Replicon MS Project Link 5.7 Project Management Integration Software User Manual
Reklam
Reklam
TOP
Copyright © 2004 Replicon, Inc. All rights reserved.
All parts of this manual are the property of Replicon, Inc.
No parts of this manual may be reproduced in any manner whatsoever including mechanical or electronic media such as disk or tape. No part of this manual may be transmitted in any form by any means without the written permission of
Replicon, Inc.
Web TimeSheet is a registered trademark of Replicon, Inc.
All other products are registered trademarks or trademarks of the respective companies.
Contact Information
Replicon, Inc.
830, 910 - 7th Ave. S.W.
Calgary, Canada T2P 3N8
Direct:
1-403-262-6519
Toll Free in North America:
1-877-737-5420
Toll Free in Europe:
*
00-800-7375-4266
Toll Free in Australasia:
*
011-800-7375-4266
Fax:
1-403-233-8046
http://www.replicon.com
*The international toll free numbers
may not work in some countries. If you
experience problems, use the direct line
to contact Replicon.
Contents
Chapter 1 - What is WTS Integration Manager? 1
Introduction ........................................................................ 1
Technical Specifications ..................................................... 1
Requirements .............................................................. 1
Constraints .................................................................. 1
Technology .................................................................. 1
Chapter 2 - Installing the WTS Integration
Manager 2
Installing WTS Integration Manager ................................... 2
Note to MS Access Users ............................................ 3
Chapter 3 - Using the WTS Integration Manager 4
Accessing WTS Integration Manager ................................. 4
Setting Up the WTS Integration Manager ........................... 4
Update Data From ....................................................... 4
Select Data to Update .................................................. 5
Selecting Projects to Update ........................................ 5
Mapping Fields ............................................................ 6
Viewing the Selected Options ...................................... 6
The Update Process .......................................................... 7
Chapter 4 - Field Relationships 8
Web TimeSheet to Microsoft Project ............................ 8
Microsoft Project to Web TimeSheet ............................ 9
Chapter 1 - What is WTS Integration Manager?
Introduction
The Web TimeSheet Integration Manager for MS Project allows users to update data between Web TimeSheet and Microsoft
Project 2000/2002/2003 easily and efficiently.
Initially, a user must set up the proper flow of data between Web
TimeSheet and Microsoft Project 2000/2002/2003 Standard/
Professional, including:
•
Specifying whether the data will be updated from Web
TimeSheet or from Microsoft Project
•
Selecting the appropriate Microsoft Project file and the project(s) being updated
•
Selecting the type of data to be updated (task hours, project/task information, project team/resource assignments)
•
Mapping fields between Web TimeSheet and Microsoft
Project.
Technical Specifications
This section contains the requirements for the 5.
7 version of the
Web TimeSheet Integration Manager for MS Project, and explains how the module works.
Requirements
•
Microsoft Project 2000/2002/2003
•
Web TimeSheet 5.
7
•
All projects saved in a .MPD database format
•
Microsoft Internet Explorer 4.0 or above
•
ActiveX controls set to “Prompt” or “Enabled” (Internet
Options for Internet Explorer)
•
Security settings for Windows NT/2000 set to allow elevated user access (Power User or higher) - applies only during installation of the ActiveX control for Web
TimeSheet Project Link (see the note at the left)
•
For Web TimeSheet with an Oracle database, Oracle
Client Tools must be installed on the client machine
(minimum version 8.1.5).
Constraints
•
Time is not updated from Microsoft Project to Web
TimeSheet
•
Projects structures are updated only up to four hierarchal levels
•
Netscape Navigator is not a supported browser.
Technology
The Web TimeSheet Integration Manager for MS Project uses
Microsoft ADO (ActiveX Data Object) technology and ODBC connections to update data between Web TimeSheet and
Microsoft Project 2000/2002/2003. The Web TimeSheet
ActiveX control establishes a link with both the Web TimeSheet database and the Microsoft Project 2000/2002 database and transfers data depending on the specified criteria.
When updating data from Microsoft Project 2000/2002/2003 to
Web TimeSheet, the connection is made to the Microsoft
Project 2000/2002 database using a Connection and
Command object.
Note ...
Elevated user access is required to register the ActiveX control associated with the
Web TimeSheet
Integration Manager for MS Project, which occurs the first time the link is accessed.
Once registered, the
ActiveX control does not require special settings, and security can be restored to standard user access without difficulty.
1
2
Chapter 2 - Installing the WTS Integration Manager
Installing WTS Integration Manager
This section explains how to complete the installation of the
Web TimeSheet Integration Manager for MS Project.
Before installing the Web TimeSheet Integration Manager for
MS Project, make sure you have already installed Web
TimeSheet 5.
7 . The Integration Manager for MS Project will need to be installed in the Web TimeSheet 5.
7 directory.
You will need to purchase the Web TimeSheet Integration
Manager for MS Project and obtain the
WTS5 7
MSProjectLink.exe file from Replicon Customer Support.
The Installation Wizard will guide you through the installation process.
1. Stop the service associated with Web TimeSheet and back up the Web TimeSheet database. the
7
MSProjectLink.exe file. The Welcome screen is displayed.
3. Next you will need to specify the directory where the Web
TimeSheet Integration Manager for MS Project should be installed.
The Integration Manager for MS Project must be installed in the root of the Web TimeSheet directory. Use the
Browse button to locate the Web TimeSheet directory (it may be provided by default).
4. Now you are ready to install the Web TimeSheet
Integration Manager for MS Project. Click the Next button to start the installation.
5. When the installation is complete, click the Finish button to close the Installation Wizard.
Note to MS Access Users
Every night Web TimeSheet performs a “compact and repair” on the MS Access database. During this operation the file access permissions for domain accounts are removed. To prevent this from happening, follow the instructions below:
1. Make sure the file share does not exist on the boot partition. The default boot partition is usually “C:”.
2. Make sure that the Web TimeSheet directory has shared access.
3. Create a local group on the server where Web TimeSheet is installed.
4. In the local group, add domain accounts for the users who will be accessing the Web TimeSheet Integration Manager for MS Project.
5. Add the local group to the Web TimeSheet directory and the MS Access database.
6. Select "Allow Inheritable Permissions from Parent to
Propagate to this Object" for the Web TimeSheet database.
6. Restart the Web TimeSheet service. You are now ready to use the Web TimeSheet Integration Manager for MS
Project.
3
Note ...
MS Project Link will appear in the Projects menu only if you have a seat assignment and permission to use the
Integration Manager for
MS Project.
For the Access version, you must specify the location of the Access database.
You must enter the same password Web
TimeSheet uses to access the SQL or
Oracle database (you can obtain the password from the Web
TimeSheet administrator).
It may take some time to load the ActiveX control the first time you access the Web
TimeSheet Integration
Manager for MS Project; however, this will occur
ONLY the first time.
Always make sure you save and close the
Microsoft Project file before performing updates between Web
TimeSheet and
Microsoft Project.
Chapter 3 - Using the WTS Integration Manager
Accessing WTS Integration Manager
To access the Web TimeSheet Integration Manager for MS
Project:
1. Log in to Web TimeSheet and click on the Projects button at the top of the screen.
Link will be available only if you have a Web TimeSheet license key that includes the Web TimeSheet Integration
Manager for MS Project.
3. If you are running the SQL or Oracle version of Web
TimeSheet, you must enter a password to the SQL/
Oracle database before you can access the Web
TimeSheet Project Link screen.
Data will be updated as follows:
•
From Microsoft Project to Web TimeSheet
If the project already exists, the data in Web TimeSheet will be replaced with whatever data is in Microsoft
Project. Any information missing in Web TimeSheet will be added, except the actual hours worked. Resources will be added to the project team only if they are already set up as users in Web TimeSheet.
If the project does not exist, a new project will be created in Web TimeSheet with all the selected attributes of the project in Microsoft Project.
•
From Web TimeSheet to Microsoft Project
If the project already exists, the Microsoft Project data will be replaced with whatever data is in Web
TimeSheet. Any information missing in Microsoft
Project will be added (e.g., actual hours worked).
If the project does not exist, a new project will be created in Microsoft Project with all the selected attributes of the Web TimeSheet project.
Setting Up the WTS Integration
Manager
The Web TimeSheet Integration Manager for MS Project is designed to allow you to update data between Microsoft Project
2000/2002 and Web TimeSheet quickly and easily.
Initially you will need to set up options to ensure that the proper data is updated and the field mapping meets your needs. Later you can perform regular updates based on the setup options you selected (or you can redefine your setup, if necessary).
Update Data From
First you will need to specify where the data is being updated.
On the Web TimeSheet Project Link screen, specify whether you are updating data from Web TimeSheet or from Microsoft
Project.
MS Project File to Synchronize With
Click the Browse button and select the Microsoft Project file that will be used for the update. When you select the file and click the OK button, the full file path name will appear in the box provided.
4
Select Data to Update
Now select the data you want to update. You can select from the following high level options:
•
Update Task Hours (available only if updating data from
Web TimeSheet to Microsoft Project)
•
Update Project/Task Information
•
Update Project Assignments
You can expand each high level option to display a list of sub- options that may be included or excluded from the update process. If a high level option is selected, all sub-options will also be selected by default; however, you can exclude sub- options by deselecting the corresponding check box. The following sub-options are available for each high level option:
•
Update Task Hours (only available from Web
TimeSheet to Microsoft Project)
Approval Status: All or Approved Only
Date Range: All or Within project start/end dates
•
Update Project/Task Information
Project/Task Structure
Project Manager
Project Start Date
Project End Date
Estimated Cost
Task Start Date
Task End Date
Time Entry Allowed
•
Update Project Team/Resource Assignments
Project Resource/Project Team
Task Assignments
Project team members must already exist as users in Web
TimeSheet to be added to the project team/task
assignments.
The available sub-options for project/task information will change depending on whether data is being updated from Web
TimeSheet to Microsoft Project or vice versa.
If you are updating the project manager or the project team/ resource assignments, you must specify the format of the names entered in Microsoft Project (“firstname lastname” ,
“lastname firstname”, or “login name”). This naming convention is a requirement because names are stored differently between the two applications - Microsoft Project stores the name as a single field, while Web TimeSheet splits the first and last names into two fields.
Selecting Projects to Update
Now you need to select the projects you want to update. The list of available projects will include the following:
•
If updating from Web TimeSheet
The list includes the projects within Web TimeSheet for which you are the project leader, or ALL projects within
Web TimeSheet if you are a project leader with full access
•
If updating from Microsoft Project
The list includes all projects within the selected
Microsoft Project 2000/2002 database.
To select the projects you want to update, select on the project name from the Available Projects list and click the >> button.
The project will move to the Selected Projects list.
Note ...
When updating projects, only the first four levels of the hierarchy will be updated.
The name format you select for a specific
Microsoft Project file must remain consistent
(i.e., each time a specific Microsoft
Project file is updated, you should use the same format).
The Web TimeSheet
Integration Manager for
MS Project will save the setup options for the last two updates completed - one set of options for Web
TimeSheet, and one set for Microsoft Project.
Fields are case sensitive. To ensure that all data is updated properly, make sure projects/tasks and resources are set up with identical upper/ lowercase combinations in both applications.
5
Note ...
When updating from
Web TimeSheet to
Microsoft Project:
If a project has no task structure in Web
TimeSheet and no corresponding project exists in Microsoft
Project, a new project will be created in
Microsoft Project, but no other project data will be transferred.
Mapped fields have a one-to-three relationship.
This means that the information for a single field in Web TimeSheet can be transferred to a maximum of three fields in Microsoft Project, and vice versa.
Clicking the Cancel
Web
TimeSheet Project Link return you to the Web
TimeSheet Project Link screen without saving the field mapping options.
You can remove projects from the Selected Projects list by selecting the project name(s) and clicking the << button. The project(s) will return to the Available Projects list.
Mapping Fields
You can use the field mapping option to specify how information in certain fields is updated between Web TimeSheet and
Microsoft Project. Field mapping applies mainly to fields for which there is no direct correlation between the two applications.
To map fields, click on the Map Fields button on the Web
TimeSheet Project Link screen.
The Web TimeSheet Project Link Options screen allows you to map fields from Web TimeSheet to Microsoft Project, or from
Microsoft Project to Web TimeSheet.
Mapping from Web TimeSheet to Microsoft Project
To map fields from Web TimeSheet to Microsoft Project:
1. Select a field from the list of Web TimeSheet Fields drop- down list.
2. Select the corresponding field from the Microsoft Project
Fields drop-down list. This list includes fields that relate to the selected Web TimeSheet field and any additional user defined fields that may have been created. For example, for the Web TimeSheet field “Estimated Hours”, related fields in Microsoft Project include “Duration” and “Work”.
3. Click the Add button to add the field combination.
4. If you are finished mapping fields, click the Save button to return to the Web TimeSheet Project Link screen.
Mapping from Microsoft Project to Web TimeSheet
To map fields from Microsoft Project to Web TimeSheet:
1. Select a field from the Microsoft Project Fields drop-down list.
2. Select the corresponding field from the Web TimeSheet
Fields drop-down list. This list includes fields that relate to the selected Microsoft Project field and any additional user defined fields that may have been created. For example, for the Microsoft Project field “Task WBS”, related fields in
Web TimeSheet include “Task Code” and “Task
Description”.
3. Click the Add button to add the field combination.
4. If you are finished mapping fields, click the Save button to return to the Web TimeSheet Project Link screen.
Viewing the Selected Options
You can view your setup at the bottom of the Web TimeSheet
Project Link screen. The Options Selected list box contains a complete list of all setup options you have selected, including the following:
•
Database from which data is being updated (Web
TimeSheet or Microsoft Project)
•
Type of data being updated
•
Selected projects
•
Mapped fields.
6
The Update Process
After setting up the options, you can perform updates at regular intervals without needing to repeat the setup process. To start the update process, simply click the Start button at the bottom of the Web TimeSheet Project Link screen.
A log file will record the progress of the update process. When the update is completed, you can save the log file for future reference.
When an update is completed from Web TimeSheet to
Microsoft Project, you must open and save the Microsoft Project file before running another update.
7
Note ...
When setting up projects in Web
TimeSheet, make sure the currency you specify at the project level remains consistent for all the associated tasks.
Chapter 4 - Field Relationships
Web TimeSheet to Microsoft Project
Web TimeSheet (source) Microsoft Project (target) Constraints
Project Description Project Category None
Project Keyword
Project Subject
None
None
Project Code
Project Team
Project Estimated Hours
Project Title
Project Category
Project Keyword
Project Subject
Project Title
Resource
None
None
None
None
None
None task level (roll-up); however, in Web TimeSheet, the project can have its own estimated hours unrelated to the tasks below it (no roll-up). Because the applications handle project values differently,
Web TimeSheet cannot transfer the project-level estimated hours to Microsoft Project (task estimates are still transferred).
Project Estimated Cost
(roll-up); however, in Web TimeSheet, the project can have its own estimated cost unrelated to the tasks below it (no roll-up). Because the applications handle project values differently, Web
TimeSheet cannot transfer project-level estimated cost to Microsoft Project (task estimates are still transferred).
Project Actual Hours
Task Name
Task Description
Task Code
Task Estimated Cost
Task Assignment
Currency Symbol
User Defined Fields
Task Name
Task WBS
Task WBS
Task Cost
Assignment
Project Currency Symbol
Project Keyword
Project Subject
Project Category
Project Title
Task WBS worked at the task level (roll-up); however, in Web TimeSheet, users can enter time directly against the project, unrelated to the tasks below it (no roll-up). Because the applications handle project values differently, Web TimeSheet cannot transfer project-level actual hours to Microsoft Project (task actual hours are still transferred).
None
None
None
None
None
In Microsoft Project, the currency is specified at the project level. Therefore, the currency symbol associated with the Task Estimated Cost in Web TimeSheet will be transferred to Microsoft Project as the currency symbol at the project level. If a task’s currency symbol in Web TimeSheet is different from the currency symbol set up in Microsoft Project, the Task Estimated Cost will be transferred to
Microsoft Project, but the currency symbol will not (e.g., if the currency is CAD in Web TimeSheet and USD in Microsoft Project, the cost amount will be transferred, but will reflected as USD in
Microsoft Project).
None
None
None
None
None
8
Microsoft Project to Web TimeSheet
Microsoft Project (source) Web TimeSheet (target) Constraints
Project Name Project Name None
Project Start Date
Project Finish Date
Project Keyword
Project Entry Start Date
Project Entry End Date
Project Code
Project Description
None
None
None
None
Project Title
User Defined Fields
Project Code
Project Description
User Defined Fields
None
None
None
None
Project Category Project Description
Project Code
User Defined Fields
None
None
None
Project Work
(roll-up); however, in Web TimeSheet, the project can have its own estimated hours unrelated to the tasks below it (no roll-up). Because the applications handle project values differently, Microsoft
Project cannot transfer the project work to Web TimeSheet.
Project Cost
(roll-up); however, in Web TimeSheet, the project can have its own estimated cost unrelated to the tasks below it (no roll-up). Because the applications handle project values differently, Microsoft
Project cannot transfer the project cost to Web TimeSheet.
Project Actual Hours
Resource Project Team
Assignment Task Assignment
Task Name
Task WBS
Task Name
Task Description
Task Duration
Task Work
Task Start Date
Task Finish Date
Task Code
User Defined Fields
Task Estimated Hours
User Defined Fields
Task Estimated Hours
User Defined Fields
Task Entry Start Date
Task Entry End Date this information as a total field. Therefore, project actual hours will not be transferred from Microsoft
Project to Web TimeSheet, because Web TimeSheet has no way of knowing how the hours should be distributed in the users’ timesheets.
None
None
None
None
None
None
None
None
None
None
None
None
© 2004 by Replicon Inc. All rights reserved.