-485 loop (that is, Tokheim pumps).

• If the jumper is off and Disable Pumps is pressed, the pumps just shut off and no message is logged at the Site Controller.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 45

Jumpers & Switch Settings

RS-232/RS-485 Converter

The following chart shows the default jumper settings for the RS-232/422 converter board.

Note: If using a tank monitor or Profit Point, be sure all jumpers are set to their default settings.

Jumper

K1 K2

K3 K4

1

2

3

1

2

3

K5

Pin Function

1 & 2 Jumpered, slave side of 485 loop transmits; default

2 & 3 Jumpered, master side of 485 loop transmits

1 & 2 Jumpered, tank monitor or PC; default

2 & 3 Jumpered, other application if positions 1 & 2 do not work

Always jumpered

K6

1

2

K7

1

2

Jumpered, listens to slave responses or for PC monitor

Unjumpered, tank gauge; default

Jumpered, 232 device listens to master side of 485 loop; default

POS Distribution Box (D-Box)

The following chart shows the default jumper settings for the POS D-Box.

Jumper

K1

1

2

K2

1

2

K3

1

2

K4

1

2

Function

Jumpered, supplies +12 volts to pin 4 at the scanner port

Unjumpered, disconnects pin 4 of the scanner port

Jumpered, supplies +5 volts to pin 9 of the scanner port

Unjumpered, disconnects pin 9 of the scanner port

Jumpered, supplies +12 volts to pin 4 of the customer display port

Unjumpered, disconnects pin 4 of the customer display port

Jumpered, supplies +5 volts to pin 9 of the customer display port

Unjumpered, disconnects pin 9 of the customer display port

Page 46 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Jumpers & Switch Settings

Fuel Point Reader

The switches on the Fuel Point Reader (FPR) CPU PCB (see

Figure 5-6

) must be set as shown

(see “Switch SW1” on page 48

) to work with the CFN system.

Figure 5-6: Fuel Point Reader CPU Printed Circuit Board

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 47

Jumpers & Switch Settings

Switch SW1

Switch

1

2

Setting

ON

ON

2

3

FPR Address

1

4

Switch 3

OFF

OFF

ON

ON

Switch 4

OFF

ON

OFF

ON

Pumps and Dispensers

If you are using GASBOY Series 9800 pumps and dispensers, there are switches that must be set correctly to insure proper operation of your CFN system. See the Series 9800 Installation/

Operation Manual for details.

If you are using a Gilbarco ® CRIND device or another pump interface (Tokheim DPTs,

Wayne ® , etc.) refer to C09146 Pumps Interface Manual.

Standalone Star Printer

The switches on the standalone Star printer are set at the factory and should be correct. If change is needed, refer to the CFN Diagnostic Manual for details.

Page 48 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

System Power

6 – System Power

1 Verify that the AC power for the CFN Series System is in accordance with the Site Controller

III Installation Manual. AC Power for the CFN system components, monitor, printer, external modem, and remote terminal must come from a separate, dedicated circuit breaker. No other equipment, including the system’s pumps or dispensers, should be powered from this breaker.

Gasboy recommends all CFN components be on the same breaker; however, it is acceptable to supply the power to the different CFN system components and accessories from multiple breakers within the same breaker panel. When necessary, power for the data terminal or modem may be supplied from a separate, dedicated breaker located in a different breaker panel.

Power for the system should be 120 VAC + 10% 47-63 HZ. Power for the CFN system components must come from the AC Surge Protector Outlet Strip supplied with the system

(except for the pump control unit, island card reader, electronic pumps/dispensers, and the

Profit Point). The Profit Point and its accessories (scanner, PIN pad, etc.) must be plugged into another AC surge protector strip.

8. SYSTEM POWER

Record the Grounding method as outlined in step 2 below. Then, record voltage readings for each component from step 4 for Hot to Neutral, Hot to Ground, and Neutral to Ground.

2

IMPORTANT

Proper system grounding is an extremely important part of the system installation.

Grounds for all system devices should be wired to the breaker panel ground bus bar which, in turn, should be grounded to a single ground rod. A conduit ground does not provide a

sufficient ground. It is recommended that the neutral and ground bus bars be bonded together unless prohibited by local codes.

3 Be sure all power switches for the system’s devices are in the OFF position. Turn on the circuit breakers for the system’s devices; optional power conditioner, pump control units, and island card readers and turn on the AC surge protector switch.

4 On the specified locations of the following components, use a digital AC voltmeter to test and record the voltages as follows:

• Optional power conditioner - on the output receptacle (see

Figure 6-1 )

• AC surge protector strip - on the output receptacle (see

Figure 6-1 )

• Pump control unit(s) - at TB202

• Island card reader(s) - at TB6

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 49

System Power

Figure 6-1: AC Output Receptacle

N

(neutral)

H

(hot)

G

(ground)

Measure

From

Hot

Hot

To

Neutral

Ground

Range

Measure AC voltage between the H and N screws.

This voltage should be 120 VAC ± 10 percent (108 VAC to 132 VAC).

Measure AC voltage between the H and G screws.

This voltage should be 120 VAC ± 10 percent (108 VAC to 132 VAC).

Neutral Ground Measure AC voltage between the N and G screws.

This voltage should be 0 VAC ± 1 volt.

Note: If power is not within these specifications, correct it before you continue.

Page 50 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Pump/Dispenser Manual Test

7 – Pump/Dispenser Manual Test

Verify General Guidelines

Verify that the general guidelines listed below were met when installing the system’s pumps and dispensers. If your system contains any electronic pumps, follow the appropriate installation manual for applicable tests.

Suction Pumps

The CFN System is capable of directly driving pump motors up to 3/4 HP at 120/240 VAC or

1-1/2 HP at 240 VAC. A starter relay must be used with pump motors exceeding these limitations. A separate circuit breaker should be supplied for each pump to meet the current requirements and to allow for isolated control with the circuit breaker panel in case of problems.

Dispensers

The CFN System is capable of directly driving submersible pumps up to 3/4 HP at 120/240

VAC or 1-1/2 HP at 240 VAC. A dispenser with a submersible pump exceeding these limitations will require the use of a submersible starter relay. A separate circuit breaker should be supplied for each dispenser in cases where it will directly drive the submersible pump.

Dispensers may be grouped together on a single breaker when the submersible pump has its own breaker. It is recommended that no more than two dispensers be powered from one breaker to maintain isolated control with the circuit breaker panel in case of problems.

Manual Override Test

The pumps and/or dispensers should be tested to verify AC wiring. The steps below indicate the proper procedure for testing and the expected results. If any of these tests fail, correct the wiring and perform the test again. See

Figure 5-3 on page 38

for location of the override switches.

WARNING

Power up only the pump control unit(s) during these tests!

1 Remove all wiring connectors (green) from the pump control I/O board located in the front of the card cage. This will prevent any damage to the PCBs if wiring is incorrect. Make sure connectors are not touching any metal surfaces.

2 Turn on the breakers for all pumps and/or dispensers.

WARNING

Do not turn on the AC power for the site controller, monitor, checkpoint, profit point, etc.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 51

Pump/Dispenser Manual Test

3 Turn the AC power and battery power switches, in the pump control unit located in the upper righthand corner of the power supply, to the ON position (up).

WARNING

AC power is present on the terminal blocks. Electrical shock may occur if the operator comes in contact with these connections.

4 Place the system override switch for Hose 1 in the MAN (manual) position.

5 Turn on Hose 1. After completing reset, the hose should be able to dispense product.

6 Turn on all other hoses. No other hoses besides 1 should activate.

7 Turn off all hoses.

8 Place the system override switch, for Hose 1 in the ON position.

9 Repeat steps

4 through 8 for all remaining hoses. Substitute the hose number being tested for

hose 1 until all hoses have been tested.

10 Replace all connectors and reassemble.

Page 52 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Component Power-Up and Configuration

8 – Component Power-Up and Configuration

Turning On AC Power

Turn on the AC POWER for all system devices as follows.

Power Conditioner/AC Surge Protector Strip

Plug in device. Turn on power switch if applicable.

Monitor

Locate the AC power switch on the monitor and turn on. See the operator’s manual for monitor adjustments and LED indicators.

Logger/Printer

Locate and turn on the AC power switch for the logger/printer. If using a Link terminal for remote log-in, see the setup parameters later in this section.

CheckPoint or Profit Point

CheckPoint: Locate the AC power switch on the back side of the unit. Push the switch down to the ON position marked 1. Verify that the console is on by observing the display on the front of the unit. If the site has an optional customer display, verify that it is also working.

Profit Point: Locate the AC power switch on the front lower righthand side of the monitor and the AC power switch on the back righthand side of the Profit Point console. Push the switch for the monitor into the ON position; then do the same for the console. Verify that it powers up.

Site Controller

Locate the AC power switch on the front of the PC and turn it on. Some units may also have a power switch in the back.

Verify that the Site Controller is operating properly. Verify that power up message prints on monitor and/or logger.

Island Card Reader (ICR)

Locate the AC power switch inside the ICR assembly, upper righthand corner and turn it up to the ON position. Verify that the two power supply LEDs (red) are lit. Verify that the two 485 communication LEDs (red), located on the upper lefthand corner of the reader CPU board, are flashing.

Pump Control Unit(s)

Locate AC power switch and battery switch and turn them on. Verify that the two power supply LEDs (red) are lit. Verify that the two RS-485 communication LEDs (red) on the pump control CPU board are flashing.

Electronic Pumps and Dispensers

Locate and turn on power switches. Refer to the Pump Interface Manual or call Gasboy

Technical Service for information.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 53

Component Power-Up and Configuration

Standalone Receipt Printer (optional)

Locate the AC power switch on the front of the unit. Push the switch to the right (ON) position.

Fuel Point Reader (if used)

Locate and turn on the power switch in the top-left side of the FPR. Verify that the power supply LED, visible through the perforated screen, is lit. Verify that the two RS-485 LEDs,

DL3 and DL4 on the FPR CPU PCB, are flashing.

Configuring the Checkpoint Console

With prior console models, configuration was accomplished with switches and jumpers. This configuration procedure replaces the switch and jumper settings.

If the console has never been configured or if its configuration has been erased, it will go into configuration mode at power up. Otherwise, you can access configuration mode by using selftest 7. Accessing self-test mode is described later in this section. The following table shows the configuration options and their possible values. The shaded column shows the default value.

Options

Console poll address

Keyswitch type

Cash drawer

Drawer switch type

Beeper

Alert beep type

Key click type

LED color

Deadman timer

Console printer/pad

Printer address

DES

Receipt line feed, top

Receipt line feed, end

Receipt left margin

Values

1

4 posn

Cash drawer

Dr clo=sw closed

Enabled

15 seconds

Short

Normal

On

No cons prnt/pad

01

Disabled

00

10

04

2

2 posn

No cash drawer

Dr clo=sw open

Disabled

8 seconds

Medium

Reverse

Off

Console prnt/pad

01 - 64

Enabled

00 - 10

00 - 18

00 - 10

3

4 seconds

Long

4

2 seconds

No

Printer

Printer port

Decimal position

Decimal point type

Ignore scan nn 57

99

99

99

Star SP300

Serial

2 (.00)

. (period)

Undefined

Parallel

3 (.000)

, (comma)

31 - 59 62 - 77 99

31 - 59 62 - 77 99

31 - 59 62 - 77 99

31 - 59 62 - 77 99

0 1 (.0)

99 31 - 59 62 - 77 99

Note: If used, console printer address cannot be the same as the ICR receipt printer address.

Page 54 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Component Power-Up and Configuration

To configure the console:

1 Turn the key to MGR position and press the NO SALE key.

Access diagnostic mode, self-test 7, if necessary. See the Check Point Reference Manual if further assistance is required. The message ***Configuration** appears and the display scrolls through the keystrokes needed to change the values. Then the first option appears. If the value selected for the option is the default value, the option is enclosed in asterisks (*). If the value is not the default, the option is enclosed in minus signs (-).

2 Accept the defaults or change the values for any of the configuration options using the following keys:

1

2

0

7

ENTER

PREV accepts the displayed value and displays the next configuration option.

selects the currently displayed option value and displays the previous option. For example, if you’re on keyswitch type and press this key, console address is displayed.

displays the next value for that option. To accept that option and go on to the next option, press ENTER.

displays the default value for the option. To accept that option and go on to the next option, press ENTER.

exits the configuration mode and saves your changes.

returns you to the initial configuration display.

3 Exit from diagnostic self-test mode by pressing 9.

Fluorescent Display Board

Switch

SW1-1

SW1-2

SW1-3

SW1-4

SW1-5

SW1-6

SW1-7

SW1-8

Function

MSTR

SLAV

TEST

Not used

Not used

Not used

Open = display only (the characters are only displayed)

Closed = display and transmit to customer display (the VF driver transmits characters through its serial interface and simultaneously displays them.)

Note: Must be closed when console is connected to a customer display.

Open = VF driver used in console (the VF driver displays characters received through its parallel interface)

Closed = VF driver not used in console (the VF driver displays all characters received through its RS-485 interface)

Note: Must be open when VF driver is used in the console.

Open = normal mode (the VF driver functions normally)

Closed = test mode (with the CPU interface ribbon cable disconnected, the VF driver displays a rotating barber-pole pattern self-test)

Not used

Not used

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 55

Component Power-Up and Configuration

Configuring the Profit Point Console

Access the Main Menu from Profit Point Console

1 Turn the Manager’s key to MGR position.

2 Sign on (if required).

3 Press SPEC FUNC, 0 and ENTER. The Main Menu displays.

Note: To return to POS mode, select 1 on the Main Menu and press ENTER.

Access the Main Menu from SC III/POS WS

1 Minimize the SC III window and double-click on the PP icon

2 Sign on (if required).

3 Press SPEC FUNC, 0 and ENTER. The Main Menu displays.

Note: To return to POS mode, select 1 on the Main Menu and press ENTER.

4 On the Profit Point Main Menu, press 4 (or C) and ENTER. This displays the Configuration

Menu

5 Select configuration options by selecting the number or first letter of the option and pressing

ENTER.

Note: The options are 1: Software, 2: Hardware, 3: Keyboard, and 4: Setup config.pos file.

Software Configuration

Type 1 (or S) and press ENTER to display the Software Configuration menu.

When you select an entry, a submenu appears allowing you to select the desired options for that entry. The entries are:

7

8

9

3

4

1

2

5

6

Training mode off-hook rate

Show change as coins and bills

Enter a value from 1 (slowest) to 9 (fastest)

Shows yes to show change, or no

Minimum age to buy ask-ID items Shows one or two ID ages, depending on selections

Product totals kept in PLU file Shows yes to update product totals, or no

Keep file of missing items

Off-hook beep rate

Validate checks

Enter birthdate when ID required

Head Clerk signon

Shows yes to keep a file, or no

Enter a value (15 seconds, standard) for length of time between 3 beep signals indicating pump is off-hook

Prints date, time, register number, clerk number, and amount tendered on checks accepted

Select 1 for require; select 2 for do not require

Enter user ID and password for head clerk. Used for keyswitch position 2 when 5-position keyswitch is used.

Page 56 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Component Power-Up and Configuration

Hardware Configuration

Type 2 (or H) and press ENTER to display the Hardware Configuration menu. When you select an entry, a submenu appears allowing you to select the desired options for that entry.

The entries are:

7

8

5

6

3

4

1

2

Console address

Address of printer/PIN pad

Type of PIN pad used

Customer display type

Profit Point type

Bar code scanner

Key switch type

Drawer type

9 Host IP address

Enter address of console

Enter address of PIN pad

Four choices: local (keyboard), Ingenico Verifone, none

Two choices: Ultimate, IEE

Two choices: modular, integral

Select enabled/disabled

Three choices: 2-position, 3-position, 5-position

Four choices: switch open = drawer open, switch open = drawer closed, drawer on printer (requires Epson serial printer), no cash drawer

Not used at this time

Keyboard Configuration

Keyboard may be different for every site. Consult MDE-4356 Profit Point Reference Manual for keyboard configuration details.

Set Up CONFIG.POS File

When you set up the CONFIG.POS file, you specify the special network cards your site accepts, the user-defined menus you want, the sale discounts you offer, the permission level required to use each of the Profit Point’s special functions, and idle messages for display.

Refer to MDE-4356 Profit Point Reference Manual for details.

Printer Configuration Submenu

The printer configuration submenu allows you to select a forms or invoice printer and specify the port (LPT1 or LPT2) to which it is connected. The receipt printer, if present, is still connected to LPT1 and prints receipts regardless of this configuration. Refer to MDE-4356

Profit Point Reference Manual for details.

Scanner Configuration

When purchased from Gasboy, the scanner should be set up at the factory. If it is not, it is programmed by scanning bar codes supplied with the scanner. A configuration instruction sheet, including a list of required bar codes, is packed with the scanner. Refer to MDE-4356

Profit Point Reference Manual for scanner port parameters.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 57

Component Power-Up and Configuration

Okidata Printer/Logger

The following printer switch settings are applicable for the Okidata 184 printer when connected to a GASBOY CFN Fuel Management System. This document is not intended to be a complete reference for the printer. Consult the documentation that came with the printer.

To prepare the Okidata 184 printer for operation with your GASBOY Fuel Management

System, perform the following steps. Install and complete the setup of the printer as specified in the manufacturer’s setup instructions. Then set up the switches as follows:

SW1-1

SW1-2

SW1-3

SW1-4

SW1-5

SW1-6

SW1-7

SW1-8

ON

ON

ON

OFF

ON

ON

ON

ON

Parity: Odd

Parity: Without

Data bits: 8

Protocol: XON/XOFF

Test select: Circuit

Mode select: Print

Busy line selection: DTR - Pin 20

Busy line selection: DTR - Pin 20

SW2

Baud Rate

9600

2400

1200

SW2-1

OFF

OFF

ON

SW2-2

ON

OFF

ON

SW3-3

ON

ON

OFF

300 ON OFF OFF

Note: Any change to the baud rate must also be changed on the Link Terminal

Communications Setup screen, Aux Baud parameter.

Page 58

SW2-4

SW2-5

SW2-6

SW2-7

SW2-8

ON

ON

OFF

ON

OFF

DSR output signal: Active

Buffer threshold: 32 bytes

Busy signal timing: 1 second (minimum)

DTR signal: Space after power on

Not used

1 Take the printer offline by pressing SELECT. The SELECT light should go off.

2 Position the print head at the top of the paper and press the TOF SET button.

3 Put the printer back online by pressing SELECT. The SELECT light should go on.

4 Press the MODE button until the light next to HSD is lit.

5 Press the PITCH button until the light next to 17 is lit.

Note: Pitch may be set to a lower number (resulting in larger print) if transactions are less than 132 characters.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Component Power-Up and Configuration

Remote Terminal Setup

The CFN remote port can be directly connected to a terminal. The terminal supplied by

GASBOY is a Link MC5 CRT terminal. If your site uses a remote terminal, install and complete the setup of the terminal as specified in the manufacturer’s setup instructions. The baud rate amd emulation mode must be set to match the Site Controller configuration.

Site Controller Configuration Changes

Although the system has already been configured and tested at the factory, you may need to perform some configuration changes to match the site’s characteristics. Follow the instructions in the Site Controller III Configuration Manual to make these changes.

The software for a CFN system with a 3-1/2" disk drive and a hard disk is supplied on the hard disk and also on two backup 3-1/2" diskettes. During normal system use, any configuration changes that you add to the CFN system are automatically place on the hard disk. To keep your backup current, these changes must be copied onto the 3-1/2" backup diskette labeled DISK

#1.

The possible configuration programs are: SYS_PAR, READER, PUMP, CONSOLE, TABLE,

TRFMT, PERM, GATE, and FUELPT. Detailed information on these programs can be found in the Configuration Manual. The following list contains items which may require changing the site controller configuration.

• Use SYS_PAR parameters to change the Site ID #, Switch timeouts, and Pulser timeouts.

• Serial port configuration. Be sure all devices are plugged into the correct ports, and the printer (if present) is set up according to the instructions provided earlier in this section.

• Use PUMP to check configuration to make sure correct pumps were set up at the factory.

Reassign pump control units if changes were made to previous pump types. If pulse rates need to be changed, open S4 at the back of the Site Controller III boards (slide away from loop connectors).

• If using a network, refer to the applicable Credit and Debit Card Networks Manual, for specific network configuration considerations.

• If using Tokheim Dispenser Payment Terminals (DPTs), refer to DPT Instructions available in C09146 Pump Interface Manual or contact GASBOY Technical Service.

• If using a CheckPoint or Profit Point, refer to the appropriate manuals listed in Section 1 for any special configuration considerations.

• If using Gate Reader, it is possible to configure the Prompts and Timeouts parameters.

• If using a tank monitoring system, it is possible to configure the add to inventory and log delivery parameters.

• Use FUELPT to set the nozzle ring assignments and other Fuel Point parameters.

• If using Unitec Car Wash option, you can use the GATE program to set parameters, types, and discounts.

Series 9800 Electronic Pumps and Dispensers

If you are using Series 9800 pumps and dispensers, there are switches that must be set correctly to insure proper operation of your CFN system. See the Series 9800 Installation/

Operation Manual for details.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 59

Component Power-Up and Configuration

Page 60 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

DC Power Measurement and Adjustment

9 – DC Power Measurement and Adjustment

The following steps describe, for each of the components, how to measure the voltages required in Section 9. DC POWER of the Start-up form. If any of the measured DC voltages are outside of the tolerances noted (except for +5 which can be adjusted), immediately shut off the AC POWER switch of the unit and diagnose the problem. Test points are shown for each of the system devices in this section. All voltage measurements should be taken with the negative lead of the digital voltmeter on the ground (GND) test point.

9. DC POWER

As you are measuring the noted voltages, fill in the readings for each in this section of the Start-up

Form.

Site Controller III

The Site Controller III has no DC power adjustments.

Pump Control Unit(s)

+5 VDC Measurement

1 Turn off the AC and DC power switches on the supply assembly.

2 Locate the connector labeled POWER in the upper left-hand corner of the motherboard.

Remove the black plastic cover.

3 Turn on the AC and DC power switches.

4 Measure the +5 VDC between the orange (+) and black (-) wires (

Figure 9-1 ).

The voltage should be +4.95 to +5.05 VDC.

Figure 9-1: PCU +5 VDC Measurement Points

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 61

DC Power Measurement and Adjustment

5

Measure the +12 VDC between the red (+) and black (-) wires ( Figure 9-1

).

The voltage should be +11.50 to +15.50 VDC depending on the type and number of pulsers and the number of relays energized.

6 Measure the POWER FAIL between the yellow (+) and black (-) wires (

Figure 9-1 ).

The voltage should be +4.75 to +5.05 VDC.

Note: There are no adjustments for these voltages.

7 Turn off the AC and DC power switches.

8 Replace the black plastic cover on the connector and turn the AC and DC power switches back on.

Island Card Reader

+5 VDC Measurement

1 Unlock, unscrew, and lower the face of the island card reader.

2 Measure the +5 VDC between the top of the resistor R7 (+) and the case of crystal Y1 (-)

(

Figure 9-2 ).

The voltage should be +5.00 to +5.10 VDC.

• If the voltage does not fall within this range, adjustment is necessary. Follow the steps in

+5 VDC Adjustment below to adjust the supply.

• If the voltage is within tolerance, skip to “+12 VDC Measurement” on page 63 .

Figure 9-2: ICR +5 VDC Measurement Point

Page 62

+5 VDC Adjustment

1 Turn off the AC POWER switch in the island card reader.

2 Remove the two white connectors on the power supply labeled DC OUT and AC IN.

3 Remove the four 5/32-inch nuts on each corner of the power supply, and remove the supply.

4 Being careful that it does not touch any of the circuits on the front door, lay the power supply on a non-conductive surface (such as heavy plastic or cardboard).

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

DC Power Measurement and Adjustment

5 Reconnect the two connectors on the power supply labeled DC OUT and AC IN.

6 Attach the meter probes to R7 and Y1 on the CPU PCB.

7 Turn the AC POWER switch back on.

WARNING

Be careful not to touch anything but the adjustment screw. High voltage exists at various points on the supply and the circuit mounted on the rear of the supply.

8 Using a 1/8 inch or smaller plastic, flat blade screwdriver, adjust the power supply to +5 VDC by turning the screw clockwise to increase voltage, counterclockwise to decrease voltage.

Turn the screw slightly to judge how sensitive the adjustment is.

9 Disconnect the meter probes.

10 Turn the AC POWER switch off and return the power supply to its normal location.

11 Fasten the nuts holding the supply.

12 Turn the AC POWER switch back on.

+12 VDC Measurement

1 Measure the +12 VDC between the red (+) and black (-) wires on the DC OUTPUT connector of the power supply (

Figure 9-3

).

The voltage should be +11.00 to +14.00 VDC.

Figure 9-3: ICR +12 VDC Measurement Point

2 Close and lock the unit, and replace the screws on the face.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 63

DC Power Measurement and Adjustment

Checkpoint Console

+5 VDC Measurement

1 Turn off power to the console.

2 Remove the four screws from the bottom of the console and carefully separate the upper housing from the lower housing.

3 Turn on the power to the console.

4 On the CPU PCB, measure at the TP1 and TP2 test points, with the positive (+) probe on TP1 and the negative (-) probe on TP2 (

Figure 9-4 ).

The voltage should be +5.00 to +5.10 VDC.

• If the voltage does not fall within this range, adjustment is necessary. Follow the steps in

+5 VDC Adjustment below to adjust the supply.

• If the voltage is within tolerance, skip to “+12 VDC Measurement” on page 65 .

Figure 9-4: Checkpoint +5 VDC Measurement Point

Page 64

+5 VDC Adjustment

1 Turn off the power to the console.

2 Remove the three screws that hold the power supply cover onto the supply; remove the cover.

3 Attach the meter probes to TP1 and TP2 on the CPU PCB.

4 Turn the AC POWER switch back on.

WARNING

Be careful not to touch anything but the adjustment screw. High voltage exists at various points on the supply.

5 Using a 1/8 inch or smaller plastic, flat-blade screwdriver, adjust the power supply to +5 VDC by turning the screw clockwise to increase voltage, counterclockwise to decrease voltage.

Turn the screw slightly to judge how sensitive the adjustment is.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

DC Power Measurement and Adjustment

6 Disconnect the meter probes.

7 Turn the AC POWER switch off and return the power supply cover to its normal location.

8 Turn the AC POWER switch back on.

+12 VDC Measurement

Locate TP3 (+12VDC) on the CPU PCB; measure the +12 VDC between TP3 (+) and TP2

(gnd) on CPU PCB.

The voltage should be +11.00 to +14.00 VDC.

Note: This voltage is not adjustable.

-12 VDC Measurement

Locate TP4 on the CPU PCB; measure the -12 VDC between TP4 and TP2 on the CPU PCB.

Voltage should be -11.00 to -14.00 VDC.

Note: This voltage is not adjustable.

+9 VDC Measurement

1 Locate TP5 on the CPU PCB; measure the +9VDC between TP5 and TP2 on the CPU PCB.

Voltage should be +6.00 to +10.00 VDC.

Note: This voltage is not adjustable.

2 Turn off power to the console and carefully set the upper half of the console on the lower half.

3 Replace the four screws in the bottom of the unit.

4 Turn on the power.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 65

DC Power Measurement and Adjustment

Fuel Point Reader (FPR)

+5 VDC Measurement

1 Unlock, unscrew, and remove the FPR door.

2 Using a DC voltmeter, measure the +5 VDC between the GND test point and the right side of

R26, both located on the FPR CPU PCB ( Figure 9-5

).

3 The acceptable voltage range is +5.0 to +5.1 VDC, but try to adjust it as close as possible to

+5.0 VDC.

Note: There is an access hole in the power supply bracket to facilitate adjustment without disassembly.

Figure 9-5: Fuel Point Reader+5 VDC Measurement Point

Page 66 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

DC Power Measurement and Adjustment

Profit Point Console

There are no DC power adjustments in the Profit Point console.

Current Loop Interface

Consult the Current Loop Interface Unit Installation Manual for voltage measurement specifications.

Electronic Pumps

Consult the manufacturer’s instructions for power adjustments for the 9800 or other electronic pumps.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 67

DC Power Measurement and Adjustment

Page 68 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Communication Tests

10 – Communication Tests

1 Verify that the external communication devices are located in the proper environment as described below.

Remote Terminal

When a remote terminal is used with the system it should be located in a clean, office-type environment. It should not be installed over a hazardous location. CRTs/data terminals supplied by GASBOY have an operative temperature range of 32 o F to 104 o F. Locating the terminal in a dirty environment may cause premature failures.

Modem

When a modem is used with the system, the modem should be located in an office-type environment. If this is not possible, it should be housed in a protective enclosure with ventilation. It should not be installed over a hazardous location. External modems supplied by

GASBOY have an operative temperature range of 32 o F to 104 o F.

2 Verify that the cables for the communication ports meet the installation requirements listed in the Installation Manual.

Ports (1, 4, 5, 6, COM1, COM2, COM3, COM4, COM5, COM6, and LPT1)

Ports 1, 4, 5, and 6 are general purpose RS-232 ports that will work with various external devices such as a direct pump interface, Hayes-compatible modem (for bank interface), or logger. These ports are configured using site configuration program SYS_PAR. COM1 may be connected to a mouse. LPT1 may be used with a parallel log printer. On the SC III/POS WS,

LPT1 is connected to the receipt printer; COM2 to the POS DBox.

Power

The AC power for all equipment must be supplied by the AC Surge Protector Outlet Strip (on a separate dedicated circuit breaker). The Profit Point and its accessories must be powered from another AC Surge Protector Outlet Strip.

Note: All conduit, system and pump/dispenser wiring must be installed according to the specifications detailed in the Site Controller III Installation Manual.

3 Test the communication ports by testing the following attached devices. The required tests will vary according to the type of devices connected to the ports and the ports used. When testing the ports, the actual equipment and communication lines that will be used at the site should be used in the test whenever possible. It is recommended that a log printer always be connected so that transactions can be logged as they occur.

4 Verify that the following are connnected and working.

• mouse

• keyboard

• monitor

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 69

Communication Tests

Site Controller III or Remote Terminal

1 Verify that the SC III (and remote terminal, if applicable) is connected properly and that the monitor is displaying a SC III window or full screen.

If it is not, put the arrow on the SC III icon (by moving the mouse) and double-click on the icon.

2 Press RETURN.

(You may have to set up switches and parameters on the terminal).

The system should respond: sign on.

3 Type GASBOY and press RETURN.

Note: For security reasons, GASBOY will not display as you type it.

The system should respond: Connected to site 1001 on along with the day, date, and time, followed by the command prompt (R*).

4 Type P DA and press RETURN.

The system prints the date, time, transaction numbers, sequence number, and version number, followed by the command prompt (R*).

5 Type LOG MESS...Testing Okidata Printer

The printer should repeat the typed message plus the date and time.

6 Type EX and press RETURN.

The system prints Sign off, along with the day, date, and time. When command terminal and logger are connected on the same port, the system goes into the monitor mode.

Page 70 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Communication Tests

Modem

If modem is not supplied by GASBOY, it must be set up using the following parameters:

• modem hangs up with on/off transmission of DTR

• auto answer enabled

• carrier detect present when connection is complete

• jack select RJ41S RJ455

• bell compatible with 103/212A modems

• line error detect disabled

• result code disabled

Note: This procedure verifies remote polling only. This is not a network test. Consult your network representative for network testing.

1 Turn on the site modem and the modem/data terminal device from which the call will originate.

2 Set communication program to proper baud rate (9600 default), N, 8, 1

(see the operator's manual that comes with the modem).

3 Dial up the CFN site and establish a communication link with the system.

4 Press RETURN.

The system should respond Sign on.

5 Type GASBOY and press RETURN.

Note: For security reasons, GASBOY will not display as you type it.

The system should respond: Connected to site 1001 on along with the day, date, and time, followed by the command prompt (R*).

6 Type P DA and press RETURN.

The system prints the date, time, transaction numbers, sequence number, and version number, followed by the command prompt (R*).

7 Type EX and press RETURN.

The system prints Sign off when connected to the remote port, and terminates the communication line.

8 Hang up the phone.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 71

Communication Tests

Tank Monitor (Serial Port)

If you have a tank monitor connected via one of the serial ports and not the RS-485, use the following to verify communications. The tank monitor must be set up with the following parameters.

TLS-250 or generic

Baud rate

Data bits

Parity

Stop bits

RS232 Security Code

9600

7

Odd

1

Disabled

TLS-350 only

Baud rate

Data bits

Parity

Stop bits

End of message character

Match Site Controller

8

None

1

Enabled

1 Be sure the tank monitor is on and set up.

2 At the site data terminal, sign on to command mode.

3 Type REC TMTST.CMD and press ENTER.

(This starts recording a temporary command file named TMTST.CMD.)

At the Data? prompt, type in the following and press ENTER at the end of each line.

In the second and third lines below, substitute the port number for the X.

Use only the PORT OPEN statement that applies to your tank monitor type (

Figure 10-1

); do not use both.

Note: Text below must be typed in uppercase; do not type text in parentheses.)

*TM PORT TEST

PORT OPEN X BAUD 9600 DATA7 PARITY ODD (this line for TLS-250 or generic)

PORT OPEN X BAUD xxxx (this line for TLS-350 only)

PORT SEND ~01

PORT SEND 200

LOOP

PORT RECEIVE QUIET 2 FILE TMTST.DTA

IF ‘%E = 1 (the special character appearing before the percent sign is a back quote)

RETURN

PORT CLOSE

TY TMTST.DTA

. (period must be on a line by itself)

Page 72 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Communication Tests

Figure 10-1: Sample of Creating TMTST.CMD File for TLS-350

REC TMTST.CMD <ENTER>

Data?

*TM PORT TEST <ENTER>

PORT OPEN 2 BAUD 9600 <ENTER>

PORT SEND ~01 <ENTER>

PORT SEND 200 <ENTER>

LOOP <ENTER>

PORT RECEIVE QUIET 2 FILE TMTST.DTA <ENTER>

IF ‘%E = 1 <ENTER>

RETURN <ENTER>

PORT CLOSE <ENTER>

TY TMTST.DTA <ENTER>

. <ENTER>

P:

4 At the command prompt (R* or [P:]*), type TMTST and press ENTER.

Once the command has completed, you should have a printout similar to the one shown in

Figure 10-2 .

Figure 10-2: Sample Tank Monitor Printout

VEEDER-ROOT

TLS

TANK LEVEL SENSOR

----------

FEB 9, 2005

2:25 PM

TANK PRODUCT GALLONS INCHES WATER DEG F ULLAGE

1 UNLEADED 3858 34.60 0.0 72.9 1142

2 DIESEL 7331 66.01 1.0 60.2 2669

5 Once you have verified the communications are working, type DEL TMTST.* and press

ENTER.

This deletes the TMTST files.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 73

Communication Tests

Page 74 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Pump/Dispenser Automatic Test

11 – Pump/Dispenser Automatic Test

The automatic test verifies pump operation and ensures that transactions are accurately recorded and that quantities and prices agree with those displayed on the pumps. As each transaction is completed, it should print on the data terminal attached to the logger port. For remote sites not using the monitor mode, either a data terminal can be temporarily connected to the logger port or the information will have to be manually polled. The steps outlined in this section indicate the proper procedure for testing and the expected results.

IMPORTANT

Before the pumps can be properly tested in automatic using the island card reader and/or console, the CFN system must be configured for the pulser type on each pump (for example, gallon wheel, money wheel, electronic register) and the pulser rate (for example, 1:1, 10:1, 100:1, 500:1). To verify this, perform the print pump command, P PU, and verify the rate column on the printout with the physical pumps at the site.

Note: The system counts edges, not pulses. For example: 10:1 on gallons = 20 edges per gallon,

100:1 on gallons = 200 edges per gallon. If you have a penny pulsing pump (for example, one pulse per penny), a 10:1 pulse ratio would yield 200 edges per dollar. When you do a P PU command, the edges figure is shown in the RATE column.

When using pumps and/or dispensers at retail sites, the proper price must be set on the pump and loaded in the system to verify proper registration. The fallback price (Level 0) should be the same as the posted prices; if using dollar pulsers it must be the same.

If you are using the Site Controller III interfaces to electronic pumps, pulse rates are not important.

On Gilbarco pumps/dispensers, pulse units must be $ (dollar).

If pulse rates need to be changed, open switch SW4.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 75

Pump/Dispenser Automatic Test

Island Card Reader - Pump Activation Test (optional)

1 Place all the override switches, located in the pump control unit(s) (see

Figure 5-3 on page 38 )

into the ON position.

2 Using the test cards (provided with each system), select Hose 1.

3 Turn on Hose 1 using the pump handle.

Hose 1 should reset and be able to dispense product.

4 Dispense some product with Hose 1.

5 Turn on all other hose handles.

Only Hose 1 should be activated or dispense product.

6 Turn off all other hose handles.

7 Turn off the handle for Hose 1.

8 Place the handle for Hose 1 back into the ON position.

Hose 1 should not reset and should not dispense product.

9 Verify that the quantity displayed on the Hose 1 register matches the quantity (and price, if applicable) recorded on the system printout.

10 Repeat steps

2 through 9 above for all hose outlets.

Note: Continue with steps 11 through 15 below only if you are using dispensers or dual hose

single motor suction pumps.

11 Using the test card, select two hose outlets of the same product type (that use the same submersible pump).

12 Turn on both pump handles.

Both hose outlets should reset and be able to dispense product.

13 While dispensing product from one hose (A), allow the other hose (B) to time out.

14 When Hose B has timed out, try to dispense product from it by squeezing the nozzle.

You should not be able to dispense product from Hose B. If you can, verify that the dispensers use solenoid valves rather than hydraulic valves, and re-check that particular pump’s or dispenser’s wiring.

15 Repeat steps

11 through 14 above for all combinations of hose outlets of the same product

type.

Page 76 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Pump/Dispenser Automatic Test

CheckPoint - Postpay Pump Activation Test (optional)

For more information, see the CheckPoint Reference Manual.

1 Use the pump handle to turn on pump 1.

CheckPoint beeps at set intervals and hose select LED flashes red for pump 1 on CheckPoint.

2 On the CheckPoint, select pump 1 and push START.

3 Dispense some product from pump 1, then turn pump 1 off by using the pump handle.

4 Pay off sale (Press CASH, enter amount, ENTER).

If cash drawer is present, it will open. Close drawer.

5 Verify that the quantity displayed on the pump 1 register matches the quantity recorded on the system printout (cash price, price level 1 or level 0 if no level 1 is used).

6 Repeat steps

1 through 5 for all hose outlets.

CheckPoint - Prepay Pump Activation Test (optional when using dual-stage solenoid valves)

1 Select Hose 1 on the CheckPoint by pushing the pump 1 key.

2 Select the prepay mode on the CheckPoint by pressing 1 0 0 PREPAY.

3 Press START on the CheckPoint to start pump 1.

Drawer opens. Close drawer.

4 Use the pump handle to turn on pump 1 and squeeze the nozzle.

Pump product until it stops. Pump 1 will dispense product in fast flow until the slow cutoff is reached, then the pump will dispense slowly until cutoff.

5 Verify that the total sale and gallon amount displayed on the pump 1 register matches the volume and amounts you pre-selected on the CheckPoint. Verify that the printout on the log printer matches these totals.

6 Repeat steps

1 through 5 for all hose outlets controlled from the CheckPoint.

Profit Point or SC III/POS WS - Postpay Pump Activation Test (optional)

For more information, see the Profit Point Clerk’s Manual.

1 Turn the pump handle of pump 1.

Profit Point beeps three times at set intervals, indicating pump is offhook.

2 On the Profit Point, press OFF HOOK button, then START.

3 Dispense some product from pump 1; then turn pump off using pump handle.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 77

Pump/Dispenser Automatic Test

4 Press PAYABLE until sale is selected in pull down menu.

5 Pay off sale (Press CASH, enter amount, ENTER).

Drawer will open. Close drawer.

6 Verify that the quantity displayed on the pump 1 register matches the quantity recorded on the logger printout (cash price, price level 1 or level 0 if no level 1 is used).

7 Repeat steps

1 through

6 for all hose outlets.

Profit Point or SC III/POS WS - Prepay Pump Activation Test (optional when using dual-stage solenoid valves)

1 Select pump 1 by pushing the Pump 1 key on the Profit Point.

2 Prepay the sale (PREPAY, 1 0 0, ENTER, START).

Drawer opens. Close drawer.

3 Use the pump handle to turn on pump 1 and squeeze the nozzle.

Pump product until it stops. Pump 1 will dispense product in fast flow until the slow cutoff is reached, then the pump will dispense slowly until cutoff.

4 Verify that the total sale and gallon amount displayed on the pump 1 register matches the volume and amounts you pre-selected on the Profit Point. Verify that the printout on the log printer matches these totals.

5 Repeat steps

1 through 4 for all hose outlets.

Before Using Fuel Point

Before using Fuel Point, verify the following.

• Vehicle Modules are installed in accordance with C35699 Fuel Point Vehicle Module

Installation Manual.

• Vehicle Modules are programmed as explained in C35629 Vehicle Module Programming

Manual.

• The necessary site controller configurations have been made to FUELPT.BIN and

SYS_PAR.BIN, using C09326 CFN III Configuration Manual for Windows NT. The configurations to FUELPT.BIN must match the factory-configuration of the vehicle module programmer. If you do not know how your programmer is configured, call

GASBOY Technical Services for assistance.

Page 78 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Pump/Dispenser Automatic Test

Fuel Point Setup for Ground Loop Fueling

This setup must be performed before the system can accept any transactions originating from the ground loop antenna. This routine only needs to be performed once for each Fuel Point

Reader (FPR), regardless of the number of pumps assigned to the FPR or the number of vehicles equipped with a Vehicle Module (VM).

1 At the site controller, go to the Individual Parameters menu of the FUELPT.BIN program; reconfigure one of the ring channels on each FPR to be type "P" (pump).

2 Position a vehicle over the ground loop antenna at one FPR.

3 At the VM, disconnect the T-Ring wires from the GATE connector and move them to the T-

RING connector.

4 Pump some quantity of fuel then hang up the hose.

5 Verify that a transaction was recorded showing the correct VM data.

6 Repeat steps

2 through 5 for each FPR.

7 At the VM, move the T-Ring wires from the GATE connector back to the T-RING connector.

8 At the site controller, go to the Individual Parameters menu of the FUELPT.BIN program; reconfigure the ring channels for each FPR back to type "L" (ground loop).

Fuel Point - Pump Activation Test

1 Take a hose from the pump and turn on the pump handle.

The pump should not reset. Turn the pump handle off again.

2 Verify that a vehicle has been properly equipped with a programmed Fuel Point Vehicle

Module (VM) and antenna. If equipped with the EID option, touch a valid EID to the EID

Reader and verify that the green lamp on the Reader is lit.

3 If this fueling position is not equipped with a ground loop antenna, skip this step.

Position the vehicle over the ground loop antenna.

The pump should be authorized.

Turn the pump handle on and begin fueling.

4 If this fueling position is equipped with a nozzle antenna ring, turn the pump on and insert the nozzle into the vehicle.

Within a few seconds, the pump should be activated and fueling can begin.

5 After a few gallons, hang the nozzle back on the pump; verify that the correct EID and VM data have been recorded.

6 Repeat for all hose outlets.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 79

Pump/Dispenser Automatic Test

Reader Entries and Fuel Point

If your system was ordered with the reader entry option, you must enter data at the card reader with every Fuel Point transaction. This entered data is combined with the data already programmed into the vehicle module.

1 Insert the wired-hose into the vehicle’s fill pipe, or, park the vehicle over the ground loop, whichever is applicable.

2 Go to the card reader that is assigned to the Fuel Point controlling this hose.

The reader will be scrolling broadcast messages, or a SLIDE CARD message.

(The card reader is assigned to a Fuel Point reader in the FUELPT.BIN configuration program.)

3 On the keypad, press the pump number that you are using, followed by the ENTER key.

The display now prompts you to enter certain data. Follow the prompts until finished.

4 The pump should turn on when all entries have been successfully entered.

Obtaining a Receipt for Fuel Point Transactions

1

If Using an Island Card Reader

Once the transaction has been completed, go to the Island Card Reader.

The reader will be scrolling broadcast messages, or a SLIDE CARD message.

2 Select the pump number you just used, followed by the ENTER key.

There is no further prompting for the receipt. The receipt will print for the last transaction that occurred at that pump within the last 20 minutes. Since only the last transaction at that pump is available as a receipt, you must get your receipt before allowing another transaction to complete at that pump.

If Using an Electronic Dispenser with a Built-in Printer

After the transaction has completed, the receipt will be printed automatically, or the display may prompt for the receipt, depending on the configuration in SYS_PAR.BIN.

Master/Satellite Dispensers with Fuel Point

The design of the Fuel Point system allows a nozzle ring on the master dispenser only. That means the master nozzle must always be inserted in the truck’s fill pipe with the tank ring in order for the satellite dispenser to operate. If the truck must be able to pull into the fuel lane from either direction, then you may add a tank ring to both fill pipes.

Using the Chain Pump Feature with Fuel Point

The chain pump feature is used when activation of a fuel dispenser also turns on a bank of fluid reels. In this application, the dispenser is known as the master of the chain. Only the master of the chain has a nozzle ring, so its hose must remain in the fill pipe until all fueling and fluid hoses are finished pumping.

Page 80 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Pump/Dispenser Automatic Test

Fuel Point - Gate Activation Test

This test should not be run until at least one successful fueling transaction is performed, as in the tests above.

1 Position the vehicle over the ground loop antenna.

Within a few seconds, the gate opener should operate.

2 Follow the gate opener manufacturer’s operating instructions.

3 Verify that the system records the correct VM data.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 81

Pump/Dispenser Automatic Test

Page 82 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

12 – Start-up Commands

CAUTION

Some of the commands in this section use the ;I option. This command option should be used only at start-up. It initializes (erases) any data previously entered for these commands. Subsequent use of these commands should omit the ;I option.

Use the following commands to set up the system at the initial start-up. Depending on the particular configuration, some of these commands need not be performed. All commands are covered in more detail in the Site Controller III Manager’s Manual.

If you filled in the checklist in Section 2 of this manual, you already have the information you need to start up the system. In all examples, bold represents the information that you enter, and <RETURN> represents the RETURN key.

To show that it is ready to accept input, the site controller displays a letter asterisk combination

(R*). The examples in this section all use the R* prompt.

Sign-on and Preliminary Steps

1 Press RETURN.

The system responds: Sign on:

2 Type GASBOY and press RETURN.

(The word GASBOY is shown in

Figure 12-1 for example only. It is not displayed as you are

typing it.)

The system displays Connected to site 1001 on day-date-time and the command prompt (R*) indicating that you are in command mode and can begin entering commands to configure the system.

Note: If the GASBOY password does not connect you to the system, use the default sign-on switch, S3-4. S3 can be accessed behind the PC where the SC III’s port connections are made. Refer to SC III Manager’s Manual.

Issuing some of these commands may require a higher permission level. It may be necessary to use SYS_PAR to temporarily set user 0 permission level to a higher number.

Figure 12-1: Example of SIGN ON Entry with Response

SIGN ON: GASBOY <RETURN>

Connected to site 1001 on Sat 02/11/05 10:20 am

R*

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 83

Start-up Commands

3 Type AD SIG and press RETURN to add users who are authorized to use the console, PC or

remote terminal ( Figure 12-2 ).

Figure 12-2: Example of AD SIG Command with Prompts

R* AD SIG <RETURN>

User number?

0 <RETURN>

Permission level?

10 <RETURN>

Sign on code?

********** <RETURN>

R*

4 Type LO DA and press RETURN to load the date and time into the system (

Figure 12-3 ).

Use military time.

Figure 12-3: Example of LO DA Command with Prompts

R* LO DA <RETURN>

Month?

8 <RETURN>

Day of month?

23 <RETURN>

Year?

05 <RETURN>

Hour?

12 <RETURN>

Minute?

31 <RETURN>

Thu 8/23/05 12:31 PM, Trans = 57, Seq = 624 SCIII v3.0

R*

Receipt Header, Broadcast Messages

1 Type LO H;IC to load into the system the receipt heading and footing messages for the receipt printer(s) (

Figure 12-4 ).

(For systems with optional receipt printer only).

If using Tokheim DPTs, contact GASBOY Technical Service for information.

Figure 12-4: Example of LO H;IC Command with Prompts

R* LO H;IC <RETURN>

Line number (0, 0X, 1X) ?

1 <RETURN>

Heading line?

CFN AUTOMATED SYSTEM <RETURN>

Line number (0, 0X, 1X) ? 2 <RETURN>

Heading line?

24 HR. FUELING <RETURN>

Line number (0, 0X, 1X) ? 11 <RETURN>

Footing line?

THANK YOU <RETURN>

Line number (0, 0X, 1X) ? 12 <RETURN>

Footing line?

PLEASE COME AGAIN <RETURN>

Line number (0, 0X, 1X) ? 0 <RETURN>

Form feed length?

5 <RETURN>

Line number (0, 0X, 1X) ?

<RETURN>

R*

Page 84 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

2 Type LO ME;IC to load into the system the broadcast messages for the reader terminal (

Figure

12-5

).

Starting with message 1, type the message number, the time in seconds to be displayed, and the text of the message (up to 20 characters). Continue for up to 10 lines (messages).

Note: If Tokheim DPTs are being used, contact GASBOY Technical Service for assistance.

Figure 12-5: Example of LO ME;IC Command with Prompts

R* LO ME;IC <RETURN>

Message number?

1 <RETURN>

Display time is seconds?

2 <RETURN>

Message to display?

WELCOME PATRONS <RETURN>

Message number?

<RETURN>

R*

Load Fuel Products, Pumps, Tanks, Prices, and Taxes

1 Type REM PRO;A to initialize all the product codes and clear any existing product information for fuel and non-fuel products (

Figure 12-6

).

Note: Use the ;A option at start-up only.

Figure 12-6: Example of REM PRO;A Command

R* REM PRO;A <RETURN>

R*

2 Type LO PRO;AC to load the system’s fuel product codes, categories, names, and pricing data

(

Figure 12-7 ).

Figure 12-7: Example of LO PRO;AC Command with Prompts

R* LO PRO;AC <RETURN>

Product code?

1 <RETURN>

Category?

1 <RETURN>

Product name?

Regular <RETURN>

Minimum price?

0 <RETURN>

Maximum price?

0 <RETURN>

Taxes?

0 <RETURN>

Product code?

<RETURN>

R*

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 85

Start-up Commands

3 Type LO IN;C to load inventory amounts and reorder levels for fuel products (

Figure 12-8 ).

Note: LO IN automatically enables inventory tracking. For more information on inventory tracking, see the Site Manager’s Manual.

Figure 12-8: Example of LO IN;C Command with Prompts

R* LO IN;C <RETURN>

Product?

1 <RETURN>

Quantity?

400 <RETURN>

Reorder level?

100 <RETURN>

R*

4 Type RE PU to reset the pumps to zero (

Figure 12-9

).

If you wish to set the quantity and dollar totalizers maintained by the Site Controller to the same settings as the mechanical totalizers on the pump, do a LO PU;C command (

Figure 12-

10 ).

Note: You may load up to five hoses per pump. When you enter the last hose for a particular pump, press RETURN at the next hose number prompt to get the next Pump Number prompt.

Figure 12-9: Example of RE PU Command with Prompt

R* RE PU <RETURN>

Verify (Y/N)?

Y <RETURN>

R*

Figure 12-10: Example of LO PU;C Command with Prompts

R* LO PU;C <RETURN>

Pump number?

1 <RETURN>

Hose number?

1 <RETURN>

Quantity?

5624.8 <RETURN>

$amount?

3217.95 <RETURN>

Hose number?

<RETURN>

Pump number?

2 <RETURN>

Hose number?

2 <RETURN>

Quantity?

2345.9 <RETURN>

$amount?

6789.10 <RETURN>

Hose number?

<RETURN>

Pump number?

<RETURN>

R*

Page 86 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

5 Type LO TA;C to load the system’s initial quantity, product code and reorder level for each tank (tank inventory) (

Figure 12-11 ).

Figure 12-11: Example of LO TA;C Command with Prompts

R* LO TA;C <RETURN>

Tank number?

1 <RETURN>

Quantity?

9325 <RETURN>

Product code?

1 <RETURN>

Reorder level?

2000 <RETURN>

Tank number?

<RETURN>

R*

6 Type LO F;C to load the pump number, hose number, product code, price code, and tank number (

Figure 12-12 ).

Note: If your site is using MPD’s, you can set them up all at once by typing an asterisk when prompted for the Pump number. For more details see the Site Manager’s Manual.

The LOad Fuel command automatically sets attribute 8 for that product. If you do not want it to be attribute 8, you must disable it. See the Site Manager’s Manual, EN PRO command.

Figure 12-12: Example of LO F;C Command with Prompts

R* LO F;C <RETURN>

Pump number?

2 <RETURN>

Hose number?

1 <RETURN>

Product code?

2 <RETURN>

Price code?

2 <RETURN>

Tank number?

2 <RETURN>

Hose number?

<RETURN>

Pump number?

<RETURN>

R*

7 Type LO CU;C to load the system’s fill limit and slow cutoff for each hose outlet (

Figure 12-

13 ).

Typing just the number is a quantity limit; preceding the number with a dollar sign is a dollar limit.

Figure 12-13: Example of LO CU;C Command with Prompts

R* LO CU;C <RETURN>

Pump number?

1 <RETURN>

Fill limit?

25 <RETURN>

Slow cutoff?

.500 <RETURN>

Pump number?

<RETURN>

R*

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 87

Start-up Commands

8 Type LO PR;IC to load the system’s fuel price codes and price levels (

Figure 12-14 ).

Figure 12-14: Example of LO PR;IC Command with Prompts

R* LO PR;IC <RETURN>

Price code?

1 <RETURN>

Price level?

0 <RETURN>

Price?

.899 <RETURN>

Price level?

<RETURN>

Price code?

<RETURN>

R*

9

Use the LO TAX command (if needed) to specify the names of tax accumulators ( Figure 12-

15 ).

Tax accumulators keep a running total of taxes collected in up to eight categories. Tax formulas are specified in system configuration or with the TAX command. Taxes are assigned to products with the LO PRO command and credited to the correct tax accumulator when a sale is made.

Figure 12-15: Example of LO TAX Command with Prompts

R* LO TAX <RETURN>

Tax #?

1 <RETURN>

Name?

Alc. Tx <RETURN>

R*

Card Lockout

Depending on whether the customer chose a negative or positive lockout file, do one of the following.

• for a negative lockout file, type U CA;A to validate all cards in the system (

Figure 12-16

)

• for a positive lockout file, type LOC CA;A to invalidate all cards in the system ( Figure 12-

17 )

Figure 12-16: Example of U CA;A Command

R* U CA;A <RETURN>

R*

Figure 12-17: Example of LOC CA;A Command

R* LOC CA;A <RETURN>

R*

Page 88 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

Card Authorizations, Limitations

1 Type LO A;IC to load the fuel codes allowed for each authorization number (

Figure 12-18 ).

For initial start-up, assign fuel codes to all authorization codes, beginning with code 1 and continuing through code 99. While up to 99 codes are possible, most systems use much less; the default is 20.

See the Site Manager’s Manual for an explanation of authorization for non-fuel products.

Figure 12-18: Example of LO A;IC Command with Prompts

R* LO A;IC <RETURN>

Auth # ?

1 <RETURN>

Product code?

1 <RETURN>

Product code?

2 <RETURN>

Product code?

<RETURN>

Auth # ?

2 <RETURN>

Product code?

3 <RETURN>

Product code?

<RETURN>

Auth # ?

<RETURN>

R*

2 Type LO LI;IC to assign the maximum fuel quantities to be used in limitation codes (

Figure

12-19 ).

For initial start-up, assign quantities to all codes, beginning with code 0 and continuing through code 99. While up to 99 codes are possible, most systems use much less. The default is 20.

Note: If the number in LIMIT? is preceded by a dollar sign, the value is in dollars ($20 in the first example). If the LIMIT? is typed alone, the value is assumed to be gallons (25 gallons in the second example).

Figure 12-19: Example of LO LI;IC Command with Prompts

R* LO LI;IC <RETURN>

Limitation code?

1 <RETURN>

Limit?

$20 <RETURN>

Limitation code?

2 <RETURN>

Limit?

25 <RETURN>

Limitation code?

<RETURN>

R*

3 Use the LO CR;IC command to load any cron commands (

Figure 12-20 ).

Cron commands instruct the Site Controller III to execute commands or recorded files at a specified time or when certain events (such as a system crash) occur. Some cron commands may already be loaded. If you wish to keep them, do not use the ;I option. Cron commands are discussed fully in the Site Manager’s Manual.

Note: CRASH.CMD and SWEEPER.CMD are automatically loaded by the AUTOEXEC. A backup of the system must be present as SYSBACK.DTA on the root directory.

SYSBACK is discussed further later in this section.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 89

Start-up Commands

Figure 12-20: Example of LO CR;IC Command with Prompts

R* LO CR;IC <RETURN>

Command number?

1 <RETURN>

Command?

! CRASH <RETURN>

Command number?

<RETURN>

R*

4 If you are dialing out to a Network Controller, Site Controller III or remote host, type LO PH to load the phone number (

Figure 12-21 ).

The system prompts MAIN or BACKUP; type M (or 1) or B (or 2) . If you are typing more than two phone numbers (the Site Controller III can store up to six), type a number from 3 to 6

(3 and 4 store bank host phone numbers, 5 and 6 store auxiliary phone numbers). You will then be prompted for the phone numbers. If you are typing more than the two CFN host phone numbers, see the Site Manager’s Manual and the applicable Credit and Debit Card Networks

Manual for more information.

Figure 12-21: Example of LO PH Command with Prompts

R* LO PH <RETURN>

Main (m) or Backup (b)?

M <RETURN>

Phone number?

456-7890 <RETURN>

R*

Load Merchandise/Departments, Prices, Inventory

1 Type LO PRO;AC to load the system’s merchandise product codes, categories, names, and pricing data (

Figure 12-22 ).

Figure 12-22: Example of LO PRO;AC Command with Prompts

R* LO PRO;AC <RETURN>

Product code?

3 <RETURN>

Category?

3 <RETURN>

Product name?

Soda <RETURN>

Minimum price?

.01 <RETURN>

Maximum price?

1.55 <RETURN>

Taxes?

0 <RETURN>

Product code?

<RETURN>

R*

2 Type LO IN;C to load inventory amounts and reorder levels for merchandise products (

Figure

12-23 ).

Note: LO IN automatically enables inventory tracking. For more information on inventory tracking, see the Site Manager’s Manual.

Page 90 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

Figure 12-23: Example of LO IN;C Command with Prompts

R* LO IN;C <RETURN>

Product?

1 <RETURN>

Quantity?

400 <RETURN>

Reorder level?

100 <RETURN>

R*

3

Type LO PLU;C to assign prices or price codes to products ( Figure 12-24 ). See the Site

Manager’s Manual for details on the type of information defined here.

Figure 12-24: Example of LO PLU;C Command with Prompts

R* LO PLU;C <RETURN>

Product?

1 <RETURN>

Price?

1.05 <RETURN>

Product?

2 <RETURN>

Price?

1.50 <RETURN>

Product?

<RETURN>

R*

4 Use the E PRO command to set product attributes (

Figure 12-25 ). See the Site Manager’s

Manual or the Pocket Reference for a list of product attributes.

Note: The LOad Fuel command automatically sets attribute 8 for that product. If you do not want it to be attribute 8, you must disable it. See the Site Manager’s Manual, EN PRO command.

Figure 12-25: Example of E PRO Command with Prompts

R* E PRO <RETURN>

Product code?

11 <RETURN>

Type?

4 <RETURN>

R*

Enable Devices

1 Type E PC;I to enable the pump control unit (

Figure 12-26

).

Figure 12-26: Example of E PC;I Command

R* E PC;I <RETURN>

R*

2 Type E PU;I to enable all the pumps (

Figure 12-27 ).

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 91

Start-up Commands

Figure 12-27: Example of E PU;I Command

R* E PU;I <RETURN>

R*

3 Type E RE;I to enable the readers (

Figure 12-28 ).

Figure 12-28: Example of E RE;I Command

R* E RE;I <RETURN>

R*

4 Type E CO;I to enable the console (

Figure 12-29 ).

Figure 12-29: Example of E CO;I Command

R* E CO;I <RETURN>

R*

Cash Drawer, Shifts

1 Type RE TO;A (

Figure 12-30

).

This resets the daily and cumulative totals to zero and automatically loads shift one.

If using the Shift Change package, use NEXTDAY command.

Figure 12-30: Example of RE TO;A Command with Prompt

R* RE TO;A <RETURN>

Verify (Y/N)?

Y

R*

2 If the site has a cash drawer, type LO DR to enter the initial amount of cash in the drawer

(

Figure 12-31 ).

If using the Shift Change package, use LDDRAWER command.

Figure 12-31: Example of LO DR Command with Prompts

R* LO DR <RETURN>

Drawer number?

1

$ Amount?

150.00 <RETURN>

R*

Page 92 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

3

If you wish to load a shift other than shift one, type LO SH to load the current shift ( Figure 12-

32 ).

Type the shift number at the prompt.

If using the Shift Change package, use NEXTDAY command to load the first shift.

Figure 12-32: Example of LO SH Command with Prompt

R* LO SH <RETURN>

Shift number?

1 <RETURN>

R*

Optional Features

1

If you use the allocation feature, type REM AL;A to initialize the totalizer file ( Figure 12-33 ).

This erases the entire file and frees all cards from allocation.

Figure 12-33: Example of REM AL;A Command

R* REM AL;A <RETURN>

R*

2 Type LO AL;C to assign allocation amounts to allocation numbers (

Figure 12-34 ).

Note: If the number in AMOUNT? is preceded by a dollar sign, the value is in dollars ($250 allocation in the first example). If the AMOUNT? is typed alone, the value is assumed to be gallons (120 gallons in the second example).

Figure 12-34: Example of LO AL;C Command with Prompts

R* LO AL;C <RETURN>

Allocation no.?

123 <RETURN>

Amount?

$250.00

Allocation no.?

300-310 <RETURN>

Amount?

120.00

Allocation no.?

<RETURN>

R*

3 If you use the MPG option, type LO V;IC to clear the vehicle file and load vehicles and odometer readings (

Figure 12-35 ).

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 93

Start-up Commands

Figure 12-35: Example of LO V;IC Command with Prompts

R* LO V;IC <RETURN>

Vehicle number?

100 <RETURN>

Odometer reading?

22954 <RETURN>

Vehicle number?

<RETURN>

R*

Reset Transaction File

The following command sequence enables you to reset and initialize the transaction file

(

Figure 12-36 ).

The command sequence is explained in

Explanation of Commands below.

CAUTION

This command procedure should only be done at start-up.

Figure 12-36: Example of Reset Transaction File Command Sequence

R* FIX TR;I <RETURN>

Verify (y/n)?

y <RETURN>

R* RE TR;A <RETURN>

Verify (y/n)?

y <RETURN>

R* RE TR;I <RETURN>

Verify (y/n)?

y <RETURN>

R* RE TR 0 <RETURN>

R* RE TR 1 <RETURN>

Verify (y/n)?

y <RETURN>

R*

Explanation of Commands

FIX TR;I

RE TR;A

RE TR:I

LO TR 0

RE TR 1

Resets the transaction file and sets all transaction numbers to -1. Use this command only at start-up as it is irreversible; all stored transactions will be made unreadable. Answer yes, y, to the VERIFY prompt and press RETURN.

Resets all transaction file pointers.

Clears any temporary or transaction in progress files.

Loads a new transaction number of 0 (zero).

Resets the transaction pointer to begin at transaction 1.

Page 94 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

Diagnostics and History

1 Type RE DI;I to set the diagnostic error totals to zero (

Figure 12-37 ).

Figure 12-37: Example of RE DI;I Command

R* RE DI;I <RETURN>

R*

2 Type E HI;I to enable history recording (

Figure 12-38 ).

This is initialized when you receive the system, but it will contain every command you just performed. Enabling it here lets you start-up the history with a clean slate.

Figure 12-38: Example of E HI;I Command

R* E HI;I <RETURN>

R*

3 Type RUN;I to start the site (

Figure 12-39 ).

Figure 12-39: Example of RUN;I Command with Prompt

R* RUN;I <RETURN>

Verify (y/n)?

y

R*

4

Type P DI ( Figure 12-40 ).

This prints diagnostics so you can verify that the system is okay.

Figure 12-40: Example of P DI Command

R* P DI <RETURN>

R*

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 95

Start-up Commands

Verification and Backup

1 Verify all data is loaded correctly by using the following commands. If any information displayed is not correct, return to the appropriate step and reload it.

P SIG

P DA

P H

P ME

P PRO

P TA

P PU

P PR

P SA;I 0

P LO

P A

P LI

P CR

P PH

P PRO; A

P DR

P AL

P V

VARIABLE

2 Make backups.

Verify that all users are loaded and their permission level; sign-on codes will not be printed.

Verify correct date and time.

Verify that receipt heading and footing are correct.

Verify the broadcast messages are correct.

Verify the product/department codes have the correct category, name, minimum and maximum price, and tax code. Verify the inventory (if loaded) is correct and the PLU price

(if loaded) is correct.

Verify the tank quantity, product code, and reorder level are correct.

Verify the pump price code, product code, and tank are assigned to the correct pump.

Verify the quantity and dollar totalizers are correct. Verify that the Limit and Slow are set correctly.

Verify all price levels and price are correct.

Verify all the tax code names are correct.

Verify the lockout is set up correctly (all cards valid or invalid).

Verify the authorization codes have the correct product codes assigned.

Verify the limitation codes have the correct limits.

Verify the cron entries are correct.

Verify remote authorization phone numbers are correct.

Verify the product attributes are correct.

Verify the current shift and balance for each drawer are correct.

Note: If site is using the Shift Change package, balance and shift number may not verify.

Use VARIABLE command (see below) to verify shift parameters.

Verify all allocation totalizers are loaded and are correct.

Verify all vehicles are loaded and odometers are correct.

Verify all parameters for the Shift Change Package are set up correctly.

Site Data

Type SYSBACK and press ENTER.

The backup will take a few minutes. The data tables being backed up are shown on the terminal.

Page 96 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

Release, Applications, and System Data

Note: Before trying this procedure, check the Site Manager’s Manual for the latest backup routines and commands.

1 Have available several (minimum 4) blank formatted (high capacity) diskettes.

2 Type HARDBACK and press ENTER.

(You must run SYSBACK before running HARDBACK).

3 Follow the prompts to insert and label diskettes.

4 Store backups in a safe place!

Standalone Profit Point Setup

Because a demo MASTER.PLU file exists on the Profit Point, you must delete or rename this file before loading department and item information.

1 To do this, access the Main Menu by turning the Manager’s key to MGR position, sign on (if required), press SPEC FUNC, 0 and ENTER.

The Main Menu displays.

2 Press 0 and ENTER.

The DOS prompt (C:\POS>) displays.

3 To delete the MASTER.PLU file, type DEL MASTER.PLU and ENTER.

~ OR ~

To rename the file, type REN MASTER.PLU and the new name of the file and press ENTER.

4 Type menu 2 and press ENTER.

5 Press 0 and ENTER.

The Main Menu displays.

To return to POS mode, select 1 on the Main Menu and press ENTER.

6 Execute special function 37.

It may be necessary to sign on as a user with a higher permission level.

This command copies the site configuration (pumps, products, prices, etc.) and department information (price, name, floor and ceiling prices, price override, etc.) to the Profit Point’s

MASTER.PLU file. Once this is done, you will have to load additional information into the

Profit Point. Use the forms from the

Site Information section to help you define your data and

refer to MDE-4356 Profit Point Reference Manual for detailed instructions.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 97

Start-up Commands

SC III/POS WS Setup

Because a demo MASTER.PLU file exists on the SC III/POS WS, you must delete or rename this file before loading department and item information.

1 To do this, access the Main Menu by turning the Manager’s key to MGR position, sign on (if required), press SPEC FUNC, 0 and ENTER.

The Main Menu displays.

2 Press 0 and ENTER.

The NT desktop displays.

3 Click on Start with the right mouse button. From the menu, click on Explore. Find the POS directory on the left side of the window and click on it. Find MASTER.PLU on the right side of the window and click on it once.

4 To delete the MASTER.PLU file, press the DEL key.

When prompted to confirm, click Yes.

~ OR ~

To rename the file, click on the file in the upper lefthand corner of the window.

From the menu, select Rename.

Type the new name of the file and press ENTER.

Close the Explorer window

5 Double-click the Profit Point icon.

A prompt saying that the master PLU file is missing will be displayed.

6 Type Y and press CLEAR MENU when prompted.

Another prompt will display saying the program was unable to open the PLU file.

7 Press ENTER.

8 Select item 2 from the Main Menu and press ENTER.

The prompt Create new PLU file MASTER.PLU (Y,N)? displays.

9 Press Y and ENTER.

You will be prompted to enter the maximum file size.

10 Enter a number between 110 and 60,000 and press ENTER.

After a new MASTER.PLU file is created, press any key to continue.

The PLU Maintenance menu displays.

11 Press 0 and ENTER.

The Main Menu displays.

To return to POS mode, select 1 on the Main Menu and press ENTER.

12 Execute special function 37.

It may be necessary to sign on as a user with a higher permission level.

Page 98 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Start-up Commands

This command copies the site configuration (pumps, products, prices, etc.) and department information (price, name, floor and ceiling prices, price override, etc.) to the Profit Point’s

MASTER.PLU file. Once this is done, you will have to load additional information into the

Profit Point. Use the forms from the

Site Information

section to help you define your data; refer to MDE-4356 Profit Point Reference Manual for detailed instructions.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 99

Start-up Commands

Page 100 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Customer Training

13 – Customer Training

q

Identify for the terminal operator, the different icons and the task bar on the NT desktop. Explain how to use the Start button or icons to start programs. Explain how to minimize a running program window, how to restore it from the task bar and how to close it. Explain how to use the NT explorer to copy, rename, and delete files.

Explain how to shut down the PC. Show the site manager how to log on to NT as the system adminstrator.

q

Explain to the terminal operator how to open the SC III terminal session and how to minimize it. Explain the importance of how to leave the SC III session running in background. Explain how the PC/remote terminal responds to all commands. Review the Site Manager’s Manual and all relevant commands. Have the terminal operator perform the commands.

q

Explain the importance and show how and when to use the backup commands.

q

Refer the user to the PC, monitor, remote terminal, and printer manuals for any periodic maintenance. Also review the data terminal switches, buttons, and LED’s for proper settings and indications.

q

Show the site manager and terminal operator how to dispense product by initiating transactions with the customer’s cards at the island card reader unit on the fuel island. If the customer’s cards are not available, use the test cards provided with the system.

q

For systems with a CheckPoint console, demonstrate the following both with and without a network: q

Fuel only sale, cash, credit q

Merchandise only sale, cash, credit q

Combined fuel/merchandise, cash, credit q

Move merchandise q

Safedrops, reversals, view sale, void item/ticket q

Change fuel prices from SC III q

Change PLU prices from SC III q

Shift break

Refer to the CheckPoint and Site Manager’s Manuals for detailed information.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 101

Customer Training q

For systems with a Profit Point console, demonstrate the following both with and without a network: q for SC III/POS WS, open a Profit Point session and switching back and forth between Profit Point and SC III.

q

Fuel only, cash, credit q

Merchandise only, cash, credit q

Combined fuel/merchandise, cash, credit q

Scanned item not on file q

Add item, add fuel q

Off hook, active payable pump menus, working sale, new merchandise q

Size (modifier keys), PLU key q

Change fuel prices from SC III q

Change PLU, UPC prices from Profit Point q

Shift break q

For systems with a receipt printer, demonstrate procedures for changing the receipt paper, the ribbon and the self-test mode of operation as explained in the

Star Receipt Printer Manual.

10. SYSTEM APPROVALS

Note any remarks or comments from the customer in the space provided.

Have a responsible contact person sign the Start-up form and sign it yourself. This indicates that the system has been accepted by the customer and the installation is approved by you.

q

Demonstrate how to clean the reader at the island card reader unit.

Magnetic Card Reader

1. Use the GASBOY cleaning card. Order GASBOY P/N C08757 for a box of 50 cleaning cards.

2. Slide the cleaning card through several times.

3. Turn the card around and slide it through several times. By turning the card around, you will use the entire cleaning area.

4. Clean the card reader at least once a week. The frequency of cleaning required depends on the environment the system is in and how heavily it is used. Failure to clean the card reader regularly could result in premature failure.

Optical Card Reader

1. Wrap a lint free cloth around an access card.

Do not use paper. It may tear and cause read errors.

2. Insert the card lengthwise and move it from side to side.

Page 102 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Customer Training q

Demonstrate how to clean the disk drive using the GASBOY disk cleaning kit

(P/N C01770) GASBOY recommends that you clean your disk drive at least once a week, although more frequent cleaning may be necessary in high dirt or dust areas.

1. Remove the contents of the disk cleaning kit from the box.

The drive cleaning kit, if used as directed, will last one year.

2. Since the disk drive on the Site Controller III is a dual-sided drive, remove the pressure arm on the cleaning diskette by bending it back until it snaps off.

CAUTION

Once the pressure arm has been removed, do not use this cleaning kit for a single-sided drive.

3. Open the bottle of cleaning fluid and fully saturate the area exposed in each of the two large cutouts.

4. Insert the cleaning diskette into the drive with the number of uses label facing up.

5. At the PC, type DIR A: and press ENTER.

6. Sign on to the SC III and type SYS and press ENTER.

You will hear the drive activate.

Wait 20 to 30 seconds.

It may be necessary to run the DIR A: command again.

7. After 20 to 30 seconds, type exit and press RETURN.

This deactivates the drive and completes the cleaning process.

8. After the disk drive access light goes off, remove the diskette and check off a box on the usage label.

After the recommended number of uses, or if the diskette becomes discolored, discard the diskette.

q

For systems with Fuel Point, demonstrate the following: q

Using the Programmer to program, read, and calibrate a VM q

Using the Master Authorizer to authorize a sale q

Using the VM to authorize a sale q

How to suspend and resume Fuel Point transactions

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 103

Customer Training

Page 104 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Finish Start-up

14 – Finish Start-up

1 Be sure customer has current backup copies of all SC III release media (CD and disks) and stored in a safe place. As an ASR, you may wish to make copies for yourself. Also make sure all disks and CD’s that were supplied with the SC III PC are stored in a safe place.

2 Answer questions and/or demonstrate the optional commands or devices such as: user and cron commands, disable and enable commands, the diagnostic commands, the system override switches, and modem polling procedure (including modem phone number, baud rate, and password).

3 Close and secure all doors for the pump control unit(s) and island card reader(s).

4 Lock out the test cards.

5 Generate a printout showing a few transactions with quantity, pump fuel assignments, limitation codes, authorization codes, and pulse rates. Use the commands P DA, P TR, P PU,

P A, P LI, P DI, P PR, P PRO, and STATUS. Also generate a printout showing any configuration changes that were made. Include these printouts with the Start-up form.

11. CUSTOMER KNOWLEDGE

Briefly describe the customer’s understanding of the CFN Series System. Write in the amount of time spent on training and who was trained.

Check to see that the test cards are locked out (Step 5) and indicate the name of the person with whom the test cards were left.

Indicate whether backups of the system and any configuration changes were made.

Fill in any remarks you may have regarding the start-up or the system. Use additional sheets if necessary and staple to form. Be sure to include any configuration changes that you may have done at start-up.

12. ATTACH PRINTOUTS

Generate printouts using the commands noted (Step 5) and attach to the Start-Up Form.

13. PARTS USED

Any defective parts resulting from a start-up should be returned with a completed GASBOY Warranty

Service Report (WSR). Follow directions on the form.

14. SITE LAYOUT

Sketch a layout of the site. Be sure to include the location of the system, hose outlets, data terminals, external modems, circuit breakers and distances between units.

Check off the appropriate box for Start-up Complete, Start-Up Incomplete, and fill in the number for

Number of Start-Up Attempts.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page 105

Finish Start-up

6 Turn over the keys and test cards for the system, and the socket bit for the island card reader to the person in charge of the site.

Date/Time of Departure: Fill in date and time of departure in Section 1 of Start-up Form.

Make a copy of the Start-up form for your records, and send the form and the printout from Step 5 above to:

Gasboy

Technical Service Department

7300 West Friendly Avenue

Greensboro, North Carolina 27420

IMPORTANT

If the Startup Form is not filled out completely, it will be returned to you for completion.

Page 106 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

Gasboy Motor Fuel Management System

CFN System Start-up Form

1. SITE IDENTIFICATION

Customer: DJP Trucking

Contact: Dave Christopher

Customer Phone: 215-555-1111

Site Location: 10 Christine St.

Lansdale, PA 19446

Electrician: Watts Happnin

Date/Time of Arrival: 6-28-05 8:37 a.m.

Date/Time of Departure: 6-28-05 5:15 p.m.

Distributor: ABC Fuels /Phone: 215-222-5555

Installer: Dun Good /Phone: 215-222-5555

Start-up Person: Arthur Ized Repp

Co. Name: Gasboy /Phone: 336-547-5000

2. SYSTEM IDENTIFICATION Site #: 1001

Mark applicable devices: q

SC II/lsl q

Profit Point q

Fuel Point q

SC III q

SC III/POS WS

SC II/

Islander CPU

UNIT SERIAL # CPU PROGRAM VERSION # CPU PROGRAM VERSION NAME DEBUG VERSION (SC II ONLY)

SC III 123456 3.0 1.0 1.0A

SERIAL # SC III VERSION # SC III I/F VERSION DSC3 (DEBUG) VERSION

Unit Serial #: Program Version NOTE:

PCU 1 67890

PumpX.Hex 4.0A

PCU 2

PCU 3

PCU 4

Unit Serial #: Program Version Rec. Prt Ped. PCU Car Wash Gate

ICR 1 12345

STAR.GATE 4.2K

Y/N Y/N Y/N Y/N

ICR 2 Y/N Y/N Y/N Y/N

ICR 3 Y/N Y/N Y/N Y/N

ICR 4 Y/N Y/N Y/N Y/N

Unit Serial #: Program Vers. Serial #: Program Vers.

Profit Point 1: 65432

Profit Point 3.5

Profit Point 2:

Current Loop Driver 1: Current Loop Driver 2:

Fuel Point 1: Fuel Point 2:

Standalone Receipt Printer Serial #: PIN Pad Serial #:

Circle One Program Vers.

PC Pump Interface: Gilbarco/Tokheim/Wayne

PC Reader Interface: Gilbarco/Tokheim/Wayne

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page S-Form-1

Gasboy Motor Fuel Management System

Gasboy PC Polling Packages Only

PC SOFTWARE (Write software version) PC/Comm PC/Fuel PC/Fleet PC/Invoicing

PC Mfr. and Model: DOS Version:

3. SYSTEM DESCRIPTION

2

3

4

PUMP # HOSE #

1 1

2

3

4

FUEL

TYPE

UNL

SUNL

PUNL

DIES

02

03

04

FUEL

CODE

01

PUMP

MFR.

GASBOY

GASBOY

GASBOY

GASBOY

MODEL # SERIAL # RESET

9152 345670 TOK

9152

9152

9152

891010

213140

151610

TOK

TOK

TOK

TYPE

SUC/SUB

SUC

SUC

SUC

SUC

$

$

$

TYPE

PULSER

$

PULSER

RATE

1O:1

1O:1

1O:1

1O:1

N

N

N

STARTER

RELAY

(Y/N)

N

Note: If additional space is needed, photocopy this page and attach.

4. COMMUNICATIONS

Data Terminal/Logger/Logger Eliminator

(CIRCLE)

: Link CRT Port: 4 Port # Baud Rate

Short Haul Modem: N/A 4 9600

Phone Modem: Hayes Port: 5 1200

Modem Phone #: ( 215 ) 555-5555

Network Name: N/A Port:

COM1

COM2

Loop 1 2 wire/4 wire

Loop 2 2 wire/4 wire

Page S-Form-2 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

5. BREAKER NUMBERS

Hose Brkr # Hose Brkr # Hose Brkr # Hose Brkr #

Power conditioner: N/A 1. 2 9. 17. 25.

AC Surge Protector: 1 2. 2 10. 18. 26.

Islander: N/A 3. 3 11. 19. 27.

PCU(s): 1 4. 3 12. 20. 28.

ICR(s): 1 5. 13. 21. 29.

FPR(s): 6. 14. 22. 30.

7. 15. 23. 31.

What components are on power conditioner? 8. 16. 24. 32.

N/A

What components are on AC surge protector?

SCIII, logger, modem, monitor Are all Gasboy components on same breaker? Y/N

6. SYSTEM ENVIRONMENT

Site Controller/Islander: inside office, air-conditioned

Console: inside office, air-conditioned

PCU(s): back room off of office

ICR(s): on island

Profit Point(s): N/A

FPRs: N/A

7. CONDUIT

All Metal Conduit? Y/N AC and DC in Separate Conduit? Y/N Wiring Neatness: Good/Fair/Bad

Is shielded cable (as specified in the Installation Manual) used? Y/N

If you answered NO to the above questions, contact Gasboy before proceeding.

8. SYSTEM POWER

Power Conditioner: Hot to Neutral N/A VAC Hot to Ground N/A VAC Neutral to Ground N/A VAC

AC Surge Protector: Hot to Neutral 120 VAC Hot to Ground 120 VAC Neutral to Ground 0 VAC

Islander: Hot to Neutral N/A VAC Hot to Ground N/A VAC Neutral to Ground N/A VAC

PCU(s): Hot to Neutral 120 VAC Hot to Ground 120 VAC Neutral to Ground 0 VAC

ICR(s): Hot to Neutral 120 VAC Hot to Ground 120 VAC Neutral to Ground 0 VAC

FPR(s): Hot to Neutral N/A VAC Hot to Ground - VAC Neutral to Ground - VAC

Grounding method: neutral and ground bus bars bonded to single ground rod

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page S-Form-3

Gasboy Motor Fuel Management System

9. DC POWER

Site Controller/Islander: +5 VDC N/A +12 VDC N/A -12 VDC N/A

PCU(s): +5 VDC 5.00 +12 VDC 11.98

ICR(s): +5 VDC 5.01 +12 VDC 11.99

Current Loop Interface: +5 VDC +12 VDC -12 VDC

Consoles: +5 VDC 5.00 +12 VDC 12.05 -12 VDC 12.00 +9 VDC 9.00

FPR(s): +5 VDC

10. SYSTEM APPROVALS

Customer Comments:

I am satisfied with the installation of the Gasboy Site Manager: Dave Christopher Date: 2-9-05

CFN System and have been trained in its use and Start-up Tech: Arthur Ized Repp Date: 2-9-05 operation.

11. CUSTOMER KNOWLEDGE

Time Spent on Training: 4 hours Names of People Trained: Dave Christopher, Christine Tabby

Were test cards locked out? Y/N Who were test cards left with? Dave Christopher

Was backup copy made of system and any configuration changes? Y/N

Remarks:

(Use additional sheets if necessary)

12. ATTACH PRINTOUTS

Generate and attach printout showing a few transactions with quantity, pump fuel assignments, limitation codes, authorization codes, and pulse rates. Use the commands PR DA, PR TR, PR PU,

PR AU, PR LIM, PR DI, PR PRI, PR PRO, and STATUS.

13. PARTS USED

Return defective parts with completed Gasboy Service Report. Please return white, yellow, and pink copies of report in box with parts

Page S-Form-4 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

14. SITE LAYOUT

(include wiring distances)

Breakers

Back

Room

PCU

Logger

SCIII

Monitor &

Keypad

Console

Office

75 feet

1

2

ICR

3

4 q Start-up Complete q Start-up Incomplete Number of Start-up Attempts: 1

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page S-Form-5

Gasboy Motor Fuel Management System

Page S-Form-6 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

Gasboy Motor Fuel Management System

CFN System Start-up Form

1. SITE IDENTIFICATION

Customer:

Contact:

Customer Phone:

Site Location:

Electrician:

Date/Time of Arrival:

Date/Time of Departure:

Distributor: /Phone:

Installer: /Phone:

Start-up Person:

Co. Name: /Phone:

2. SYSTEM IDENTIFICATION Site #:

Mark applicable devices: q

SC II/lsl q

Profit Point q

Fuel Point q

SC III q

SC III/POS WS

SC II/

Islander CPU

UNIT SERIAL # CPU PROGRAM VERSION # CPU PROGRAM VERSION NAME DEBUG VERSION (SC II ONLY)

SC III

SERIAL # SC III VERSION # SC III I/F VERSION DSC3 (DEBUG) VERSION

Unit Serial #: Program Version NOTE:

PCU 1

PCU 2

PCU 3

PCU 4

Unit Serial #: Program Version Rec. Prt Ped. PCU Car Wash Gate

ICR 1 Y/N Y/N Y/N Y/N

ICR 2 Y/N Y/N Y/N Y/N

ICR 3 Y/N Y/N Y/N Y/N

ICR 4 Y/N Y/N Y/N Y/N

Unit Serial #: Program Vers. Serial #: Program Vers.

Profit Point 1: Profit Point 2:

Current Loop Driver 1: Current Loop Driver 2:

Fuel Point 1: Fuel Point 2:

Standalone Receipt Printer Serial #: PIN Pad Serial #:

Circle One Program Vers.

PC Pump Interface: Gilbarco/Tokheim/Wayne

PC Reader Interface: Gilbarco/Tokheim/Wayne

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Form-1

Gasboy Motor Fuel Management System

Gasboy PC Polling Packages Only

PC SOFTWARE (Write software version) PC/Comm PC/Fuel PC/Fleet PC/Invoicing

PC Mfr. and Model: DOS Version:

3. SYSTEM DESCRIPTION

PUMP # HOSE #

FUEL

TYPE

FUEL

CODE

PUMP

MFR.

MODEL # SERIAL # RESET

TYPE

SUC/SUB

TYPE

PULSER

PULSER

RATE

STARTER

RELAY

(Y/N)

Note: If additional space is needed, photocopy this page and attach.

4. COMMUNICATIONS

Data Terminal/Logger/Logger Eliminator

(CIRCLE)

: Port: Port # Baud Rate

Short Haul Modem:

Phone Modem: Port:

Modem Phone #: ( )

Network Name: Port:

COM1

COM2

Loop 1 2 wire/4 wire

Loop 2 2 wire/4 wire

Page Form-2 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

5. BREAKER NUMBERS

Hose Brkr # Hose Brkr # Hose Brkr # Hose Brkr #

Power conditioner: 1. 9. 17. 25.

AC Surge Protector: 2. 10. 18. 26.

Islander: 3. 11. 19. 27.

PCU(s): 4. 12. 20. 28.

ICR(s): 5. 13. 21. 29.

FPR(s): 6. 14. 22. 30.

7. 15. 23. 31.

What components are on power conditioner? 8. 16. 24. 32.

What components are on AC surge protector?

Are all Gasboy components on same breaker? Y/N

6. SYSTEM ENVIRONMENT

Site Controller/Islander:

Console:

PCU(s):

ICR(s):

Profit Point(s):

FPRs:

7. CONDUIT

All Metal Conduit? Y/N AC and DC in Separate Conduit? Y/N Wiring Neatness: Good/Fair/Bad

Is shielded cable (as specified in the Installation Manual) used? Y/N

If you answered NO to the above questions, contact Gasboy before proceeding.

8. SYSTEM POWER

Power Conditioner: Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

AC Surge Protector: Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

Islander: Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

PCU(s): Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

ICR(s): Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

FPR(s): Hot to Neutral VAC Hot to Ground VAC Neutral to Ground VAC

Grounding method:

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Form-3

Gasboy Motor Fuel Management System

9. DC POWER

Site Controller/Islander: +5 VDC +12 VDC -12 VDC

PCU(s): +5 VDC +12 VDC

ICR(s): +5 VDC +12 VDC

Current Loop Interface: +5 VDC +12 VDC -12 VDC

Consoles: +5 VDC +12 VDC -12 VDC +9 VDC

FPR(s): +5 VDC

10. SYSTEM APPROVALS

Customer Comments:

I am satisfied with the installation of the Gasboy Site Manager: Date:

CFN System and have been trained in its use and Start-up Tech: Date: operation.

11. CUSTOMER KNOWLEDGE

Time Spent on Training: Names of People Trained:

Were test cards locked out? Y/N Who were test cards left with?

Was backup copy made of system and any configuration changes? Y/N

Remarks:

(Use additional sheets if necessary)

12. ATTACH PRINTOUTS

Generate and attach printout showing a few transactions with quantity, pump fuel assignments, limitation codes, authorization codes, and pulse rates. Use the commands PR DA, PR TR, PR PU,

PR AU, PR LIM, PR DI, PR PRI, PR PRO, and STATUS.

13. PARTS USED

Return defective parts with completed Gasboy Service Report. Please return white, yellow, and pink copies of report in box with parts

Page Form-4 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Gasboy Motor Fuel Management System

14. SITE LAYOUT

(include wiring distances) q Start-up Complete q Start-up Incomplete Number of Start-up Attempts:

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Form-5

Gasboy Motor Fuel Management System

Page Form-6 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Warranty

Warranty

General Statements:

Gasboy International LLC. warrants all new equipment manufactured by Gasboy against defective material and/or workmanship, for the warranty period specified below, when the equipment is installed in accordance with specifications prepared by Gasboy. This warranty does not cover damage caused by accident, abuse, Acts of God, lack of surveillance of automatic recording systems, negligence, mis-application, faulty installation, improper or unauthorized maintenance, installation or use in violation of product manuals, instructions, or warnings. Under no circumstance shall Gasboy be liable for any indirect, special, or consequential damages, losses, or expenses to include, but not limited to, loss of product, loss of profits, litigation fees, or the use, or inability to use, our product for any for any purpose whatsoever.

Parts Only - During the warranty period, Gasboy will, at its option, repair or replace defective parts returned transportation prepaid to its factory.

On-Site Labor Included - Gasboy will also provide, within the Continental United States and during the warranty period, the services of an Authorized Service

Representative (ASR) for on-site repair or replacement of defective parts.

Replacement Parts - Any system components that are not part of the original system order, including Island Card Readers, Pump Control Units, etc., are considered replacement parts.

Equipment

Commercial Pumps and Dispensers

Full-Cabinet Consumer Pumps

Small Transfer Pumps,

Meters,Pressure Regulators

Keytrol

Term

One year from date of installation or 18 months from date of

Gasboy International’s invoice to the purchaser, whichever comes first.

One year from date of installation or 18 months from date of

Gasboy International’s invoice to the purchaser, whichever comes first.- Excepting the Model 2020 Hand Pump, which has a 90-day warranty from date of GASBOY International’s invoice.

One year from date of installation or 18 months from date of

Gasboy International’s invoice to the purchaser, whichever comes first.

One year from date of start-up or 15 months from date of

Gasboy International’s invoice to the purchaser, whichever comes first.- The basic warranty only applies to systems which have been started up by a Gasboy Authorized Service

Representative (ASR).

Coverage

Parts and Labor.

Parts Only.

Parts and Labor.

Fuel Management Systems:

- CFN/ Profit Point

- Series 1000/Fleetkey

- TopKAT

- Fuel Point Readers

(sold with new systems)

Additional Fuel Point Items:

- Fuel Point Readers sold for retrofitting existing systems

- Fuel Point vehicle and dispenser components

Encoders, Embossers, Modems,

CRTs, and Logger Printers

One year from date of start-up or 15 months from date of

Gasboy International’s invoice to the purchaser, whichever comes first.

Parts and Labor.

Parts Only.

Purchased with Fuel Management System (Encoders,

Embossers only): 90 days from the date of start-up by a

Gasboy ASR, or 180 days from date of Gasboy

International’s invoice, whichever occurs first.

Purchased with Fuel Management System(Modems, CRTs, and Logger Printers only): Matches system warranty.

Purchased with System

(Encoders, Embossers only):Parts only.

Purchased with System (Modems,

CRTs, Logger Printers only):

Matches system warranty.

Purchased Separately:Parts Only.

Air Diaphragm Pumps

Purchased Separately: 90 days from date of Gasboy

International’s invoice to the purchaser.

Three years from date of purchase (for full warranty description, see Price List).

Parts Only.

Items not manufactured by Gasboy

(ex. automatic nozzles, hoses, swivels, etc.)

Replacement Parts

Not warranted by Gasboy International (consult original manufacturer’s warranty).

Not Applicable.

One year from date of Gasboy International’s invoice to the purchaser.

Parts Only.

To the extent permitted by law, this warranty is made in lieu of all other warranties, expressed or implied, including warranties of freedom from patent infringement, or merchantability, or fitness for a particular purpose, or arising from a course of dealing or usage of trade. No one is authorized to vary the terms of the warranty nor may anyone make any warranty of representation, or assume any liability other than that herein stated, in connection with the sale described herein. The acceptance of any order by Gasboy International is expressly made subject to the purchaser’s agreement to these conditions.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Warranty-1

Warranty

Page Warranty-2 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Appendix: Trademark Information

15 – Appendix: Trademark Information

The following are the non-Gasboy trademarks used in this document.

• CRIND ® is a registered trademark of Gilbarco Inc.

• Gilbarco ® is a registered trademark of Gilbarco Inc.

• Star ® is a registered trademark of Star Micronics America, Inc.

• Tokheim ® is a registered trademark of Tokheim Holding B.V. Corporation.

• Wayne ® is a registered trademark of Dresser Equipment Group, Inc.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page A-1

Appendix: Trademark Information

Page A-2 MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

Index

Index

Symbols

;I Option 83

A

Address 3

C

CAUTION 6, 29, 31, 43, 52, 94, 103

;I Option 83

command

;I Option 83

AD SIG 6, 84

CRON 13

DIR A 103

E CO;I 92

E HI;I 95

E PC;I 91

E PRO 91

E PU;I 92

E RE;I 92

EN PRO 87

LDDRAWER 92

LO A 13

LO A;IC 89

LO AL;C 93

LO CR 13

LO CR;IC 89, 90

LO CU 12

LO CU;C 87

LO DA 84

LO DR 92

LO F 11, 87

LO F;C 87

LO H 7

LO H;IC 84

LO IN 9, 15

LO IN;C 86, 91

LO LI 13

LO LI;IC 89

LO ME 8

LO ME;IC 85

LO PH 14, 90

LO PLU 16

LO PLU;C 91

LO PR 10

LO PR;IC 88

LO PRO 8, 15, 16, 88

LO PRO;AC 85, 90

LO PU 12

LO PU;C 86

LO SH 93

LO TA 9

LO TA;C 87

LO TAX 13, 88

LO V;IC 94

LOC CA 13

LOC CA;A 88

NEXTDAY 92, 93

P A 105

P DA 105

P DI 95, 105

P LI 105

P PR 105

P PRO 105

P PU 75, 105

P TR 105

POS.CMD 16

PR AU S-Form-4, Form-4

PR DA S-Form-4, Form-4

PR DI S-Form-4, Form-4

PR LIM S-Form-4, Form-4

PR PRI S-Form-4, Form-4

PR PRO S-Form-4, Form-4

PR PU S-Form-4, Form-4

PR TR S-Form-4, Form-4

RE DI;I 95

RE PU 86

RE TO;A 92

REC TMTST.CMD 72

REM AL;A 93

REM PRO;A 85

Reset Transaction File 94

RUN;I 95

STATUS 105, S-Form-4, Form-4

TAX 13, 88

TMTST 73

TR 94

U CA;A 88

UN CA 13

D

Default

Baud Rate 71

Codes 89

Jumper Setting 37, 46

Keyboard 14, 21

Price 16, 17

Switch 83

Switch Setting 36, 37, 38

Value 54, 55

I

IMPORTANT 3, 35, 49, 75, 106

K

Keyboard 21

P

Phone Number 1

S

Start-up Form

1. SITE IDENTIFICATION 25, S-

Form-1, Form-1

10. SYSTEM

APPROVALS 102, S-

Form-4, Form-4

11. CUSTOMER

KNOWLEDGE 105, S-

Form-4, Form-4

12. ATTACH PRINTOUTS 105, S-

Form-4, Form-4

13. PARTS USED 105, S-Form-

4, Form-4

14. SITE LAYOUT 105, S-Form-

5, Form-5

2. SYSTEM

IDENTIFICATION 25, S-

Form-1, Form-1

3. SYSTEM DESCRIPTION 26, S-

Form-2, Form-2

4. COMMUNICATIONS 26, S-

Form-2, Form-2

5. BREAKER NUMBERS 27, S-

Form-3, Form-3

6. SYSTEM

ENVIRONMENT 27, S-

Form-3, Form-3

7. CONDUIT 30, S-Form-3, Form-

3

8. SYSTEM POWER 49, S-Form-

3, Form-3

9. DC POWER 61, S-Form-

4, Form-4

Blank Copy Form-1

Sample Copy S-Form-1

T

Tools 2

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Index-1

W

WARNING 51, 63, 64

Worksheet

MASTER.PLU File (Dept Entry) 18

MASTER.PLU File (Stock

Entry) 20

MASTER.PLU File (UPC Entry) 19

Pump/CRIND Device - Current

Loop Interface 23

Pump/CRIND Device - PC

Interface 22

Index

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005 Page Index-2

© 2005 Gasboy International Inc.

7300 West Friendly Avenue • Post Office Box 22087

Greensboro, North Carolina 27420

Phone (336) 547-5000 • http://www.gasboy.com

• Printed in the U.S.A.

MDE-4375 CFN Series Site Controller III Start-Up Manual · June 2005

advertisement

Related manuals

advertisement

Table of contents