LG Electronics DLGX4001W 7.4 cu. ft. Large Capacity Vented Smart Stackable Gas Dryer installation Guide

Add to My manuals
20 Pages

advertisement

LG Electronics DLGX4001W 7.4 cu. ft. Large Capacity Vented Smart Stackable Gas Dryer installation Guide | Manualzz

10 INSTALLATION

INSTALLATION

Installation Overview

Please read the following installation instructions first after purchasing this product or transporting it to another location.

Check and choose the proper location

Level the dryer Vent the dryer

Connect the inlet hose

(steam models)

Connect the Gas dryer

DLEX4200*, DLGX4201*, DLEX4000*,

DLGX4001*, DLEX4500*, DLGX4501*

Connect the Electric dryer

DLE3600*, DLG3601*

Gas dryer Electric dryer

Plug in the power cord

Installation test Test run

Product Specifications

The appearance and specifications listed in this manual may vary due to constant product improvements.

Dryer Models

DLE3600*,

DLG3601*

DLEX4000*,

DLGX4001*

DLEX4200*,

DLGX4201*

DLEX4500*, DLGX4501*

Description

Non-steam

Dryer

Steam Dryer Steam Dryer

Electrical requirements Please refer to the rating label for detailed information.

Gas requirements

NG: 4 - 10.5-inch (10.2 - 26.7 cm) WC

LP: 8 - 13-inch (20.4 - 33.1 cm) WC

Dimensions

27” (W) X 30 1/8” (D) X 39” (H), 51 3/8” (D with door open)

68.6 cm (W) X 76.5 cm (D) X 99 cm (H),

130.5 cm (D with door open)

27” (W) X 30” (D) X 39” (H), 51” (D with door open)

68.6 cm (W) X 76.1 cm (D) X 99 cm (H),

129.7 cm (D with door open)

Net weight

Gas : 136.03 lb (61.7kg) - 139.34 lb (63.2kg)

Electric : 121.9 lb (55.3kg) - 125.3 lb (56.8kg)

Gas : 140.4 lb (63.7 kg)

Electric : 133.4 lb (60.5 kg)

Drying capacity

Steam Cycle IEC 7.4 cu.ft. (8 lb/3.6 kg)

Normal Cycle IEC 7.4 cu.ft. (22.5 lb/10.2 kg)

NOTE

Model numbers can be found on the cabinet inside the door.

INSTALLATION 11

Installation Location Requirements

WARNING

Read all installation instructions completely before installing and operating your dryer. It is important that you review this entire manual before installing and using your dryer. Detailed instructions concerning electrical connections, gas connections, and exhaust requirements are provided on the following pages.

WARNING

To reduce the risk of serious injury or death, follow basic precautions, including the following:

Use long-sleeved gloves and safety glasses.

The appliance is heavy. Two or more people are required when installing the dryer.

The installation requires:

A location that allows for proper exhaust installation. A gas dryer must be exhausted to the outdoors. See

Venting the Dryer.

A grounded electrical outlet located within 2 ft. (61 cm) of either side of the dryer. See Connecting Electric

Dryers.

A sturdy floor to support the total dryer weight of 200 lb (90.7 kg). The combined weight of a companion appliance should also be considered.

No other fuel-burning appliance can be installed in the same closet as a dryer.

Additional clearances might be required for wall, door and floor moldings.

Companion appliance spacing should also be considered.

NOTE

The floor must be level, with a maximum slope of 1 inch (2.5 cm) under the entire dryer. Clothes may not tumble properly, and automatic sensor cycles may not operate correctly if the dryer is not level.

For garage installation, you will need to place the dryer at least 18 inches (45.7 cm) above the floor. The standard pedestal height is 15 inches (38 cm). You will need 18 inches (45.7 cm) from the garage floor to the bottom of the dryer.

Do not operate your dryer at temperatures below 45 °F (7 °C). At lower temperatures, the dryer might not shut off at the end of an automatic cycle. This can result in longer drying times.

The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.

Check code requirements that limit, or do not permit, installation of the dryer in garages, closets, mobile homes or sleeping quarters. Contact your local building inspector.

12 INSTALLATION

Clearances

14" max.*

(356 mm)

18" min.*

(457 mm)

14" max.*

(356 mm)

18" min.*

(457 mm)

1"*

(25 mm)

30 - 30

1/8"

(761 - 765mm)

5"**

(127 mm)

3" *

(76 mm)

1"*

(25 mm)

48 in.

(310 cm

2*

2 )

24 in.

2*

(155 cm 2 )

Closet Door

Vent Requirements

3" *

(76 mm)

1"

(25 mm)

27"

(686 mm)

1"

(25 mm)

0"

(0 mm)

39"

(990 mm)

30 - 30

1/8"

(761 - 765mm)

5"**

(127 mm)

1"

(25 mm)

27"

(686 mm)

1"

(25 mm)

Installation Spacing for Recessed Area or Closet Installation

The following clearances are recommended for this dryer. This dryer has been tested for clearances of 1 inch

(2.5 cm) on the sides and rear. Recommended clearances should be considered for the following reasons:

Additional clearances should be considered for ease of installation and servicing.

Additional clearances should be considered on all sides of the dryer to reduce noise transfer. For closet installation, with a door, minimum ventilation openings in the top and bottom of the door are required. Louvered doors with equivalent ventilation openings are acceptable.

Closet Ventilation Requirements

Closets with doors must have both an upper and lower vent to prevent heat and moisture buildup in the closet.

One upper vent opening with a minimum opening of 48 sq. in. (310 cm 2 ) must be installed no lower than 6 feet above the floor. One lower vent opening with a minimum opening of 24 sq. in. (155 cm 2 ) must be installed no more than one foot above the floor. Install vent grilles in the door or cut down the door at the top and bottom to form openings. Louvered doors with equivalent ventilation openings are also acceptable.

NOTE

There should be at least a little space around the dryer (or any other appliance) to eliminate the transfer of vibration from one appliance to another. If there is enough vibration, it could cause appliances to make noise or come into contact, causing paint damage and further increasing noise.

INSTALLATION 13

Installation Spacing for Recessed Area or Closet, with Stacked Washer and

Dryer

3" *

(76 mm)

6" *

(152 mm)

48 in.

2*

(310 cm 2

)

77 ½"

(1968 mm)

24 in.

2*

(155 cm 2 )

3" *

(76 mm)

1" *

(25 mm)

5 ½" **

(140 mm)

1"

(25 mm)

27"

(686 mm)

* Required spacing

** For side or bottom venting, 2-inch (5.1 cm) of spacing is allowed.

Installation Spacing for Cabinet

For cabinet installation with a door, minimum ventilation openings in the top of the cabinet are required.

* Required spacing

7" *

(178 mm)

7" *

(178 mm)

1"

(25 mm)

9" *

(229 mm)

5"*

(127 mm)

30 - 30 1/8"

(761 - 765mm)

1"*

(25 mm)

1"

(25 mm)

27"

(686 mm)

1"

(25 mm)

14 INSTALLATION

Leveling the Dryer

NOTE

Adjust the leveling feet only as far as necessary to level the dryer. Extending the leveling feet more than necessary may cause the dryer to vibrate.

To ensure that the dryer provides optimal drying performance, it must be level. To minimize vibration, noise, and unwanted movement, the floor must be a perfectly level, solid surface.

1 Position the dryer in the final location. Place a level across the top of the dryer.

2 Use an adjustable wrench to turn the leveling feet. Unscrew the legs to raise the dryer or screw in the legs to lower it. Adjust the leveling feet until the dryer is level from side to side and front to back. Make sure that all four leveling feet are in firm contact with the floor.

Level

Leveling Feet

• All four leveling feet must rest solidly on the floor. Gently push on the top corners of the dryer to make sure that the dryer does not rock from corner to corner.

NOTE

If you are installing the dryer on the optional pedestal, you must use the leveling feet on the pedestal to level the dryer. The dryer leveling feet should be fully retracted.

Reversing the Door

Tools Required

Phillips screwdriver

Large flat blade screwdriver (recommended for hinge screws if they are tight or your Phillips screwdriver is worn)

Small flat blade screwdriver (for lifting out parts)

2

INSTALLATION 15

While supporting the door, remove the 2 screws on the door hinge. Remove the door.

WARNING

To reduce the risk of damage to the dryer, property damage or personal injury, follow basic precautions, including the following:

Support the door with a stool or box that fits under the door, or have an assistant support the weight of the door.

Avoid dropping the door.

Unplug the dryer or turn off power at the main circuit breaker before beginning door reversal.

Always reverse the door BEFORE stacking the dryer on top of the washer.

Door Reversal Instructions

The instructions here are for changing the door swing from a right to a left side hinge. If the door has been reversed, and it is necessary to change it back, use care when following these instructions. Some of the illustrations and the left/right references will be reversed, and you will need to read the instructions carefully.

WARNING

Be sure to support the weight of the door before removing the hinge screws.

1 Open the door and remove the two decorative screws, two latch screws, and the latch on the catch side with a screwdriver. Save these for step 4.

3 Turn the door upside down and line up the holes in the hinge with the holes on the opposite side of the cabinet. Reinstall the door with the screws removed in step 2.

WARNING

Be sure to support the weight of the door before installing the hinge screws.

4 Install the two decorative screws, the latch, and two latch screws removed in step 1 on the opposite side from which they were removed.

5 Check that the door closes properly.

16 INSTALLATION

Installing the Side Vent Kit

WARNING

To reduce the risk of serious injury, death or property damage, follow basic precautions, including the following:

Use long-sleeved gloves and safety glasses.

Use a heavy metal vent.

Do not use plastic or thin foil ducts.

Clean old ducts before installing this dryer.

Your new dryer is configured to vent to the rear. It can also vent to the bottom or side (right-side venting is not available on gas models).

An adapter kit, part number 383EEL9001B, may be purchased from your LG retailer. This kit contains duct components necessary to change the dryer vent location.

1 Remove the rear exhaust duct retaining screw.

Pull out the exhaust duct.

Retaining Screw

3 Preassemble a 4-inch (10.2 cm) elbow to the next 4-inch (10.2 cm) duct section, and secure all joints with duct tape. Be sure that the male end of the elbow faces AWAY from the dryer.

Insert the elbow/duct assembly through the side opening and press it onto the adapter duct.

Secure it in place with duct tape. Be sure that the male end of the duct protrudes 1.5 inches

(3.8 cm) to connect the remaining ductwork.

Attach the cover plate to the back of the dryer with the included screw.

Cover Plate

Elbow

1½" (38 mm)

Option 2: Bottom Venting

2 Press the adapter duct onto the blower housing and secure it to the base of the dryer as shown.

Adapter Duct

Rear Exhaust Duct

Option 1: Side Venting

2 Press the tabs on the knockout and carefully remove the knockout for the desired vent opening (right-side venting is not available on gas models). Press the adapter duct onto the blower housing and secure to the base of the dryer as shown.

Adapter Duct

3

Bracket

Insert the 4-inch (10.2 cm) elbow through the rear opening and press it onto the adapter duct.

Be sure that the male end of the elbow faces down through the hole in the bottom of the dryer. Secure it in place with duct tape. Attach the cover plate to the back of the dryer with the included screw.

Bracket

Knockout

Cover Plate

Elbow

Stacking the Dryer

Stacking Kit Installation

This stacking kit includes:

Two (2) side rails

One (1) front rail

Four (4) screws

INSTALLATION 17

To ensure safe and secure installation, please observe the following instructions.

1 Make sure the surface of the washer is clean and dry. Remove paper backing from the tape on one of the stacking kit side brackets.

Tools Needed for Installation:

Phillips screwdriver

2 Fit the side bracket to the side of the washer top as shown in the below illustration. Firmly press the adhesive area of the bracket to the washer surface. Secure the side bracket to the washer with a screw on the back side of the bracket.

Repeat steps 1 and 2 to attach the other side bracket.

WARNING

To reduce the risk of electrical shock, fire, explosion, property damage, serious injury or death, follow basic precautions, including the following:

The weight of the dryer and the height of installation make this stacking procedure too risky for one person. Two or more people are required when installing the stacking kit.

Do not use the stacking kit with a gas dryer in potentially unstable conditions such as a mobile home.

Place the washer on a solid, stable, level floor capable of supporting the weight of both appliances.

Do not stack the washer on top of the dryer.

If appliances are already installed, disconnect them from all power, water, or gas lines and from draining or venting connections.

3 Place the dryer on top of the washer, fitting the dryer feet into the side brackets as illustrated.

Avoid finger injuries; do not allow fingers to be pinched between the washer and dryer.

Slowly slide the dryer toward the back of the washer until the side bracket stoppers catch the dryer feet.

4 Insert the front rail between the bottom of the dryer and the top of the washer. Push the front rail toward the back of the washer until it comes in contact with the side rail stoppers.

Install the two remaining screws to secure the front rail to the side rails.

18 INSTALLATION

Venting the Dryer

WARNING

To reduce the risk of fire or explosion, electric shock, property damage, injury to persons or death when using this appliance, follow basic safety precautions, including the following:

Do not crush or collapse ductwork.

Do not allow ductwork to rest on or contact sharp objects.

If connecting to existing ductwork, make sure it is suitable and clean before installing the dryer.

Venting must conform to local building codes.

Gas dryers MUST exhaust to the outdoors.

Use only 4-inch (10.2 cm) rigid, semi-rigid or flexible metal ductwork inside the dryer cabinet and for venting outside.

To reduce the risk of fire, combustion, or accumulation of combustible gases, DO

NOT exhaust dryer air into an enclosed and unventilated area, such as an attic, wall, ceiling, crawl space, chimney, gas vent, or concealed space of a building.

To reduce the risk of fire, DO NOT exhaust the dryer with plastic or thin foil ducting.

The exhaust duct must be 4-inch (10.2 cm) in diameter with no obstructions. The exhaust duct should be kept as short as possible. Make sure to clean any old ducts before installing your new dryer.

Rigid, semi-rigid or flexible metal ducting is recommended for use between the dryer and the wall. All non-rigid metal transition duct must be UL-listed. Use of other materials for transition duct could affect drying time.

DO NOT use sheet metal screws or other fasteners which extend into the duct that could catch lint and reduce the efficiency of the exhaust system. Secure all joints with duct tape.

Do not exceed the recommended duct length limitations noted in the chart. Failure to follow these instructions may result in extended drying times, fire or death.

WARNING

Ductwork is not provided with the dryer. You should obtain the necessary ductwork locally.

The vent hood should have hinged dampers to prevent backdraft when the dryer is not in use.

The total length of flexible metal duct must not exceed 8 ft. (2.4 m).

Ductwork

Wall Cap Type

Recommended

Number of 90°

Elbows

2

3

0

1

Maximum length of 4-inch diameter rigid metal duct

65 ft.(19.8 m)

55 ft.(16.8 m)

47 ft.(14.3 m)

36 ft.(11.0 m)

4 28 ft.(8.5 m) a: 4" (10.2 cm)

Use only for short run installations

2

3

0

1

4

55 ft.(16.8 m)

47 ft.(14.3 m)

41 ft.(12.5 m)

30 ft.(9.1 m)

22 ft.(6.7 m) b: 2.5" (6.35 cm)

NOTE

Deduct 6 ft. (1.8 m) for each additional elbow. Do not use more than four 90° elbows.

In Canada, only those foil-type flexible ducts, if any, specifically identified for use with the appliance by the manufacturer should be used. In the United

States, only those foil-type flexible ducts, if any, specifically identified for use with the appliance by the manufacturer and that comply with the Outline for Clothes Dryer Transition Duct, Subject 2158A, should be used.

Routing and Connecting Ductwork

NOTE

Follow the guidelines below to maximize drying performance and reduce lint buildup and condensation in the ductwork. Ductwork and fittings are NOT included and must be purchased separately.

Use 4-inch (10.2 cm) diameter rigid, semi-rigid or flexible metal ductwork.

The exhaust duct run should be as short as possible.

Use as few elbow joints as possible.

The male end of each section of exhaust duct must point away from the dryer.

Use duct tape on all duct joints.

Insulate ductwork that runs through unheated areas in order to reduce condensation and lint buildup on duct surfaces.

Incorrect or inadequate exhaust systems are not covered by the dryer warranty. Dryer failures or service required because of such exhaust systems will not be covered by the dryer warranty.

Correct Venting

Incorrect Venting

INSTALLATION 19

20 INSTALLATION

Connecting the Inlet Hose

(Steam Models)

NOTE

Water supply pressure must be between 20 and 120 psi (138—827 kPa) .

Do not strip or cross-thread when connecting the inlet hose to the valve.

If the water supply pressure is more than 800 kPa, a pressure-reducing valve should be installed.

Periodically check the condition of the hose and replace the hose if necessary.

Replace inlet hoses after 5 years of use to reduce the risk of hose failure.

Record hose installation or replacement dates on the hoses for future reference.

1 Check the rubber seal at each end of the inlet hoses.

Two ru ber seals are supplied with each inlet hose.

They are used for preventing water leaks. Make sure the connection to the cold water tap is tight.

WITHOUT WASHER: If the dryer does not share the cold water tap with a washer.

a. Connect the straight end of the long hose to the cold water faucet.

NOTE

Before connecting the water line to the dryer, flush several gallons of water into a drain or bucket. This will help prevent foreign particles such as sand and scale from clogging the dryer inlet valve.

Do not overtighten. Damage to the coupling may result.

3 Connect the hose to the dryer. Connect the water supply hose to the dryer inlet valve tightly by hand and then tighten another 2/3 turn with pliers.

Make sure that there are no kinks in the hoses and that they are not crushed.

2 Check the installation type.

Hose connector

Rubber seal

Y connector

4 Turn on the cold water faucet.

Short hose

Long hose

Y-connector

WITH WASHER WITHOUT WASHER

Connect all water supply hoses tightly by hand and then tighten another 2/3 turn with pliers.

WITH WASHER: When connecting the dryer to the a. Shut off the cold water tap and remove the washer hose.

b. Connect the short hose to the Y-connector using one of the rubber seals.

c. Connect the other end of the short hose to the cold water faucet.

d. Connect the long dryer hose to one side of the

Y-connector and connect the washer hose to the other side.

5 Check for leaks at the Y-connector (if used) and in all hoses.

NOTE

If any leaks are found, shut off the water faucet, remove the hose and check the condition of the rubber seal.

Connecting Gas Dryers

WARNING

To reduce the risk of fire or explosion, electric shock, property damage, injury to persons, or death when using this appliance, follow requirements including the following:

Electrical Requirements for Gas

Models Only

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

For personal safety, this dryer must be properly grounded.

This dryer must be plugged into a 120-VAC,

60-Hz. grounded outlet protected by a

15-ampere fuse or circuit breaker.

Where a standard 2-prong wall outlet is encountered, it is your personal responsibility and obligation to have it replaced with a properly grounded 3-prong wall outlet.

ELECTRIC SHOCK HAZARD

Failure to follow safety warnings could result in serious injury

This dryer is equipped with a three-prong grounding plug for protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug.

Gas Supply Requirements

As shipped from the factory, this dryer is configured for use with natural gas (NG). It can be converted for use with propane (LP) gas.

Gas pressure must not exceed 8-inch (20.4 cm) water column for NG, or 13-inch (33.1 cm) water column for LP.

A qualified service or gas company technician must connect the dryer to the gas service.

Isolate the dryer from the gas supply system by closing its individual manual shutoff valve during any pressure testing of the gas supply.

DO NOT attempt any disassembly of the dryer; disassembly requires the attention and tools of an authorized and qualified service technician or company.

Securely tighten all gas connections.

Connect the dryer to the type of gas shown on the nameplate.

INSTALLATION 21

WARNING

Gas Supply Requirements (continued)

Supply line requirements: Your laundry room must have a rigid gas supply line to your dryer.

In the United States, an individual manual shutoff valve MUST be installed within at least 6 ft. (1.8 m) of the dryer, in accordance with the National

Fuel Gas Code ANSI Z223.1 or Canadian gas installation code CSA B149.1. A 1/8-inch NPT pipe plug must be installed.

If using a rigid pipe, the rigid pipe should be

0.5-inch IPS. If acceptable under local codes and ordinances and when acceptable to your gas supplier, 3/8-inch approved tubing may be used where lengths are less than 20 ft. (6.1 m). Larger tubing should be used for lengths in excess of 20 ft. (6.1 m).

To prevent contamination of the gas valve, purge the gas supply of air and sediment before connecting the gas supply to the dryer. Before tightening the connection between the gas supply and the dryer, purge remaining air until the odor of gas is detected.

DO NOT use an open flame to inspect for gas leaks. Use a noncorrosive leak detection fluid.

Use only a new AGA- or CSA-certified gas supply line with flexible stainless steel connectors.

Use Teflon tape or a pipe-joint compound that is insoluble in propane (LP) gas on all pipe threads.

Connecting the Gas Supply

Installation and service must be performed by a qualified installer, service agency, or the gas supplier.

Use only a new stainless steel flexible connector and a new AGA-certified connector.

A gas shutoff valve must be installed within 6 ft.

(1.8 m) of the dryer.

The dryer is configured for natural gas when shipped from the factory. Make sure that the dryer is equipped with the correct burner nozzle for the type of gas being used (natural gas or propane gas).

If necessary, the correct nozzle (for the LP nozzle kit, order part number 383EEL3002D) should be installed by a qualified technician and the change should be noted on the dryer.

All connections must be in accordance with local codes and regulations. Gas dryers MUST exhaust to the outdoors.

22 INSTALLATION

NOTE

In the Commonwealth of Massachusetts: This product must be installed by a licensed plumber or gas fitter. When using ball-type gas shut off valves, they shall be T-handle-type. A flexible gas connector, when used, must not exceed 3 feet.

This dryer is configured from the factory for natural gas (NG). If the dryer is to be used with propane

(LP) gas, it must be converted by a qualified service technician.

1 Make sure that the gas supply to the laundry room is turned OFF and the dryer is unplugged.

Confirm that the type of gas available in your laundry room is appropriate for the dryer.

2 Remove the shipping cap from the gas fitting at the back of the dryer. Be careful not to damage the threads of the gas connector when removing the shipping cap.

3 Connect the dryer to your laundry room’s gas supply using a new flexible stainless steel connector with a 3/8-inch NPT fitting.

NOTE

DO NOT use old connectors.

4 Securely tighten all connections between the dryer and your laundry room’s gas supply.

5 Turn on your laundry room’s gas supply.

6 Check all pipe connections (both internal and external) for gas leaks with a noncorrosive leakdetection fluid.

7 Proceed to Venting the Dryer.

3/8" NPT gas

Connection

AGA/CSA-Certified

Stainless Steel Flexible

Connector

1/8" NPT Pipe Plug

Gas Supply Shutoff

Valve

High-Altitude Installations

The BTU rating of this dryer is AGA-certified for elevations below 10,000 feet.

If your gas dryer is being installed at an elevation above 10,000 feet, it must be derated by a qualified technician or gas supplier.

INSTALLATION 23

Connecting Electric Dryers

WARNING

To reduce the risk of fire or explosion, electric shock, property damage, injury to persons, or death when using this appliance, follow requirements including the following:

Electrical Requirements for

Electric Models Only

The wiring and grounding must conform to the latest edition of the National Electrical

Code, ANSI/NFPA 70 and all applicable local regulations. Please contact a qualified electrician to check your home’s wiring and fuses to ensure that your home has adequate electrical power to operate the dryer.

This dryer must be connected to a grounded metal, permanent wiring system, or an equipment-grounding conductor must be run with the circuit conductors and connected to the equipment-grounding terminal or lead on the dryer.

The dryer has its own terminal block that must be connected to a separate 240 VAC, 60-Hertz, single-phase circuit, fused at 30 amperes (the circuit must be fused on both sides of the line).

ELECTRICAL SERVICE FOR THE DRYER

SHOULD BE OF THE MAXIMUM RATE

VOLTAGE LISTED ON THE NAMEPLATE. DO

NOT CONNECT THE DRYER TO 110-, 115-, OR

120-VOLT CIRCUIT.

If the branch circuit to dryer is 15 ft. (4.5 m) or less in length, use UL (Underwriters

Laboratories) listed No.-10 AWG wire (copper wire only), or as required by local codes. If over

15 ft. (4.5 m), use UL-listed No.-8 AWG wire

(copper wire only), or as required by local codes.

Allow sufficient slack in wiring so the dryer can be moved from its normal location when necessary.

The power cord (pigtail) connection between the wall receptacle and the dryer terminal block IS

NOT supplied with the dryer. Type of pigtail and gauge of wire must conform to local codes and with instructions on the following pages.

WARNING

A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996. A 4-wire connection must be used where local codes do not permit grounding through the neutral wire.

Do not modify the plug and internal wire provided with the dryer.

The dryer should be connected to a 4-hole outlet.

If the plug does not fit the outlet, a proper outlet will need to be installed by a qualified electrician.

Connect the power cord to the terminal block.

Each colored wire should be connected to the same color screw. Wire color indicated on manual is connected to the same color screw in the block.

Grounding through the neutral conductor is prohibited for: (1) new branch-circuit installations,

(2) mobile homes, (3) recreational vehicles, and

(4) areas where local codes prohibit grounding through the neutral conductor.

This dryer is supplied with the neutral wire grounded. This white ground wire MUST BE

MOVED to the neutral terminal when a 4-wire cord is to be used, or where grounding through the neutral conductor is prohibited.

NOTE

For electrical requirements for mobile or manufactured homes, see Special Electrical

Requirements .

24 INSTALLATION

Four-Wire Power Cord

A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996.

A UL-listed strain relief is required.

Use a 30-amp, 240-volt, 4-wire,

UL-listed power cord with #10 AWGminimum copper conductor and closed loop or forked terminals with upturned ends.

1 Remove the terminal block access cover on the upper back of the dryer.

2 Install a UL-listed strain relief into the power cord through-hole.

3 Thread a 30-amp, 240-volt, 4-wire, UL-listed power cord with #10 AWG-minimum copper conductor through the strain relief.

Terminal Block

UL-Listed Strain Relief

UL-Listed 4-Wire Power

Cord

4 Transfer the dryer’s ground wire from behind the green ground screw to the center screw of the terminal block.

5 Attach the two hot leads of the power cord to the outer terminal block screws.

6 Attach the white neutral wire to the center screw of the terminal block.

7 Attach the power cord ground wire to the green ground screw.

8 Tighten all screws securely.

9 Reinstall the terminal block access cover.

Hot (Black) Neutral (White)

Hot (Red)

Ground Screw

White Wire moved from

Ground Screw

Power Cord Ground

Wire

Four-Wire Direct Wire

A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996.

A UL-listed strain relief is required.

Use UL-listed 4-wire #10 AWGminimum copper conductor cable.

Allow at least 5 ft. (1.5 m) of wire to allow for removal and reinstallation of the dryer.

INSTALLATION 25

6 Attach the two hot leads of the power cord to the outer terminal block screws.

7 Attach the white neutral wire to the center screw of the terminal block.

8 Attach the power cord ground wire to the green ground screw.

9 Tighten all screws securely.

1 Remove 5-inch (12.7 cm) of the outer covering from the wire. Remove 5-inch of insulation from the ground wire. Cut off approximately 1.5-inch

(3.8 cm) from the other three wires and strip 1 inch (2.5 cm) insulation from each wire. Bend the ends of the three shorter wires into a hook shape.

1" (2.5 cm)

Ground Wire

5" (12.7 cm)

10 Reinstall the terminal block access cover.

Hot (Black) Neutral (White)

Hot (Red)

Ground Screw

White Wire moved from

Ground Screw

Power Cord Ground

Wire

2 Remove the terminal block access cover on the upper back of the dryer.

3 Install a UL-listed strain relief into the power cord through-hole.

4 Thread the 4-wire #10 AWG-minimum copper power cable prepared in step 1 through the strain relief.

Terminal Block

UL-Listed Strain Relief

UL-Listed 4-Wire Power

Cord

5 Transfer the dryer’s ground wire from behind the green ground screw to the center screw of the terminal block.

26 INSTALLATION

Three-Wire Power Cord

A 3-wire connection is NOT permitted on new construction after January 1,

1996.

A UL-listed strain relief is required.

Use a 30-amp, 240-volt, 3-wire,

UL-listed power cord with #10 AWGminimum copper conductor and closed loop or forked terminals with upturned ends.

1 Remove the terminal block access cover on the upper back of the dryer.

2 Install a UL-listed strain relief into the power cord through-hole.

3 Thread a 30-amp, 240-volt, 3-wire, UL-listed power cord with #10 AWG-minimum copper conductor through the strain relief.

Terminal Block

UL-Listed Strain Relief

8 Reinstall the terminal block access cover.

Hot (Black) Neutral (White)

Hot (Red)

Ground Screw

White Wire from Dryer harness

External Ground Wire (If required by local codes)

UL-Listed 3-Wire Power

Cord

4 Attach the two hot leads (black and red) of the power cord to the outer terminal block screws.

5 Attach the neutral (white) wire to the center terminal block screw.

6 Connect the external ground (if required by local codes) to the green ground screw.

7 Tighten all screws securely.

6 Attach the neutral (white) wire to the center terminal block screw.

INSTALLATION 27

Three-Wire Direct Wire

A 3-wire connection is NOT permitted on new construction after January 1,

1996.

A UL-listed strain relief is required.

Use UL-listed 3-wire, #10 AWGminimum copper conductor cable.

Allow at least 5 ft. (1.5 m) length to allow for removal and installation of dryer.

7 Connect the external ground (if required by local codes) to the green ground screw.

1 Remove 3.5-inch (8.9 cm) of the outer covering from the wire. Strip 1 inch (2.5 cm) insulation from each wire. Bend the ends of the three wires into a hook shape.

1" (2.5 cm)

8 Tighten all screws securely.

9 Reinstall the terminal block access cover.

Hot (Black) Neutral (White)

Hot (Red)

Ground Screw

White Wire from Dryer harness

External Ground Wire (If required by local codes)

2 Remove the terminal block access cover on the upper back of the dryer.

3 Install a UL-listed strain relief into the power cord through-hole.

4 Thread the 3-wire, #10 AWG-minimum copper conductor power cable prepared in step 1 through the strain relief.

Terminal Block

UL-Listed Strain Relief

UL-Listed 3-Wire Power

Cord

5 Attach the two hot leads (black and red) of the power cord to the outer terminal block screws.

28 INSTALLATION

Special Electrical

Requirements

(For Mobile or Manufactured Homes)

Any installation in a manufactured or mobile home must comply with the Manufactured Home

Construction and Safety Standards Title 24 CFR,

Part 3280 or Standard CAN/ CSA Z240 MH and local codes and ordinances. If you are uncertain whether your proposed installation will comply with these standards, please contact a service and installation professional for assistance.

A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996.

A gas dryer must be permanently attached to the floor.

The electrical connection for an electric dryer must be a 4-wire connection. More detailed information concerning the electrical connection is provided in the section Connecting Electric Dryers.

To reduce the risk of combustion and fire, the dryer must be vented to the outside.

DO NOT vent the dryer under a manufactured home or mobile home.

Electric dryers may be vented to the outside using the back, left, right, or bottom panel.

Gas dryers may be vented to the outside using the back, left, or bottom panel. Gas dryers may not be vented to the outside using the right side panel because of the burner housing.

The dryer exhaust duct must be affixed securely to the manufactured or mobile home structure, and the exhaust duct must be made of a material that will resist fire and combustion. It is recommended that you use a rigid, semi-rigid or flexible metal duct.

DO NOT connect the dryer exhaust duct to any other duct, vent, chimney, or other exhaust duct.

Make sure the dryer has adequate access to outside fresh air to ensure proper operation. The opening for outside fresh air must be at least

25 sq. in (163 cm²).

It is important that the clearance of the duct from any combustible construction be at least 2 inches

(5 cm), and when venting the dryer to the outdoors, the dryer should be installed with a clearance of at least 1 inch (2.5 cm) at the sides and back of the dryer.

Please be aware that venting materials are not supplied with the dryer. You must obtain the venting materials necessary for proper installation.

Final Installation Check

Once you have completed the installation of the dryer and it is in its final location, confirm proper operation with the following tests and Installation Test (Duct

Check).

Testing Dryer Heating

GAS MODELS

Close the dryer door and press the Power button to turn the dryer on. Press the Time Dry and Start/

Pause buttons to start the test. When the dryer starts, the igniter should ignite the main burner.

NOTE

If all air is not purged from the gas line, the gas igniter may turn off before the main burner ignites. If this happens, the igniter will reattempt gas ignition after approximately two minutes.

ELECTRIC MODELS

Close the dryer door and press the Power button to turn the dryer on. Press the Time Dry and Start/

Pause buttons to start the test. The exhaust air should be warm after the dryer has been operating for 3 minutes.

Checking Airflow

Effective dryer operation requires proper airflow.

The adequacy of the airflow can be measured by evaluating the static pressure. Static pressure in the exhaust duct can be measured with a manometer, placed on the exhaust duct approximately 2 ft.

(60.9 cm) from the dryer. Static pressure in the exhaust duct should not exceed 0.6 inch (1.5 cm).

The dryer should be checked while the dryer is running with no load.

Checking Levelness

Once the dryer is in its final location, recheck the dryer to be sure it is level. Make sure it is level front to back and side to side, and that all four leveling feet are in firm contact with the floor.

Installation Test (Duct Check)

Once you have completed the installation of the dryer, use this test to make sure the condition of the exhaust system is adequate for proper operation of the dryer. This test should be performed to alert you to any serious problems in the exhaust system of your home.

Your dryer features Flow Sense™, an innovative sensing system that automatically detects blockages and restrictions in dryer ductwork.

Keeping ductwork clean of lint buildup and free of restrictions allows clothes to dry faster and reduces energy use.

NOTE

The dryer should be cool before starting this test. If the dryer was warmed up during installation, run the

Air Dry cycle for a few minutes to reduce the interior temperature.

Activating the Installation Test

1 Remove the drying rack and literature, and then close the door.

Do not load anything in the drum for this test, as it may affect the accuracy of the results.

INSTALLATION 29

3 Press the START/PAUSE button.

The dryer will start the test, which will last a few minutes. The heat will be turned on and the temperatures in the drum will be measured.

4 Check the display for results.

(DLEX4200*,DLGX4201*, DLEX4000*,

DLGX4001*, DLEX4500*, DLGX4501*)

During the test cycle, monitor the Flow Sense™ display on the control panel. If the Flow Sense™

LED has not turned on, when the cycle ends, the exhaust system is adequate. If the exhaust system is severely restricted, the Flow Sense™

LED will turn on. Other problems may also be shown with error codes. See the chart on the next page for error code details and solutions.

LED turned on:

RESTRICTED

The Flow Sense™ LED indicates that the exhaust system is severely restricted. Have the system checked immediately, as performance will be poor.

(DLE3600*,DLG3601*)

During the test cycle, monitor the Flow Sense™ display on the control panel. If no bars are displayed, when the cycle ends, the exhaust system is adequate. If the exhaust system is severely restricted, the display will show four bars. Other problems may also be shown with error codes. Refer to the next page for error code details and solutions.

2 (DLEX4200*, DLGX4201*, DLEX4000*,

DLGX4001*, DLEX4500*, DLGX4501*) Press and hold Signal and Temp.

(DLE3600*, DLG3601*) Press and hold

Energy Saver and Temp.

Then press the Power button.

(On models with a glass touch control panel, press the Power button then IMMEDIATELY press and hold the other 2 buttons.

This button sequence activates the installation test. The code will display if the activation is successful.

NO BARS:

OK

FOUR BARS:

RESTRICTED

Four bars indicates that the exhaust system is severely restricted. Have the system checked immediately, as performance will be poor.

5 End of cycle.

(DLEX4200*,DLGX4201*, DLEX4000*,

DLGX4001*, DLEX4500*, DLGX4501*)

At the end of the test cycle, will display.

The test cycle will end and the dryer will shut off automatically after a short delay.

(DLEX4200*,DLGX4201*

DLEX4000*,DLGX4001*,

DLEX4500*, DLGX4501*)

(DLE3600*,DLG3601*)

At the end of the test cycle, will display. The test cycle will end and the dryer will shut off automatically after a short delay.

(DLE3600*,DLG3601*)

advertisement

Related manuals

Download PDF

advertisement